HomeMy WebLinkAboutResolutions - No. 2000-156RESOLUTION NO. 2000-156
A RESOLUTION OF THE LODI CITY COUNCIL ADOPTING
CERTAIN AMENDMENTS TO THE ELECTRIC UTILITY
DEPARTMENT'S RULES AND REGULATIONS
WHEREAS, on March 1, 1989, the City Council adopted Ordinance No. 1447
§13.20.010 of the Lodi Municipal Code, authorizing and allowing adoption by resolution
Rules and Regulations for the Electric Utility Department; and
WHEREAS, on May 18, 1994 the City Council adopted Resolution No. 94-58
adopting by reference, certain Rules and Regulations; and
WHEREAS, amendments to the Electric Utility Department Rules and Regulations
are necessary from time to time.
NOW, THEREFORE, BE IT RESOLVED that the Amendments to the Electric
Utility Department's Rules and Regulations are hereby approved as shown on Exhibit A
attached hereto.
Dated: August 16, 2000
--------------------------------------------------------------------
--------------------------------------------------------------------
I hereby certify that Resolution No. 2000-156 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held August 16, 2000, by the following
vote:
AYES: COUNCIL MEMBERS - Hitchcock, Land, Nakanishi and Mann
(Mayor)
NOES: COUNCIL MEMBERS - None
ABSENT: COUNCIL MEMBERS - None
ABSTAIN: COUNCIL MEMBERS - Pennino
SUSAN J. SLAC ON
City Clerk
2000-156
E.
F
EXHIBIT A
CITY OE LODI
ELECTRIC UTILITY DEPARTMENT
6. a. Mobile home parks for which submetering was permitted prior to
March 31, 1989, and for which electric service is included in the
facilities furnished to their tenants, may employ metering equipment
as a means of retroactively adjusting rental charges for energy
consumption, provided that the portion of such charges allocable to
electricity may not exceed the rates the City would charge if it served
the tenants directly.
b. Expansion of submetering systems in service as of March 31, 1989
will only be permitted in the case of minor rearrangement of pads
within an existing mobile home park. Development of land even
though contiguous to an existing mobile home park shall not qualify
for expansion of an existing submetering system. The City will serve
each such pad directly at the park operator's/owner's expense.
Master Meters and Submeterinq Systems
Master meters and submetering systems are not permitted except for those in
service as of March 31, 1989 and by exception "D5" above.
Testing of Submeters
As a condition of service for submetering, where electric energy is furnished in
accordance with "Df" above, customers using submeters as a basis for charges
for electricity shall submit to the City certification by a meter testing laboratory,
satisfactory to the City, as to the accuracy of the submeters upon request of the
City. As a further condition of service for submetering, the customer shall agree
that he/she will be governed by the City's Rule No 18, Meter Tests and
Adjustment of Bills for Meter Error. As a further condition of service for
submetering, the customer shall agree that the City may inspect and examine
customer's billing procedures from time to time to determine that such service is
made in accordance with this rule.
Effective October 1, 2CCO Page No. 19-3
I
EXHIBIT A I
i- CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
RULE AND REGULATION _
APPENDIX
Schedule of Charges
(Fee Schedule)
Reconnection Charge
(Seal for Non-payment, SNP)
A. During normal business hours
B. After hours
Meter Test Charge
Remote Meter Installation Charge
(Residential Only — Form 2S)
Temporary Service hook-up Charge
(Saw Service)
Vehicle and Equipment Charge:
Backhoe -Loader
Compressor
Crane
Dump Truck
Line -Truck
Pick-up/Van/Flatbed Truck
Service truck
Effective October 1. 20M
$ 33.00
$ 48.00
$ 18.00
$ 140.00
$ 65.00
$ 10.00/hour
$ 5.00/hour
$ 105.00/hour
$ 14.00/hour
$ 15.001hour
$ 3.00/hour
$ 4.00/hour
(END)
Page No. A-1