Loading...
HomeMy WebLinkAboutResolutions - No. 91-84RESOLUTION NO. 91-84 A RESOLUTION OF THE LODI CITY COUNCIL REJECTING ALL BIDS RECEIVED FOR THE CONTRACT FOR TREE TRIMMING AT LODI LAKE PARK, APPROVING AMENDED SPECIFICATIONS, AND AUTHORIZING READVERTISEMENT FOR BIDS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on April 19, 1991 at 11:00 a.m. for the contract for tree trimming at Lodi Lake Park, described in the specifications therefor approved by the City Council on April 3, 1991; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached hereto; and WHEREAS, due to confusion among the bidders regarding the size of crew, and discrepancy between the bid proposal and the contract document; NOW, THEREFORE, BE IT RESOLVED BY THE LODI CITY COUNCIL, that all bids for the tree trimming contract at Lodi Lake Park are hereby rejected, the amended specifications for same are hereby approved, and the readvertisement for bids is hereby authorized. Dated: May 15, 1991 I hereby certify that Resolution No. 91-84 was passed and adopted by the City Council of the City of Lodi in a regular meeting held May 15, 1991 by the following vote: Ayes: Council Members - Pennino, Pinkerton, Sieglock, Snider and Hinchman (Mayor) Noes: Council Members - None Absent: Council Members - None inifer Perrin Deputy City Clerk for Alice M. Reimche City Clerk 91-84 RES9184/TXTA.02J ,- Tree Trimming Bids for Lodi Lake Bid Opening April 19, 1991 11:00 01 City Hall Grover Landscaping Modesto, CA Bidders Bond of 105o # Description 1 Helper/Groundman 2 Tree Trimmer 3 Crew Leader 4 Chipper 5 Dump Truck 6 Aerial boom with dump truck 7 Percent to be added to above labor rates for overhead 8 Percent to be added to above labor rates for overtime including overhead. EXHOT A Price per Hour Straight Time 57.61/hr S 11.01/hr 511.01/hr 86.88/hr $8.94/hr S 16.50/hr 144.00% 267.00% t - i 1� r' )1 LANDSCAPING INC. 2825 KIERNAN • MODES 10. C' 9535o (209) 545-4-401 Summary of Bid for Lodi Lake Tree Trimming Since Specification Section 2.1400 Bid Evaluation =ys: The lowest responsible bidder will be determined, .:s follows: a. Contract price for bid evaluation purposes will be the hourly bid price. Note, the crew bid price to be all inclusive, i.e. labor, overheads, supervision, equipment, disposal costs, fees, licenses, etc., all to be included; and Specification Section 6.10 Crews and Equipment a. 'Street Crew' consisting of two or three crew per discretion of Contractor and equipped with chipper, insulated aerial boom with dump body and incidental power and hand tools. Our crew bid price is $68.83/hour The Page 3.2 Tree Trimming lists our respective prices per hour for after hour emergency work figuring it at 1 1/2 times labor hourly rate. If Double Time work is required the overhead % add on rate is 388% The Bid Proposal sheet that apparently is asking for a total lump sum containing our projected total cost over a several year period to prune all of the trees in the park. This lump sum is our estimation for budgetary purposes. - Grover Landscaping, Inc. Mark S. Grover, President Certified Arborist #242 I/ -i9-9/ Date Tree Trimming Bids for Lodi Lake Bid Opening April 19, 1991 11:00 PNI City Hall Town and Country Tree Service Stockton, CA Cashiers Check #22343 $2,500.00 7 Description 1 Helper/Groundman 2 Tree Trimmer 3 Crew Leader 4 Chipper Dump Truck 6 Aerial boom with dump truck 7 Percent to be added to above labor rates for overhead 8 Percent to be added to above labor rates for overtime including overhead. Price per Hour Straiaht Time 540.00/hr 560.00/hr S60.00/hr 520.00/hr 520.00/hr S40.00/hr 10.00% 10.00% Tree Trimming Bids for Lodi Lake Bid Opening April 19, 1991 11:00 VLM City Hall Asplundh Rocklin, CA Bidders Bond of $2,00.00 # Description 1 Helper/Groundman 2 Tree Trimmer 3 Crew Leader 4 Chipper 5 Dump Truck 6 Aerial boom with dump truck 7 Percent to be added to above labor rates for overhead 8 Percent to be added to above labor rates for overtime including overhead. Price per Hour Straight Time 510.25/hr 515.05/hr S16.70/hr 52.75/hr 55.00/hr S9.90/hr 74.57 0 114.577a Tree Trimming Bids for Lodi Lake Bid Opening April 19, 1991 11:00 AM 1, City Ball Berndt Tree Service Lodi, CA Cashiers Check #222131 52,500.00 # Description 1 Helper/ Ground man 2 Tree Trimmer 3 Crew Leader 4 Chipper 5 Dump Truck 6 Aerial boom with dump truck 7 Percent to be added to above labor rates for overhead 8 Percent to be added to above labor rates for overtime including overhead. Price per flour Straight Time 55.00/hr 510.00/hr S10.00/hr S10.00/hr 53.00/hr S25.00/hr 15.00:"0 20.00%