HomeMy WebLinkAboutAgenda Report - June 4, 2014 C-16 PHAGENDA ITEM C 'v 1/0
CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Set Public Hearing for July 16, 2014, to Consider Adopting Resolution Setting
Pre -Approved Engineering News Record Adjustment Index for Wastewater Rates and
Restructured Water Rates for Residential, Commercial and Industrial Customers
MEETING DATE: June 4, 2014
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Set public hearing for July 16, 2014, to consider adopting resolution
setting pre -approved Engineering News Record Adjustment Index
for wastewater rates and restructure water rates for residential,
commercial and industrial customers.
BACKGROUND INFORMATION: City Council, on May 7, 2014, approved a program of future wastewater
and water rate increases, capped at 3 percent maximum. City Council
also approved a restructuring of the usage -based water rates. Prior to
that, the City Council, on December 18, 2013, approved a 2.5 percent increase in water rates that became
effective January 1, 2014. A Proposition 218 procedure was conducted that validated these actions.
Staff has regularly updated the Wastewater Utility Financial Plan and a copy of the current Financial Plan is
attached as Exhibit A. The recommended rate adjustments in the Financial Plan are 2.5 percent beginning
July 1, 2014. The rates for this next year, attached as Exhibit B, reflect an increase of 2.5 percent, which is
lower than the ENR -based index of 2.6.
City Council is requested to implement the first year of a three-year transition to re -structure the usage -based
water rates. By design, the restructured rate schedule is revenue neutral, meaning the same revenue will be
collect from the current usage -based water rates as the restructured rates. A summary of the restructured
water rates changes is provided below.
1. The monthly base charge, comprised of fixed customer costs and system capacity costs, are
allocated as follows. Fixed customer costs (such as meter reading, billing, and customer service) are
allocated equally to each customer. Fixed capacity costs (such as debt service, capital expenditures,
and system maintenance) are allocated based upon the relative capacity of the meter size. The
biggest change here is in the larger meter sizes that were paying disproportionately less based upon
the meter size.
2. The commodity charge (cents per cubic foot used) for single-family uses will slightly reduce over
time (mostly in the second and third rate tiers) while for non-residential and multi -family uses, it
will increase over time. As currently, the non-residential and multi -family will remain on a single
tier rate, but the charge will reflect the weighted average rate across the three single-family tiers.
A copy of the current and proposed usage -based water rates is provided in Exhibit C. A copy of the
Water Utility Financial Plan is provided in Exhibit D.
FISCAL IMPACT:
FUNDING AVAILABLE:
Attachments
cc: Information Systems Manager
Increased revenues to the wastewater utility are required to keep up with
cost of service increases and new mandated costs.
Not applicable.
E�
F. Wally Sandelin
Public Works Director
City of Lodi -- Wastewater Utility
Financial Plan Summary
Beginning Balance
Revenues
Wastewater Sales
Interest Earnings
Other Revenues
Transfer In for Debt Service (172)
Transfer In for Debt Service (173)
Total Revenues
Expenditures
Operating Transfers Out (to GF)
