Loading...
HomeMy WebLinkAboutResolutions - No. 90-53RESOLUTION NO. 90-53 --------------------- --------------------- A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT AND APPROPRIATING FUNDS FOR LOWER SACRAMENTO ROAD IMPROVEMENTS, 900 FEET SOUTH OF LODI AVENUE TO 400 FEET NORTH OF TEJON STREET, AND REMOVAL OF STOP SIGNS ON LOWER SACRAMENTO ROAD AT PARK WEST DRIVE .WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on April 4, 1990 at 11:00 a.m. for the contract for Lower Sacramento Road improvements, 900 feet south of Lodi Avenue to 400 feet north of Tejon Street, and removal of stop signs on Lower Sacramento Road at Park West Drive, described in the specifications therefor approved by the City Council on March 21, 1990; and WHEREAS, only one bid was received for this project from Claude C. Wood Company, and said bid has been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached hereto; and WHEREAS, the City Manager recommends that award of the contract for Lower Sacramento Road improvements, 900 feet south of Lodi Avenue to 400 feet north of Tejon Street, and removal of stop signs on Lower Sacramento Road at Park West Drive be made to the sole bidder, Claude C. Wood Company for full depth asphalt concrete structural section (Alternate B) and Schedule 1, Median Curb and Gutter South of Elm Street; NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that award of contract for Lower Sacramento Road improvements, 900 feet south of Lodi Avenue to 400 feet north of Tejon Street, and removal of stop signs on Lower Sacramento Road at Park West Drive be and the same is hereby awarded to the sole bidder, Claude C. Wood Company, for full depth asphalt concrete structural section (Alternate B) and Schedule 1, Median Curb and Gutter South of Elm Street, in the amount of $340,974.40; and BE IT FURTHER RESOLVED, that the City Council hereby authorizes the City Manager to reappropriate funds for the project. Dated: April 4, 1990 --------------------- --------------------- I hereby certify that Resolution No. 90-53 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 4, 1990 by the following vote: Ayes: Council Members - Hinchman, Olson, Pinkerton, Reid and Snider (Mayor) Noes: Council Members - None Absent: Council Members - None Alice M. Rei theuxA") City Clerk 90-53 City of Lodi - Public Work Department Bid Tabulation 1 I ' I Projectkower Sacramento Road Improvement Bids Opened: 1,April 4th, 1990 I j i i t i I I Engineer's Estimate Claude C. Wood Total I unit) unit! Item Description ! Ouantity 1 Unit ! Pricel Total Price! Total 1 Clearing & Grubbing 1! LS $10.000.00 ! $10.000.00 $11,000.00 $11,000.00 2 Compact Original Ground 83.2251 SF 1 0.15 12,483.75 0.20 16645.00 3 Pavement Grinding (1.51 3,564; LF 0.751 2,673.00 0.60 2138.40 4 Misc. Concrete Subgrade Comp. 2,750, SF 1 1.001 2,750.00 2.001 5500.00 5 Vertical Curb & Gutter 4471 LF 15,001 6,705.00 12.001 5364.00 6 Median Curb i 1081 LF 1 13.00 1,404.00 10.001 1080.00 7 JAC Curb I 1321 LF 8.001 1,056.00 10.00 1320.00 8 Sidewalk 14221 SF 4.00 6,088.00 6.00 9132.00 9 Signs & Delineators I 1 LS 1,500.00 1,500.00 6,500.00 6500.00 10 Traffic Signal Elm / Lwr Sac i 1; LS 50,000.00 50,000.00 72,000.00 72000.00 11 Pavement Striping & Markers ; 11 LS 3,000.00 , 3,000.00 8,000.00 8000.00 12 Removal Of Striping &Markers 11 LS 7,500.00 1 7,500.00 8,500.00 8500.00 13 Traffic Control ; 11 LS 2,000.00 2,000.00 13.500.001 13500.00 14 Street Light 1 11 EA 1 2.000.001 2,000.00 1,600.00 1600.00 15 8' Water Main 80� LF 60.001 4,800.00 50.00 j 4000.00 16 Blow -Off i 1I EA 200.001 200.00 550.001 550.00 17 Adjust Water Valve Frame & Cover ; 41 EA 1 300.00 1 1,200.00 400.0077 1600.00 18 12' Storm Drain 29 LF 60.001 1,740.00 200.001 5800.00 19 Drop Inlet Gatch Basin 11 EA 800.001 800.00 850.00 850.00 20 Abandon Drop Inlet Catch Basin 11 EA 1 200.001 200.00 500-001 500.00 21 Adjust Manhole Frame &Cover ! 41 EA 315.001 1,250.00 450.001 1800.00 22 Excavation Safety 11 LS 1 500.001 500.00 SOO-001 500.00 I Base Bid Subtotal $119.859.75 : ' $177,879.40 Structure Section - Alternate A e I 1 Roadway Excavation 4.0141 Cy 1 510.00 540,140.00 S11.001 $44,154.00 2 Aggregate Base 3,312 Ton 17.00 56,304.00 15.00 l 49680.00 3 Asphalt Concrete i 1,7911 Ton 34.00 60,894.00 38.001 68058.00 Alternate A Subtotal $157,338.00 .' $161,892.00 Structural Section - Alternate B 1 Roadway Excavation f 3,1131 CY 1 $11.00 $34,243.00 $12.001 $37,356.00 2 Asphalt Concrete 1 3.3011 Ton 1 33.50 110,583.50 36.001 118836.00 Alternate B Subtotal $144,826.50 '• $156,192.00 � 1 i Subtotal Base + Alternate A $277,197.75 'Lower Alternate Cost = _ _ _ _ > Subtotal Base + Alternate B $264,686.25 � - $334,071.40 Schedule 1 - East Side Median (S/Elm) i 1 Vertical Curb &Gutter I 341; LF $15.00 $5,115.00 $12.001 $4,092.00 2 Imisc. Concrete Subgrade Comp. 9371 SF I 1.00 937.00 3.00 2.611.00 Schedule 1 Subtotal $6,052.00 $6,903.00 I j I Base Subtotal + Lower Alternate + Schedule 1 5270.738.25 I ' $340,974.40