Loading...
HomeMy WebLinkAboutResolutions - No. 2003-157RESOLUTION NO. 2003-157 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING ADVERTISEMENT FOR BIDS FOR THE ALLEY SOUTH OF PINE STREET WASTEWATER MAIN REHABILITATION PROJECT (CHURCH STREET TO HUTCHINS STREET); AND FURTHER AUTHORIZING THE CITY MANAGER TO AWARD OR REJECT THE CONTRACT UP TO $90,000, AND APPROPRIATING FUNDS FOR THE PROJECT WHEREAS, this wastewater main rehabilitation project was initiated at the request of the California Regional Water Quality Control Board (Board) in a letter to the City of Lodi dated February 2003; and WHEREAS, the letter requested that the City take action to rehabilitate the wastewater main located in the alleyway behind 212 West Pine Street, between Church Street and Hutchins Street; and WHEREAS; according to the letter, -Guild Cleaners is currently in the process of installing a soil vapor extraction (SVE) system in the vicinity of the wastewater line. The Board believes the rehabilitation of the pipeline is critical to the successful pilot study and long-term operation of that SVE system, and it has requested that the City proceed with the repair/rehabilitation of this pipeline as soon as practical; and WHEREAS, although this location was not a high-priority,on the replacement program, it is one that would be done in the foreseeable future. , Staff has therefore completed the design documents for rehabilitating 1,190 LF of existing 6 -inch diameter wastewater main and reinstating 53 active service connections using trenchless methods; and WHEREAS, in order to expedite this project, staff recommends that the City Council approve the plans and specifications and authorize advertisement for bids for the Alley South of Pine Street Wastewater Rehabilitation Project (Church Street to Hutchins Street), authorize the City Manager to award or reject the contract up to $90,000.00, and further appropriate funds for this project. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve the plans and specifications and authorize advertisement for bids for the Alley South of Pine Street Wastewater Rehabilitation Project (Church Street to Hutchins Street) and authorize the City Manager to award or reject the contract up to $90,000.00; and BE IT FURTHER RESOLVED that funds in the amount of $90,000.00 be appropriated from the Wastewater Fund for this project. Dated: September 3, 2003 I hereby certify that Resolution No. 2003-157 was passed and adopted by the City Council of the City of Lodi in a regular meeting held September 3, 2003, by the following vote: AYES: COUNCIL MEMBERS — Beckman, Howard, Land, and Mayor Hitchcock NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Hansen ABSTAIN: COUNCIL MEMBERS — None SUSAN J. BLACKSTON City Clerk 2003-157