Loading...
HomeMy WebLinkAboutResolutions - No. 88-165RESOLUTION NO. 88-165 A RESOLUTION OF THE LODI CITY COUNCIL ESTABLISHING A STORM DRAINAGE FEE FOR ALL DEVELOPMENTS WITHIN THE CITY OF LODI WHEREAS, the Lodi City Council has adopted Ordinance No. 1440, creating and establishing the authority for imposing and charging a Storm Drainage Fee in the City of Lodi; and WHEREAS, studies have been made and data gathered on the impact of contemplated future development on existing public drainage facilities in the City of Lodi, along with an an analysis of the need for new public drainage facilities and improvements required by new development was conducted, and said ordinance and study set forth the relationship between new development, the needed facilities, and the estimated cost(s) of those improvements. This study, entitled Master Storm Drain System was prepared by the City of Lodi Public Works Department, Engineering Division and is dated November 1988; and WHEREAS, such information was available for public inspection and review fourteen days prior to the public hearing; and WHEREAS, the City Council finds as follows: 1. The purpose of this fee is to finance Master Drainage facilities and to reduce the impacts of flooding and related problems caused by new development, within the City of Lodi; 2. The Storm Drainage Fees collected pursuant to this resolution shall be used to finance only the public facilities described or identified in the project summary of said study, attached hereto as Exhibit 1; 3. After considering available information and data, and the testimony received at the public hearing, the Council approves said study and incorporates such study herein, and further finds that new development within the City of Lodi will generate additional drainage impacts within the impacted area described in the map attached hereto as Exhibit 2 and will contribute to the degradation of the existing drainage facilities and the overall quality of life in that area; 4. There is a need in this described impact area for such drainage facilities which have not been constructed or have been constructed, but new development has not contributed its fair share toward these facility costs and said facilities have been called for in or are consistent with the City of Lodi's General Plan, and/or Master Drainage Plan. -1- 5. The facts and evidence presented establish that there is a reasonable relationship between the need for the described public facilities and the impacts of the types of development described in paragraph 3 above, for which the corresponding fee is charged, and, also there is a reasonable relationship between the fee's use and the type of development for which the fee is charged, as these reasonable relationships or nexus are in more detail described in the studies and data referenced above; 6. It is appropriate to establish the fee on a city-wide basis in order to construct facilities in a timely and cost effective manner and reduce the need for replacement of existing facilities in order to accommodate new development; 7. The cost estimates set forth in Exhibit 1 are reasonable costs estimates for constructing these facilities, and the fees expected to be generated by new development will not exceed the total of such costs; 8. The City has appropriated funds and established a Capital Improvement Program which includes a portion of the projects shown in Exhibit 1; NOW, THEREFORE, IT IS RESOLVED by the Lodi City Council that: 1. DEFINITIONS. (a) "New development" shall mean the filing of a Final Subdivision Map or the construction or reconstruction of any residential, commercial, industrial or other nonresidential improvements, or other improvements such as parking or storage lots or the installation of storm drains. New development shall not include reconstruction of improvements on property for which a Storm Drainage Fee has already been paid except as provided in Section 2(c) of this Resolution. For purposes of this Resolution, "previous Storm Drainage Fee" refers to Master Storm Drainage Fees per Resolution 3618, or per this Resolution. (b) "Gross acre" shall mean the area of the development plus street frontage computed to the centerline of the street or forty (40) feet from the ultimate right-of-way, whichever is less. 2. FEES. STORM DRAINAGE FEE The City Council hereby repeals Resolution No. 3618, "Master Drainage