HomeMy WebLinkAboutResolutions - No. 2000-61RESOLUTION NO. 2000-61
A RESOLUTION OF THE LODI CITY COUNCIL
ESTABLISHING AREA OF BENEFIT AND REIMBURSEABLE
COST FOR BRIDGETOWNE UNIT 4 TURNER ROAD STREET
IMPROVEMENTS
WHEREAS, the Lodi City Council has adopted Ordinance No. 1518, creating and
establishing the authority for imposing and charging Development Impact Mitigation
Fees in the City of Lodi; and
WHEREAS, the Public Works Director has submitted information regarding
actual project cost(s) for the Bridgetowne Unit 4 Turner Road Street Improvements; and
WHEREAS, the relationship between new development(s) and the constructed
facilities is as indicated in the Public Works Director's Memorandum dated April 19,
2000; and
WHEREAS, the Lodi City Council has established Chapter 16.40 of the Lodi
Municipal Code establishing procedures for reimbursements for construction costs; and
WHEREAS, the Lodi City Council has adopted Resolution No. 93-26, updating
the adopted Development Impact Mitigation Fees and Supplemental Specific Area Fees
in accordance with the above mentioned ordinance; and
WHEREAS, various street improvements have been constructed in the Areas of
Benefit identified and shown on Exhibit A, attached hereto and made a part hereof; and
WHEREAS, the total cost of said street improvements has been distributed
among the benefiting properties using a "fair -share" cost allocation methodology based
on acreage and land use; and
WHEREAS, such information was available for public inspection and review
fourteen days prior to the public hearing.
NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that:
FEES:
a) The City Council hereby establishes Area of Benefit Reimbursement
Amounts as shown on Exhibit B, attached hereto and made a part hereof.
b) The Reimbursement Amounts shall be adjusted annually on January 1 by
the Finance Director using the Engineering News Record 20 Cities
Construction Cost as of the end of the year. The initial index shall be that
in effect in March 2000 (6201).
RES2000-63.DOC
2. EFFECTIVE DATE:
a) The Reimbursement Amounts adopted in this Resolution shall take effect
immediately upon adoption.
Dated: April 19, 2000
hereby certify that Resolution No. 2000-61 was passed and adopted by the Lodi
City Council in a regular meeting held April 19, 2000, by the following vote:
AYES: COUNCIL MEMBERS — Hitchcock, Land, Nakanishi, Pennino and
Mann (Mayor)
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
CJac eline L. aylo
Inte City Clerk
2000-61
RES2000-64.00C
CITY OF LODI
PUB LICWORKSDEPART MENT
Exhibit A
VICINITY MAP
Bridgetowne Unit 4
(APN 015-230-43)
Waterford Way
a.
I fol I Y I
"j .� "I"I "� " c• z
rs �o
Inverness Drive Y
O�`� r
An
O
Z
Z
T
U
« Bridgetowne I I may— e �I z
way I z
n "I_� Ifs F Everc
Drive
o v _ � _ � r --I It ►i
U - p
Z
F
Wesibrid a Drive - Z
i U
ILS.O. CA!fay, / W
f Z
' I
Area of Benefit = i o
cLuu _ i I
v)
D Go�q.n Oak
=
Frontage Improvements !
City of Lodi
Publics Works Department
Developmen Bridgetowne, Unit 4 (APN 015-230-43)
Developer: A. Fred Baker
Engineer: Baumbach & Piazza
Cost of Reimbursable Improvements for Turner Road
Item Descriation
Street System
EXHIBIT B
Cost Estimate for
Reimbursement
Percent
Quanti1y Uniit Price eimbursabl
1.
Roadway Excavation
487
CY
S2.50
2.
Compact Original Ground (0.50')
9,630
SF
0.20
3.
Compact Native Material (0.50')
9,630
SF
0.20
4.
Aggregate Base, Class II (.60')
9,630
SF
0.71
5.
Asphalt Concrete, Type B (0.40')
9,630
SF
1.20
Subtotal
Plan Check & Inspection Fees
Total -Street System
Interest from 8199 to 3100
(See calculation below)
Subtotal reimbursable Costs
Reimbursement Preparation Fee
(1% of reimbursable costs, 5500 minumurn )
Total Reimbursable Costs
100
100
100
100
100
Interest Calculations Based on Engineering News Record 20 Cities Construction Cost Index
$25,105.20 x 6201 (ENR Index for March 2000) - $25,105.20 = S453.39
6091 (ENR Index for August 1999)
Tota f
S1,217.50
1,926.00
1,926.00
6,837.30
11, 556.00
S23,46230
S1,642.40
$25,105.20
S453.39
$25,558.59
S26,058.59