HomeMy WebLinkAboutAgenda Report - August 19, 1998 (64)AGENDA TITLE: Plans and Specifications and Advertisement for Bids for Lodi Multimodal Station
Restoration Project, 24 South Sacramento Street
MEETING DATE: August 19, 1998
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council approve the plans and specifications for the above
project and authorize advertising for bids.
BACKGROUND INFORMATION: This project will relocate the existing train station building, north of
Pine Street, to its new location, south of Pine Street. The building will
then be restored and remodeled to serve as a rail and bus route center
for the City. This project will also improve the site around the remodeled
train station building, build a south annex for drivers' break room, bus stops, a small office under the clock
tower, landscaping, fountain, shade structures, irrigation and site lighting for the entire facility, and a railroad
passenger platform. The small office will be used by the Police Bike Patrol.
Parking is a major part of the project and consists of:
38 stalls south of Pine Street, north of the depot, for patrons and general use.
21 stalls south of the depot behind the tire store which will be designated for employees.
10 stalls along the Walnut Street entrance for patrons and general use.
17 bus parking stalls in a fenced area at the old depot site, between Pine and Elm streets.
23 stalls will be created on Walnut Street between School and Sacramento streets when the
current bus stops are relocated to the station.
The site includes space for a future north annex which could house Greyhound and/or a small concessionaire.
Staff is still working to see if we can accommodate Greyhound in the depot building as an interim measure.
Construction is scheduled to start in fall 1998 and be completed in summer 1999. The City Dial -A -Ride and
GrapeLine dispatch staff and facilities will be relocated to the remodeled train station building and will monitor
the site and waiting room.
The plans and specifications are on file in the Public Works Department.
FUNDING: The money for this project will becoming from State Transit Capital Improvements (TCI),
Measure K, Transportation Development Act (TDA), and Federal Section 9 funds. A request for
appropriation of funds will be made at contract award.
Project Estimate (This Phase): $2,500,000
Budgeted: 1997/98 fiscal year
Planned Bid Opening Date: September 23, 1998
Richard C. Prima, r.
Public Works Director
Prepared by Mark J. Lindseth, Associate Civil Engineer
attachments
cc: Purchasing Officer
San Joaquin Regional Rail Commission
San Joaquin County Council of Governments
APPROVED:
H. ixon Flynn -- City Manager
Cps&a.doc 08/11/98
<0CITY OF •
PUBLIC WORKS DEPARTMENT
I 1
I
SOUTHERN PACIFIC
II 33'.
—
----" II -- -------------------------
u
I II
u
I I
1-—
�� ------�r---------------
II
W :If I
In
BUS PARKING LOT
ELM ST. TO PINE ST.
OLD DEPOT SITE
1
1
RAILROAD COMPANY
MAIN TRACK 1 _
-- — — --- — LSI— —
E I
Spur Line, Paved over or Removed
------------------------------------
— I--�I
--
11
�11
--- - - - - - - I"
—.—_---------------- I II W
1 I II
1 I 11 Z
I II a
II
1 11
I II
EX. PUPLIC PARKING LOT
1"=50'
M:\OPEN\EXHIBITS\MultimodalParking