Loading...
HomeMy WebLinkAboutResolutions - No. 2003-144When Recorded, Retum to: City of Lodi City Clerk's Office P.O. Box 3006 Lodi, CA 95241-1910 RESOLUTION NO. 2003-144 A RESOLUTION OF THE LODI CITY COUNCIL ESTABLISHING AN AREA OF BENEFIT AND REIMBURSABLE COSTS FOR PUBLIC IMPROVEMENTS FOR 770 NORTH GUILD AVENUE ------------------------------------------------------------------------ ------------------------------------------------------------------------ WHEREAS, construction of the Robert Mondavi warehouse facility located at 770 N. Guild Avenue required the installation of all public improvements necessary to serve the project, including the installation of a master plan storm drain line in the Guild Avenue and Turner Road alignments, extension of a master plan sanitary sewer main from Cluff Avenue to Guild Avenue, installation of master plan water mains in Lime Street and southerly in Guild Avenue to Lockeford Street as well as street pavement improvements in Guild Avenue; and WHEREAS, due to the extensive nature of the public improvements required to serve the warehouse and in order to facilitate development in the area and minimize future disruption to residents and businesses, the developer, Lodi 2000 Distribution Trust, represented by Robert Mondavi staff and City staff worked cooperatively to include the installation of all public underground improvements in Guild Avenue and the Turner Road alignment as wJas the extension of Turner Road street improvements to Guild Avenue in the warehouse project. The additional improvements included the master plan sanitary sewer main in Guild Avenue north and south of the Mondavi project site, extension of the master plan water main northerly in Guild Avenue from Lime Street and westerly in Turner Road, and pavement improvements in Turner Road from Guild Avenue to the existing terminus. The improvements installed with the project are shown on Exhibit 1; and WHEREAS, under the terms of the Improvement Agreement for the project approved by Council on May 16, 2001, it was agreed that the developer would be reimbursed by the City for the cost of those improvements not required to serve the warehouse project as well as the cost of installation for the master plan storm drain facilities, excess width street pavement improvements in Guild Avenue, and oversize water and sanitary sewer mains required by LMC 15.64 Development Impact Mitigation Fees and 16.40 Reimbursements for Construction; and WHEREAS, since the installation of the underground utilities required the removal of all the existing pavement in Guild Avenue, it was agreed that the costs for pavement removal and replacement be apportioned to each of the underground utilities in Guild Avenue as follows: master storm drain, 50%; master water main, 25%; master sewer main, 25%. The pavement costs would then be paid by the party responsible for the cost of the underground utility. The public improvements for the project were accepted by Council in June 2001 and reimbursement to the Developer for the City -funded improvements was made in August 2001; and WHEREAS, in April 2002, the developer, Lodi 2000 Distribution Trust, requested a Reimbursement Agreement (RA -03-01) and establishment of an area of benefit in conformance with Chapter 16.40 of the Lodi Municipal Code for those improvements constructed with their project that benefit neighboring properties. A copy of the Reimbursement Agreement is attached as Exhibit 2. Exhibits attached to the Reimbursement Agreement include the proposed area of benefit (Exhibit A), itemized costs for the improvements reimbursable to developer (Exhibit B), and the fair share amounts to be reimbursed to developer by each benefiting parcel (Exhibit C). As shown on Exhibit C, the public improvements funded by the City are not eligible for reimbursement to Lodi 2000 Distribution Trust; and WHEREAS, installation of the Turner Road improvements shown as Schedule 1 on Exhibit B was required by the City in conjunction with the Mondavi project in conformance with the Improvement Deferral Agreement between the City and California Waste Removal Systems, Inc. recorded June 11, 1998 as Instrument No. 98067664. Under the terms of the agreement, Central Valley Waste Services, Inc., successor in interest to California Waste Removal Systems, Inc., was responsible for the design and installation of street frontage improvements along their property frontage upon request by the City. Central Valley Waste Services worked directly with the Developer to include those improvements in the Mondavi project and reimbursed Developer at the time of construction for all costs associated with those improvements. Therefore, those improvement costs are not included in the Reimbursement Agreement and the Central Valley Waste Services parcels are not included in the Area of Benefit; and WHEREAS, in conformance with Chapter 16.40 of the Lodi Municipal Code, the City is eligible for reimbursement for the cost of those City -funded improvements that would be required as a condition of development for neighboring properties. The proposed area of benefit, itemized costs for the improvements reimbursable to the City and the fair share amounts to be reimbursed to City by each benefiting parcel are shown on the attached Exhibits 3, 4 and 5, respectively; and WHEREAS, the areas of benefit covered by Reimbursement Agreement RA -03-01 and the Resolution are coincident. A Summary of Fair Share Reimbursement Amounts showing the reimbursement to the developer and the City for each benefiting parcel is attached as Exhibit 6. The property owners within the area of benefit have been notified. The Developer has paid the appropriate application fee and the fees to cover the cost of recording the Reimbursement Agreement; and WHEREAS, pursuant to Lodi Municipal Code Section 16.40.50.A.3, the reimbursable amounts shall be recalculated annually to include an amount attributable to interest, using the Engineering News Record (ENR) 20 Cities Construction Cost Index. Similar adjustments to the reimbursable costs will be made each January until payment is received. The initial ENR index to be used in the calculations is 6581. In the event that the benefiting properties develop, the City will collect the appropriate amounts from the developers of the benefiting property, and reimburse the Developer and City as appropriate. The charges for a benefiting property shall be paid in full at the time of the first development on that property; and WHEREAS, following the public hearing held August 6, 2003, in conformance with Lodi Municipal Code (LMC) Section 16.40, staff recommends that the City Council approve the following: 1) Reimbursement Agreement #RA -03-01 for public improvements for 770 N. Guild Avenue establishing an area of benefit and reimbursable costs for developer - funded public improvements for 770 N. Guild Avenue; and 2) Resolution establishing an area of benefit and reimbursable costs for City -funded Improvements for the project at 770 N. Guild Avenue. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve the following: 1) Reimbursement Agreement #RA -03-01 for public improvements for 770 N. Guild Avenue establishing an area of benefit and reimbursable costs for developer - funded public improvements for 770 N. Guild Avenue; and 2) Resolution establishing an area of benefit and reimbursable costs for City -funded Improvements for the project at 770 N. Guild Avenue. Dated: August 6, 2003 I hereby certify that Resolution No. 2003-144 was passed and adopted by the Lodi City Council in a regular meeting held August 6, 2003, by the following vote: AYES: COUNCIL MEMBERS — Beckman, Hansen, Howard, Land, and Mayor Hitchcock NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None Susan J. Blackston City Clerk 2003-144 EXHIBIT I _ s SANITARY SEWER EASEMENT SCHEDULE 4CD i d I m o 9 i m • I r� s ' -j PL A 1 � I— — Iark.IwJ �lfeet ' ti • ' I� — € rhat Di++wad ry 4.s. •it I �� ••5 1 ' I wza a o ' � ::.. �..: Taakr s.wr. •. � 1 I r I N ai I y .�.