HomeMy WebLinkAboutResolutions - No. 93-134RESOLUTION NO. 93-134 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING THE 1993/94 CAPITAL IMPROVEMENT PROGRAM AND FISCAL YEAR 1993/94 APPROPRIATIONS BE IT RESOLVED, that the Lodi City Council does hereby approve the 1993/94 Capital Improvement Program and Fiscal Year 1993/94 appropriations, as described in a written report dated September 1993, a copy of which is on file in the office of the City Clerk, and as summarized in Exhbit A attached hereto; and BE IT FURTHER RESOLVED, upon adoption by Council, staff will make the appropriate editorial changes to the Report and prepare new copies for the public, the City Council and for staff. Dated: November 3, 1993 I hereby certify that Resolution No. 93-134 was passed and adopted by the Lodi City Council in a regular meeting held November 3, 1993 by the following vote: Ayes: Council Members - Mann, Sieglock, Snider and Pennino (Mayor) Noes: Council Members - Davenport Absent: Council Members - None J��� Jennifer M. Perrin � City Clerk 93-134 RES93134/TXTA.02J Exhibit A Recommended Actions on the Capital Improvement Program General City Facilities • Approve the General City Facilities Capital Improvement Program (Appendix B); and, • Appropriate funds as shown in Appendix B for the 1993/94 fiscal year. Storm Drainage Streets • Approve the Storm Drain Master Plan; • Approve the Storm Drain Capital Improvement Program (Appendix B); • Appropriate funds as shown in Appendix B for the 1993/94 fiscal year; • Approve closing the In -Tract Drainage Account to the Drainage Fund; and, • Direct staff to prepare a report on possible funding sources and organization for the drainage function (i.e. separate utility, part of wastewater, other). • Approve the amended Street Master Plan; • Approve the Streets Capital Improvement Program (Appendix B); • Appropriate funds and close projects as shown in Appendix B for the 1993/94 fiscal year; • Authorize the Public Works Director to make non-binding applications for additional funds for future year projects; • Authorize the Public Works Director to prepare plans and specifications and obtain bids on the approved "Pavement Rehabilitation Projects"; and, • Direct staff to prepare a report on the possible establishment of a revolving fund for street improvements. Wastewater . Approve the Wastewater Master Plan; Water • Approve the Wastewater Capital Improvement Program (Appendix B); and, • Appropriate funds as shown in Appendix B for the 1993/94 fiscal year. • Approve the Water Master Plan; • Approve the Water Capital Improvement Program (Appendix B); • Appropriate funds as shown in Appendix B for the 1993/94 fiscal year; • Approve closing the Fire Protection Reserve Account to the Water Capital Outlay Fund; and, • Direct staff to prepare a comprehensive report on the status of the water utility, addressing long term capital and operating needs and funding. CIP CC.00C 10126/93 Appendix A Capital Improvement Program Fund Balances Note: Portions of revenue transferred to operating accounts are not shown below Fiscal Year Fund Number Code FY91 /92 FY92 /93 FY93 /94 FY94 /95 FY95 /96 FY96 /97 1997/02 200207 Capital Outlay Reserve 121.0 C Beg. Balance: approx. 93/94 interest added: (168) (168) (439) (1,970) (2,092) (2,731) Revenue: 0 0 0 0 0 0 Project Costs: 0 271 1,532 121 640 569 End Balance: (233) (1 6a) (439) (1,970) (2,092) (2,731) (3,301) Community Development Block Grant 45.x BG Beg. Balance: 0 410 909 1,409 3,906 Revenue: 500 500 500 500 2,498 2,498 Project Costs: 499 90 0 0 0 0 End Balance: 410 909 1,409 3,906 6,404 Hutchins Street Square - Capital 120.1 HS Beg. Balance: (48) (48) (48) (48) (48) (48) Revenue: 0 0 0 0 0 0 Project Costs: 0 0 0 0 0 0 End Balance: (48) (48) (48) (48) (48) (48) (48) Equipment 12.0 Eq Beg. Balance: 176 176 176 176 176 176 Revenue: 153 0 0 0 0 0 Project Costs: 153 0 0 0 0 0 End Balance: 153 176 176 176 176 176 176 Hotel/Motel Tax 134.0 H Beg. Balance: 320 320 320 320 320 320 Revenue: 0 0 0 0 0 0 Project Costs: 0 0 0 0 0 0 End Balance; 320 320 320 320 320 320 320 Lodi Lake Capital Improvement 122.0 LL Beg. Balance: 77 128 181 234 286 549 Revenue: 53 53 53 53 263 263 Project Costs: 2 0 0 0 0 0 End Balance: 77 128 181 234 286 549 612 General City Facilities Dev. Imp. Mitigation 60.8 GFI (long term revenue not updated) Beg. Balance: 0 (15) (59) 328 (164) (103) (420) (3,900) Revenue: 15 36 402 635 365 238 1,190 1,190 Project Costs: 30 80 15 1,127 304 554 4,671 1,806 End Balance: (15) (59) 328 (164) (103) (420) (3,900) (4,516) Parks & Recreation Dev. Impact Mitigation 60.7 PRI (long term revenue not updated) Beg. Balance: 0 10 (32) 682 845 (1,861) (2,317) (5,474) Revenue: 10 25 755 1,193 686 447 2,235 2,235 Project Costs: 0 67 41 1,030 3,392 903 5,392 8,040 End Balance: 10 (32) 682 845 (1,861) (2,317) (5,474) (11,279) Appendix A - Page 1 o(4 Draft 10/25193 CIP PROG.XLS ApnentGx A Capital Improvement Program Fund Balances Note: Portions of revenue transferred to operating accounts are not shown below Appendix A - Page 2 of 4 Draft 10/25/93 CIP PROG.XLS Fiscal Year Fund Number Code FY91 /92 FY92 /93 FY93 /94 FY94 /95 FY95 /96 FY96 /97 1997/02 200207 Fire Development Impact Mitigation 60.6 FI (long term revenue not updated) Beg. Balance: 0 4 24 37 58 34 (920) (859) Revenue: 4 20 33 52 30 19 95 95 Project Costs: 0 0 20 31 54 973 34 31 End Balance: 4 24 37 58 34 (920) (859) (796) Police Development Impact Mitigation 60.5 PI (long term revenue not updated) Beg. Balance: 0 11 78 149 234 273 185 (1,789) Revenue: 11 67 71 110 64 41 205 205 Project Costs: 0 0 0 25 25 129 2,179 113 End Balance: 11 78 149 234 273 185 (1,789) (1,697) Appendix A - Page 2 of 4 Draft 10/25/93 CIP PROG.XLS Appendix A Capital Improvement Program Fund Balances Note: Portions of revenue transferred to operating accounts are not shown below Fiscal Year Fund Number Code FY91 /92 FY92 /93 FY93 /94 FY94 /95 FY95 /96 FY96197 1997102 200207 Streets - Trans. Dev. Act (less transit) 124.0 TD Beg. Balance: 63 (14) (11) (11) (11) (11) Revenue: 3 3 0 0 0 0 Project Costs: 80 0 0 0 0 0 End Balance: 63 (14) (11) (11) (11) (11) (11) Streets - Gas Tax 2106 & 2107 33, 32 TG Beg. Balance: 221 117 2 2 2 2 Revenue: (11) 0 0 0 0 0 Project Costs: 92 115 0 0 0 0 End Balance: 221 117 2 2 2 2 2 Streets - Federal 126.0 TF Beg. Balance: 0 0 0 0 0 0 Revenue: 27 638 0 0 0 0 Project Costs: 27 638 0 0 0 0 End Balance: 0 0 0 0 0 0 Streets - Gas Tax Prop. 111(2105) 36.0 TP incl. closeouts & transfers per CIP summary Beg. Balance: 101 385 550 666 523 133 Revenue: 289 289 289 289 1,447 1,447 Project Costs: 5 124 174 433 1,838 1,580 End Balance: 38 385 550 666 523 133 0 Streets - Measure K 38.0 TK Beg. Balance: 687 663 400 (93) (82) (11) Revenue: 462 475 1,251 1,200 2,500 2,500 Project Costs: 486 738 1,744 1,189 2,429 2,617 End Balance: 687 663 400 (93) (82) (11) (128) Streets - Bicycle & Pedestrian 128.0 TB Beg. Balance: (12) 1 2 2 2 3 Revenue: 20 20 20 20 101 101 Project Costs: 7 20 20 20 100 100 End Balance: (8) 1 2 2 2 3 4 Streets - State/Local Partnership 37.0 TL Beg. Balance: 0 0 0 0 0 0 Revenue: 103 46 0 0 0 0 Project Costs: 103 46 0 0 0 0 End Balance: 0 0 0 0 0 0 0 Streets Development Impact Mitigation 60.4 TI (long term revenue not updated) Beg. Balance: 0 90 45 290 395 (717) (3,386) (6,741) Revenue: 181 326 400 545 313 204 1,020 1,020 Project Costs: 91 372 155 439 1,425 2,873 4,375 5,530 End Balance: 90 45 290 395 (717) (3,386) (6,741) (11,251) Appendix A - Page 3 of 4 Draft 10/25/93 CIP PROG.Xi-S Capital Improvement Program Fund Balances Fund Number Code Note: Portions of revenue transferred to operating accounts are not shown below Fiscal Year FY91 /92 FY92 /93 FY93 /94 FY94 /95 FY95 /96 Storm Drain Development Imp. Mitigation 60.3 DI (long term revenue not updated) 232 (219) Beg. Balance: 221 460 499 4,800 Revenue: 270 300 613 981 Project Costs: 32 261 595 918 End Balance: 460 499 516 Storm Drain Fund 123.0 SD 550 440 55 Beg. Balance: 0 821 0 Revenue: 110 19 110 Project Costs: 50 70 550 End Balance: 569 770 Sewer Utility Captial Outlay 17.1 SC 447 392 117 Beg. Balance: Cash: 707 0 Revenue: 55 0 55 Project Costs: 275 150 447 End Balance: 117 557 Wastewater Capital Reserve 17.2S2 1,125 1,056 959 Beg. Balance: Cash: 2,093 634 Revenue: 518 127 196 Project Costs: 990 450 1,125 End Balance: 959 1,770 Sewer Dev. Impact Mitigation 60.2 SI (long term revenue not updated) (548) (743) Beg. Balance: 0 37 83 205 Revenue: 37 47 86 345 Project Costs: 0 1 90 (244) End Balance: 37 83 79 Water Capital Outlay 18.1 WC incl. closeouts & transfers per CIP summary (557) Beg. Balance: 481 514 481 Revenue: 2,404 481 439 Project Costs: 2,289 499 (458) End Balance: 256 495 Water Development Impact Mitigation 60.1 WI (long term revenue not updated) (163) (1,118) Beg. Balance: 0 6 196 213 Revenue: 25 251 450 912 Project Costs: 19 61 428 421 End Balance: 6 196 218 Water - DBCP (State Loan) 18.1 WS (assumed loan amounts will match expenditures) 0 Beg. Balance: 0 0 0 Revenue: 0 1,068 0 Project Costs: 0 1,068 End Balance: 0 Appendix A FY96 /97 1997/02 200207 516 744 918 232 (219) 788 453 295 4,800 6,667 560 279 981 5,251 6,673 744 918 232 (219) (225) 770 660 550 440 55 0 0 0 0 0 110 110 110 385 50 660 550 440 55 5 557 502 447 392 117 0 0 0 0 0 55 55 55 275 275 502 447 392 117 (158) 1,770 1,379 1,125 1,056 959 127 127 127 634 634 518 381 196 731 990 1,379 1,125 1,056 959 603 79 188 (244) (548) (743) 109 62 41 205 1,095 0 494 345 401 392 188 (244) (548) (743) (40) 495 (458) (416) (557) (442) 481 481 481 2,404 2,404 1,434 439 621 2,289 2,281 (458) (416) (557) (442) (318) 218 421 (163) (1,118) (1,441) 568 327 213 3,500 3,913 365 912 1,168 3,823 3,584 421 (163) (1,118) (1,441) (1,112) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Appendix A - Page 4 of 4 Draft 10/25/93 CIP PROG.XLS Appendix I3 DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP A xopriations Annual Cost Incr. Factor: 1.0 Cost not uodated Estimated Cost as of I Work In Progre ($000) 1 PROJECT YEAR COST ($000) & Fund Code (5 year blocks) Project July 19931 Approp. 6 /93 :xp./Enc. 6/9: FY93 /94 FY94 /95 FY95 /96 FY96 /97 1997/02 2002 /07! Remarks/Account p General City Facilities Miscellaneous Public Facilities Civic Center Complex City Hall Expansion Architectural Services 263,000 Annex Improvements 270,000 Temporary Office Improvements 671,000 City Hall Remodel 1,391,000 60% of project = Ramped Entry to City Hall 90,000. 90 BG $1,611,000 Total: $2,685,000 1,772 C 150 C 823 GFI 121.0-350.61 Public Safety Building Expansion (See Police) Municipal Service Center Garage Expansion Electric Utility share 323,000 323 EU Wastewater Share 323,000 323 SI Water Share 323,000 323 Wi Total: $969,000 Public Works Office Building Expansion Wastewater Share 438,500 439 St Water Share 438,500 439 WI Total: $877,000 Public Works Covered Storage Wastewater Share 260,500 261 SI Water Share 260,500 261 WI Total: $521,000 Hutchins Street Square Auditorium, Multipurpose Bldg & Rotunda 8,500,000 52 HS HS 120.1-350.82 Auto Shop (Camp Hutchinsrrokay Players) 1,500,000 Equipment Purchases Note: 1993/94 equipment already approved by City Council) Misc. New Equipment - 1993/94 24 Eq Misc. Replacement Equipment - 1993/94 127 Eq Public Works - Trucks t~$ft 58 GFI 58 GFI 58 GF 288 GF 288 GF Public Works Sedans & Pickups y N : 55 GFI 55 GFI 55 GF 275 GF 275 GF Public Works -Air Comp., mist eq.u> ;; ni 7 GFI 7 GFI 7 GF 35 GF 35 GF q. Public Works - Office EX. :?` `: y r M,. 5 GFI 5 GFI 5 GF 25 GF 25 GF Public Works - Local Area Net. @MSC 18,000 2 Eq " add'I funding 2 EU "add'Ifunding 4 WC "add'Ifunding i i i 5 SC Appendix B - Page 1 of 18 rtt 1U/Z5/93 (AF'_F KL)U.AL5 Appendix B DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr. Factor: 1.0 Cost not updated Estimated Cost as of Project July 1993 Work In Progress ($000) I Approp. 