HomeMy WebLinkAboutResolutions - No. 87-06RESOLUTION NO. 87-06
RESOLUTION CALLING FOR REIMBURSEMENT
TO THE CITY OF LODI FOR INSTALLATION OF WATER LINES
IN TURNER ROAD WEST OF WOODHAVEN LANE
WHEREAS, the City of Lodi heretofore adopted Ordinance No. 1136, which
ordinance provides for the reimbursement to developers of utility lines
when benefits will result from said installation to other property owners;
and
WHEREAS, The City of Lodi has installed an extension of the water line
in Turner Road west of Woodhaven Lane, in accordance with the City of Lodi
Drawing 85D123; and
WHEREAS, the extended location of said extension is shown. on Exhibit A
attached hereto and by this reference made a part hereof.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lodi
that in the event any of the abutting property owners shown on Exhibit A
attached hereto develop and/or connect to the water extension line
installed as shown on City of Lodi Drawing 85D123 and said connection is
made, then the City shall collect from the developers of the abutting
property owners, a sum based upon a charge of $20.19 per front foot, which
front foot cost has been determined by the Public Works Director to be the
proper charge, all in accordance with said Ordinance 1136.
Dated: January 7, 1987
I hereby certify that Resolution No. 87-06 was passed and adopted by
the City Council of the City of Lodi in a regular meeting held January
7, 1987 by the following vote:
Ayes: Council Members - Olson, Pinkerton, Snider, Hinchman, and
Reid (Mayor)
Noes: Council Members - None
Absent: Council Members - None
� v �
Alice M. Re he
City Clerk
87-06
e
OA O
t3Cm
Ac ,.I= X
AMI=
�02
n o 4
Q y N
C
� O
:'
NA 0A
n A
W3
v 7
7 � O
A 7
0
0
e
N. LOWER
SACRAMENTO RD• wo vDNA vE �. ,
N N
i I
n m<
00 a
d n
m
v
�01�T1
z 0
CITY OF LODI
PUBLIC WORKS DEPARTMENT
TURNER ROAD WATERMAIN EXTENSION
W/WOODHAUEN LANE
COST OF WATER MAIN EXTENSION
COST ESTIMATE
FOR
REIMBURSEMENT
10" Watermain 47 LF @ * $ 25.00 $ 1,175.00
Temporary Blowoff 1 EA @ $550.00 $ 550.00
Sub -total S 1,725.00
10% Engineering and Administration s 172.50
TOTAL S 1,897.50
* Using 8" Prices
TOTAL FRONTAGE:
Wine & Roses Country Inn 47 LF
City Participation 47 LF
94 LF
COST OF WATER MAIN EXTENSION/FRONT FOOT
$ 1,897.50 = $20.19
94 LF
TOTAL REIMBURSEMENT AMOUNT
Wine & Roses Country Inn
TRNWMRCE/TXTW.01C
1/2($1,897.50) _ $ 948.75