� ... .... ... . .i. • � m PL LIME STREET i I r D I m i cn PL I Z I PL 1 m cn H I LOT 16 ( s M Ex �• s 0 r rn ;N J SCHEDULE 1 t LOT 16 SCH DOLE 2 TURNER ROAD o PL - w • m X 00 W w LOT 1, ie svLmew 107 14 ►s'� GUILD AVENUE . - \ - 16,11] "MONDAVI PROJECT, - 17� SCHEDULE 4 IIISCHEDULE 5 i I LOT 27 I + I I I 1 !! I i I I y I ! I I Cn I I = I I c= rn IM i fa PL III I liI C.C.T. CO. I v.Td 0 N.T 12 i >>. �I t 1 . ...... EXHIBIT 2 WHEN RECORDED, RETURN TO: City Clerk City of Lodi 221 West Pine Street Lodi, CA 95240 REIMBURSEMENT for PUBLIC IMPROVEMENTS for 770 N. GUILD AVENUE AGREEMENT # RA -03-01 THIS AGREEMENT is made by and between the CITY OF LODI, hereinafter referred to as "City", and LODI DISTRIBUTION TRUST 2000 hereinafter referred to as "Applicant". RECITALS: WHEREAS, Applicant is the developer of that certain parcel known as 770 N. Guild Avenue and entered into an Improvement Agreement with the City dated May 17, 2001, to construct public improvements needed to serve the development, and WHEREAS, the Applicant constructed certain public improvements on Guild Avenue and Turner Road (hereinafter "Improvements"), including street pavement, water, wastewater and storm drain lines, and other miscellaneous and related items, that will serve those properties, hereinafter "Benefit Area", that are designated and shown on the plan attached and labeled Exhibit A to this agreement and indicated thereon; and WHEREAS, the Applicant has filed a request with the Public Works Director in conformance with Chapter 16.40 of the Lodi Municipal Code requesting reimbursement for those improvements which benefit other properties in the Benefit Area or would be required of those properties upon development, and WHEREAS, the property owners of those properties shown in Exhibit A have been notified and the City Council has conducted a public hearing regarding the Applicant's request for reimbursement. NOW THEREFORE, in consideration of the mutual covenants and conditions herein contained and pursuant to Government Code Sections 66486 through 66489 2nd Title 16 of the Lodi Municipal Code, it is hereby agreed between the parties as follows: 1. The amount of the reimbursable costs due to the Applicant includes construction costs, including utility relocation costs, less any applicable credits plus administrative and engineering design costs (10%), engineering plan check fees, engineering inspection fees (2.5%) and the reimbursement application fee (1%). Total construction costs and costs attributable to the Benefit Area are shown on attached Exhibit B. 2. The reimbursable amount shall be recalculated annually to include an amount attributable to interest, using the Engineering News Record (ENR) 20 Cities Construction Cost Index. On uncollected reimbursements, the reimbursement Reimbursement Agreement . rates shall be calculated in January of each year beginning January 2004 by the following formula: (ENR Jan. 1 of current year) i (initial ENR) X (Balance due Jan. 1 of prior year less payments made during the previous year) The initial ENR index for this agreement is 6581. The initial reimbursable amounts for each property within the Benefit Area are shown on Exhibit C. • 3. In the event that the benefiting properties shown on Exhibit A develop, the City shall collect the appropriate charges from the developers of the benefiting property and reimburse the Applicant or the Applicant's heirs, successors or assigns, for a period of fifteen (15) years. The charges for a benefiting property shall be paid in full at the time of the first development on that property. 4. The Applicant shall pay the City $5,030.83 for the preparation of this agreement prior to approval and recording of this agreement. This is based on one percent (1%) of the reimbursable construction costs, excluding engineering, administrative and other costs. 5. Upon each collection of reimbursement charges, an administrative charge shall be deducted and retained by the City for administering the reimbursement provisions of this agreement. This charge shall be established from time to time by resolution of the City Council. As of the date of this agreement, the current charge is $60.00. 6. This agreement shall inure to the benefit of the heirs, successors and assigns of the Applicant. The City shall mail the reimbursement to the last address of the Applicant on file with the Public Works Director of the City. In the event a reimbursement is returned or unclaimed after two (2) years from the date of mailing, the amount of the reimbursement shall revert to the City and be deposited in the appropriate development impact mitigation fee fund. 7. All correspondence and payments. herein required shall be in writing, and delivered in person or sent by registered mail, postage prepaid. Correspondence and payments to City shall be addressed as follows: Richard C. Prima, Jr. Public Works Director 221 West Pine Street P. O. Box 3006 Lodi, CA 95241-1910 Correspondence and payments to Applicant shall be addressed as follows: Reimbursement Agreement • • 8. This agreement is entered into pursuant to the provisions of Title 16 of the Lodi Municipal Code and the provisions of that section shall be deemed a part of this agreement. IN WITNESS WHEREOF, the Applicant and the City have caused their names to be hereunto affixed and the City of Lodi has caused its corporate name and seal to be hereunto affixed by its proper officers thereunto duly authorized. LODI DISTRIBUTION TRUST 2000, by First Security Bank, National Association, not in its Individual capacity but solely as Owner Trustee Date (CORPORATE SEAL) CITY OF LODI, A MUNICIPAL CORPORATION Bv: H. Dixon Flynn, City Manager Date ATTEST: Susan J. Blackston, City Clerk Date APPROVED AS TO FORM: Randall A. Hays, City Attorney Reimbursement Agreement 3 EXHIBIT A F\\ \\F.Uz\ ♦ 1 �_• ._�� L , •moo `, `� `♦ `♦`, `, `� ♦, `, `\ ♦ . � . ♦ ` ` 9L 090 6i0�NdV � ` • • Yyy'1'1�4`'NO�VB1 ,\\\ ,♦\`\ ,\ ,`• 211 ♦` `�W \ ♦ \ 6iO�Ndd \ ♦ I ,\ � ♦ Q�.�o , ,WC , ♦ `LL 090 ♦ ` `♦ ♦ ♦ `♦ 1501 No`,C� ♦ ♦vi c) \ ` ��.00'S :7d ♦`\``.Z`%oh`♦ `♦`� ♦`♦; ♦\\\`♦`♦`♦` \`\ 902! t1NdR3�0Y1• .�. tv ♦`\`♦ `\` ``♦\ `,\♦\�\`,`,`\ ♦6l 080 610Ndd j ,`♦moo I `♦ `,`\`♦ ` ` ` `, `,�,`♦ LM38OM ONdl3MOW r � k Y PaPlele 0 0 - *IBIT CVOIUdl B Plbdce Wake Department . DevNoplleM; 170N. Gutid Avertue Developer: L00120000Whbudan Trust DEVELOPER COSTSATTRIBUTABLE TO TOTAL COST OF PROJECT IMPROVEMENTS" DEVELOPER COSTS'" COST OF CITY-FUMED FACILITIES BUILT BY DEVELOPER rel BENEFIT AREA In )Iem Ott 011/10801 SOR Elice Iwo DuRtltllr TDMI WONT Igo 01tao6gt 7my Schedub 1(Tumer Road Sts. 699.17.7 to Sta. 702#61.3( SIROLS35tem 1 Mis "ams Gwng I LS 3870.00 5870.00 1 $870.00 0 $0.00 1 $870.00 2 Asphall Removal 1 LS 400.00 40000 0.80 320.00 020 8000 0.90 320.00 3 Clear 6 Grub 1 LS 2.500.00 2.500.00 0.85 2.125.00 015 375.00 0.85 2,125.00 4 Chain UNn Fence Removal 1 LS 4.000.00 4,000 1 4. W0.()0 0 0.00 1 4,OW.00 5 Roadway Evcavallon 620 CV 4.00 2.480.00 527 2.106.00 93 372.00 527 2,108.00 6 cwf"o Od" Graud(0.5m 21,240 SF 0.12 2,545.80 17,112 2,053.44 4,128 495.36 17,112 2,053.44 7 Compact Native Material (0.91y) 21,240 SF 0.14 2.973.60 17,112 2.395.68 4,12a 577.92 17,112 2,395.68 8 Agyrople Base, Class 1140.751 21,240 SF 0.85 18.054.00 17,112 14,545.20 4,128 3.508.80 17,112 14,345.20 9 AsphaB Concrete, Type 8 (0.401 21,240 SF 1.25 28,550.00 17,112 21,390.00 4,128 5.160.00 17,112 21,390.00 10 30Comm enchd Orlaway 1 EA 2,200.00 2.200.00 1 2200.00 0 0.00 1 2200.00 11 VeNcd Cub, Gutar a SWewalk 309 LF 24.00 7,418.00 309 7,416.00 0 0.00 309 1.416.00 12 Vertical Cub a Cyber 344 LF 14.00 1,816.00 344 4.81600 0 0.00 344 4,816.00 13 Comm. CGSW 8 AC Dike 76 LF 15.00 1,140.00 78 1,140.00 0 0.00 76 t,140.0D 14 CwWake Snbgrade Compaction 3A40 SF 0.40 1,378.00 3.440 1,376.00 0 0.00 3,440 1,37800 15 Barricade 1 EA 300.00 300.00 1 300.00 0 0.00 1 300.00 18 Tealk Control Plan 1 LS 165.00 165.00 0.81 132.93 0.19 32.07 0.81 132.93 17 Traffic Cabot Pim 1 LS 3,190.00 3,190.00 0.81 2,570.02 0.19 619.96 0.81 2.570.02 18 Pavement Marking a Swiping 1 LS 1,281.17 1.281.17 0.61 1,032.17 0.19 219.00 0.61 1,032.17 19 Sbtxt LfpNs 1 LS 9,8W-W _..