6 193 JE.p.lEn.. 6193 PROJECT YEAR COST ($000) & Fund Code FY93 /94 FY94 /95 FY95 /96 FY96 /97 (5 year blocks) 1997/02 2002/071 Remarks/Account # add'] funding'12 TD TO 5 TO 124,0-013.69 Finance -Office Eq. : -;p - ogg:i.j 14 GFI 14 GFI 14 GFI 70 GFI 70 GFI Finance - Computer upgrade 6 GFI 6 GFI 6 GFI 28 GFI 28 GFI Library Expansion 2,900 GFI Miscellaneous Projects/Studies (Note: 1993/94 CDBG projects already approved by City Council) HUD Grant Admin 21 BG 5 BG 22 BG 45.7,8-301.01 Fair Housing Program 14 BG 4 BG 10 BG 45.4.6,7,8-301.02 Code Enforcement 24 BG BG 45.6,7-301.03 Housing Rehabilitation 260 BG 90 BG 225 BG 45.7.8-350.50 Senior Citizen Transp. Assistance/Dial -A- Ride 11 BG 4 BG 5 BG 45.6,7,8-704.01 Sr. Service Agency Kitchen 17 BG 17 BG 24 BG 45.7,8-705.01 Hotel Lodi Rehabilitation 150 BG BG 45.6-350.80 Good Samaritan Food Bank 3 BG 45.8-360.61 Women's Center Site Acquisition 50 BG 45.8-360.60 East Side Task Force 5 BG 45.8-360.62 Gang Task Force 5 BG 45.8-360.63 Graffiti Abatement Program 11 H 10 H Now in Street Op. Budget Development Impact Fee Program Admin. 15 GFI 160 GFI 160 GFI 160 GFI 800 GFI 800 GFI interfund xfer in Op. budget General Plan UpdatesW. W.- 250 GFI 250 GFI Automated Fuel System rough estimate On-line Project/Accounting System rough estimate Parking Lots Parking Lot - 107/109 N. School St. Property Acquisition Construction 346 N. Stockton Parking Lot - 217 E. Lockeford St. Property Acquisition NX 213 GFI Construction Parking Lot - N.E. Cor. Lockeford Stocktoff-ti ft: ­ Construction 72 GFI Contingencies Special Allocations (COR) 1,300,000 100 C 100 C 100 C 500 C 500 C Misc. Public Facilities Total: 24,767.6551 1 2,344 289 534 1,317 1,281 1,623 5,692 2,306 All above projects Appendix B - Page 2 of 18 Draft 10/25/93 CIP_PRO(3.XLS Appendix B DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr, Factor: 1.0 Cost not updated Estimated Cost as of Work In Progress ($000) PROJECT YEAR COST ($000) & Fund Code (5 year blocks) Project July 1993 Approp. 6 /93 1 Exp./Enc. 6/93 FY93 /94 FY94 /95 FY95 /96 FY96 /971 1997 /021 2002/071 RemarkslAccount# Parks & Recreation (Parks & Recreation not updated except Block Grant and other work -in -progress projects due to pending Master Plan adoption) Parks & Recreation Corporation Yard Admin. Building Addition &Remodel •',•.?:;�4fF�:pp partial funding 45% 129 PRI 1,160 PRI partial funding 55% 158 C 1,418 C Fuel Tanks & Dispensers 33 C 33 C Armory Park Backstop & Dugouts 1 C C ........................ Press Box & Bleacher Wall €atni Upgrade Elect. & Sports Lighting System SR Parking Lot [)t]{ ............... ter::::... Blakely Park Park Restroom Rehab. - Construction 7 BG 4 BG Park Lighting Candy Cane Park DeBenedetti Park (G -Basin) Park Improvements 318,000 318 Emerson Park Restroom Rehabilitation (ADA) 56,176 56 BG Glaves Park Hale Park Park Improvements 546 BG 544 BG Parking Lot Expansion ... ,N ,,.'.:.:5..,.,.' Community Building Kofu Park Handicap Walkway 8 BG 3 BG Enlarge Bleacher Area Install New Playground EquipmentA°v'`{lt3 Backstop & Fencing @ Small Diamond Group Picnic Facilities:`' tDp Upgrade Entrance (Design) Sac±gS Lawrence Park/Zupo Field Restroom Modifications for ADA 44,090 44 BG Upgrade Electrical & Sports Lighting ►�fjp Aluminum Seats/Planking Replacement;^s+ aper 1987 Master Plan 1121.0-760.09 1121.0-760.68 No plan, preliminary estimate 45.5-760.52 45.8-760.64 45.4,5,6,7-760.60 45.7-760.62 45.8-760.63 Appendix B - Page 3 of 18 Draft 10/25/93 CIP PROG,XLS Appendix 13 DRAFT - City of Lodi - Capital Improvement Program and 1993194 CIP Appropriations Annual Cost Incr. Factor: 1.0 -,"Cost not updated ... Estimated Cost as of .... Project July 1993 Work In Progress ($000) Approp. 6 /93 Exp./Enc. 6193 PROJECT YEAR COST ($000) & Fund Code (5 year blocks) FY93 /94 FY94 /95 FY95 /96 FY96 197 1997 Y02 2002 /071 Remarks/Account # Lodi Lake Park Master Plan Improvements per Bigler Plan & Estimates Nature Areas Park Improvements Central Park Impr. 141 Peninsula Park West 13 Acres 183 PRI 1,644 PRI Lake Improvements ................. Total: $3.814,000 Miscellaneous Improvements Lake/River Signs 1 LL LL 121.0-760.53 Boat Ramp Grant Application 46 LL LL 121.0-760.54 RV Dump Station Paving 5 LL 5 LL 121.0-760.73 Picnic Facilities - 1988 State Bond 83 65 44.3-760,12 Silt Removal in Lake 10 LL LL 121.0-760.77 Picnic Tables (7/93 Spec. Alloc.) 1,500 2 LL Turner/Laurel Fence 110,000 Turner Rd. Retaining Wall Repl. Pixley Park (C -Basin) Trees & Landscaping 44 PRI Parking Lot w/Landscaping & Lights 111 PRI Walkways 0,101110M. 63 PRI Sports Fences, Bleachers, Backstops 97 PRI Playground, Sand Lot, Equipment 56 PR "Airport" paving 16 PR � Sports Field Lighting -357M, 79 PRI Restroom/Park Building 137 PRI Total: $603,000 Salas Park Protective Shade Structure Fence Diamond Areas Softball Complex Concession Stands Shade Structure (West Side) Area Paving Upgrade sports lighting Group Picnic Area - by Umpire Association Stadium Upgrade Elect. & Sports Lighting System 86 C 81 C 121.0-760.78 Parking Lot Landscaping & Lighting Regrade Field, Turf & Drainage si Additional Seating (North, 1000 seats Appendix B - Page 4 of 18 Draft 10t25/93 CIP­PR0G.XLS Append& B DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr. Factor: 1.0 Cost not updated Estimated Cost as of Project July 1993 Work In Progress ($000) Appro p. 6 /93 lExp./Enc. 6/93 PROJECT YEAR COST ($000) & Fund Code (5 year blocks) FY93 /94 FY94 /95 FY95 Y96 FY96 /97 1997/02 20021071 R.,n.,ksJA .... nt# Westgate Park Frontage & Site Improvements - See Storm Drainage Park Improvements 353 PRI Miscellaneous Parks Projects Area 1 Park (per Fee study) it 459 PRI Area 3 Park (per Fee study) 712 PRI Area 4 Park (per Fee study) ....... 