Program Fee", adopted April 5, 1972, and Resolution No. 4394, "Intract Drainage Fee", adopted September 21, 1977, and herein provides for a unified fee structure for such Storm Drainage Fees as follows: -2- (a) For new residential development, the Storm Drainage Fee shall be $3620.00 per gross acre, and (b) For each new commercial or industrial development, the Storm Drainage Fee shall be $4830.00 per gross acre, and (c) For each conversion of residential development to commercial or industrial development, where a Storm Drainage Fee was previously paid, the Storm Drainage Fee shall be $1210.00 per gross acre. The fee shall not apply to City projects, other projects exempted by law, nor to reconstruction of, or additions to single family dwellings. 3. TIME OF PAYMENT. In accordance with Government Code § 53077.5(b), such Storm Drainage fees shall be paid prior to the Final Subdivision Map filing; or, in cases of Parcel Maps or other developments, prior to the issuance of a building or other permit, by all non -exempted new development in this area. The Public Works Director shall determine the type of development, area to be charged, and the corresponding fee in accordance with this Resolution. 4. USE OF FEE. The fee shall be solely used to pay (1) for the described public facilities to be constructed by the City; (2) for reimbursing the City for the developer's fair share of those capital improvements already constructed by the City; or (3) to reimburse developers who have constructed public facilities described in Exhibit 1 attached hereto, where those facilities were beyond that needed to mitigate the impacts of the developer's project(s). 5. FEE REVIEW. The Public Works Director shall, on an annual basis, review the estimated cost of the described capital improvements, the continued need for those improvements, and the reasonable relationship between such need and the impacts of the various types of development pending or anticipated and for which this fee is charged. The Public Works Director shall report his findings to the City Council at a noticed public hearing and recommend any adjustment to this fee or other action as may be needed. 6. JUDICIAL ACTION TO CHALLENGE THIS RESOLUTION. Any judicial action or proceeding to attack, review, set aside, void or annul this resolution shall be brought within 120 days following its adoption. PASSED AND ADOPTED THIS 21st day of December, 1988. -3- I hereby certify that Resolution No. 88-165 was passed and adopted by the City Council of the City of Lodi in a regular meeting held December 21, 1988 by the following vote: Ayes: Council Members - Hinchman, Olson, Reid, Snider and Pinkerton (Mayor) Noes: Council Members - None Absent: Council Members - None 4�. A i ce M. Reimche City Clerk (ATTACHMENTS: 1) Exhibit 1 List of Public Facilities to be financed. 2) Exhibit 2 Map of Impacted Areas. 88-165 -4- CITY OF LODI PUBLIC WORKS DEPARTMENT STORM DRAINAGE FEE STUDY November 1988 1988 SET NO. City or Lodi Master Storm Drain System Capital Improvement Program Introduction Tnis document presents the background material for the expansion and funding of the City's Master Storm Drain System. The report consists of the following: Project Summary - list of projects and their total cost Master Storm Drain System Map - shows service area and projects Project Sheets - individual sheets describing the project with cost estimate Ordinance - the ordinance implementing the storm drain fee Resolution - the resolution setting the actual storm drain fee and administrative procedures Cost Study - drainage design and cost comparison for residential area vs. commercial/industrial area Storm Drain Fee Calculation - summary of figures used to calculate fee Storm Drain Fee Comparison - summary of existing and proposed fee structures with comparison examples 11/16/88 MSDINTRO.XLS City o f Lodi Master Storm Drain System Capital Improvement Program Project Summary Proiect Number Proiect Title Undated Cost for: Jan -89 MS0001 C -Basin Development (Pixley Park) $ 686.000 MS0002 Calaveras St. Storm Drain Lockeford to Turner 119,000 MSD003 Turner Rd./Guild Ave. Storm Drain 211,000 MS0004 Pine St. Storm Drain Guild Ave. to 800' E/Guild 41,000 MS0005 Thurman St. Storm Drain 69.000 MSD006 Vine St. Storm Drain 400' E/Cluff Ave. to Guild Ave. 54,000 MSD007 C -Basin Southeast Area Storm Drain 171,000 MSD008 Evergreen