HomeMy WebLinkAboutResolutions - No. 2001-178RESOLUTION NO. 2001-178
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING BID
FOR TRUCK HAULING SERVICES FOR ASPHALT CONCRETE,
ASPHALT CONCRETE GRINDINGS, AND SPOILS
WHEREAS, in answer to notice duly published in accordance with law and the
order of this City Council sealed bids were received and publicly opened on June 20,
2001 at 11:00 a.m. for the bid for truck hauling services for asphalt concrete, asphalt
concrete grindings, and spoils, described in the specifications therefore approved by the
City Council on June 6, 2001; and
WHEREAS, a sole bid was received from Frank C. Alegre Trucking, and a
breakdown of that bid is shown on the attached Bidding Schedule marked Exhibit A.
NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the bid for
truck hauling services for asphalt concrete, asphalt concrete grindings, and spoils is
hereby awarded to the sole bidder, Frank C. Alegre Trucking, Inc., of Lodi, at the rate of
$90.00 per hour per truck, as shown on Exhibit A attached.
Dated: July 18, 2001
----------------
----------------
I hereby certify that Resolution No. 2001-178 was passed and adopted by the
City Council of the City of Lodi in a regular meeting held July 18, 2001, by the following
vote:
AYES: COUNCIL MEMBERS — Hitchcock, Howard, Land, Pennino and
Mayor Nakanishi
NOES. COUNCIL MEMBERS — None
I1 -49LN 0W04uI-114& 0
ABSTAIN: COUNCIL MEMBERS — None
SUSAN J. BLACKSTON
City Clerk
2001-178
LO'd
EXH I BITe A
BIDDING SCHEDULE I
TRUCK HAULING OF ASPHALT CONCRETE
PER HOUR
ITEM DESCRIPTION QUANTITY COSTIRATE
Trucking time including labor and fuel, to pick up 200 Hours
at asphalt plant, haul, and delivery of asphalt
concrete to job site. Unit per hour represents
payment to contractor using as many trucks as
necessary as not to cause delays in the paving
operation. $_ D ei►�..� QRZ }�"
BIDDING SCHEDULE II
TRUCK HAULING OF ASPHALT CONCRETE GRINDINGS
DURING GRINDING OPERATIONS
PER HOUR
ITEM DESCRIPTION QUANTITY COST/RATE
Trucking costihour including fuel, complete 160 Hours
including hauling away and disposing of all
grindings, or to City of Lodi stockpile at Century
Boulevard west of Stockton Street. Unit per hour
represents payment to contractor using as many
trucks as necessary as not to cause delays in the
grinding operation.
BIDDING SCHEDULE III
TRUCK HAULING OF ASPHALT CONCRETE GRINDINGS AND SPOILS
FROM STOCKPILE
PER HOUR
ITEM DESCRIPTION QUANTITY COSTIRATE
Trucking cost/hour including fuel (unit per hour 160 Hours
represents payment to contractor for providing
number of trucks designated by the City to haul
asphalt concrete grindings), complete, to White
Slough Water Pollution Control f=acility or to �, p
approved recycling company.
Any questions regarding specifications should be directed to Street Contracts
Administration Curt Juran in the Street Division at (209) 333-6740.