__9,000.00 19,600.00 O 0.00 1___ 9.800.09, Subtotal $92.060.57 subtotal $80.590.45 Subtotal SIIA70.12 subtotal $80,590.45 10%Ergk*erbg A Administration _ _ .1117.01 Subtotal Street System $12.617.13 swittarahs alelo 1 OV C1P 344 LF $99.00 $34,05600 0 $0.00 344 $34,056.00 0 Wait 2 iS SO 15 LF 35.00 525.00 15 525.00 0 0.00 13 52HO 3 1TSD 0 LF 33.00 0.00 0 0.00 0 (10D 0 000 4 Pipe Marker i EA 180.00 180.00 1 160.00 0 0.00 1 180.00 5 Drop Intel Catch Basin 1 EA 1,200.00_._ 1,200,00 1 _ 1,200,OD 0 __0.00 1,_..__ _1,ZOOAD Subtotal $35,961.00 Subtofal $1.905.00 subtotal $34.058.00 Subtotal $605.00 10% EnOineabq S Admbdsbadon _ _- 3,405.60 subtotal Sturm Dram system $31.461.60 amBawlin a 3ilgim Ir Sanitary Sewer Pipe (VCP) 105 LF 531.OD S3,235.00 105 53,25;1.00 0 $0.00 105 $3.255.00 2 Sao" Sewer Mw*wk 1 EA 21600.00 2.600.00 1 2,600.00 0 0.00 1 2.6WW 3 Pipe Marker 1 EA 180.00 180.00 1 180.00 O 0.00 1 180.00 4 Remove Esbtbp Riser 1 EA 240.00 ___ 240.00 1240.00. 0 __0.00. Subtotal $6.275.00 Subtotal 18.215.00 Sublotal $0.00 Sublomf $6.275.00 10% ErOoMbg 6 Admkesoatbn - 0.00 Subtotal Sanitary Sewer System $0.00 1 IV Water P"W4C) 414 LF $25.0 $10,85000 434 510,160.00 34S 169000 434 S1Q1MW 2 1V Water Lateral (PVC) 35 LF 25.00 875.00 35 875.00 0 000 35 875.00 3 10, Water Valve 2 EA 1,100.00 2.200.00 2 1.700.002 500.00 2 1,700.00 4 1VINOW Lateral Valve 1 EA 1,100.00 1.10D.00 1 1,100.00 0 0.00 1 1,1WW 5 6' water Lateral valve 1 EA 850110 85000 1 850.00 0 0.00 1 850.00 6 IV s IV Cross 1 EA 550.00 550.00 1 $50.00 0 0.00 1 550.00 7 IM a r Reducer 1 EA 180.0 180.00 1 180.00 0 0.00 1 180.00 8 a- Fite F"ard AssennNy 1 EA 2,70008 2.700.00 1 2.700.00 0 0.00 1 2,700.01) 9 PIM Marker 1 EA ta0.00 180.00 1 180.00 0 0.00 1 150.00 10 Blow on 1 EA 700.00_--.--... 700.00. 1 _. _ ..--.-- 700.00 0 _ _....--- 0.00 1 700.00 subtotal s20.i&S.Do subtotal 516,995.00 subtotal #1,190.40 subtotal $18,993.00 10%Engbleerbtga AdntiNsbalion subtotal Water system $1.709.00 Schedute 1 Total $154,481.57 Total $107,765.45 Total 551,387.73 Total 5107,765.45 Prepaid by Cal Waste ___(5107,785.431 Total 50.00 PaPlele 9w 1 -6*e 00'►LL'9S 19101 99'I9C1Zt9 lewl o0wreS 19101 19'C60'L 1IS 101011 OPM-IS 00S999ts "IsAS•aleM 1e1o1gnS o0'W'l uw441u..kwv 9 urva 115ug %01 0009 KJolgnS W09VIls Ielowas 00'09#emgns 00'0Gt'LIS AM90S --'---_0. 6D•0►S_... C 000 _. 0 00"OK - -OD"091 v3 C iaY+eW Odld it 60'0 0 oo'oot'z c 000 0 000017 00.9DL v3 c ROAAM it 000 0 00'091 1 00'0 0 00091 wool Y3 l 65wo A S.9 S.OI S.OI tt 00'0 0 00091 t 00'0 0 00091 WOW v3 { law"kiA■-0t O► 000 0 00'055 1 00'0 0 00099 60099 V3 1 SSWO.Ot 5.01 6 000 0 00'OOL l ODO 0 00 COOL 00'OOL r3 t OMPAAM -9 9 00'0 0 00'OZL oc 000 0 OO OIL 001Z it 0C (OAd) Odld 1ORM A L 000 0 00'059 l 00'0 0 moss 00'050 Y3 I ay9A AMM A 9 00'0 0 00 oat OC OD'0 0 00 O9L 009z dl OC (OAd) OdW JWM A S 000 0 00'001't 1 00'0 0 00'0011 OOODVI V3 l On1eA 108191019MAl ► 000 0 00"OSt't 9► 00'0 0 DWOSI't 00'9Z dl 9► (OAd) lesmi NICM.01 c 000 0 00901't 1 00"0 0 000O1'l 00'001'1 V3 l aWA W9M.01 Z 00'09 0 00'Oorls 99Z 00'0S 0 00"o0Z'tt OOSZS it 99Z (OM) adld A19M,Ol t 07191S7i1[M OD'ZZI'S►S —I.As w a �js lelolgns 00'201'1 - _ __ uOOe4smuXN 1 ama"OU3 %ol WVLt'9S lelolgnS OD'OZO't►s MUMS 0OWL'9s j9mQnS OO'►6L'L►S Iemg4S .�• 0 �;� ..... 0 OG'OiL — --"—'-► o.wo o0'O9t v3 ► NVeW 4d 9 OD'O t 00'OOC'S 1 00'0 0 COME'S 00'OOC'9 va 1 a101N9W tlrcip uuols lL S OO'►OB'Z 0 000 0 o0'►067 99 00'1067 00 CC it 99 We10 wAs It ► ODOSVC o 000 0 90'09t'c a o0'o94'c 00'9c it os 019Aaunols.st c 00"0, OS 00'000'9 09 00"0 0 00000'9 00'09t Al o9 d3a A9 L 00'os COZ 00'ort'1Zs O9z Wes 0 OD'OZL'LZS 00'665 it OR d1O-09 w-l%Xg umu m019 ► 961WISS uwlsAS Nails IelolgnS 001►lZ'4._.... -*6AI Wupv 90^.x++3%01 00'09 #9101942 19'614799 Iesamns 00'0S #elomns to6►t79t MOWS.� -----0 .p--.... 0 .bolo_ _"' ----0 000_........_.000 Sl 0 Sol Na45 S► OD'O 0 CZ ewt l 00'0 0 MOWS Cz,owt Sl 1 WOAS 1 Wl"W wow—d ►t 00'0 6 004197 I 00.0 0 00'Ol9'z 00'ot9'z Sl l uey f0 003 NW1 Ct 00'0 0 C0'90 t 00'0 0 OD'SCl 00'SCl Sl I Oe1dPAWD MCJ1 ZI 00'0 0 001ozc I 000 0 00'OZC 00'OZc V3 t 11190d 9 AS NOAS It Coo 0 06'609 OZC 00'0 0 WON 09'9 Al OM (S9N)Ptah—LuoAW045 Ot o0'0 0 00'0401 Olz 00'0 0 60'OSO'l OD's Al Olz 0N10 Ne4dsVA 6 00'0 0 WOOZ'91' KWEL 00'0 0 onerel SZ'l is ►ZO'Cl (DVO) 9 OdA1'alalxa3 W4ftV 9 00'0 0 WWII vzwEt 00'0 O D►'olo'll 99'0 is Mw" (SL'0) O SSW3'asee W GNNV L Oo'0 0 9C"CZ9'l ►ZO'Cl 00'0 0 9C'CZ9'I ►t'O is RM (09'0)AjWWaWN1►e&103 9 00'0 0 B9 IWI Reel 00'0 0 99'Z9s'I ZVO is ►ZO'ct (09'0) P MAD Ie016P0pedulo3 S 000 0 oo'Ozs'1 ORE 00'0 0 00'OWI 00'► AO oat 11w-3-3Ae4Peoa O OD'O 0 0000e'Zl l 00'0 0 0000971 00'ODWZt sl t MAD 919OIO C 00'0 0 00'009 t 00.0 0 00.009 00.009 Sl I wwLwa Neov z 00'OS 0 OO OCss I COOS 0 00'OCSS W'0M sl t OuNlejo sraau On". ► WWlA$lial(S (91,4901'915 01 C39•101'NS Pena JO -al) Z W WfkPS RAZ m RM fiord Ion AWJMD o 0 9191# u�v3dv Ld3N36 0, a3d013A30 AG VMS S31LI113VJ 030Nni-A113 i01sOO S1SOOW3dO13A3G ��� S1N3W3AOadW1 1O3f01W i01SOO1v101 0j. 378V1�SOO a3dO13A30 ap.3 err e 0 TOTAL COST OF PROJECT IMPROVEMENTS"' OEVEICOSTS 1A COST OF CITY -FUNDED FACILITIES WILT BY DEVELOPER re DEVELOPER LTOL2TO BENEFIT m Item OtBO/JBf IN enc! 1" 91111111111111 99111110 ia>al 011BOY2t I9n( Schedule 3 (GYBd Avenue Sta.114.12) to Sts. 119.28.71 1 SWIMMING Miscellaneous Grading 1 LS $2,016.00 $2,01600 0.18 $371.56 0.84 $1,693.44 0.16 $322.66 2 AS"Peamal 1 LS 3.040.00 3,040.00 018 488.40 0.84 2553.60 - 0.16• 486.40 3 Cleer 6Gnb 1 LS 272.00 272.00 015 43.52 0.84 228.48 0.16 4.52 4 Roadway Excavation 1,280 CY 4.00 5,120.00 205 819.20 1.075 4,300.80 205 819.20 5 Compact 0(*W Ground (0-501 17.519 SF 0.12 2,102.28 2,835 340.20 14,684 1,762.08 2,835 340.20 8 Comped Native Malarial (0.00') f 7.519 SF 0.14 2,452.88 2,835 396.90 14,864 2,055.76 2.835 398.90 7 Aggregate Base, Class 0 (0.80) 17.519 SF 0.87 15,241 53 2,833 2,466.45 14.684 12,775.08 2,835 2,466,45 0 ASOMN Concroe, Type 8 (0.40) 17.519 SF US 21,858.75 2,835 3,54175 14,684 18,355.00 2.835 3,543.75 9 Driveway Repay ] EA 500,00 1,500.00 0 0.10 3 1500.00 0 000 t0 Shoulder (E 6 W) 1,030 LF 2.40 2,472.00 515 1238Ao 515 1,7!8.00 SIS 1238.00 11 Tra6k Control Plan I LS 240.00 240.00 0.16 38.40 0.84 201.80 0.16 38.40 12 Traffic Coneol Plan 1 LS 4.640.00 4,640.00 0.16 742.40 0.84 3J097,60 0.16 742.40 t3 Paw:maN Markin 6 Striping 1 LS 1,863.52 1,863.52 0.16 298. t8 0.84 1,585.38 0.16 298.16 14 Streetltghas 0 EA 0.00 ------ 0.�_.._._ 0:0.. 0 _.. ..._ 0.00. 0 0_00 Subtotal 582,658.74 subtotal 510,733.91 Subrolal S52,120.80 Subtotal 5110,7]].91 10% Ernyreerkn 6 Administration 5,212.46 Subtotal Street System $57,337.28 Btmmn DMU 9Y92M 1 4r CIP 490 LF 585.00 $32,240.00 0 S0.00 495 $32,240.00 O SO.00 2 24' Stoma Drain 10 LF 50.00 500,00 0 0.00 10 500.00 0 0.00 3 tr SIarm Drain 182 LF 48.00 6,736.00 0 000 162 8,735,00 0 0.00 5 1r Sloan Drain 80 LF 33.00 2,640.00 0 0.00 80 2,640.00 0 0.00 6 48' Slam Orain Marftk 3 EA 3,100.00 9,300.00 0 0.00 3 9,300.40 0 0.00 7 Relocate Double t8' SO 1 LS 5.698.26 5,00626 0 0.00 1 5,698.28 0 0.00 0 Pipe Marker 2 EA 180.00 360.00 0 0.00 2 360.00 0 000 9 Side tnilt Caleb Basin / FA 1,200.00._.__1,200.00. 0 0.00 1 __. _. 12 .00 00_00 Subtotal $60,674.26 Subtotal $0.00 Subtotal 560,674.28 Subtotal 5000 10% Enoirmetirn 6 AdminisNatbn 8,067.43 Subtotal Storm Drain System $66,741,69 SemtaN 8ewrer Svslem 1 r Sw*ary Sewer Pi000 (VCP! 565 LF $36.00 $20.340.00 0 {0.00 565 $20,340.00 0 $0.00 2 Sa iiary Sewer Mantle 2 FA 2.600.00 5,200.00 0 0.00 2 5200.00 0 $0.00 3 Pipe Marker 1 EA 180.00 180.00 O 0.00 1 180.00 0 $0.00 4 SRle Sanitaryewer er 1 EA 24000 _. 240.00 f1_ _ ._.. _ 0.00 1 240.00 0__. Subtotal $25,960.00 Subtotal $0.00 Subtotal $25,960.00 Subtotal 50.00 10% Enolow" 6 Arkninistrallon 2,5911, W. Subtotal Sanitary Sewer System $28,558.00 Walac3Yalam 1 10'Water Pfpe(PVC) 508 LF $25.00 S12.700.00 SOB $11,694.00 508 $1018.00 508 $11,884.00 2 10'Watervatve 4 EA 1,100.00 4,400.00 4 3.40D.00 4 1,000.00 4 3,400.00 3 or Waw Pipe (PVC) 56 LF 26.00 1,456.00 56 1,456.00 0 OW 58 1.458.OD 4 r Water Valve 2 EA 850.00 1,700.00 2 1,700.00 0 0.00 2 170000 4 6' WaterValve 2 EA 70D.00 1,400.00 2 1,400.00 0 0.00 2 1,400.00 5 /. V iteducer 2 EA 180.00 360.00 2 360.00 0 O O 2 360.00 5 10' x r Reducer 2 EA 180.00 3W.OD 2 360.00 0 0.00 2 360.00 6 10' x10' Cross Assembly 2 EA SWAG 1,100.00 2 1,100.00 0 0.00 2 1,100.00 7 6' Fee Hydrant Assembly 2 EA 2,500.00 5,000.00 2 SAD0.00 0 0.00 2 5,000.00 6 Pipe Marker 2 EA 180.00 360.00 2 360.00 0 OAO 2 360.00 9 Blow ON 2 EA 700.00_.