Dr. Storm Drain White Oak Way to 500' N/Turner Rd. 128,000 MS0009 Evergreen Dr. Storm Drain Bayberry Dr to 1400' S/Bayberry 63,000 MSD010 E -Basin Expansion (Westgate Park) 1,059,000 MSD011 F -Basin Development 1.555,000 MS0012 F -Basin North/South Storm Drain 363,000 MS0013 Kettleman Lane Storm Drain East of 6 -Area Trunk Line 147,000 MSD014 Kettleman Lane Storm Drain West of 6 -Area Trunk Line 182,000 MSD015 G -Basin Southeast Area Storm Drain 258.000 MSD016 Orchis Drive Storm Drain West of Sylvan Way 62.000 MSD017 G -Basin Development (future family golf center) 2.661,000 MSD018 Master Storm Drain System Engineering 82,000 MSD019 Lodi Ave. Storm Drain 600' E/Cluff Ave. to Guild Ave. 31,000 Remarks Refer to individual project sheets for details. Total Cost: $ 7,942,000 Exhibit 1 11/16/88 MSDSUM.XLS wEST6ATE CITY OF LODI MASTER STORM DRAIN PUBLIC WORKS DEPARTMENT SYSTEM moll II= rilIN MI1 rim co co .7.1HL-1 GLAVE - LE3END g 1 5 IMP MI mscma • . 1 ORB 1 ../mNE RIvER . a -- go. 1 rh 7 I) 1 1 i I 1 1 1 OOIAv 17 ; I I Id 5 .MSD°I7 BEC -:A -11 L_ �oo HARNEY LANE 1 11111, MEW -erruny &Arc 'OMNI 1 sio0I Ile I 1 I IPINE f).1 r TRUNK LINES C OUTFALLS --- EXISTING — FUTURE BASIN/PARKS El FUTURE EXISTING DRAINAGE AREA(APPROX.) o PUMP STATION MSDOOt ?ea., 7 NurviSE.F.' 1 1 Rol M04. ms -00 msDoo5 a. ao), O 1/0 I/. 3/0 S/2 RILE O woo moo MET Exhibit 2 L 00 I S,O EXTERIOR City of Lodi Capital Improvement Program Proiect Description C -Basin Development (Pixley Park) This project included the expansion and development of the C -Basin according to the Master Plan adopted in 1988 (Dwg 88E003). The estimates are for Master Storm Drain improvements only. Park improvements are estimated separately. The basin will be developed in phases as shown. Excavation will be over a period of approximately 3 years. It is assumed the landscape architect who prepared the Master Plan will be retained to participate in the design of the grading, landscaping and irrigation. Related Proiects estimated Costs Item_ Prelim Eng: EIR: Rights of Way: Easements: Consultants: (Bigler, design concepts, landscaping) Design Eng.: Amount 4,000 Project Number: MSD001 Date of ENR Updated Cost for: Jan -89 Estimate Index_ ENR Index: 4623 Construction: a) Excavation, fence budgeted 88/89 b) Street Improv's 171,000 Jun -88 4525 c) Interior drainage 72,000 Dec -86 4348 d) Control/Pump Str. 140.000 Jun -88 4525 e) Landscape/Irrig. Z84,700 Jun -88 4525 Other: Remarks Design Engineering shown separately if anticipated to be budgeted it is included in construction. Construction includes contract administration & inspection unless $ 175,000 $ 77.000 $ 143.000 $ 291,000 Total Cost: $ 686,000 prior to construction; if not. shown otherwise. 10/29/86 MS0001.XLS C i ty of Lod i Calaveras St. Storm Drain Capital Improvement Program Lockeford to Turner Proiect Description This project includes the installation of a 30" storm drain in Calaveras Street to carry drainage from the Lockeford St. area to the trunk line in Pioneer Drive. Related Projects Project Number: MS0002 Estimated Costs Date of ENR Updated Cost for: Jan -89 Item unt Estimate Index ENR Index: AIL Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: 9,000 Jun -88 4525 $ 9.000 Construction: 108.000 Jun -88 4525 $ 110.000 Other: 72. Total Cost: $ 119,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 10/29/88 MSD002.XLS C i t y or L od i Turner Rd./Guild Ave. Storm Drain Capital Improvement Program Proiect Descrietion This project includes the installation of approximately 650 LF of 60", 800 LF of 54" and 1150 LF of 42" storm drains in Turner Rd. and Guild Ave. plus manholes. The lines will connect to the existing 60" line in Turner Rd. The project will be phased to accomodate adjacent development. Related Proiects Estimated Costs Item Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: Other: Date of ENR Amount Fstimatg Index Project Number: MSD003 Updated Cost for: Jan -89 ENR Index: 4� 206,700 Jun -88 4525 $ 211.000 Total Cost: $ 211,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 10/29/88 MSD003_XLS City of Lodi Pine St. Storm Drain Capital Improvement Program Guild Ave. to 800' E/Guild Proiect Descriotion This project includes the installation of approximately 800 LF of 30" storm drain and manholes. The project will be phased to accomodate adjacent development. Related Projects Project Number: MS0004 }stimated Costs Date of ENR Updated Cost for: Jan -89 Item Amount Estimate Index ENR index:, 4623 Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: 40,600 Jun -88 4525 $ 41,000 Other: Total Cost: $ 41,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction: Construction includes contract administration & inspection unless shown otherwise. 