Loading...
HomeMy WebLinkAboutResolutions - No. 87-06RESOLUTION NO. 87-06 RESOLUTION CALLING FOR REIMBURSEMENT TO THE CITY OF LODI FOR INSTALLATION OF WATER LINES IN TURNER ROAD WEST OF WOODHAVEN LANE WHEREAS, the City of Lodi heretofore adopted Ordinance No. 1136, which ordinance provides for the reimbursement to developers of utility lines when benefits will result from said installation to other property owners; and WHEREAS, The City of Lodi has installed an extension of the water line in Turner Road west of Woodhaven Lane, in accordance with the City of Lodi Drawing 85D123; and WHEREAS, the extended location of said extension is shown. on Exhibit A attached hereto and by this reference made a part hereof. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lodi that in the event any of the abutting property owners shown on Exhibit A attached hereto develop and/or connect to the water extension line installed as shown on City of Lodi Drawing 85D123 and said connection is made, then the City shall collect from the developers of the abutting property owners, a sum based upon a charge of $20.19 per front foot, which front foot cost has been determined by the Public Works Director to be the proper charge, all in accordance with said Ordinance 1136. Dated: January 7, 1987 I hereby certify that Resolution No. 87-06 was passed and adopted by the City Council of the City of Lodi in a regular meeting held January 7, 1987 by the following vote: Ayes: Council Members - Olson, Pinkerton, Snider, Hinchman, and Reid (Mayor) Noes: Council Members - None Absent: Council Members - None � v � Alice M. Re he City Clerk 87-06 e OA O t3Cm Ac ,.I= X AMI= �02 n o 4 Q y N C � O :' NA 0A n A W3 v 7 7 � O A 7 0 0 e N. LOWER SACRAMENTO RD• wo vDNA vE �. , N N i I n m< 00 a d n m v �01�T1 z 0 CITY OF LODI PUBLIC WORKS DEPARTMENT TURNER ROAD WATERMAIN EXTENSION W/WOODHAUEN LANE COST OF WATER MAIN EXTENSION COST ESTIMATE FOR REIMBURSEMENT 10" Watermain 47 LF @ * $ 25.00 $ 1,175.00 Temporary Blowoff 1 EA @ $550.00 $ 550.00 Sub -total S 1,725.00 10% Engineering and Administration s 172.50 TOTAL S 1,897.50 * Using 8" Prices TOTAL FRONTAGE: Wine & Roses Country Inn 47 LF City Participation 47 LF 94 LF COST OF WATER MAIN EXTENSION/FRONT FOOT $ 1,897.50 = $20.19 94 LF TOTAL REIMBURSEMENT AMOUNT Wine & Roses Country Inn TRNWMRCE/TXTW.01C 1/2($1,897.50) _ $ 948.75