HomeMy WebLinkAboutResolutions - No. 90-53RESOLUTION NO. 90-53
---------------------
---------------------
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE CONTRACT AND APPROPRIATING FUNDS FOR LOWER SACRAMENTO ROAD
IMPROVEMENTS, 900 FEET SOUTH OF LODI AVENUE TO 400 FEET NORTH OF TEJON STREET,
AND REMOVAL OF STOP SIGNS ON LOWER SACRAMENTO ROAD AT PARK WEST DRIVE
.WHEREAS, in answer to notice duly published in accordance with law and
the order of this City Council, sealed bids were received and publicly opened on
April 4, 1990 at 11:00 a.m. for the contract for Lower Sacramento Road
improvements, 900 feet south of Lodi Avenue to 400 feet north of Tejon Street, and
removal of stop signs on Lower Sacramento Road at Park West Drive, described in the
specifications therefor approved by the City Council on March 21, 1990; and
WHEREAS, only one bid was received for this project from Claude C. Wood
Company, and said bid has been compared, checked, and tabulated and a report thereof
filed with the City Manager as shown on Exhibit A attached hereto; and
WHEREAS, the City Manager recommends that award of the contract for
Lower Sacramento Road improvements, 900 feet south of Lodi Avenue to 400 feet north
of Tejon Street, and removal of stop signs on Lower Sacramento Road at Park West
Drive be made to the sole bidder, Claude C. Wood Company for full depth asphalt
concrete structural section (Alternate B) and Schedule 1, Median Curb and Gutter
South of Elm Street;
NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that award of
contract for Lower Sacramento Road improvements, 900 feet south of Lodi Avenue to
400 feet north of Tejon Street, and removal of stop signs on Lower Sacramento Road
at Park West Drive be and the same is hereby awarded to the sole bidder, Claude C.
Wood Company, for full depth asphalt concrete structural section (Alternate B) and
Schedule 1, Median Curb and Gutter South of Elm Street, in the amount of
$340,974.40; and
BE IT FURTHER RESOLVED, that the City Council hereby authorizes the City
Manager to reappropriate funds for the project.
Dated: April 4, 1990
---------------------
---------------------
I hereby certify that Resolution No. 90-53 was passed and adopted by
the City Council of the City of Lodi in a regular meeting held April 4, 1990 by the
following vote:
Ayes: Council Members - Hinchman, Olson, Pinkerton, Reid and
Snider (Mayor)
Noes: Council Members - None
Absent: Council Members - None
Alice M. Rei theuxA")
City Clerk
90-53
City of Lodi - Public Work Department
Bid Tabulation
1
I
'
I
Projectkower Sacramento Road Improvement
Bids Opened: 1,April 4th, 1990
I
j i
i
t
i
I
I
Engineer's Estimate
Claude C. Wood
Total I
unit)
unit!
Item
Description ! Ouantity 1 Unit !
Pricel
Total
Price!
Total
1
Clearing & Grubbing
1! LS
$10.000.00 !
$10.000.00
$11,000.00
$11,000.00
2
Compact Original Ground
83.2251 SF
1 0.15
12,483.75
0.20
16645.00
3
Pavement Grinding (1.51
3,564; LF
0.751
2,673.00
0.60
2138.40
4
Misc. Concrete Subgrade Comp.
2,750, SF
1 1.001
2,750.00
2.001
5500.00
5
Vertical Curb & Gutter
4471 LF
15,001
6,705.00
12.001
5364.00
6
Median Curb i
1081 LF
1 13.00
1,404.00
10.001
1080.00
7
JAC Curb I
1321 LF
8.001
1,056.00
10.00
1320.00
8
Sidewalk
14221 SF
4.00
6,088.00
6.00
9132.00
9
Signs & Delineators I
1 LS
1,500.00
1,500.00
6,500.00
6500.00
10
Traffic Signal Elm / Lwr Sac i
1; LS
50,000.00
50,000.00
72,000.00
72000.00
11
Pavement Striping & Markers ;
11 LS
3,000.00 ,
3,000.00
8,000.00
8000.00
12
Removal Of Striping &Markers
11 LS
7,500.00 1
7,500.00
8,500.00
8500.00
13
Traffic Control ;
11 LS
2,000.00
2,000.00
13.500.001
13500.00
14
Street Light 1
11 EA
1 2.000.001
2,000.00
1,600.00
1600.00
15
8' Water Main
80� LF
60.001
4,800.00
50.00 j
4000.00
16
Blow -Off i
1I EA
200.001
200.00
550.001
550.00
17
Adjust Water Valve Frame & Cover ;
41 EA
1 300.00 1
1,200.00
400.0077
1600.00
18
12' Storm Drain
29 LF
60.001
1,740.00
200.001
5800.00
19
Drop Inlet Gatch Basin
11 EA
800.001
800.00
850.00
850.00
20
Abandon Drop Inlet Catch Basin
11 EA
1 200.001
200.00
500-001
500.00
21
Adjust Manhole Frame &Cover !
41 EA
315.001
1,250.00
450.001
1800.00
22
Excavation Safety
11 LS
1 500.001
500.00
SOO-001
500.00
I Base Bid Subtotal
$119.859.75
: '
$177,879.40
Structure Section - Alternate A
e
I
1
Roadway Excavation
4.0141 Cy
1 510.00
540,140.00
S11.001
$44,154.00
2
Aggregate Base
3,312 Ton
17.00
56,304.00
15.00 l
49680.00
3
Asphalt Concrete i
1,7911 Ton
34.00
60,894.00
38.001
68058.00
Alternate A Subtotal
$157,338.00
.'
$161,892.00
Structural Section - Alternate B
1
Roadway Excavation f
3,1131 CY
1 $11.00
$34,243.00
$12.001
$37,356.00
2
Asphalt Concrete 1
3.3011 Ton
1 33.50
110,583.50
36.001
118836.00
Alternate B Subtotal
$144,826.50
'•
$156,192.00
� 1
i
Subtotal Base + Alternate A
$277,197.75
'Lower Alternate Cost = _ _ _ _ >
Subtotal Base + Alternate B
$264,686.25
� -
$334,071.40
Schedule 1 - East Side Median (S/Elm)
i
1
Vertical Curb &Gutter I
341; LF
$15.00
$5,115.00
$12.001
$4,092.00
2
Imisc. Concrete Subgrade Comp.
9371 SF I 1.00
937.00
3.00
2.611.00
Schedule 1 Subtotal
$6,052.00
$6,903.00
I j I
Base Subtotal + Lower Alternate + Schedule 1
5270.738.25
I
'
$340,974.40