10/29/88 MSD004.XLS City of Lodi Thunman St. Storm Drain Capital Improvement Program Proiect Description This project includes the installation of approximately 1250 LF of 36" storm drain and manholes. The line will extend east from the existing 54" trunk line located in an easement along the extension of Cluff Ave. The project will be phased to accomodate adjacent development. Related Proiects Project Number: MS0005 Estimated Costs Date of ENR Updated Cost for: Jan -89 Item Amount Estimate Index ENR Index: 4623 Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: 68,000 Jun -88 4525 $ 69,000 Other: 1C:s := _ - Total Cost: $ 69,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 10/29/88 MS0005.XLS C i t y or Lod i Vine St. Storm Drain Capital Improvement Program 400' E/Cluff Ave. to Guild Ave. Proiect Descrintion This project includes the installation of approximately 650 LF of 30" storm drain and manholes. The line will extend east from the existing 30" trunk line located in Vine St. east of Ciuff Ave. The project will be phased to accomodate adjacent development. Related Proiect Project Number: MSD006 Estimated Costs Date of ENR Updated Cost for: Jan -89 Item Amount Estimate Index ENR Index: Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: a) 444' E/Cluff to 750' E/Cluff b) 750' E/Cluff to Guild Other: 21,000 Jun -88 4525 32,000 Jun -88 4525 $ 21,000 $ 33,000 Total Cost: $ 54,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 11/16/88 MSD006.XLS City of Lodi C -Basin Southeast Area Storm Drain Capital Improvement Program Proiect Description This project includes the installation of 42" and 30" storm drains and manholes south and east of C -basin (Pixley Park) to Guild Ave. The project will include an inlet structure at the southeast corner of the basin. Exact alignment of the storm drain will depend on the street layout of the area. The project will be phased to accomodate adjacent development. Related Proiects Project Number: M50007 jrstimated Costs. Date of ENR Updated Cost for: Jan -89 Item Amount Estimate Index ,ENR Index: 4623. Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: 157,000 Jun -88 4525 $ 171.000 Other: Total Cost: $ 171,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 10/29/88 NSD007.XLS City or Lod i Evergreen Dr. Storm Drain Capital Improvement Program White Oak Way to 500' 14/Turner Rd. Proiect Description This project includes the installation of 36" and 30" storm drains and manholes north of the Parkwest Subdivision. The line will connect to the existing trunk line in Evergreen Or. to E -Basin (Westgate Park). The project will be phased to accomodate adjacent development. Related Proiects Project Number: MS0008 estimated Costs Date of ENR Updated Cost for: Jan -89 Item Amount Estimate, Index ENR Index: 4623 Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng_: Construction: Other: 125,000 Jun -88 4525 $ 128.000 Total Cost: $ 128,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. - Construction includes contract administration & inspection unless shown otherwise. 10/29/88 MS0008.XLS City of Lodi Evergreen Dr. Storm Drain Capital Improvement Program Bayberry Dr to 1400' S/Bayberry Project Description This project includes the installation of 36" and 30" storm drains and manholes south of the Parkwest Subdivision. The line will connect to the existing trunk line in Evergreen Dr. to E -Basin (Westgate Park). The project will be phased to accomodate adjacent development. Related Prolec Project Number: MSD009 Estimated Costs Date of ENR Updated Cost for: Jan -89 Item Amount Estimate Index ENR Index: Mal Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: 61,300 Jun -88 4525 S 63,000 Other: Total Cost: $ 63,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 10/29/88 MSD009.XLS City or Lodi Capital Improvement Program Protect Description E -Basin Expansion (Westgate Park) This project includes the expansion and development of the E -Basin according to the Master Plan adopted in 1986 (Dwg 88E002). The estimates are for Master Storm Drain