--1,400.00. 2.___..._._1,400.00 D _ ...,0.00 2.... _.. _.�_1S10A 00. Subtotal 530,236.00 Subtotal S28,220.00 Subtotal $2.016.00 Subtotal $26,220.00 10% Ernkleering 6 Administration _ _ _ 201.60 Subtotal Water System $2,2117.60 Schedule 7Total $179,729.00 Total 538,953.99 Total $154,852.56 Total $38,953.94 ap.3 err e • TOTAL COST OF PROJECT IMPROVEMENTS DEVEL R COSTS "' I COST OF CITY -FUNDED FACILITIES BUILT BY DEVELOPER "1 Rem otsa o rNonsa, UWI Plfce 79!21 ffimSIY TAW Sctwdule 4 ((luld Avenue Sla. 119.267 to Sta. 124.14.8; Mondavi Project) $90.00 $56,100.00 0 SO.00 2 48' CIP 921 LF 80.00 73,1180.00 0 0.00 3 42'RCP 40 1 Mam�ous Grading 1 LS $8,215.20 $8.215.20 0.36 S3,090.71 2 Asphaa Removal 1 LS 12.368.00 12,386.00 0.38 4,645.52 3 clear &Grub 1 LS 1,105.40 1,108.40 036 415.65 4Rosdway Excavation 5,216 CY 4.00 20,864.00 1,958 7,024.04 5 Camped Original Ground 10.50) 71,333 SF 0.12 8,559.98 26,750 3.210.00 6 Compact Native Maledal(080) 71,333 SF 0.14 9,98662 26,750 3,745.00 1 Aggregate Base, Class 0 (0.617) 71,333 SF 0.87 62,059.71 26,750 23,272.50 6 Asphalt Concrete. Type 6 (0.4(y) 71,333 SF 1.25 89,166.25 28,750 33,437.50 9 100 commercial DrW ra" 1 EA 4,600.00 4,800.00 1 4.800.00 10 170'CommerciatDdveway 2 EA 9,000.00 18,000.00 2 18.000.00 11 Vertical C1m6 OAer&$Mvwalk 1,160 LF 24.00 27,840.00 1,160 27,640.00 12 Concrete SrAgraOe Compaction 11,146 SF 0.40 4.45840 11,146 4,458.40 13 Shoulder (W) 1,486 LF 2.40 3,566.40 1,488 3,588.40 11 Barricade 2 EA 300.00 600.00 2 600.00 15 Mao Baa Relocation 1 EA 150.00 150.00 1 150.00 18 DdvewarovMay 3 EA 50000 1,500.00 3 1,500.0 11 Traffic Control Plan 1 LS 690.00 690.00 0.36 256.75 18 Traffic Control 1 LS 13,340.00 13,340D 0.38 5.002.52 19 Patterned Marking 6 Striping 1 LS 5.357.62 5.357.62 0.38 2.009.12 20 Sheet Lwft 1 LS 21,800.00 21,600.00 1 21,800.00 46 LF 300.00 13,800.00 Subtotal -� $314250.56 Subtotal - - --- 'S769.116.12 M9rmDoll Ifftem 1 5r CIP 624 LF $90.00 $56,100.00 0 SO.00 2 48' CIP 921 LF 80.00 73,1180.00 0 0.00 3 42'RCP 40 LF 69.00 2,800.00 0 0.00 4 ta'Stomm Drain 108 LF 48.00 5,184.00 108 S,1B1.W 5 IS' Stone Drain 45 LF 35.00 1,575.00 45 1,515.00 6 tY Storm Oram 60 LF 33.00 1,980.00 69 1,980.00 1 7P Storm Drain Mad1Me 0 EA 5,300.00 0.00 0 Moo 6 60' Storm Drain Manhole 5 EA 4,200.00 21 ,000,00 2 8,40 0.00 9 Pipe Marse 8 EA MAD 1,440.00 0 t0 Side Intel Catch Basin 1 EA 1.200.00 1,200.00 1 1,200.00 Subtotal _ W4,8 _ Subtotal _ _19.00 519,779.00 bisitarlLS Oyst6m IIS* Sanitary SewerPoeMPI 683 LF $75.00 $51225.00 663 534150.00 2 12' Sanitary Sewer Pipe (VCP) 351 LF 87.00 23,511.00 351 12,836,00 3 f0' Sanitary Sewer Poo (VCP) 1,022 LF 50.00 51,100.00 1,022 51,100.00 4 r Sanitary Sewer Poe(VCP) 743 LF 36.00 26,748,00 743 26,748.00 5 G Sanitary Sewer Pipe (VCP) 50 LF 31.00 1550.00 50 1,550.00 6 Sardtary Sewer Mamole 5 EA 2,600.00 13,000.00 5 13.000.00 7 Pipe Marker 8 EA /80.00 1.440.00 8 1,440.00 6 Sanitary Sewer Riser 2 EA 240.00 480.00 2 480.00 Subtotal $169,060.00 Subtotal--� $141,104.110 WAtItL.SYNem 1 10' Water Pipe (PVC) 2.92& LF 525,00 S73.100.00 2,924 $67,252.00 2 10'Wate Pipe(') 70 LF 27.00 1,89040 70 1,750.00 3 10' Water Valve 24 EA 11100.00 26,400.00 24 21.90040 4 RR Xing Jack & Bore I8' Casing 46 LF 300.00 13,800.00 23 6900.00 5 f0'a 10' Cross 3 EA 550.00 1,850.00 3 1,650.00 6 Rabe eM 10'a10'Cmss I LS 1,049.69 1.049.69 1 1,049.69 7 10' x IV x 8' x 6' Cross Assembly 3 EA 420.00 1,260.00 3 1,160.00 a 10'. IV a 10' Tee 4 EA 300.00 1200.0D 4 1,200.00 9 IVx f0'a Or Tee 4 EA 180.00 720.00 4 720.00 10 to" BW Flange 3 EA 90.00 270.00 3 27000 11 6' MW Flange 3 FA 50.00 150.00 3 150.00 12 VGale Valve 7 EA 70090 4.900.00 7 4.900.0D 13 6' Fire Hydrant Assembil 7 EA 2,500.00 17,500.00 7 17,500.00 14 Pipe Marker 5 EA 1110,00 900.00 5 900.00 15 BAwr011 5 EA 700.00 3,600.00 5 3,500.00 Subtotal `-�f18.26989 SWto4a1 ---5110,901:69 Sd*dWe 4 Taal 6796,419.25 Told $461,200.61 Q9Nlu. Y 0.62 0.62 0.62 3,260 . 14.583 44.583 44,587 44,583 0 0 0 0 0 0 0 0 0.62 0.62 0.62 0 Subtotal 10% Engineering & Admirdshatlon Subtotal street system 624 9211 40 0 0 0 0 3 0 0 Subtotal to%Engineening & AMrinistraflon Subtotal Stam Drain System 683 351 0 0 0 0 0 0 Subtotal 10%Etgineenng & Admkisba6on Subtotal SonOary sewer System 2.924 70 18 23 0 0 0 0 0 0 0 0 0 0 0 Subtotal 10% EntpYtcednp a Adnttrtishalbn Sublotal Water System Total 55,13449 7,742.48 692.75 13.039.96 5.349.96 8,241.62 38,787.21 55,728.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 O.OD 431.25 6337.48 3.348.50 0.00 5144,834.44 14,483,44 5750,317,119 $56.160.00 73.680.00 2.600.00 0.00 0,00 0.00 0.00 12.800.00 0.00 0.00 S14.O4000 14.501.00 S159,544.00 $17.075.00 10.881.00 0.00 0.00 0.00 0.00 0.00 0.00 527,458.00 2.795.60 $30.751.60 $5.848.00 140.00 4,500.00 6.900.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 ' 377,368.00' 1,738.80 579,726.80 $368.74029 DEVELOPER COSTABLE TO BENEFIT 'm Oua09bf IOU 0.08 5884.55 0.06 1,032.26 0.08 92.36 435 1.738.34 5,944 713.28 5,944 832.16 5,944 5,171.28 5.944 7.430.00 0 0.00 0 O.OD 0 0.00 0 0.00 1,486 3,580.40 0 0.00 1 150.00 3 1,300.00 0.08 57.50 0.09 1,111.59 0.08 448." 1 21,600.OD -_'--546.128.36 0 $0.00 0 0.00 0 0.00 106 5,18440 45 1,575.00 W 1.980.00 0 0.00 2 8.400.00 a 1.440 OD 1 1,200:00 ... _..---S79.779.00 1183 534.00.00 351 12.638.00 1,022 51,10000 743 28,748.00 50 1.550.00 S 13.000.00 6 1.44.00 2 480.00 -5141,706.7X1 2.924 587252.00 70 1,750.00 24 21.909.00 23 a,9m..00 3 1,BSO40 1 1.049.69 3 1,290.00 4 t,100A0 4 720.00 3 270.00 3 130.OD 7 4.900.00 7 17,500.00 5 900.00 5 3,500.00 - ---51!0.901.09 $337.9,1.05 r1 TOTAL COST OF PROJECT IMPROVEMENTSj° bm I9st1 OutrHbt Una Eft low Schedule 5 (Guild Avenue Su.134.14.6 to Sta. 177.44.4) 0 0.00 0 0.00 0 simtuxslkm 0 0.00 0 0.00 1 Miscellaneous Grading I LS 11,600.20 71,600.20 2 Anton Renewal I LS 2.413.00 2.413.00 3 CL-Wa Onb I LS 215.90 215.90 4 Roadway Excavation 1.016 CY 4.00 4.064.00 5 Co ext Original Ground 10.50') 13,440 SF 0.12 1.663.20 6 Coad Native MBWW (0.00) 13.460 SF 0.14 1,940.40 T Aggregate Base. Gass II 10.80) 13,460 SF 037 12.054.20 8 Asphalt Concrete, Type 6(0.40) 13,460 SF 1.25 17,325.00 9 Shoulder IE 6 W) 330 LF 2.40 792.00 10 6'Asphalt Duke 230 LF 5.00 11150.00 f 1 Traffic Cement Plan 1 LS 150.00 150.00 12 Traffic Coned 1 LS 2.900.00 2.900.00 13 PavemM4 Marking 4 Striping I LS 1,164.70 1,164.70 14 Sleet Ughh 0 EA MAO___ 0.00 $17.312.00 Subfolaf $0.00 wa&LSyskm Subloral $47,436.60 BEAR OSTS m sionlui Svsttm I9st1 0 $0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 000 0 0.00 0 0.00 0 ------ _0.00 Subtotal $0.00 sionlui Svsttm 0 $0.00 0 0.00 1 60•ClP 326 LF $99.00 532.274.00 0 $0.00 2 24' Sean Oram 45 LF 50.00 2.250.00 45 2,250.00 3 14' Sloan 0laln 45 LF 46.00 2.100.60 45 2.160.00 4 12' Slam Orcin 70 LF 33.00 2.310.00 70 2.310.00 5 77, Storm Drake Manhole 1 EA 5.300.00 5.300.00 0 0.00 6 Pee Madter 2 EA 180.00 360.00 2 360.00 7 Sift Wel Catch Basin i FA 1200.00 01)- Subl01s1 $43.654.00 Subtotal T $8.280.00 SMIRM SaWLSISIem 1 8• Sanitary Sewer Pipe (VCP) 352 LF $36.00 $12.672.60 0 $0.00 2 6• Sanitary Sewer Pipe (VCP) 60 LF 31.60 1.1180.00 0 0.00 3 Sanitary Sewer Manhole I EA 2.600.00 2,800.00 0 0.00 4 Pipe Mads 1 EA 180.00 .. 180.00 0 ...... ... .... 0.00. Subtotal $17.312.00 Subfolaf $0.00 wa&LSyskm I t0. Nara Pipe (PVC) 397 LF $25.00 $9.925.00 0 50.00 2 'XiNaler VaWe 4 EA 1,100.00 4,400.00 0 0.00 3 f0' x/0• Cross Assembly I EA 550.00 550.00 0 O.W 4 Pipe Marker 2 EA 180.00 MOO 0 0.00 5 Blow 06 2 EA 700.00,. 