Loading...
HomeMy WebLinkAboutAgenda Report - January 15, 1997 (65)5 kz.. CITY OF LODI COUNCIL COMMUNICATION 5-� AGENDA TITLE: Contract Change Orders for Well 4R Water Storage Tank and Pump Station Project, 1215 Thurman Street MEETING DATE: January 15, 1997 PREPARED BY: Public Works Director RECOMMENDED ACTION: This item is for information only. No action is required. BACKGROUND INFORMATION: In accordance with the Contract Change Order Policy, the City Council is being informed of change orders approved by the City Manager for this project since the November 20, 1996 City Council meeting. The change orders for this project are shown on the attached summary. The original contract for this project was $1,222,300.00. The total cost of change orders to date is $105,040.65, or approximately 8.6 percent of the contract. The project is approximately 41 percent complete. The summary, showing descriptions of the change orders, is very brief; however, detailed below is a more complete description of the work involved in the change orders over $1,500.00. More detailed descriptions and backup information for all of the change orders are available in the Public Works office. Change Order No. 9 - Upgrading of the chlorination system. It was determined that the system originally specified would not meet the cities needs. ($61,144.79) Change Order No. 10 - This change order covers the additional cost of changing the paint at the steel water tank to an epoxy coating system. The epoxy coating system will last longer and require less maintenance. ($7,323.06) FUNDING: There are sufficient funds budgeted in the Well 4R Water Storage Tank and Pump Station account to cover these change orders. ac L. Ronsko Publi Works Director Prepared by Gary Wiman, Construction Manager JLR/GRW/Im Attachment cc: City Engineer Construction Manager AITROVru: H. Dixon Flynn Aily fianager CCCO2.DOC 01/06/97 CITY OF LODI CHANGE ORDER LOG PROJECT: WELL NO. 411 WATER STORAGE TANK AND PUMP STATION CONTRACTOR: CONCO WEST Inc. CONSULTANT: MONTGOMERY WATSON AMERICAS, INC. CO NUMBER DESCRIPTION OF CHANGE NEG COST 1 RFI 2001 Add electrical grounding grid to site 35,587.39 2 JRFI 7 Delete PVC rigid conduit requirement CREDIT -2,600.00 3 RFI 2002 Delete water softener at pump building CREDIT -7,754.00 4 RFI 18 Add thrust blocks at underground piping 1,092.15 5 RFI 2003 Building structural changes required by Building Dept. 7,410.21 6 Added work at existing manholes and piping due to unknown conditions 833.84 7 16" Storm drain pipe conflict with 8"backwash pipe line 648.94 8 Add plumbing waste line trap rimers 1,354.27 9 Chlorine Generation System 61,144.79 10 _Epoxy Coating System at Steel Water Tank 7,323.06 Change Order Total To Date 105,040.65 Original Contract 1,222,300.00 Total Contract To Date 1,327,340.65 CHANGE ORDER PERCENT OF ORIGINAL CONTRACT 8.60% pcolog.xls:1/6/97