HomeMy WebLinkAboutResolutions - No. 90-11RESOLUTION NO. 90-11
--------------------
--------------------
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE CONTRACT FOR WHITE SLOUGH WATER POLLUTION CONTROL FACILITY
EXPANSION PROJECT, 12751 NORTH THORNTON ROAD
WHEREAS, in answer to notice duly published in accordance with law and
the order of this City Council, sealed bids were received and publicly opened on
November 1, 1989 at 11:00 a.m. for the contract for White Slough Water Pollution
Control Facility Expansion Project, 12751 North Thornton Road, described in the
specifications therefor approved by the City Council on July 19, 1989; and
WHEREAS, at a noticed special meeting of the City Council held November
21, 1989, the City Council:
1) rejected all bids received on November 1, 1989, since the City had
insufficient funds to award the project;
2) approved a revised set of plans and specifications removing certain
items from the bid document; and
3) authorized readvertising of bids for the project; and
WHEREAS, in answer to notice duly published in accordance with law and
the order of this City Council, sealed bids were received and publicly opened on
December 15, 1989 at 11:00 a.m. for the above described project; and
WHEREAS, based on the findings that the low bidder, Alder Engineering
and Construction, had omissions in their bid which made it nonresponsive, and that
the second lowest bid of F & H Construction Company was approximately $500,000 higher
than the low bid, the City Council at its regular meeting of January 3, 1990 again
rejected all bids and authorized readvertising of bids for the project; and
WHEREAS, in answer to notice duly published in accordance with law and
the order of this City Council, sealed bids were received and publicly opened on
January 16, 1990 at 11:00 a.m. for the above described project, and only two bids
were received. Alder Engineering was again low bidder and F&H Construction submitted
the other bid; and
WHEREAS, recaps of the January 16, 1990 and the December 15, 1989 bids
are both shown on Exhibit A attached hereto; and
WHEREAS, said bids have been compared, checked, and tabulated and a
recap of the base bids with deductive alternates A and D has been filed with the City
Manager as follows:
Resolution No. 90-11
January 17, 1990
Page Two
Base Bid
Deductive Alternate A
Deductive Alternate D
Alder
Engineering
$9,962,114
[242,360]
[38,536]
$9,681,218
Difference $405,782
F&H
Construction
$10,347,000
[212,000)
[48,000]
$10,087,000
WHEREAS, the City Manager recommends that award of the contract for
White Slough Water Pollution Control Facility Expansion Project, 12751 North
Thornton Road (Base Bid with Deductive Alternates A and D), be made to Alder
Engineering and Construction, Salt Lake City, Utah;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lodi
that award of contract for White Slough Water Pollution Control Facility Expansion
Project, 12751 North Thornton Road be and the same is hereby awarded to Alder
Engineering and Construction in the amount of $9,681,218.
Dated: January 17, 1990
-------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------
I hereby certify that Resolution No. 90-11 was passed and adopted by the
City Council of the City of Lodi in a regular meeting held January 17, 1990 by the
following vote:
Ayes: Council Members - Hinchman, Olson, Reid and Snider
(Mayor)
Noes: Council Members - Pinkerton
Absent: Council Members - None
�L
�—nni
fe M. Perrin
Deputy City Clerk
for Alice M. Reimche
City Clerk
90-11
RES9011/TXTA.02J
T?
I LP"T_p 711 A":,
City of Lodi
White Slough
Water Pollution Control
Facility Expansion
Bid Tabulations
Bid Opening: 11:00 am, Dec. 15,1989
Carnegie Forum, Lodi CA
Rebid
Deductive Alternates
Bidder
Base Bid S -.1. Opwep Ccr , E. Siorape Pt)-=
C 1".epcon Sys.
O. Free. Cont!V. IE. Pa m. Ex. Erwn.F. ACC Oays,
Alder Engineering & Const.
S 9,933,405. • 227,294. 326,671.
152.108.
92,468.
5,000. 0.
Salt Lake City, UT
. .......... ..
... . ... .....
..
F&H Construction
S 10,397.000. • 181.000.: 212,370.
247,600.
45,000.
-
4,494. 0.
Stockton, CA
........ . .....
............... ..........
Kaweah Construction
S 10,650,000. i 200,000.1 320,000.1
210,000.:
40,000.
3,000.1 0.
Fresno, CA
idid not rebid
Dan Caputo Co.
S 10,667,000. 296,000.: 98,500.1
186,000.
44,000.'
30,000.1 30,000.
San Jose, CA
;did not rebid
Gateway/Mark
S10,796,500.' 240,417. 222,969.•
136,461.'
53,052.:
3,559.: 30,000.
Sacramento, CA
idid not rebid
C.W. Roen Construction
S 10,977,400. 257,000. 215,000.;
285.000.'
43,000.1
25,000.1 1,000.
Danville, CA
idid not rebid
Engineer's Estimate
S 10,700,000.
T?