1,462 PRI Area 5 Park (per Fee study) 402 PRI 402 PRI 34 PRI 310 PRI Area 6 Park (per Fee study) 689 PRI 689 PRI Area 7 Park (per Fee study) atMr 166 PRI 1,494 PRI Eastside Park (per Fee study) 307 PRI Eastside Softball Complex 2,669 PRI F -Basin Park Improvements 120 PRI I -Basin Park Improvements 120 PRI Community Buildings - Citywide partial funding 333 PRI 333 PRI 333 PRI 1,665 PRI 1,665 PRI partial funding 14 C 14 C 14 C 69 C 69 C Site Evaluation (Minton Bldg.) 20 PRI (Close project per Council decision Oct. 21, 1993) Parks & Recreation Program Master Plan 60 PRI 50 PRI 121.0-760.79 6 C 6 C Parks & Rec. Projects Total: 25,377,768� 892 791 122 1,201 4.820 917 5,461 8,109 All above P&R projects Appendix B - Page 5 of 18 Draft 10/25t93 CIP—PROG.XLS Appendix B DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr. Factor: 1.0 -:;;;.'*,*:*:Cost not updated Estimated Cost as of Work In Progress ($000) PROJECT YEAR COST ($000) & Fund Code (5 year blocks) Project July 1993 Approp. 6 /93 Exp./Enc, 6193 FY93 /94 FY94 /95 FY95 /96 FY96 /97 I 1997/02 2002/07 Remarks/Account # Fire Protection Truck/Engine /Replacements Truck 1, 1990 E-1 460,000 Truck 2, 1967 Van Pelt 460,000 Engine 1, 1971 Van Pelt 210,000 Engine 2, 1981 Van Pelt 210,000 Engine 3, 1973 Van Pelt 210,000 Engine 4, 1969 Van Pelt 140,000 Sedan/Pickup/Van replacements 114,500 West Side Station Building 554,000 20 FI 54 FI 480 FI Ladder Truck & Equipment 475 FI Station 2 (E. Lodi Ave.) Remodel t`ti4f10 estimate by Fire Dept. New Equipment: (expansion) Sedans =>3 SO FI 10 FI ...�.;.;.y.;.;: Mini -vans E3r< Wya 15 FI 15 FI Computers ?>'•>='#yftl0 3 FI 6 FI 6 FI Fire Fighting Gear Sell contained breathing app. v {8 18 FI Station #1 remodel 18 FI Fire Projects Total: 3,653,500 20 31 54 973 34 31 All above Fire projects Police Services Station Expansion Impact Fee Funding: 96.3% 96 PI 1,830 PI General Fund Funding: 3.7% 7 C 70 C Jail Expansion 7•`.w<# p K.,,.:. ; 28 PI 248 PI Safety Equipment :^E# 3 PI 3 PI 3 PI 15 PI 15 PI Animal Control Truck & Eq.0 -vim ,, 23 PI Pickups w/ radios & eq. 36 PI Patrol Cars w1eq q 18 PI 18 PI 36 PI 54 PI Portable Radios :..••'..... , 3 Pi 3 PI 8 PI 10 PI Work Stations 'svQ 4 PI 4 PI 8 PI Computer Terminals . p $ `-M ice v>s'sN: �<�x� � A 2 PI 3 PI 3 PI Police Projects Total: 2,576,000 i i 25 25 137 2,249 113 All above Police projects Gen. City Fac. Projects Total: 56,374,923 1 3,237 1 1,080 676 2,574 6,180 3,650 13,437 10,560 All above projects Gen. City Fac. Funding Total: 39,480,654 1 3,293 1,095 732 2,574 5,307 3,004 12,916 10,560 Non utility, street & drainage fund Appendix B - Page 6 of 18 Draft 10/25/93 CIP_PROG.XLS Apgendix B DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr. Factor: 1.0 <�' Cost not updated Estimated Cost as of Project July 1993 Work In Progress ($000) I Approp. 6 /93 Ex ./Enc. 6/93 PROJECT YEAR COST ($000) & Fund Code (5 year blocks) FY93 /94 FY94 /95 FY95 /96 FY96 /97 1997/02 2002/071 Remarks/Account # Storm Drainage System_ Basin Proiects C -Basin (Pixely Park) Fence @ ultimate location 63,000 63 DI Topsoil removal & repl., basin preparation 53,000 53 DI Street Improvements 198,000 198 DI Interior Drainage 87,000 87 DI Control/Pump Structure 162,000 162 DI Landscape/Irrigation 335,000 335 DI Total: $898,000 E -Basin (Westgate Park) Preliminary Design 16 DI 12 DI 121.0-525.44 Fence & Mowstrip 53,000 53 DI Street Impr•s - Evergreen Dr. 54 DI 54 DI 121.0-760.80 7 PRI 7 PRI Street Impes - Applewood Dr. 28,000 25 DI 3 PRI Interior Drainage 37,000 37 DI Turf & Irrigation 172,000 151 DI 21 PRI Total: $290,000 F -Basin (west of LSR, N/Hwy 12) Phase 1 -Land Acquisition, misc 2,705,000 2,705 DI Phase 2 -Improvements 1,303,000 1,303 DI Total: $4,008,000 G -Basin (DeBenedetti Park) Excavation, prelim. design 107 DI 7 DI 121.0-525.41 Additional land acquisition 2,277,000 assumed acquisition cost will be under reimbursement agreement Fence & Mowstrip 186,000 186 DI Street Improvements 434,000 434 DI Interior Drainage 157,000 157 DI Control/Pump Structure 136,000 136 DI Total: $3,190,000 I -Basin (west of LSR, S/Hwy 12) Basin acquisition & development 4,008,000 4,008 DI Appendix 8 - Page 7 of 18 Draft 10/25/93 CIP PROG.XLS Appeitrlix B DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr. Factor: 1.0 Cost not updated Estimated Cost as of Work In Progress ($000) PROJECT YEAR COST ($000) & Fund Code (5 year blocks) Project July 1993 I A pro . 6 /93 Exp./Enc. 6/93 FY93 /94 FY94 /95 FY95 /96 FY96 197 1997 /02 2002 /07 Rernwks/Account # Trunk Lines Calaveras St. SD, Lockeford to Pioneer 135,000 135 SD C -area Southeast SD 194,000 97 DI 97 DI Evergreen Dr. SD Wesgate Park to 1400' S/Bayberry 32,000 17 DI 01 32 DI 121.0-525.47 Tejon to 500' Nfrurner Rd. 95,000 38 DI 38 DI 27 DI 42 DI 26 DI 121.0-525.46 F -area North/South SO 412,000 412 DI G -area Southeast SD 293,000 293 DI Hutchins St. SD - Walnut to Elm 59 SD SD (completed north of Pine St.) 121.0-525.31 I -area SD's 613,000 613 D1 Orchis Dr. SD - W/Sylvan 29,000 39 DI DI Close W I P project 29 DI 121.0-525.42 Pine St_ SD E/Guild Ave. 47,000 47 Df Thurman St. SD Industrial Substation 34,000 34 DI E/Industrial Sub. to Guild 45,000 45 DI Tienda Dr. SD East of G -area trunk line 167,000 84 DI W/ G -area trunk line (Target project) 75,000 75 DI West of Target project 44,000 44 DI Turner Rd./Guild Ave. SD 240,000 240 DI Miscellaneous Proiects/Studies Miscellaneous Storm Drains 140,000 10 SD 10 SD 10 SD 10 SD 50 SD 50 SD Collection System Improvements 500,000 100 SD 100 SD 100 SD 200 SD SD Main St., Lodi Ave. southerly 60,000 60 SD Cherokee Ln., Delores to Eden 300,000 Master Plan Updates 44,000 22 DI 22 DI Reimbursement Agreements Due 1,966,000 245 DI 315 DI 181 DI 118 DI 1,107 DI do not appropriate, pay out of revenue Storm Drain Projects Total: 17,859,000 337 118 686 670 392 1,091 1 5,636 6,723 _ All above Storm projects Storm Drain System Total: 15,615,125H 330 111 665 —_ S7D 389 1,091 5,636 6,723 Drainage funded projects Appendix B - Page 8 of 18 Draft 10/25/93 CIP_PROG.XLS Annendix B DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr. Factor: 1.0 #'Cost not updated Estimated Cost as of Project July 1993 Work In Progress ($000) Appro . 