improvements only. Park improvements are estimated separately. The basin expansion will be needed when either of the areas north or south of the Parkwest Subdivision develop. It is assumed the excavation will be done at no net cost to the City. Related Protects Project Number: MS0010 Lstimated Costs Date of ENR Updated Cost for: Jan -89 Item Mount :stimate Index ENR Index: Prelim Eng: EIR: Rights of Way: (15.5 Ac @ 530,000/ac) 465,000 Jun -88 4525 $ 475,000 Easements: Consultants: Design Eng.: Construction: a) Fence 62,920 Jun -88 4525 b) Street Improv's 140.400 Jun -88 4525 c) Interior drainage 100.750 Jun -88 4525 d) Control/Pump Str. (existing) e) Landscape/Irrig. 268,060 Jun -88 4525 Other: $ 64.000 $ 143,000 $ 103,000 $ 274,000 Total Cost: $ 1,059,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 10/29/88 MSD010.XLS C i ty of Lodi F -Basin Development Capital Improvement Program Proiect Description This project includes the development of the F -Basin to be located north of Kettleman Lane, west of Lower Sacramento Road. No detailed plan has been adopted for this park. The basin will be'needed when the area west of Lower Sacramento Road between Kettleman Lane and the WID canal develops. It is assumed the excavation will be done at no net cost to the City. Related Proiects Project Number: MS0011 Estimated Costs Date of ENR Updated Cost for: Jan -89 Item Amount Estimate Index ENR Index: 0.2.1 Prelim Eng: $ 5.000 Jun -88 4525 $ 5,000 EIR: Rights of Way: (20 Ac @ 530,000/ac) 600.000 Jun -88 4525 $ 613,000 Easements: Consultants: Design Eng.: Construction: a) Fence 106,340 Jun -88 4525 b) Street Improv's 217,620 Jun -88 4525 c) Interior drainage 130,000 Jun -88 4525 d) Control/Pump Str. 117,000 Jun -88 4525 e) Landscape/Irrig. 345.800 Jun -88 4525 Other: Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. $ 109,000 $ 222.000 $ 133,000 $ 120.000 $ 353,000 Total Cost: $ 1,555,000 11/4/88 MSD011.XLS City cyf Lodi F-8asin North/South Story Drain Capital Improvement Program Proiect Description This project includes the installation of 54", 48", 42" and 30" storm drains and manholes north of F -Basin. Exact alignment and lengths of the storm drains will depend on the street layout of the area. The project will be phased to accomodate adjacent development. Related Projects Project Number: NSD012 1;timated Costs Date of ENR Updated Cost for: Jan -89 Jii Amount Istimate Index FNR Index: Ain Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: 355.000 Jun -88 4525 $ 363,000 Other: • •• Total Cost: $ 363,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 10/29/88 MSD012.XLS City or Lodi Kettleman Lane Storm Drain Capital Improvement Program East of G -Area Trunk Line Proiect Description This project includes the installation of 36" and 30" storm drains and manholes north of Kettleman Lane easterly from the existing 54" trunk line. Exact alignment and lengths of the storm drains will depend on the street layout of the area. The project will be phased to accomodate adjacent development. Related Proiects Project Number: MSD013 Estimated Costs Date of ENR Updated Cost for: Jan -89 Item Amount Fstimate Index FNR Index: Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: 144.000 Jun -88 4525 $ 147,000 Other: • Total Cost: $ 147,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 10/29/88 MSD013.XLS City of Lodi Kettleman Lane Storm Drain Capital Improvement Program Nest of G -Area Trunk Line Proiect Description This project includes the installation of a 30" storm drain and manholes north of Kettleman Lane westerly from the existing 54" trunk line to the future F -Basin. Exact alignment and lengths of the storm drains will depend on the street layout of the area. The project will be phased to accomodate adjacent development. The estimate included jacking pipe across Lower Sacramento Road. Related Proiects Project Number: M5D014 estimated Costs Date of ENR Updated Cost for: Jan -89 Item Amount Estimate Index ENR Index: ALZ1 Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: 178,000 Jun -88 4525 S 182,000 Other: Total Cost: $ 182,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 10/29/86 MSD014_XLS C it y of Lod i G -Basin Southeast Area Storm Drain Capital Improvement Program Proiect Description This project includes the installation of 48" and 36" storm drains and manholes south and east of the G -Basin. A second inlet will