Loading...
HomeMy WebLinkAboutResolutions - No. 97-83RESOLUTION NO. 97-83 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BID FOR ROCK AND SAND MATERIAL FOR FISCAL YEAR 1997/98 WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council sealed bids were received and publicly opened on June 5, 1997 at 11:00 a.m. for Rock and Sand Material for Fiscal Year 1997/98, described in the specifications therefore approved by the City Council on May 21, 1997 and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached: WHEREAS, the City Manager recommends awarding all three items of the contract for Rock and Sand Material for Fiscal Year 1997/98 as shown as follows: Item A. 100 Tons/aggregate base Item B. 300 Tons/concrete sand Item C. 250 Tons/crushed rock Bidder/Location BID George Reed, Inc., Lodi $ 1,073 George Reed, Inc., Lodi $ 3,153 Granite Construction, Stockton $ 3,972 NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of all three items of the contract for Rock and Sand Material for Fiscal Year 1997/98, be and the same is hereby awarded as shown above, in the amount of $8,198.50; and Dated: June 18, 1997 I hereby certify that Resolution No. 97-83 was passed and adopted by the City Council of the City of Lodi in a regular meeting held June 18, 1997, by the following vote: AYES: COUNCIL MEMBERS - Land, Mann, Sieglock, Warner and Pennino (Mayor) NOES: COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - None ABSTAIN: COUNCIL MEMBERS - None &W�7-A� ALICE M. REIMCHE Acting City Clerk 97-83 Item B. $/Ton $ Tax: $ Total $/Ton S Item C. $/Ton S Tax: S Total S/Ton S Stockpile Citv Limits (150 Tons Granite F.T.G. Construction, Construction, American River RMC Lonestar, Stockton Lodi Asphalt, Folsom Pleasanton 29.55 $ 28.77 S 29.25 S - 2.29 $ 2.23 S 2.27 $ - 31.84 $ 31.00 5 31.52 No Bid Hopoer of Paver (2,000 Tons Granite F.T.G. Construction, Construction, American River RMC Lonestar, Stockton Lodi Asphalt, Folsom Pleasanton 30.55 $ 29.70 S 30.35 S - 2.37 $ 2.30 S 2.35 S 32.92 $ 32.00 S 32.70 No Bid Standby/Hr S Low Bid 1997-98 Item A. Item B. Item C. Contract 1996-97 Item A. Item B. Item C. 60.00 $ 60.00 $ 60.00 No bid Tons Unit Price Total 1500 $ 26.94 S 40,410.00 150 S 31_00 $ 4,650.00 2000 S 32.00 S 64,000.00 $ 109,060.00 Total cost based on bid Tons Unit Price Total 1500 S 25.32 S 37,980.00 150 S 31.23 S 4,684.50 2000 $ 32.16 S 64,320.00 s 106,984.50 Previous Contract Price Percentaae of Chanae from crevious vear item A. 6.40% Item B. -0.74% Item C. -0.50% 1.72% Average one percent increase from previous year G' sspecslaspnait�DdrstV Page 1 1997-98 ASPHALT MATERIALS Bid Results Bid Opening 615197, 11:00 am Item A. F.O.B. Plant (1,500 Tons) Granite Construction, F.T.G. American River RMC Lonestar, Stockton Construction, Lodi Asphalt, Folsom Pleasanton $lion $ 25.00 S 27.84 $ 23.50 $ 19.50 Tax: $ 1.94 $ 2.16 $ 1.82 $ 1.51 Total $/Ton $ 26.94 $ 30.00 $ 25.32 $ 21.01 Mileage 44 88 81 89 Hauling $ $ 48.84 $ 97.68 $ 89.91 S 98.79 Final Won $ 75.78 $ 127.68 $ 115.23 $ 119.80 Item B. $/Ton $ Tax: $ Total $/Ton S Item C. $/Ton S Tax: S Total S/Ton S Stockpile Citv Limits (150 Tons Granite F.T.G. Construction, Construction, American River RMC Lonestar, Stockton Lodi Asphalt, Folsom Pleasanton 29.55 $ 28.77 S 29.25 S - 2.29 $ 2.23 S 2.27 $ - 31.84 $ 31.00 5 31.52 No Bid Hopoer of Paver (2,000 Tons Granite F.T.G. Construction, Construction, American River RMC Lonestar, Stockton Lodi Asphalt, Folsom Pleasanton 30.55 $ 29.70 S 30.35 S - 2.37 $ 2.30 S 2.35 S 32.92 $ 32.00 S 32.70 No Bid Standby/Hr S Low Bid 1997-98 Item A. Item B. Item C. Contract 1996-97 Item A. Item B. Item C. 60.00 $ 60.00 $ 60.00 No bid Tons Unit Price Total 1500 $ 26.94 S 40,410.00 150 S 31_00 $ 4,650.00 2000 S 32.00 S 64,000.00 $ 109,060.00 Total cost based on bid Tons Unit Price Total 1500 S 25.32 S 37,980.00 150 S 31.23 S 4,684.50 2000 $ 32.16 S 64,320.00 s 106,984.50 Previous Contract Price Percentaae of Chanae from crevious vear item A. 6.40% Item B. -0.74% Item C. -0.50% 1.72% Average one percent increase from previous year G' sspecslaspnait�DdrstV Page 1 Bid Opening 615197, 11:00 am Price/Ton Tax Total Pricefron lb -r-98 ROCK AND SAND MATERIALS Bid Results $8,198.50 Total Cost based on Bid 1996-97: Price per fon includes delivery. Granite Construction, Tons KRC Aggregate, Clements FTG Construction Stockton George Reed, Inc., Lodi Item No. Item No. Item No. Item No. Item No. Item No. Item No. Item No. Item No. Item No. 1 2 3 1 2 3 1 2 3 Item No.1 Item No. 2 3 $ '4.90 $ 5.40 $ 6.10 $ 10.21 $ 11.14 $ 15.31 $ 11.30 $ 11.75 $ 14.75 $ 10.00 $ 9.75 $ 16.75 $ 0.38 $ 0.42 $ 0.47 $ 0.79 $ 0.86 $ 1.19 $ 0.88 $ 0.91 $ 1.14 $ 0.73 $ 0.76 $ 1.21 $ 5.82 $ 6.57 $ 11.00 $ 12.00 $ 16.50 $ 12.18 1 $ 12.66 $ 15.89 $ 10.73 $ 10.51 1 $ 17.96 . $8,198.50 Total Cost based on Bid 1996-97: Price per fon includes delivery. Low Bid 1997-98 Tons Unit Price Contract Price Item No. 1 100 $ 10.73 $1,073.00 Item No. 2 300 $ 10.51 $3,153.00 Item No. 3 250 $ 15.89 $3,972.50 $8,198.50 Total Cost based on Bid 1996-97: Tons Unit Pric Contract Price Item 1 100 $ 9.70 $ 970.00 Item 2 300 $ 10.78 $3,234.00 Item 3 250 $ 15.89 $3,972.50 $8,176.50 Percent of change from previous year Item 1fron 13% Item 2/Ton -5% Item 3/Ton 0% 3% Average 3% increase per ton BIM197 Page 1 6t7W