6 /93 Exp./Enc. 6/93 PROJECT YEAR COST ($000) & Fund Code FY93 /94 FY94 /95 FY95 /96 FY96 /97 (5 year blocks) 1997 /02 2002 /07 Remarks/Account # Street System Traffic Operation & Safety Improvements Miscellaneous Traffic Improvements 265,000 14 TG 3 TG 5 TG 20 TG 20 TP 20 TP 100 TP 100 TP 121.0.500.09 20 TP 3 TP Church/Lodi Coordination Impr - Phase 2 66 TG 18 TG 121.0-500.33 Street Lighting Eastside Public Facilities 86 BG 75 BG 45.7-503.11 Miscellaneous Lighting no estimate Convert fixed time signals to actuated 166,000 Traffic Signals 1. Lockeford/Stockton 105,000 53 TI Need street widening decision " additional funding 53 TK 2. Lockeford/Sacramento 105,000 105 TK 3. Turner/Stockton (project combined w/Kettleman/Central, # 9 below) 4. Lwr. Sacramento/Vine 105,000 53 TI " additional funding 53 TP 5. Cherokee/Tokay 100,000 100 TK 6. Harney/Stockton 105,000 53 TI " additional funding 53 TP 7. Lodl/Mills 105,000 53 Ti " additional funding 53 TP B. Turner/Lwr. SacramentoNVoodhaven 100 TF TF 121.0-500._ 11 TI TI 35 TI 9. Kettleman/Central 215 TF 2 TF 121.0-500.64 24 TI TI 10. Kettleman/Crescent 116,000 116 TK 11. Turner/Mills 100,000 50 TI " additional funding 50 TF RR Xing Protection Fu, 12. Pine/Stockton 105,000 53 TI " additional funding 53 TP 13. Harney/Ham 100,000 100 TI 14. Mills/Elm 105,000 53 TI " additional funding 53 TP 15. Turner/Edgewood-California 105,000 53 TI " additional funding 53 TK 16. Cherokee/Hale 92 TF 92 TF 121.0-500.95 8 H 6 H 17 TG apped 9/1/93 17. Ham/Century 105,000 53 TI " additional funding 53 TK 18. Cherokee/Vine 100,000 50 TI .. additional funding 50 TK 19. Hutchins/Pine 105,000 105 TK Appendix B - Page 9 of 16 Draft 10/25/93 CIP PROG.XLS Appendix B DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr. Factor: 1.0 z ;:Cost not updated Estimated Cost as of Project July 1993 Work In Progress ($000) Appro . 6 /93 Exp./Enc. 6/93 PROJECT YEAR COST ($000) & Fund Code (5 year blocks) FY93 /94 FY94 /95 FY95 /96 FY96 /97 1997/021 2002/07 Remarks/Account # 20. Cherokee/Elm 100,000 50 TI .. additional funding 50 TK Turner/Hwy 99 Ramp 105,000 105 TI Kettieman/Hwy 99 Ramp 105,000 105 TI Kettleman/Beckman 105,000 105 TI Lower Sacramento/Harney 105,000 105 TI Harney/Mills 100,000 100 TI Street Widening (Capacity Improvement) Projects Century Blvd. (w/ adj. dev. appr. as needed) 270,000 74 TI 74 TI 270 TI 121.0-500.65 Guild Ave. (w/ adj. dev. appy. as needed) 189,000 32 TI 32 TI 63 TI 63 TI Harney Lane (w/ adj. dev. appr. as needed) 1,024,000 165 TI 658 TI 201 TI Hutchins Street Lodi to Pine Construction 8 R/W 152 TP 2 TP 121.0-500.99 Construction, add'I funding 110 TK TK Hutchins St Frontage Rd 600' N/Century Appraisat 5,000 5 TK Right -of -Way 93,000 93 TK Construction 14,000 14 TK Hwy 12/Kettleman Lane Widening Project Study Report 92 TI TI 121.0-500.61 SR99/12 Interchange Impr's 3,315,000 1,658 TI 1,658 TI " (Measure K funding) 700,000 700 TK " (State funding, est. 30%) 1,721,000 1,721 Total: $5,736,000 Widening/restriping 847,000 291 TI 39 TI 25 TI 491 TI Hwy 12/ impr's @ Target 120,000 51 TI TI 120 TI 121.0-500.66 added signal Lockeford Street @ Tienda Dr. per prev. Church to SPRR (N. side) 163,000 Council approval SPRR to Cherokee EIR/Preliminary Engineering 67,000 Right -of -Way, SPRR to Stockton 283,000 Construction, SPRR to Stockton 415,000 Right -of -Way, Stktn to Cherokee 233,000 Construction, Stktn to Cherokee 407,000 Total: $1,568,000 1,568 TI Lodi Ave. (with adjacent dev. & E/Cherokee) 146,000 37 TI 109 TI Lower Sacramento Road Prelim. Eng. for Ultimate Widening 20 TI 20 TI 121.0-500.62 Widening 1,294,250 (to be updated as part of preliminary engineering) 1,294 TI " (Measure K funding) 750,750 751 TK Total: $2,045,000 Stockton Street Harney to Ket. (w/adj. dev. appr. as ne 91,000 46 TI 46 TI Appendix B - Page 10 of 18 Draft 10/25/93 CIP_PROGALS Appendix B DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr. Factor: 1.0 3 .,Cost not updated Estimated Cost as of Project July 1993 Work In Progress ($000) Approp. 6 /93 Exp./Enc. 6/93 PROJECT YEAR COST ($000) & Fund Code (5 year blocks) FY93 /94 FY94 /95 FY95 /96 FY96 /97 1997/02 2002 /07 Remarks/Account It Turner Road Hwy 99 overpass widening 1,685,000 1,685 TI Widen/Restripe to 4 lanes E/99 37,000 37 TI Widen/Restripe to 4 lanes W/LSR 94,000 47 TI 47 TI Victor Rd. (SR 12) - 99 to E. City Limit 384,000 384 TI Pavement Rehabilitation Projects Almond Drive overlay east portion recons(. west 111,000 103 TK SLPP Cycle 5 funding 8 TL Cherokee Lane Century to Kettleman 246,000 246 TK Kettleman to Poplar, NB lanes 62,000 62 TK Poplar to Vine 170,000 158 TK appropriate as one project SLPP Cycle 5 funding 12 TL Vine to Lodi 163,000 147 TK SLPP Cycle 5 funding 16 TL Lodi to Pioneer 377,000 377 TK Total; $1,018,000. Church Street Kettleman to Vine, overlay 209 TD TO 121.0-500.69 SLPP Cycle 4 funding 25 TL Houston Lane Overlay 36 TO TO 75 TO apped 9/15, includes Tokay St. Hutchins to Fairmont 121.0-500.79 SLPP Cycle 3 funding 20 TL " Hutchins Street Kettleman to Harney ov'lay SB, bike In. 221,000 188 TF local matching funds 33 TK Lodi Avenue Prelim. Eng. - Main to Cherokee 4 TG TG 121.0-500.24 22 TK TK Overlay, track removal 362,000 362 TK Mills Avenue - Tokay to Vine, overlay 92,000 83 TK SLPP Cycle 4 funding 9 TL Oak St - Pacific to Ham; reconstruct 65 TK 52 TK 13 TK apped 9/1/93 121.0-500.70 Sacramento Street Lodi to Lockeford 226,000 228 TK Vine to Park, overlay 134,000 124 TK SLPP Cycle 5 funding 10 TL Appendix B - Page 11 of 18 Draft 10/25/93 CIP PROG.XLS DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr. Factor: 1.0 „'Cost not updated Estimated Cost as of Work In Progress ($000)I PROJECT YEAR COST ($000) & Fund Code (5 year blocks) Project July 1993 I Approp. 