1,400.00 0__.... -_.. _0.00 Subtotal SI6.635.00 Subtotal $0.00 Schedule 5 Tolal $127.237.60 P."s eie $8,281.00 COST OF CITY -FUNDED FACILITIES Blm.T BY DEVELOPER O1 QLs0i1{Y 1 f 1 1,018 MOW 13.11W 13,060 13,1160 330 230 1 1 1 Subtotal 10%Ergkteering 4 Administration Subtotal Streat System 326 0 O 0 1 0 0 Subtotal 10%Ef gineerkV 6 Adlerxstralbn Subtotal storm Drain System 352 60 1 1 Subtotal 10%Ergfneedq 6 Admtristralion Subtotal Sanitary Sewn System 397 4 1 2 2 Subtotal 10% Engine" 6 AdnYntstration Subtotal Wala Syslan Taal law $1,600.20 2,413.00 215.9D 4.064.00 1.603.20 1,940.40 12,055.20 17,325,00 792.00 1,150.00 150.00 2,900.00 1,164.70 0.00 $47,436.60 4,743.66 $52,180.26 $32.274.00 0.00 0.00 0.00 5,300.00 0.00 $37,574.00 1,757,40 $41.331.40 $12,672.00 IHSW Oo 2,600A0 180.00 $17,312.00 1.731.20 $19.043.20 $9.925.00 4,400.00 550.00 380.00 1 A00.00 sla.6T5.00 1,98],50 $16.296.50 $130.853.36 DEVELOPER COST#ABLE TO BENEFIT w 0 $0.00 0 0.00 0 0.00 0 QOD 00.0D 0 0.00 0 0.00 0 000 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 D - -_- O.OD Amotal i066- 0 $0.00 45 2.250.00 45 2,160.00 702,310.00 0 0.00 2 360.00 1_-- 1200_00 $4.280.00 0 SOHO 0 1.00 0 0.00 00.00 --$0.00 0 $0.00 0 000 0 0.00 0 0.00 50.00 $6.280.00 "I The amounts shown are based on Contract and change order prices provided by Siegfried Eniihaeing. etc Developers engkteer, P." 6.0 6 COST OF CITY -FUNDED FACILITIES BUILT BY DEVELOPER 1O Qginlity Tn1.81 DEVELOPER COSIUTABLE TO BENEFIT "' Duao9a law 1 i 0 $0.00 1 1,159.00 TOTAL COST OF PROJECT IMPROVEMENTS "' 0 OEVEOLCOSTS 01 Item Qnctlmim Quail" Una ELI= Total Guaft Intal Schedule a (fund Avenue Sta. 137.44.8 to Sta.139481) 0 0.00 6,700 MM.00 0 MmLSYslw 6,700 938.00 0 0.00 1 Miscellaneous Grading 1 LS S768.60 5766.60 0 $0.00 2 Asphalt Removal 1 LS 1,159.00 1,159.00 0 0.00 3 clear S Grub 11 LS 103.70 103.70 0 0.00 4 Roadway Excavation 488 CY 4.00 1,952 DO 0 0.00 5 Compact Original Geoutd (0.50') 6,708 SF 0.12 804.00 0 0.00 8 Compact Native Material (0.80) 8,700 SF 0.14 938.00 0 000 7 Aggregate Base, Class II (D.aa) 6,700 SF 0.87 5.829.00 0 0.00 8 AspnaO Concrete, Type 8 (0.40') 0700 SF 1.25 8,375.00 0 0.00 9 Survey Monument 1 EA 550.00 550.00 0 0.00 10 Tratitc Control Plan I LS 120.00 120.DD 0 0.00 I Traffic Cartrol 1 LS 2,320.00 2,320.00 0 000 12 Pavement Mar" 6 Striping 1 LS 931.76 931.76 0 OOD 13 Street Los 0 EA 0.00 _ 000 0 _ O00 - _$0.00 Subtotal 523,851.06 Subtotal S(gt111Dnln 1192 l 270 $8280.00 0 $0.00 1 60'Ce' 155 LF $99.00 $15,345.00 0 $0.00 2 or RCP 10 LF 160.00 1,600.00 0 000 3 30'Sl" Drain 68 LF 68.00 4,488.00 69 4,488.00 4 1B' Storm Oram 30 LF 48.00 1,440.00 30 1,440.00 S 72 Storm Drain Manhole 1 EA 5,300.00 5,300.00 0 0.00 6 Pipe Marker 2 EA 180.00.., 380.00 2 .. _ .... . 360.00 4 4,400.00 Subtotal 528,533.00 Subtotal $6,288.00 1 8�Plpe mp) 230 LF $38.00 58280.00 0 $0.00 2 Ir Sanitary Sewer Pipe (VCP) 80 LF 31.00 2,480.00 0 000 3 Santlary Sewer MaNgN I EA 2.600.00 2,600.00 0 000 4 P Sanitary Sewer Sente (55 LF) 1 EA 2,000.00 2,000.00 0 0.00 5 Pipe Marker 3 EA 18000,540.00. TOTAL 0.... _. .._.--0.00 PCE Relocation Fee $S7,33&30 Subrolad 515,900.00 __547,341.41 10.00 subtotal Wat4LSYStain 1 10' Water Ppe (PVC) 244 LF $25.00 $6.100.00 0 $0.00 2 l0` wale Valve 4 EA 1.100.00 4,400.00 0 0.00 3 lo- 010' Goss Assembly 1 EA 550.10 550.00 0 0.00 4 slow OB 2 EA 100.00 1,400.00 O___^---_000 Subtotal $12A50.00 Schedule 6 Total $80,734.08 Total $6.288.00 TOTAL COST OF IMPROVEMENTS 11.455.695.35 TOTAL 5629,262.20 PGE Reloca0on Fee SS7,333.30 Pink Bell Rekxallon Fee $47,'N• 2.41 TOTAL CONSTRUCTION COSTS 2734,137.91 "I The amounts shown are based on Contract and change order prices provided by Siegfried Eniihaeing. etc Developers engkteer, P." 6.0 6 COST OF CITY -FUNDED FACILITIES BUILT BY DEVELOPER 1O Qginlity Tn1.81 DEVELOPER COSIUTABLE TO BENEFIT "' Duao9a law 1 $768.80 0 $0.00 1 1,159.00 0 0.00 1 103.70 0 0.00 488 1,952.00 0 0.00 6,700 MM.00 0 0.00 6,700 938.00 0 0.00 8,700 5,829.00 0 0.00 6,700 8,375.00 0 0.00 1 550.00 0 0.00 1 120.00 0 0.00 1 2,320.00 0 0.00 1 931.76 0 o(k) 0 0.00 0000 Subtotal $23,851.06 Subtotal 10% Engateertng 6 Admk4straWn 2,385.11 subtotal street System 526,238.17 155 S1S,345.00 0 $0.00 10 1,600.00 0 ODD 0 O.00 64 4.488.00 0 0.00 30 1,440.00 1 5,300.00 O 000 0 0.00 2. 360.00 Subtotal ._. S22,245.00 Subtotal _ ..... _... _. 58.288.00 10% Eagineeetrg 8 Administration „2,224:50 SubtotalStorrn Orafn System 321.469.50 270 $8280.00 0 $0.00 90 2,480.00 0 5000 1 2,800.00 0 $0.00 1 2,000.00 0 $0.00 3 540.00 0 $0.00. 5/5.900.00 10% Engineering 6 Administration 1,590.00 Subtotal Subrofal Sanitary Sewer System $17,490.00 244 $6,10000 0 $0.00 4 4,400.00 0 0.00 1 5511.00 0 000 2__1,4000D ---312,450.00 $0.00 10% Erglr Wit 6 AdmlMstrawn ,. _ 1,245.00 Subtotal Wart System 573,005.00 Total $81.890.67 Total 36.26800 TOTAL $909,076.47 TOTAL 1394,206.99 PCE Relocation Fee $S7,33&30 Ps,ifk Be8 Relocation Fee __547,341.41 TOTAL CONSTRUCTION COSTS ATTRIBUTABLE TO BENEFIT AREA $503.082.70 10%Engfeeeeing 8 Administration $39.020.70 Englneark* Plan Check Fee $4.177.55 Englneering Imp tcOon Fee 12.3%) 8,955.17 RetmbursamaM Application Fee 11%1 £5,070.87 TOTAL DEVELOPER COSTS ATTRIBUTABLE TO BENEFIT AREA $SN.448fa EGE PROPERTIES BENEFITING FROM GUILD AVE. IMPROVEMENTS ®PROPERTIES B FROM GUILD AVE.EAND ANO TURNER ROAD IMPROVEMENTS APN AC 0 AREA OF IMPROVEMENT ASSESSOR'S PARCEL NUMBER ACRES Lou STORAGE ASSOCIATES LP J AC:5.19 L001 STORAGE APN:049 OBO 81 XASSOCIATES IP AC: .55 TURNER ROAD STREET APN:049 OBO 82 AND INFRASTRUCTURE IMPROVEMENTS 2E LODI 2000/ ,'DISb8UTIOW TRUSTi�Y AC;5.00' APN.049 080 28 DOD� 15.00( )49 080 OS83 / /LORI .2()0(1 ,/ / / / /�• //� /'�DISIIBUTION TRUST ,APN-049 080 83/Go / , I /GUILD AVENUE STREET' / AC:4.52/ Al1D INFRASTRUCTURE / , / / / / ,APN;049 040 06' IMPROVEMENTS' / GWILD AVENUE,/ 92 'I . METTLER 0 R 0 M' ` I10 ;'0/'1 & 0,'I , /m,P 1i, // m/12001 TRUST/ o l' // o b o o f o •$,/ 0 1 AC: 4.49. /C/a,,'1 / ;'^,'a'� / vi ,'ab/(APN:049 080 O7 1 rc /0 /R W W ...z 0 . LODI STORAGE ASSOCIATES LP I AC.: 2.59 I AP14:049 OBO 74 BENEFIT AREA m x rp mq LI, EXHIBIT C .swn ftJ..m s:.aA sts»1 e+ +A»t Snp aw A s+e»n .tr.» p 1pae SSr roaA wp tl —Sxf.as S., SM13 11,m 10 S., sl—. M.. $t NAN s+.w21 f%fD !Il +f 10 p 11.1319 iu:: 3 L p Sn.NeU » - m stun p slJ . $M, M.M O+Y-4 P,T7 pw »lA so, fl.F ., WI, tM" p SI.M. 1 .tlsm t.U.—% f+..l.ro Nt i9 pp E.NtA •0/% w .Ttl.R i131tlA �A p f1H n N»p u. b t.pT» fL1wTT S.+ iStlA SS.t9Tb Rllt. sA.W +/ wp b..ero SSR. upft w 11tAp .rnW. +wl"x tl A/ UAIIJ. .Sn A pp +A+ ff..].. /i t1.Al,p mi s"I". 1.+5 pp .l.N ism sr. Np ftl mfp fl sm.. N.OpN liewtl t.+/Sm mi.. 1».ro i.+w. S+.»tN f .tM pp ..1 01 ]Tr': .1KN pW w fro.tl1 p —SS ]t W.l» pp P.S.p 1., Simi— .—" N.M. los.ls wA 5. ro II eP+ SS:SN pw b Stl.em ar :x151 10 1LLf11 52AWa n 1 fro.»1f1 f+:tAp 1+ ft, ro S1I.IK 01 tl+3W SIAi]N »tw f>Ol:tl 3.135 Sf i+:.]»% ilJr/13 .lA» fti+�t it fl».tlfw f/n.0A11 St l." 19]1 A]1A +eTN S1AS+tl FEMon S+..ASN tsA. T1) ..:%p 51.1/r ]] 53.1»% iro..]% st.Aab E]01% 6lb dt St.e+etl l�.ero» f+f.liOM Nec }t9.'10W SNti f+A% fGm f10.,q+K f1L.At% Srol.l.Ae N.p I fN.Ni.p_ f�T+q S.A� NJf f]M.If1Jr _fA�fie.af I—M1iT.N ffJ3d1T fm.uxw .i,SNAI {fA.dTe.l] ffNAN.t) SNf.aN.T+ I lb.p% tl.03911 _ _ tlAp,Si f]N fJlT1 33N fn.» iOTX OdIdiwKilOw CO/Ta FE£a 3559,/39.}3 FEWASSLrtMT FeFLca.Tpnrfe SS.93043 T0:4 GONSlM1OTnnGOSTS•FEEE ra09a LCOt 29b WSTF]Flagn T4Vfl S594.09AS FFKfwllSRn]TgNO03TFpl LOW SAC WSTMS13iiOn ilNEi 3$194.393,341 SEx.tiL lrtvi—LOW— SMSAW, City or LAI � EXHIBIT PubBcs Works Oeparlment aio I01 Development: 770 N. Guild Avenue 79181 QMKY Oewdoper, Lodi 2000 lMtrlbullon Trust Schedule I (Turner Road Sta. 699+17.7 to Sta. 702+61.3) Engineer: Baumbach 8 Piazza TOTAL COST OF PROJECT IMPROVEMENTS rrr I COST OF CITY4UNDED IMPROVEMENTS tri I REIMBURSABLE IMPROVEMENTS rrl Rem Description QLhvklY (1015 aio I01 Quffift 79181 QMKY Inlet Schedule I (Turner Road Sta. 699+17.7 to Sta. 702+61.3) 1 street 8ltstem Miscellaneous Grading 1 LS $870,00 $870.00 0 $0.00 0 $0.00 2 Asphalt Removal 1 LS 400.00 400.00 0.20 80,00 0 0.00 3 Clear&Grub 1 LS 2,500.00 2,500.00 0.15 375.00 0 0.00 4 Chain Link Fence Removal 1 LS 4,000.00 4,000.00 0 0.00 0 0.00 5 Roadway Exravalion 620 CY 4.00 2,480.00 93 372.00 0 0.00 6 Compact Original Ground (0.50') 21,240 SF 0.12 2,548.80 4,128 495.36 0 0.00 7 Compact Native Material (0.80') 21,240 SF 0.14 2,973.60 4,128 577.92 0 0.00 8 Aggregate Base, Class II (0.75') 21,240 SF 0.85 18,054.00 4,128 3,508.80 0 0.00 9 Asphalt Concrete, Tyle B (0.40') 21,240 SF 1.25 26.550.00 4,128 5.180.00 0 0.00 10 30' Commercial Driveway t FA 2,200.00 2,200.00 0 0.00 0 0.00 I t Vertical Curb, Gutter d Sidewalk 309 LF 24.00 7,416.00 0 0.00 0 0.00 12 Vertical Curb 6 Gutter 344 LF 14.00 4,816.00 0 0.00 0 0.00 13 Comm. CGSW & AC Dice 76 LF 15.00 1,140.00 0 0.00 0 0.00 14 Concrete Subgrade Compaction 3,440 SF 0.40 1,376.00 0 0.00 0 0.00 15 Barricade 1 EA 300.00 300.00 0 0.00 0 0.00 16 Traffic Control Plan 1 LS 165.00 165.00 0.19 32.07 0 0.00 17 Traffic Control Plan 1 LS 3,190.00 3,190.00 0.19 619.98 0 0.00 18 Pavement Marking 8 Striping 1 LS 1,281.17 1,281.17 0.19 249.00 0 0.00 19 Street Lights 1 LS 9,800.00 9,800.00 0 0.00 0 ..