Loading...
HomeMy WebLinkAboutResolutions - No. 2001-178RESOLUTION NO. 2001-178 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING BID FOR TRUCK HAULING SERVICES FOR ASPHALT CONCRETE, ASPHALT CONCRETE GRINDINGS, AND SPOILS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council sealed bids were received and publicly opened on June 20, 2001 at 11:00 a.m. for the bid for truck hauling services for asphalt concrete, asphalt concrete grindings, and spoils, described in the specifications therefore approved by the City Council on June 6, 2001; and WHEREAS, a sole bid was received from Frank C. Alegre Trucking, and a breakdown of that bid is shown on the attached Bidding Schedule marked Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the bid for truck hauling services for asphalt concrete, asphalt concrete grindings, and spoils is hereby awarded to the sole bidder, Frank C. Alegre Trucking, Inc., of Lodi, at the rate of $90.00 per hour per truck, as shown on Exhibit A attached. Dated: July 18, 2001 ---------------- ---------------- I hereby certify that Resolution No. 2001-178 was passed and adopted by the City Council of the City of Lodi in a regular meeting held July 18, 2001, by the following vote: AYES: COUNCIL MEMBERS — Hitchcock, Howard, Land, Pennino and Mayor Nakanishi NOES. COUNCIL MEMBERS — None I1 -49LN 0W04uI-114& 0 ABSTAIN: COUNCIL MEMBERS — None SUSAN J. BLACKSTON City Clerk 2001-178 LO'd EXH I BITe A BIDDING SCHEDULE I TRUCK HAULING OF ASPHALT CONCRETE PER HOUR ITEM DESCRIPTION QUANTITY COSTIRATE Trucking time including labor and fuel, to pick up 200 Hours at asphalt plant, haul, and delivery of asphalt concrete to job site. Unit per hour represents payment to contractor using as many trucks as necessary as not to cause delays in the paving operation. $_ D ei►�..� QRZ }�" BIDDING SCHEDULE II TRUCK HAULING OF ASPHALT CONCRETE GRINDINGS DURING GRINDING OPERATIONS PER HOUR ITEM DESCRIPTION QUANTITY COST/RATE Trucking costihour including fuel, complete 160 Hours including hauling away and disposing of all grindings, or to City of Lodi stockpile at Century Boulevard west of Stockton Street. Unit per hour represents payment to contractor using as many trucks as necessary as not to cause delays in the grinding operation. BIDDING SCHEDULE III TRUCK HAULING OF ASPHALT CONCRETE GRINDINGS AND SPOILS FROM STOCKPILE PER HOUR ITEM DESCRIPTION QUANTITY COSTIRATE Trucking cost/hour including fuel (unit per hour 160 Hours represents payment to contractor for providing number of trucks designated by the City to haul asphalt concrete grindings), complete, to White Slough Water Pollution Control f=acility or to �, p approved recycling company. Any questions regarding specifications should be directed to Street Contracts Administration Curt Juran in the Street Division at (209) 333-6740. G-SPECS%AsphiliTtickHeuln+rySrvrA%AsP lfOI V02Specs dx 3.2 e9loi TV89 £££ SOZ OSW LPO -1 30 /C��' dbS:£O TO-GT-Lnr