6 /93 IExp./Enc. 6/93 FY93 /94 FY94 /95 FY95 /96 FY96 1971 1997 /02 Stockton Street Tokay to Lodi Preliminary Engineering 31,000 local match Reconstruction w/new c&g 300,000 local match Overlay Alternative: $92,000. Lodi to Locust, overlay, minor widening Locust to Lockeford, widen W. side Lockeford to Turner, rehabilitation 260,000 SLPP Cycle 3 funding Tokay Street Fairmont to Mills 180,000 local match Hutchins to Fairmont Church to Hutchins Miscellaneous Structural Overlays 4,600,000 " additional funding 2,093,000 " additional funding 0 Pavement Rehabilitation Subtotal: 9,630,000 Box Culverts @ Woodbridge Irrigation District Canal Lower Sacramento Road S/Lodi 333,000 Mills Avenue N/Kettleman 158,000 Harney Lane W/Hutchins 243,000 Turner Rd % mi. W/Lower Sacramento 169,000 " S.J. Co. share Lilac St. N/Academy, replacement " S.J. Co. share Railroad Crossing Improvements Locust St. @ SPRR, new sidewalk 35,000 Loma Dr @ SPRR, sidewalk Cherokee @ SPRR; gates & median (d 22,000 Lower Sac, @ SPRR, upgrade zing 227,000 " S.J. co. share Guild Ave. Q SPRR; upgrade xing (dei 227,000 Victor Rd. @ CCT; upgrade xing 249,000 Beckman Rd. @ CCT S/Lodi; upgrade x 255,000 Guild Ave. @ CCT S/Lodi; new zing 242,000 Thurman St. @ CCT; new zing 212,000 Kettleman Ln. @ CCT % mi E(Guild 242,000 "S.J. co. share Harney Ln. @ SPRR % mi E/Hutchins 227,000 Lodi Avenue Underpass @ SPRR 12,234,000, Appendix B - Page 12 of 18 163 TF 49 TG 51 TP 1 TP 66 TP 49 TP 27 TF 4 TG 250 TF 50 TG TF TG TP Combine project & funding with Lodi to Locust (121.0-500.35) 1 TP 260 TK 48 TL 150 TF 30 TG 4 TP close acct. to fund balance & combine project w/Houston Ln. 121.0-500.79 TP 5 TP for Handicap ramp change order 400 TK 50 TK 1,750 TK TP 193 TP 1,000 TP TD TG TG 570 1,279 35 TP I TP 347 SJ Co./Federa SJ Co./Federal) 8 TG TG 762 682 3,224 333 TI 35 TP Appendix 13 /071 Remarks/Account p 121.0-500.35 (Federal"Santa Clara" funds) 121.0-500.71 121.0-500.72 121.0-500.73 121.0-500.74 2,400 TK 900 TP TG 93/94 thru 06/07 3,300 1 Avg: $701,000 158 TI 243 TI 85 TI 85 S.J. Co. 121.0-500.82 121.0-500.31 defer 114 TI 114 S.J. Co. 227 TI 249 TI 255 TI 242 TI 212 TI 121 TI 121 S.J. Co. 227 Tl Draft 10/25x93 CIP_PROG.XLS Appendix B DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr, Factor: 1.0 Cost not updated Estimated Cost as of Work In Progress ($000) PROJECT YEAR COST ($000) & Fund Code (5 year blocks) Project July 1993 Approp. 6 /93 Exp./Enc. 6/93 FY93 194 FY94 /95 fY95 196 FY96 /97 1997/02 2002 /07 Remarks/Account # Railroad Crossing Surface Improvemen 553,000 5 TK TK close project, adjust fund balance 121.0-500.75 Miscellaneous Projects/Studies Miscellaneous Street Improvements 670,000 60 TG 3 TG 20 TG 50 TP 50 TP 50 TP 250 TP 250 TP 121.0-500.01 Misc. Curb & Gutter Replacements 195,000 10 TG 7 TG 15 TK 15 TK 15 TP 75 TP 75 TP 121.0-500.03 " additional funding 20 TP 10 TP Sidewalk Replacements 430,000 33 TP 31 TP 40 TG 30 TP 30 TP 30 TP 150 TP 150 TP 121,0-500.04 " additional funding 267,000 25 TB 24 TB 7 TB 20 TB 20 TB 20 TB 100 TB 100 TS Handicap Ramp Retrofits 195,000 13 TD 7 TD 15 TG 15 TP 15 TP 75 TP 75 TP 121.0-500.05 49,868 50 BG 45.8-503.09 Overlay Analysis/Design 84,000 6 TP 2 TP 6 TG 6 TP 6 TP 6 TP 30 TP 30 TP 121.0-500.80 Hutchins Street Median Landscaping Vineyard to Century 62,000 Century to Kettleman 128,000 Century @ Hutchins 46,000 frontage road, Century to Mendocino 93,000 Tokay Fence, Gate & Planter rebuild g WID 6 TG TG 121.0-500.30 Ham Ln - N/Kettleman fence replacement 65,000 " property owners contr. ($8500) Street Master Plan Updates 44,000 80 TI TI 22 TI 22 TI 121.0-500.81 Traffic Control Device Inventory 22,000 22 TP Church St. Tree Replacements Downtown 32,000 15 TP TP 16 TP 16 TP 121.0-500.76 Pleasant Ave. Curb & Gutter Replacement 42 TP 24 TP 121.0-500.77 Peach St. Improvements 22 TK TK 121.0-500.78 Bicycle Transportation Master Plan 30,000 30 TK only appropriate if grant is approved Park -and -Ride Lot, LSR @ Hwy. 12 100,000 100 TK only appropriate if grant is approved Street Projects Total: 44,735,868 2,576 460 999 2,120 3,363 6,235 8,940 9,948 All above Street projects Street System Total: 32,057,560 2,149 388 955 2,120 3,363 4,514 8,742 9,827 All street funded projects Appendix 8 - Page 13 of 18 Draft 10/25/93 CIP PROG.XLS DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr. Factor: 1.0 Cost not updated Estimated Cost as of Work In Progress ($000) PROJECT YEAR COST ($000) & Fund Code (5 year blocks) Prolect July 1993 I Approp. 6 /93 IExp./Enc. 6/93 FY93 /94 FY94 /95 FY95 /96 FY96 /971 1997 /02 1 2002 /07 Wastewater System 20 SC Capital Maintenance Projects SC 100 Collection System Improvements 3 SC1 15 Manhole Channelization/Rehab 20 SC Miscellaneous System Relocations 280,000 19 SC New Wastewater Mains & Replacements 1,694,000 15 Miscellaneous Sanitary Sewers 210,000 SC Lodi Avenue E/Crescent 90,000 Alley N/Elm, Washington to Cherokee SC City Funding (dev. share, $800D, paid) Poplar St. @ Cherokee Ln. S2 Treatment (White Slough Water Pollution Contrc Improve Roadways 13,000 Erosion Abatement Program 305,000 Sludge Pump Replacements 33,000 S2 Misc. Plant Equipment Replacements Other (Miscellaneous Projects/Studies) none Capital Investment (New Capacity) Collection System Improvements Oversize Wastewater Mains 565,000 Manhole Improvements Interconnection blwn Ind. & Dom. Trunks Treatment (White Slough Water Pollution Contrc Irrigation System Expansion 149,000 Flow Equalization Pump 22,000 Security Improvements 81,000 Landscaping Improvements 38,000 Debt Service: 1991 COP Debt Service - Principal 2,165,000 1963 A series GO Bond - Principal 497,112 WSWPCF Expansion Construction Engineering New Plant Equipment Other (Miscellaneous Projects/Studies) Wastewater Service Taps 280,000 Update Wastewater Master Plan 134,000 New Equipment Wastewater Projects Total: 6,556,112 Wastewater System Total: 7,105,137, Appendix B - Page 14 of 18 13 SC 20 SC 100 SC 100 SC 3 SC1 15 SC 20 SC 20 SC 19 SC 17 SC 15 SC 15 SC 5 SC 90 SC 171 S2 S2 151 SC 136 SC il Facility) 4 S2 2 S2 1 SI 5 SC 18 SC I Facility) 137 SC 154 S2 128 S2 9 SC 811 811 13 S2 82 S2 82 S2 11 S2 11 S2 (future equipment not estimated) 20 SC 20 SC 100 SC 100 SC 15 SC 15 SC 75 SC 75 SC 65 S2 76 S2 5 SC 11 S2 1 SI 55 SI 3 SC SC 5 SC 149 S2 22 S2 