__ 0.00 Subtotal 592,060.57 Subtotal $11,470.12 Subtotal _ $0.00 10% Engineering d Administration 1.147.01 10% Engineering d Administration 0.00 Subtotal Street System 512,617.13 Subtotal Street System 50.60 ,$tn►m orale SY9111B 1 6(' CIP 344 LF $99.00 $34,056.00 344 $34.056.00 0 $0.00 2 15' SD 15 LF 35.00 525.00 0 0.00 0 0.00 3 12' SO 0 LF 33.00 0.00 0 0.00 0 0.00 4 Pipe Marker 1 EA 180.00 180.00 0 0.00 0 0.00 5 Side Inlet Catch Basin 1 FA 1,200.00___1,200.00 0 ___0.00 0 --..-0.00 Subtotal $35,961.00 Subtotal $34,05-00 Subtotal $0.00 10% Engineering 8 Administration 3,405.60 10% Engineering 6 Administration 0.00 Subtotal Storm Drain System $37,46i.60 Subtotal Storm Drain System $0.00 Ila Sewer SYatem 1 6' Sanitary Sewer Pipe (VCP) 105 LF $31.00 $3,255.00 0 50.00 0 $0.00 2 Son" Sewer Manhole 1 EA 2,600.00 2,600.00 0 0.00 0 0.00 3 Pipe Marker 1 EA 180.00 180.00 0 0.00 0 0.00 4 Remove Existing Riser 1 FA 240.00 ... 240.00 0 0.00 0 _0.00 Subtotal $6,275.00 Subtotal S0.00 Subtotal $0.00 10% Engineering dAdmlniskallon 0.00 10%Engineering 6Administration 0.00 Subtotal Sanitary Sewer System 50.00 Subtotal sealtarySewer system 50.00 wal2r syskm 1 10' Water Pipe (PVC) 434 LF $25.00 $10,850.00 345 $690.00 0 $0.00 2 10' Water Lateral (PVC) 35 LF 25.00 875.00 0 0.0D 0 0.00 3 10' Water Velve 2 EA 1,100.00 2,200.00 2 50-00 0 0.00 4 10' Water Lateral Valve 1 FA 1,too.00 1.100.00 0 0.00 0 0.00 5 8' Water Valve 1 FA 850.00 850.00 0 0.00 0 0.00 6 10' x 10' Cross 1 EA 550.00 550.00 0 0.00 0 0.00 7 10'x 8' Reducer 1 FA 180.00 180.00 0 0.00 0 0.00 8 8' Fire Hydrant Assembly 1 FA 2,700.00 2,700.00 0 0.00 0 0.00 9 Pipe Marker 1 FA 180.00 160.00 0 0.00 0 0.00 10 Blow Off 1 EA 700,00700.00 0 0.00 0 0.00 Subtotal $20,185.00 Subtotal $1,190.00 Subtotal $0,00 10% Engineering 8 Administration 119.00 10% Engineering 8 Admintstration0.OD _ Subtotal Water System $1,30990 Subtotal Water System $0.00 Schedule 1 Toldt $154,481.57 Total $51,387.73 Total $0.00 1\ W TOTAL COST OF PROJECT IMPROVEMENTS 111 I COST OF CI1WEO IMPROVEMENTS 111 I REIMBURSABLE iMPROVEMEhin 111 In Oesedritim 9ueNItY Stmt Price IM 4ull" I" Qua0tity I" Schedule 2 (Tumor Road Sta. 702+61.3 to Sts. 705+46) 1 Street Salem Miscellaneous Grading 1 LS 5530.00 $530.00 1 $530.00 0.736 $390.08 2 Aphah Removal 1 LS 600.00 600.00 1 600.00 0.736 441,60 3 Clear & Grub 1 LS 12,800.00 12,800.00 1 12,8W.00 6.736 9,420.80 4 Roadway Excavation 380 CY 4.00 1,520.00 380 1,520.00 279.68 1,118.72 5 Compact Original Ground (0.50') 13.024 SF 0.12 1,562.68 13,024 1,562.88 9.585.66 1,150.28 6 Compaq Native Material (0.80') 13,024 SF 0.14 1,823.36 13,024 1,823.36 9,585.66 1,341.99 7 Aggregate Base, Class 11(0.75') 13,024 SF 0.85 11,070.40 13,024 11,070.40 9,585.66 8,147.81 a Asphalt Concrete. Type B (0.49) 13,024 SF 1.25 16.260.00 13,024 16.280.00 9.585.66 11,982.08 9 6'Asphalt Dike 210 LF 5.00 1,050.00 210 1,050.00 210 1,050.00 10 Shoulder an Turner Road (N b S) 320 LF 2.50 800.00 320 800.00 320 800.00 11 Street Sign d Posts 1 EA 320.00 320.00 1 320.00 1 320.00 12 Traffic Control Plan 1 LS 135.00 135.00 1 135.00 0.736 99.36 13 Traffic Control Plan 1 LS 2,610.00 2,610.00 1 2,610,00 0.736 1,920.96 14 Pavement Marking d Striping 1 LS 1,046.23 1,048.23 1 1,048.23 0.736 771.50 15 Street Lights 0 LS 0.00 _ 0.00 0 0.00 0 0.00 Subtotal $52.149.87 Subtotal $52,149.87 Subtotal $38,955.16 10% Engineering 6 Administration _ _ 5,214.99 10% Engineering 6 Administration _ 3,895.52 Subtotal Street System $57,364.86 Subtotal Street System $42.850.70 a St413B.DLill"irsteID 1 60' CIP 280 LF $99.00 $27,720.00 200 $27,720.00 0 $0.00 2 60' RCP 50 LF 160.00 8.000.00 50 8,000.00 0 0.00 3 15' Storm Drain 90 LF 35.00 3,150.00 0 0.00 0 0.00 4 12' Stomp Drain 88 LF 33.00 2,904.00 0 0.00 0 0.00 5 72' Storm Drain Manhole 1 EA 5,300.00 5,300.00 1 5,300.00 1 0.00 6 Pipe Marker 4 EA 180.00 ____._.720.00 0 _ _ _ _ 0.00 0 „-- ------ 0.00 Subtotal $47,794.00 Subtotal $41,020.00 Subtotal $0.00 10% Engineering d Administration 4.102.00 10% Engineering d Administration 0.00 -.--.-0-00. Subtotal Storm Drain System $45,122.00 Subtotal Storm Drain System $0.00 WAISILSYltem 1 10' Water Pipe (PVC) 286 LF S25.00 S7.200.00 288 $7,200.00 289 $6,624.001! 2 10' Waler Valve 1 EA 1,100.00 1,100.00 1 1,100.00 .1 850.00111 3 10'WaterLateral (PVC) 46 LF 25.00 1,150.00 46 1,150.00 46 1,150.00 4 10' Water Lateral Valve 1 EA 1.100.00 1,10000 1 1,100.00 1 1,100.00 5 8' Water Pipe (PVC) 30 LF 26.00 780.00 30 780.00 30 780.00 6 8' Water Valve 1 EA 850.00 850.00 1 850.00 1 850.00 7 B' Water Pipe (PVC) 30 LF 24.00 720.00 30 720.00 30 720.00 8 6' Water Valve 1 EA 700.00 700.00 1 700.00 1 700.00 9 10"x 10' Cross 1 FA 550.00 550.00 1 550.00 1 550.00 10 10' x 8' Reducer 1 FA 180.00 180.00 1 180.00 1 110.00 11 10"x 10'x 6"x 6' Cross 1 EA 180.00 180.00 1 180,00 1 180.00 12 Blowoff 3 EA 700.00 2.100.00 3 2,100.00 3 2,100.00 13 Pipe Marker 3 EA 180.00 _ - _ - -. _ 540.00 3 _ _ _ ._ 540.00 3 _ ........ _540_00 Subtotal $17,150.00 Subtotal $17,150.00 Subtotal $16,324.00 10% Engineering d Administration 1,715,110, 10% Engineering b Adninislration Subtotal Water System $18,865.00 Subtotal Water System $17,956.40 Schedule 2 Total . $117,093.87 Total $121,351.06 Total $60,807.10 • TOTAL COST OF PROJECT IMPROVEMENTS ni COST OF CW6ED IMPROVEMENTS t'1 REIMBURSABLE IMPROVEMENTS M 9 Ubm Qsintity L(Dd eke Iola) Q,,W law Quantity rmw Schedule 3 (Guad Avenue Sta. 114+13.9 to Sta.119+28.71 Sbeet Svstent 1 Miscellaneous Grading 1 LS $2.016.00 $2,016.00 O.a4 $1,693,44 0.42 $846.72 2 AsphaR Removal 1 LS 3,040.00 3,040.00 0.84 2.553.60 0.42 1,276.60 3 Clear 8 Grub 1 LS 272.00 272.00 0.84 228.48 0.42 114.24 4 Roadway Excavation 1,280 CY 4.00 5,120.00 1,075 4,300.80 538 2,150.40 5 Compact Original Ground (0.517) 17,519 SF 0.12 2,102.28 14,684 1,762.08 7,342 881.04 6 Compact Native Material (0.80') 17,519 SF 0.14 2,452.66 14,684 2,055.76 7.342 1,027.88 7 Aggregate Base, Class II (0.80') 17.519 SF 0.87 15,241.53 14,684 12,775.06 7,342 6,387.54 8 Asphalt Concrete, Type B (0.401) 17,519 SF 1.25 21,898.75 14,684 18,355.00 7,342 9,177.50 9 Driveway Repair 3 FA 500.00 1,500.00 3 1,500.00 1.5 750.00 10 Shoulder (E 6 W) 1,030 LF 2.40 2,472.00 515 1,236.00 257.5 618.00 11 Tragic Control Plan 1 LS 240.00 240.00 0.84 201.60 0.42 100.80 12 Traffic Control Plan 1 LS 4,640.00 4,640.00 0.64 3,897.60 0.42 1,948.60 13 Pavement Marking b Striping 1 LS 1.863.52 1,863.52 0.64 1,565.36 0.42 782.68 14 Street Lights 0 EA 0.00,.-_-0.00 0--_---._--._.0:00.. 0 0.00_ Subtotal $62,858.74 Subtotal $52.124.80 Subtotal 526,062.40 10% F_rgfirwring d Administration _ . 5,212.48 1D% Engineering E Administration ----2.60621. Subtotal Street System $57,337.28 Subtotal Street System 528,668.64 Stam Drain System 1 42' CIP 496 LF $65.00 532,240.00 496 $32.240.00 0 $0.00 2 24' Storm Drain 10 LF 50.00 500.00 10 500,00 0 0.00 3 18' Storm Drain 182 LF 48.00 8,736.00 182 8,736.00 0 0.00 4 12' Slam Drain 80 LF 33.00 2,640.00 BO 2,640.00 BO 2,640.00 5 48' Storm Drain Manhole 3 EA 3.100.00 9,300.00 3 9,300.00 0 0.00 6 Relocate 18' Double SO 1 LS 5,696.26 5,698.26 1 5,698.26 0 0.00 7 Pipe Marker 2 EA 180.00 360.00 2 360.00 2 360.00 8 Side Intel Catch Basin 1 EA 1,200.00 1200.00 1 1200.00 1 _ - _ _ 1,200.00 Subtotal 560.674.26 Subtotal $60,674.26 Subtotal $4,200.00 10% Engineering 9 Administration _ 6.067.43 10% Engineering 6 Administration --- 420.00 Subtotal Storm Drain System $66,741.69 Subtotal Storm Drain System 54,620.00 S901tity sewer SysllN 1 8' Sanitary Sewer Pipe (VCP) 565 LF $36.00 $20,340.00 565 $20.340.00 565 $20.340.00 2 Sanitary Sewer Manhole 2 EA 2,600.00 5,200.00 2 5.200.00 2 5,200.00 3 Pipe Marker 1 EA 180.00 180.00 1 180.00 1 180.00 4 Sanitary Sewer Riser 1 FA 240.00 240.00 1 -.,.