be added to the 6 -Basin at the southeast corner. Exact alignment and lengths of the storm drains will depend on the street layout of the area. The project will be phased to accomodate adjacent development. Related Proiects Project Number: MS0015 Estimated Costs Date of ENR Updated Cost for: Jan -89 Item Amount Estimate Index ENR Index: 4623 Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: Other: 252.500 Jun -88 4525 $ 258,000 Total Cost: $ 258,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 10/29/88 MSD015.XL5 City of Lodi Capital Improvement Program Proiect Description Orchis Drive Storm Drain West of Sylvan Way This project includes the installation of 36" and 30" storm drains and manholes west and north from the existing 36" storm drain in Orchis Way. Exact alignment and lengths of the storm drains will depend on the street layout of the area. The project will be phased to accomodate adjacent development. Related Proiects Estimated Costs Date of ENR Item Amount Fstimate Index Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: 60.800 Jun -88 4525 Other: Remarks Design Engineering shown separately if anticipated to be budgeted prior it is included in construction. Construction includes contract administration & inspection unless shown Project Number: MS0016 Updated Cost for: Jan -89 ENR Index: 42., 3 62,000 Total Cost: $ 62,000 to construction; if not, otherwise. 10/29/88 MSD016.XLS City of Lodi' G -Basin Development Capital Improvement Program (future family golf center) Proiect Description This project includes the expansion and development of the 6 -Basin according to the family golf center concept. The estimates are for Master Storm Drain improvements only. Golf course improvements are estimated separately. The basin will be developed in phases as shown. Excavation will be over a period of approximately 3 years with no net cost to the City. It is assumed a golf course architect will be retained to participate in the design of the grading. landscaping and irrigation. Related Projects Project Number: MS0017 Estimated Costs Date of ENR Updated Cost for: Jan -89 Item Amount Lstimatl Index ENR Index: Prelim Eng: EIR: Rights of Way: (24 Ac @ $30,000/ac) 720,000 Jun -88 4525 $ 736.000 Easements: Consultants: (design concepts. 6,000 Jun -88 4525 $ 6,000 landscaping) Design Eng.: Construction: a) Excavation, fence 160,160 Jun -88 4525 $ 164.000 b) Street Improv's 374.400 Jun -88 4525 $ 383.000 c) Interior drainage 334,750 Jun -88 4525 $ 342,000 d) Control/Pump Str. 117,000 Jun -88 4525 $ 120,000 e) Landscape/Irrig. 890,500 Jun -88 4525 $ 910.000 Other: Total Cost: $ 2,661,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction: if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 10/29/88 MSD017.XLS City or Lodi Master Storm Drain System Engineering Capital Improvement Program Proiect Description This project includes engineering and administration of the Master Storm Drain system which consists of planning, system studies, map updating. storm drain fee calculations and updates. This engineering will include development of additional .projects needed to mitigate the impact of infill development and conversion of land to higher runoff developments. The projects may include: o increasing basin capacity o extension of Master Plan trunk lines o improvement of flow regulation/control system as the system grows and becomes more complex Related Proiects Project Number: MSD018 estimated Costs Date of ENR Updated Cost for: Jan -89 Item Amount Estimate Index ENR Index: 4� Prelim Eng: E1R: Rights of Way: Easements: Consultants: Design Eng.: ($4,000/yr x 20 yrs Construction: Other: 80.000 Jun -88 4525 $ 82,000 Total Cost: $ 82,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 11/16/88 MSD018.XL$ City o f Lodi Lodi Ave. Storm Drain Capital Improvement Program 600' E/Cluff Ave. to Guild Ave. Proiect Description This project includes the installation of approximately 600 LF of 30" storm drain and manholes. The line will extend east from the existing 30" trunk line located in Lodi Ave. east of Cluff Ave. Related Proiects Project Number: MSD019 Estimated Costs Date of ENR Updated Cost for: Jan -89 Item Amount Estimate Index ENR Index: 4§Z2 Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: Other: 30,500 Jun -88 4525 $ 31,000 Total Cost: S 31,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 11/16/88 MS0019.XL5