52 S2 29 S2 118 SI 1 392 S 110 S2 110 S2 115 S2 120 S2 720 S2 990 S2 154 S2 160 S2 166 S2 172 S2 117 S2 (future equipment not estimated) See Public Facilities, General City Facilities - Municipal Service Center for additional projects 8 SC 20 SC 20 SC 20 SC 20 SC 100 SC 100 SC 90 SI repay 17.1, adj. fund balance 22 SI 22 SI (to be determined - Impact fees) Appendix B Remarks/Account # 17.1-400.04 17.1-400.05 17.1-400.01 17.2-400.59 17.1-400.60 17.2-400.50 17.1400.21 17.1400.02 17.1400.20 17.2-410.70 runs until yr 2026 17.2-030.01(int. in Op. Bud.) 17.2-410.65 17.1-402.20 17.1-012.xx 443 685 573 491 273 1,146 1,657 All above Wastewater Projects 443 690 573 929 596 1,407 1,657 All Wastewater Funded Projects Draft 10/25/93 CIP_PROG.XLS Appendix B DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr. Factor: 1.0 s''Cost not updated Estimated Cost as of Work In Progress ($000) PROJECT YEAR COST ($000) & Fund Code (5 year blocks) Project July 1993 I Approp. 6 /931Exp./Enc. 6/93 FY93 /94 FY94 /95 FY95 /96 FY96 1971 1997 /021 2002 1071 Remarks/Account# Water System Capital Maintenance Proiects Distribution system Fire Hydrant Installations 0 WC 24 WC 24 Miscellaneous System Relocations 317,000 15 WC 20 WC 1 WC Lead Service Replacement 5 WC WC New Water Mains & Replacements 27 WC 10 WC Misc. Mains 195,000 48 WC 1 WC Upgrading Existing System 1,772,000 Lodi Lake/Laurel Ave. WM & Fire Prot. 95,000 Spruce WM - School & Sac. 102,000 Source of Supply Standby Generators - Engineering 59 WC 50 WC Standby Generators - Lease/Purchase 1,180,000 Well 3 Repl. (@ Hutchins St. Sq.) 137,000 230 WC 209 WC Well 11 Repl. (E. Turner Rd.) 127 WC 69 WC Well & Pump Repl./Abandonments 804,000 Well 1 & 3 Abandonment 39,000 Treatment (DBCP Cleanup) (State loan repayment not shown) GAC Unit Carbon Replacement Other (Miscellaneous Projects/Studies) Equipment Replacements 520,000 4 WC 4 WC Water Tank Demolition 17 WC 5 WC Capital Investment (New Capacity) Distribution system Oversize Water Mains & Crossings 810,000 4 WI 3 WI Source of Supply New Water Wells 7,678,000 50 WI 28 WI Well 25 (Washington School) 331,000 Well 26 (Lakewood School) 331,000 Total: 8,340,000.00 Treatment (DBCP Cleanup) (State loan revenue/appropriation not included in Wa GAC Design 89 WS76 WS Well 4R & GAC (@ Industrial Sub. site) 1,033,000 123 WS 104 WS Standby Generator 87,000 DBCP Loan repayment 1,063,953 GAC backwash tank 35,000 WC 5 WC 24 WC close to fund balance 15 WC 95 WC 102 WC WC WC 24 WC 24 WC 120 15 WC 15 WC 75 236 WC 236 WC 236 WC 236 137 WC reduce appropriation by $33,000, return to fund balance 348 WC 10 WC 10 39 WC 180 40 WC 40 WC 40 reduce appropriation by $4,000, return to fund balance 34 WI 34 WI 331 WI 331 WI er Capital (WC) shown under "WS") 1,033 WS 87 WC 66 WC 35 WS 85 WI 11 WI 388 WI 812 WI 69 WC 71 4500.24W'I' C 181-40120 W. 8. 7 18.1-450.08 18.1-450.35 (close) 75 WC 18.1-450.01 18.1450.34 236 WC 18.1-460.03 18.1-460.11 140 WC 296 WC 900 WC 900 WC 200 WC 200 WC 18.1-012.xx 1 18.1-450.44 272 WI 3,268 WI 393 374 WI 3,210 WI 18.1-450.09 18.1-460.99 465 WC1 20 yr loan starting 1994 Appendix B - Page 15 of 18 Draft 10/25/93 CIP PROG.XLS Appendix 13 DRAFT - City of Lodi - Capital Improvement Program and 1993194 CIP Appropriations Annual Cost Incr. Factor: 1.0 Cost not updatedEstimated Cost as of Work In Progress ($000) PROJECT YEAR COST ($000) 8 Fund Code (5 year blocks) Project July 1993 A pro . 6 193 1 Exp./Enc. 6193 FY93 /94 FY94 195 FY95 196 FY96 197 1997/02 2002 /07 Remarks/Account # Other (Miscellaneous Projects/Studies) Water Meters - Comm] 8 Ind. Retrofit 517,000 140 WC 135 WC 18.1-450.06 Water Meters - Touch read conversion 129,000 Water Meters - Residential Retrofit 16,158,000 Water Service Taps 630,000 44 WC 40 WC 45 WC 45 WC 45 WC 45 WC 225 WC 225 WC 18.1-402.10 Update Water Master Plan 107,000 63 WI repay 18. 11, adj. fund balance 22 WI 22 WI New Equipment (to be determined - impact fees) Electric Utility Loan Repayment 18 WC1 18 WC 209 WC 200 WC See Public Facilities, General City Facilities - Municipal Service Center for details Water Projects Total: 33,007,000 1,006 1 753 All above Water Project. 1,991 1,799 912 1,466 5,851 5,865 1,995 1,799 1,350 1,789 6,112 5,865 All Water Funded Projects Water System Total: 20,358,958 1,006 443 Appendix B - Page 16 of 18 Draft 10/25/93 CIP PROG.XLS Annend& B DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr. Factor: 1.0 %;;Cost not updated Estimated Cost as of Work In Progress ($000) PROJECT YEAR COST ($000) & Fund Code (5 year blocks) Project July 1993 I Approp. 6 /93 Exp./Enc. 6/93 FY93 /94 FY94 /95 FY95 /96 FY96 /97 1997 /02 2002 /07 Remarks/Account # Capital Improvement Program Summary (by System) 1,095 (including funding shown in other categories) 732 2,574 5,307 3,004 12,916 10,560 Gen. City Fac. Funding Total: 39,480,654 3,293 Street System Total: 32,057,560 2,149 388 955 2,120 3,363 4,514 8,742 9,827 Storm Drain System Total: 15,615,125 330 111 665 670 389 1,091 5,636 6,723 Wastewater System Total: 7,105,137 811 443 690 573 929 596 1,407 1,657 Water System Total: 20,358,958 1,006 443 1,995 1,799 1,350 1,789 6,112 5,865 Grand Total: 114,617,433 7,589 2,480 5,037 7,736 11,337 10,994 34,812 34,632 Appendix B - Page 17 of 18 Draft 10/25/93 CIP PROGALS Appendix 13 DRAFT - City of Lodi - Capital Improvement Program and 1993/94 CIP Appropriations Annual Cost Incr. Factor: 1.0 Cost not updated Estimated Cost as of Work In Progress (5000)I PROJECT YEAR COST (;000) & Fund Code (5 year blocks) Proiect July 1993 I AODroD. 