----240.00- 1 _ 240.00 Subtotal $25,960.00 Subtotal $25,960.00 Subtotal $25,960.00 f0% Engineering b Administration 2.596.00 10% Engineering b Administration __ 2 595.00 Subtotal Sanitary Sewer System $28,556.00 Subtotal Sanitary Sewer System 529,556.00 watet.solem 1 10' Water Pipe (PVC) 508 LF $25.00 $t2,700.00 508 51,016.00 0 $0.00 2 1(rWater Valve 4 FA 1,100.00 4,400.00 4 1,000.OD 0 0.00 3 B' Water Pipe (PVC) 56 LF 26.00 1,456.00 0 0.00 0 0.00 4 B' Water Valve 2 EA 850.00 1,700.00 0 0.00 0 0.00 5 6' Water Vaw 2 EA 700.00 1,400.00 0 0.00 0 0.00 6 10'x W Reducer 2 EA 160.00 360.00 0 0.00 0 0.00 7 10' x B' Reducer 2 FA 180.00 360.00 0 0.00 0 0.00 a 10' x10' Cross Assembly 2 EA 550.00 1,100.00 0 0.00 0 0.00 9 6' Fre Hydrant Assembly 2 EA 2.500.00 5,000.00 0 0.00 0 0.00 10 Pipe Marker 2 EA 180.00 360.00 0 0.00 0 0.00 11 Blowoff 2 EA 700.00.----- - 1,400.00 0 0.00. 0 __. 0.00 Subtotal $30,236.00 Subtotal $2,016-00 Subtotal 50.00 10% Engineering d Administration 201.60_ 10% Engineering d Administration 0.00 Subtotal Water System $2217.60 Subtotal Water System $0.00 Schedule 3 Total $179,729.00 Total $154,852.56 Total 561,844.64 1W TOTAL COST OF PROJECT IMPROVEMENTS 111 I COST OF CAWED IMPROVEMENTS ut I REIMBURSABLE IMPROVEMENTS trr Item Descdpwri Q=WY LIM 2dce BW !?!4a08IY I1Lti 4uaOWX IWaI Schedule 4 (Guild Avenue Sta.119428.7 to Sts. 134+14.8: Mondavi Project) 1 8tent$Yitom Miscellaneous Grading 1 LS $8,215.20 $8,2t5.20 0.62 $5,134.49 0 $0.00 2 Asphalt Removal 1 LS 12,388.00 12,388.00 0.62 7,742.48 0 0.00 3 dear d Grub I LS 1,108.40 1,108.40 0.62 692.75 0 0.00 4 Roadway Excavation 5,216 CY 4.00 20,864.00 3,260 13,039.98 0 0.00 5 Comped Original Ground (0.50') 71,333 SF 0.12 8,559.96 44,583 5,349.96 0 0.00 6 Compact Native Material (0.80') 71,333 SF 0.14 9,988.62 44,583 6,241.62 0 0.00 7 Aggregate Base, Class II (0.80') 71,333 SF 0.87 62,059.71 44,583 38,787.21 0 0.00 a Asphalt Concrete, Type 8 (0.40') 71,333 SF 1.25 89,166.25 44,583 55,728.75 0 _ 0.00 9 100' Commercial Driveway 1 EA 4,800.00 4,800.00 0 0.00 0 0.00 10 170' Commercial Driveway 2 EA 9,000.00 18,000.00 0 0.00 0 0.00 1 t Vertical Curb, Gutter 6 Sidewalk 1,160 LF 24.00 27,840.00 0 0,00 0 0.00 12 Concrete Subgrade Compaction 11,146 SF 0.40 4,458.40 0 0.00 0 0.00 0 Shoulder (w) 1,486 LF 2.40 1,566.40 0 0.00 0 0.00 14 Barricade 2 EA 300.00 600.00 0 0.00 0 0.00 15 Mail Box Relocation 1 EA 150.00 150.00 0 0.00 0 0.00 16 Driveway Overlay 3 EA 500.00 1,500.00 0 0.00 0 0.00 17 Traffic Control Plan 1 LS 690.00 690.00 0.62 431.25 0 0.00 10 Traffic Control 1 LS 13,340.00 13,340.00 0.62 8,337.48 0 0.00 t9 Pavement Marking b Sniping 1 LS 5,357.62 5,357.62 0.62 3.346.50 0 OAO 20 Street Lights 1 LS 21,600.00 21,600.00 0 _ 0.00 0 Subtotal $314,250.56 Subtotal $144,834.44 Subtotal $0.00 10% Engineering 6 Administration _ _ _ 14,483.44 10% Engineering d Administration Sublotal Street System $159,317.89 Subtotal Street System $0.00 Storm anent %MM 1 54' CIP 624 LF $90.00 $56,160.00 624 $56.160.00 0 $0.00 2 48' CIP 921 LF 80.00 73,680.00 921 73,680.00 0 0.00 3 42' RCP 40 LF 65.00 2,600.00 40 2,600.00 0 0.00 4 Ir Storm Drain 108 LF 48.00 5,184.00 0 0.00 0 0.00 5 1S' Storm Drain 45 LF 35.00 1,575.00 0 0.00 0 0.00 6 12' Storm Drain 60 LF 33.00 1,980.00 0 0.00 0 0.00 7 72' Storm Drain Manhole 0 EA 5,300.00 0.00 0 0.00 0 0.00 a 60' Storm Drain Manhole 5 EA 4,200.00 21,000.00 3 12,600.00 0 0.00 9 Pipe Marker 8 FA 100.00 1,440.00 0 0.00 0 0.00 10 Side Inlet Catch Basin 1 EA 1,200.00 _ 1,200.00 0 _ 0.00 0 _ 0.00 Subtotal $164,819.00 Subtotal $145,040.00 Subtotal $0.00 10% Engineedng d Administration _ 14.504.00 10% Engineering 6 Administration _. _-_ _0. Subtotal Storm Drain System $159,544.00 Subtotal Storm Drain System $0.00 Sant(uy Sewer Witill 1 15' Sanitary Sewer Pipe (VCP) 683 LF $75.00 551,225.00 683 517,075.00 0 $0.00 2 12' Sanitary Sewer Pipe (VCP) 351 IF 67.00 23,517.00 351 10,681.00 0 0.00 3 10' Sanitary Sewer Pipe (VCP) 1,022 LF 50.00 51,100.00 0 0.00 0 0.00 4 8' Sanitary Sewer Pipe (VCP) 743 LF 36.00 26.748.00 0 0.00 0 0.00 5 6' Sanitary Sewer Pipe (VCP) 50 LF 31.00 1.550.00 0 0.00 0 0.00 6 Sanitary Sewer Manhole 5 EA 2,600.00 13,000.00 0 0.00 0 0.00 7 Pipe Marker 8 FA 180.00 1,440.00 0 0.00 0 0.00 8 Sanitary Sewer Riser 2 EA 240.00 400.00. 0 0.00 0 Subtotal $169,060.00 Subtotal $27,956.00 Subtotal $0.00 10% Engineering 8 Administration 2,795.60 10% Engineering 8 Administration _ 0.00 Subtotal Sanitary Sewer System $30,751.60 Subtotal Sanitary Sewer System $0.00 Witaymem 1 10' Water Pipe (PVC) 2.924 LF 525.00 $73,100.00 2,924 $5,848.00 0 SO.00 2 10' Water Pipe (DIP) 70 LF 27.00 1,890.00 70 140.00 0 0.00 3 10' Water Valve 24 FA 1,100.00 26,400.00 18 4,500.00 0 0.00 4 RR Xing Jack 8 Bore IW Casing 46 LF 300.00 13,800.00 23 6,900.00 0 0.00 5 10' x 10' Cross 3 EA 550.00 1,650.00 0 0.00 0 0.00 5 Relocate 10' x 10' Cross 1 LS 1,049.69 1,049.69 0 0.00 0 0.00 8 10' x 10' x 6' x 6' Cross Assembly 3 FA 420.00 1,260.00 0 0.00 0 0.00 7 10' x 10' x 10' Tee 4 EA 300.00 1,200.00 0 0.00 0 0.00 8 10' x 10' x 6' Tee 4 EA 180.00 720.00 0 0.00 0 0,00 9 10' Blind Flange 3 EA 90.00 270.00 0 0.00 0 0.00 10 6' Bind Flange 3 FA 50.00 150.00 0 0.00 0 0.00 11 6' Gate Valve 7 EA 700.00 4,900.00 0 0.00 0 0.00 12 6' Fire Hydrant Assembly 7 EA 2.500.00 17,500.00 0 0.00 0 0.00 13 Pipe Marker 5 EA 100.00 900.00 0 0.00 0 0.00 14 Blow011 5 EA 700.00___3,50D.W 0 0.00_ 0 0" Subtotal 5148,289.69 subtotal 317.380.00 Subtotal 50.00 10% Engineering 3 Administration _ .... 1,738.80 10% Engineering 8 Administration _ 0,00_ Subtotal Wafer System $19.126.80 Subtotal watersystem $0.00 Tht.l 5366.740.29 Total $0.00 • TOTAL COST OF PROJECT IMPROVEMENTS "' COST OF CIT IWO IMPROVEMENTS t" REIMBURSABLE IMPROVEMENTS t'r &M Ikscripti0e QuazUilY unit Pace low alto Y TOW Qua UY 7�a1 Schedule S (Gulld Avenue S1a.134+14.8 to Ste. 137.44.6) skalit:$ygtt81 1 Miscellaneous Grading 1 LS $1,600.20 51,600.20 1 51,600.20 0.5 $800.to 2 Asphalt Removal 1 LS 2.413.00 2,413.00 1 2,413.00 0.5 1.206.50 3 Clear &Grub 1 LS 215.90 215.90 1 215.90 0.5 107.95 4 Roadway Excavation 1,016 CY 4.00 4,064.00 1,016 4,064.00 508 2,032.00 5 Compact Original Ground (0.50') 13,860 SF 0.12 1,663.20 13,860 1,663.20 6.930 831.60 6 Compact Native Material (0.80') 13.860 SF 0.14 1,940.40 0.11M 1,940.40 6.930 970.20 7 Aggregate Base, Class II (0.80') 13,860 SF 0.87 12.058.20 13.860 12,058.20 6.930 6,029.10 8 Asphalt Concrete. Type 8 (0.4(r) 13.860 SF 1.25 17,325.00 13.860 17,325.00 6,930 8,662.50 9 Shoulder (E & W) 330 LF 2.40 792.00 330 792.00 165 396.00 10 6'Asphalt Dike 230 LF 5.00 1,150.00 230 1,150.00 115 575.00 11 Traffic Control Plan 1 LS 150.00 150.00 1 150.00 0.5 75.00 12 Traffic Control 1 LS 2.900.00 2,900.00 1 2.900.00 0.5 1,450.00 13 Pavement Marking 8 Striping 1 LS 1,164.70 1,164.70 1 1,164.70 0.5 582.35 14 Street Lights 0 EA 0.00 _0.00 0 _ 0.00 0 0_0. Subtotal 547,436.60 Subtotal 547,436.60 Subtotal $23,718.30 10% Engineering 6 Administration 4,743.66 10% Engineering 8 Administration _ _ 2.371.83 Subtotal Street System $52,180.26 Subtotal Street System $26,090.13 Storm Drain System 1 60' CIP 326 LF $99.00 532,274.00 326 $32,274.00 0 $0.00 2 24' Storm Drain 45 LF 50.00 2,250.00 0 0.00 0 0.00 3 18'Storm Drain 45 LF 48.00 2,160.00 0 0.00 0 0.00 4 12' Storm Drain 70 LF 33.00 2.310.00 0 0.00 0 0.00 5 72' Storm Drain Manhole 1 EA 5,300.00 5,300.00 1 5.300.00 0 0.00 6 Pipe Marker 2 EA 180.00 360.00 0 0.00 0 0.00 7 Side Intel Catch Basin 1 EA 1,200.00 1,200.00 0 0.00 0 0.00 Subtotal $45,854.00 Subtotal $37,574.00 Subtotal 50.00 10%Engineering &Administration 3,757AD 10% Engineering &Adminislration 0.00 Subtotal Storm Drain System 541,331.40 Subtotal Storm Drain System $0,00 S- 6Y 1 Sew Pipe 8' Sanitary Sewer Pipe (VCP) Sanitary( 352 LF 536.00 512.672.00 352 $12.672.00 352 $12,672.00 2 6' Sanitary Sewer Pipe (VCP) 60 LF 31.00 1.860.00 60 1,860.00 60 1,860.00 3 Sanitary Sewer Manhole 1 EA 2,600.00 2,600.00 1 2,600.00 1 2,600.00 4 Pipe Marker 1 EA 180.00 _ 180.00 1 180.00 1 -----180.00 Subtotal $17,312.00 Subtotal $17,312.00 Subtotal 517,312.00 10% Engineering & Administration 1,73120 10% Engineering & Administration 1,731.20 Subtotal Sanitary Sewer System 519,043.20 Subtotal Sanitary Sewer System 519,043.20 1 Water Svstam 10' Water Pipe (PVC) 397 LF 525.00 59.925.00 397 59,925.00 397 $9,285.00 2 10' Water Valve 4 EA 1,100.00 4,400.00 4 4,400.00 4 3.9D0.00'n 3 10' x 10' Cross Assembty 1 EA 550.00 550.00 1 550.00 1 2 550.00 360.00 4 Pipe Marker 2 EA 180.00 360.00 2 360.00 1,400.00 2 1,400.00 5 Blow OB 2 EA 700.00 1.400.00 2 Subtotal $16,635.00 Subtotal $15,635.00 Subtotal $15.495.00 10% Engineering & Administration _ -_ -_ 1,663_50_ 10% Engineering & Administration 1,549.50. Subtotal Water System $18,298.50 Subtotal Water System 517,044.50 Schedule 5 Total $127,237.60 Total $130,853.36 Total $62.177.83 TOTAL COST OF PROJECT IMPROVEMENTS I'I I COST OF CfwED IMPROVEMENTS Irl I REIMBURSABLE IMPROVEMENTS m bm Description Quantity t8ti1 Schedule 6 (Guild Avenue $is.137+44.8 to Sta.139+81) 4.00 1,952.00 MMLUsttm 804.00 0.14 1 Miscellaneous Grading 1 LS 2 Asphalt Removal 1 LS 3 Clear 6 Grub 1 LS 4 Roadway Excavation 488 CY 5 Compact Original Ground (0.50') 6,700 SF 6 Camped Native Material (0.80') . 6,700 SF 7 Aggregate Base, Gass 11(0.80') 6,700 SF 8 Asphalt Concrete, Type 6 (0.4(r) 6,100 SF 9 Survey Monument 1 EA 10 Traffic Control Plan 1 LS it Traffic Control 1 LS 12 Pavement Marking It Striping 1 LS 13 Street Lights O EA Price I" 5768.60 $768.60 1,159.00 1,159.00 103.70 103.70 4.00 1,952.00 0.12 804.00 0.14 938.00 0.137 5,829.00 1.25 8,375.00 550.00 550.00 120.00 120.00 2.320.00 2,320.00 931.76 931.76 0.00 -.0.00 Subtotal 523,851.06 $term Dnln System LF 525.00 $6,100.00 4 1 60' CIP 155 LF $99.00 $15,345.00 2 60' RCP 10 LF 160.00 1,600.00 3 30' Storm Drain 68 LF 66.00 4,488.00 4 18' Storm Drain 30 LF 48.00 1,440.00 5 72' Storm Drain Manhole 1 EA 5,300.00 5,300.00 6 Pipe Marker 2 EA 180.00 _._ _ 360.00, Subtotal $28,533.00 $ant- ariSewerSttsttm 1 8' Sanitary Sewer Pipe (VCP) 230 LF $36.00 $8,280.00 2 6' Sanitary Sewer Pipe (VCP) 80 LF 31.00 2,480.00 3 Sanitary Sewer Manhole 1 EA 2,600.00 2,600.00 4 4' Sanitary Sewer Service (55 LF) 1 EA 2,000.00 2,000.00 5 Pipe Marker 3 EA 180.00 .. 540.00 Subtotal $15,900.00 MkILSYS1em I t0' Water Pipe (PVC) 2 1(' water Valve 3 10' x10' Cross Assembly 4 Blow Off 244 LF 525.00 $6,100.00 4 EA 1,100.00 4.400.00 1 EA 550.00 550.00 2 EA 700.00.__ _ 1.400.00 Subtotal $12,450.00 Schedule 6 Total $00,734.06 Total Cost of Improvements $1,455,695.35 QMNY 1 1 1 488 6,700 6,700 6,700 6,700 1 1 1 1 0 Subtotal 10% Engineering 6 Administration Subtotal Street System 155 to 0 0 1 0 Subtotal 10% Engineering 6 Administration Subtotal Storm Drain System 230 80 1 1 3 Subtotal 10% Engineering 6 Administration Subtotal Sanitary Sewer System 244 4 1 2 Subtotal 10% Engineering 6 Administration Subtotal Water System Total Total "I The amounts shown are based at contract and change order prices provided by Siegfried Engineering, the Developers engineer. in Reimbursable costs for 10' PVC Water Pipe and IV Water Valve have been adjusted to include credit for oversize mains. T9ial $768.60 1,159.00 103.70 1,952.00 804.00 938.00 5,829.00 8,375.00 550.00 120.00 2,320.00 931.76 0.00 $23,851.06 --..-2.385.11 528,236.17 515,345.00 1,600.00 0.00 0.00 5,300.00 0.00 $22,245.00 2,224.50 $24,469.50 $8,200.00 2,480.00 2.600.00 2,000.00 540.00 _ $15,900.00 11599A .00 517,490.00 $6.100.00 4,400.00 550.00 1,400.00 $12.450.00 1,245.00 $13,695.00 $81,890.67 $909,076.47 0.5 0.5 0.5 244 3,350 3,350 3,350 3,350 0.5 0.5 0.5 0.5 0 Subtotal 10% Engineering d Administration Subtotal Street System 0 0 0 0 0 0 Subtotal 10% Engineering It Administration Subtotal Storm Drain System 230 so 1 1 3 Subtotal 10% Engineering E Administration Subtotal Sanitary Sewer System 244 4 1 2 Subtotal 10% Engineering d Administration Subtotal Water System Total Total Engineering Plan Check Fee (1.5%) Engineering Inspection Fee (2.5%) Reimbursement Application Fee TOTAL REIMBURSABLE COSTS $384.30 579,50 51.85 976.00 402.0D 469.00 2.914.50 4,187.50 275.00 60.00 1,160.00 465.88 __ 0.00_ 511,925.53 _....- ._ 1.192.55 $13,118.06 $0.00 0.00 0.00 0.00 0.00 0.00 ------- $0.00 --- -- -- 0.00 $0.00 $8.280.00 2.480.00 2.600.00 2.000.00 515,900.00 1,590.00 $17,490,00 $5,660.00 pl 3,900.00 RI 550.00 .. _ _1.400.00 $11,510.00 1,151.00 --$12,661.00 543,269.08 $228,098.65 $3,110.44 $5,184.06 _ __ $2,073.62, $238,466.77 • EXHIBIT C 52 53539.04 5231.26 5+.78089 S1o187.50 S1.018.75 S186.06 I 5310.13 511.702.45 5.98% 512405 S11.826.150 323.66101 52 S3,53044 5251.26 5+,700.89 510,187.30 31.018.75 5188.08 $310.13 511.702.45 5.93% $124.05 515,626.50 R S3.539.S4 5251.26 S+.180.89 310.187.50 $1.016.75 $IB6.OS $310.13 511,702.45 5.98% St2A05 $11826.50 S/1A26.50 52 S3.SnS4 3251.26 5+,780.89 51016750 $1,018.73 $186.06 $310.13 511,702.45 5.90% $124.05 sit ,B20.30 $11 50 . 377191 51.43164 50.00 5130.15 50,00 52.51336 . 52.82434 $8.873.70 5367J3 59639 5150.35 510.011.67 3.50% $86 .28 $10081.93 1 S163.93 5369.36 $0.00 527.64 50.00 5333.94 539034 S1.473.43 S147.34 52047 534.11 $1.675.36 0.68% $13.65 31,689.01 91 51.5".96 53,674.36 $0.00 3260.60 5000 $3,151.23 33.593.71 $13.W3.86 $1.3W.39 5193.15 5321.91 S15.BW30 6.21% 5126.76 515.936.06 Si3a,256.6T D 52.113.15 $5019.50 $000 3356.28 $000 $4,30495 S4.W9.32 515.993.01 SIA99.39 S263.95 5439.76 421.596.91 8.46% SISS.W 321712.81 71 SSA29 T9 St3A0.66 $000 5982.91 5000 S11.076.30 513.543.91 $52.400.66 55.240.07 3727.93 $1.213.21 $59.581.88 23.40% S"5.28 380067.16 17 $1.4276.4 $3.391,17 $0.00 5240.70 3000 52,96.36 33,316.73 512.43227 51,263.23 517826 5297.10 314,550.66 573% 3118.84 $14,706.70 50 $4.470.70 $10.619.53 30.00 575377 30,00 $9.107.59 S10.388.43 S"194.57 51.018.46 5558.23 5930.36 515.691.63 17.65% $372.15 576,053,76 POAU76' $.50 5000 50.00 SO W 36.00 50.00 50.00 50.50 060% 50.00 $.50 -. soo0.�.- $o.50 50.00 36.50 $0.50 $0.50 5650 S0.00 39.00 0.00% 36.00 II 53,058.42 $217.09 $4,130.69 36.602.00 5850.20 5750.17 5267.05 310.110.025107.18 510316/0 510216,10 00 1118 324.06 $31173.00 SOA6 $4.200.00 11600 S61,70623 $38,955.10 fN7.N2.�1 St0 75.6.54 f3�110.A/ 111_736.06 �. f27y]93.13_ 706.O6K 112,073.62 $238 4".36 5236 -66.76 TOTAL CONSTRUCTION COSTS 6 F_?5 5236,383.1! REIMBURSEMENT PREPARATION FEE $2.073.62 REIMBURSEMENT OUE CT' OF L001 $238.666.76 �J SUMMARY OF FAIR SHARE REIMBURSEMENT AMOUNTS EXHIBIT 6 G Guild Avenue Improvements GT Guild Avenue and Turner Road Improvements si 049-08-07 G Mettler M1 4.49 $20,051.13 $10,620.20 $30,671.33 049-08-16 G Batch M1 5.00 $22,328.65 $11,826.50 $34,155.15 049-08-17 G Batch M1 5.00 $22,328.65 $11,826.50 $34,155.15 049-08-18 G Moreland M1 5.00 $22,328.65 $11,826.50 $34,155.15 049-08-19 G Moreland MI 5.00 1 $22,328.65 1 $11,826.50 $34,155.1.5 049-08-74 GT Lodi Storage Assoc. LP M1 2.59 $11,918.61 $10,081.92 $22,000.53 049-08-82 GT Lodi Storage Assoc. LP M2 0.55 $2,414.79 $1,689.01 $4,103.80 GT Lodi Storage Assoc. LP M2 5.19 $22,786.81 $15,938.07 $38,724.88 1049-08-81 049-08-32 GT Lodi Storage Assoc. LP M2 7.09 $31,128.80 $21,772.81 $52,901.61 049-08-33 GT Lodi Storage Assoc. LP M2 19.56 $85,878.60 $60,067.17 $145,945.77 049-08-77 GT Lodi Storage Assoc. LP M2 4.79 $21,030.60 $14,709.70 $35,740.30 049-08-05 GT Atwood M2 15.00 $65,857.82 $46,063.78 $111,921.60 049-08-28 G Lodi 2000 Dist. Trust Mi 5.00 $0.00 $0.00 $0.00 049-08-83 G Lodi 2000 Dist. Trust M1 38.53 $0.00 $0.00 $0.00 049-04-06 G Batch M1 4.32 $19,291.95 $10,218.10 $29,510.05 TOTAL REIMBURSEMENT AMOUNTS: $369.673.71 $238.466.76 $608.140.47 G Guild Avenue Improvements GT Guild Avenue and Turner Road Improvements