6 /93 1EXo./Enc. 6/93 FY93 /94 FY94 /95 FY95 /96 FY96 /9-71 1997/021 2002 /07 1 Remarks/Account# Capital Improvement Program Summary (by Fund) Name Number Code Capital Outlay Reserve 121.0 C 1,899 270 0 271 1,532 121 640 569 Funds within the heavy Community Development Block Grant 45.x BG 1,143 746 499 90 0 0 0 0 lines at left are those Hutchins Street Square - Capital 120.1 HS 52 0 0 0 0 0 0 included in the System" totals shown Equipment 12.0 Eq 0 0 153 0 0 0 0 0 above. Hotel/Motel Tax 134.0 H 70 16 0 0 0 0 0 0 Electric Utility Outlay Reserve 16.1 EU 0 0 2 0 0 323 0 0 Lodi Lake Capital Improvement 122.0 LL 62 5 2 0 0 0 0 0 General City Facilities Dev. Imp. Mitigation 60.8 GF] 0 0 15 1,127 304 554 4,671 1,806 Parks & Recreation Dev. Impact Mitigation 60.7 PRI 67 58 41 1,030 3,392 903 5,392 8,040 Fire Development Impact Mitigation 60.6 FI 0 0 20 31 54 973 34 31 Police Development Impact Mitigation 60.5 PI 0 0 0 25 25 129 2,179 113 Streets - Trans. Dev. Act (less transit) 124.0 TD 271 16 80 0 0 0 0 0 Streets - Gas Tax 2106 & 2107 33,32 TG 216 30 92 115 0 0 0 0 Streets - Federal 126.0 TF 570 94 27 638 0 0 0 0 Streets - Gas Tax Prop. 111 (2105) 36.0 TP 492 78 5 124 174 433 1,838 1,580 Streets - Measure K 38.0 TK 224 52 486 738 1,744 1,189 2,429 2,617 Streets - Bicycle & Pedestrian 128.0 TB 25 24 7 20 20 20 100 100 Streets - State/Local Partnership 37.0 TL 0 0 103 46 0 0 0 0 Streets Development Impact Mitigation 60.4 Ti 352 94 155 439 1,425 2,873 4,375 5,530 Storm Drain Development Imp. Mitigation 60.3 DI 271 111 595 560 279 981 5,251 6,673 Storm Drain Fund 123.0 SD 59 0 70 110 110 110 385 50 Sewer Utility Captial Outlay 17.1 SC 354 169 150 55 55 55 275 275 Wastewater Capital Reserve 17.2 S2 456 273 450 518 381 196 731 990 Sewer Dev. Impact Mitigation 60.2 SI 1 1 90 0 494 345 401 392 Water Capital Outlay 18.1 WC 739 542 499 1,434 439 621 2,289 2,281 Water Development Impact Mitigation 60.1 WI 54 32 428 365 912 1,168 3,823 3,584 Water - DBCP (State Loan) 18.1 WS 213 179 1,068 0 0 0 0 0 Total: 7,589 2,789 5,037 7,736 11,337 10,994 34,812 34,632 Appendix B - Page 18 of 18 Draft 10/25/93 CIP PROG.XLS •.k City of Lod General City Facilities Capital Improvement Program E . City Public Works Department Lodi Lake Park Turner Rd. & Laurel Ave. Fence Project Description This project consists of the construction of a steel/wrought iron fence along the Turner Road and Laurel Avenue frontages of Lodi Lake Park. The main purpose is to require Parte users to enter through the manned gates on Turner Road. This would increase Park revenue and decrease parking and related problems along Turner and Laurel. As of Sept. 1993, this project is not identified in the draft Parks Master Plan. This plan calls for establishment of a neighborhood park at the southeast comer of the Park after the west side entrance is developed- This concept conflicts with the fence plan and would have to be reconciled at some point. The estimate also includes some chain link fence along the levee west of the beach area. Costs for this type of fence can vary by over 100% based on the appearance and quality desired. This estimate is based on a mid-range figure similar to that proposed for Hutchins Street Square. Unless the desire is to completely enclose the Park during off -hours, gates will not be necessary. The footage is based on a preliminary Parks Dept. drawing for a chain link fence (#1104. Aug. 16, 1993) Related Projects Estimated Costs Item Prelim Eng: EIR: exempt Rights of Way: Easements: Consultants: Date of ENR Updated Cost for: Jul -93 Amount Estimate Index ENR Index: 5250 Design Eng.: including contingencies 20% 18,000 Jul -93 5250 $ 18,000 Construction: Chain Link Fence: $16 /LF. 350 5,600 Jul -93 5250 $ 6,000 Decorative Fence: $40/LF. 1977 79,080 Jul -93 5250 $ 79,000 Mowstrip: $5/LF. 1457 7,285 Jul -93 5250 $ 7,000 Other: Gates: (not included) $7,000 lea. 4 28,000 Total Cost: $ 110,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not, it is included in construction. Construction includes contract administration 8 inspection unless shown otherwise. 10118193 LL FENCE.XLS . *• City of Lodi Drainage Capita! Improvement Program Public Works Department Cherokee Lane Storm Drain Delores St. to Eden St. Project Description This project consists of the installation of 15" up to 30" storm drains in the project limits. In this area, Cherokee Lane drains via the side streets to storm drains in the adjacent neighborhoods. This means that property owners desiring to improve their property with on-site drains are severely restricted. It also limits the City's ability to improve curb & gutter drainage with additional catch basins. In this area, there are 5 parcels over 1 acre in size and an additional 7 parcels between %Z and 1 acre that do not have a storm drain available. (The City's development standards require on-site drainage for parcels over 1 acre and in some types of commercial uses.) One alternate was considered for this project. That is the replacement of an existing, substandard 8" storm drain in Vine Street between Cherokee Lane and Garfield Street plus some new storm drains in Cherokee Land at Vine St. Although the cost is lower by about 50%, it does not all the problems mentioned above and may cause some hydraulic problems on Garfield Street. The remaining sections of Cherokee Lane are relatively well served by existing storm drains and the curb & gutter. This estimate is based on a very preliminary design with an allowance for some additional catch basins and laterals. Street crossings for individual parcels are not included. If this project is to be considered, it should be done so in light of the proposed pavement overlay project and the lack of sidewalk and curb & gutter at some Related Proiects Cherokee Lane overlay Cherokee Lane Beautification Estimated Costs Item Prelim Eng: EIR: assume Neg. Dec. (by Community Development Dept.) Rights of Way: Easements: Consultants: Design Eng.: Construction: Other: Project Number: Date of ENR Updated Cost for: Jul -93 Amount Estimate Index ENR Index: 5250 $ 15,000 Jul -93 5250 $ 15,000 285,000 Jul -93 5250 $ 285,000 Total Cost: $ 300,000 Remarks Design Engineering shown separately if anticipated to be budgeted prior to construction: it not, it is included In construction. Construction includes contract administration & inspection unless shown otherwise. 10/19/93 CHER_SD.XLS 23.1