Transfer Out to Gen'I Fund (Cost of Services)
Transfer Out to WW Capital Outlay (171)
Administration & Other
Plant Maintenance
Sanitary System Maintenance
Storm Drainage Maintenance
Industrial System Maintenance
2003 Wastewater COP Debt Service
2004 Wastewater COP Debt Service
2007 Wastewater COP Debt Service
2012 Wastewater Refinancing
Total Expenditures
Ending Balance
Operating Reserve (25%)
Available Balance
Debt Service Coverage (min. = 1.20)
without COST
FY 13-14 1 FY 14-15 1 FY 15-16 1 FY 16-17 1 FY 17-18 1 FY 18-19
2.5%
3,240,603
2.5%
3,811,123
3%
2,239,962
3%
4,374,962
3%
5,277,062
3%
4,876,262
14,118,000
14,499,000
14,890,000
15,292,000
15,705,000
16,129,000
37,000
43,000
96,000
171,000
202,000
188,000
234,400
241,200
248,000
255,900
263,800
271,800
31,000
31,000
110,000
110,000
110,000
110,000
16,000
149,000
150,000
154,000
154,000
154,000
14,436,400
14,963,200
15,494,000
15,982,900
16,434,800
16,852,800
1,068,000
1,068,000
1,068,000
1,068,000
1,068,000
1,451,478
-
5,900,000
2,500,000
4,000,000
5,500,000
500,000
1,124,330
1,160,173
1,204,000
1,248,800
1,294,600
1,342,400
3,948,650
3,989,577
4,146,000
4,308,000
4,476,000
4,652,000
611,260
406,782
422,000
438,000
454,000
471,000
415,710
313,813
327,000
340,000
354,000
368,000
23,930
25,016
26,000
27,000
28,000
29,000
3,050,000
-
-
-
-
-
98,000
98,000
98,000
98,000
98,000
98,000
1,604,000
1,603,000
1,607,000
1,606,000
1,614,000
1,617,000
1,922,000
1,970,000
1,961,000
1,947,000
1,949,000
1,949,000
13,865,880
16, 534,361
13, 359,000
15, 080,800
16,835,600
12,477,878
3,811,123
2,239,962
4,374,962
5,277,062
4,876,262
9,251,184
2,986,000
2,166,000
2,225,000
2,283,000
2,347,000
2,507,000
825,123
73,962
2,149,962
2,994,062
2,529,262
6,744,184
1.11
2.18
2.27
2.34
2.39
2.33
2.33
2.47
2.56
2.64
2.68
2.73
Beginning Balance
9,242,732 7,767,857
52,285
1,113,714
252,143
424,571
Revenues
Transfer In (from 170)
- 5,900,000
2,500,000
4,000,000
5,500,000
500,000
Other Revenue
96,429 96,429
96,429
96,429
96,429
96,429
Total Revenues
96,429 5,996,429
2,596,429
4,096,429
5,596,429
596,429
DRAFT -- 5/6/2014
Expenditures
Financial System Replacement
Elm to Pine Alley Sewer/Laurel Storm Project
Misc. System Relocations
Misc. Wastewater Taps
Collect. System Capac. Enhanc. Projects
Wastewater Main Replac./Lining Proj.
City Hall Annex
Storm Drain Trash Handling System
Sacramento Street
Lodi Lake Pump Station
Lodi Lake Outfall Line
Realignment of Domestic & Industrial pipe
Domestic Trunk Assessment and Rehab
MSC/Kofu Parking Lot
Vehicles /Equipment
White Slough Compliance Studies & Rpts
Plant Maint. & Land Applic. Area Improv.
Influent Screening Replacement
UV Disinfection Upgrade
Aeration Diffuser Replacement
Cloth Filter Media Replacement
Digested Sludge Line to Presses
Electrical Upgrades
Admin/Ops Building Improvements
Rotary Press Maintenance Crane & air compressor
Pond Gates
Shop Rollup Door
Emergency Generator Maintenance
Road to Outfall Repair
Secondary Scum Trough Drives
Misc Paving
SCADA Upgrades/PLC Replacement
Primary Chain & Flights
Effluent Irrigation Improvements
Dewatering screwpress
Irrigation Conveyance & Pumping Construction
Micro Turbine
Fence Repairs/Upgrades
Anaerobic Digester Painting
WSWPCF Building/Restroom Expansion
Plant Security Enhancements
Miscellaneous Future Projects
Total Expenditures
Ending Balance
FY 13-14 1 FY 14-15 1 FY 15-16 1 FY 16-17 1 FY 17-18 1 FY 18-19
250,000
250,000
-
-
-
-
33,000
-
-
-
-
-
35,000
35,000
36,000
38,000
39,000
41,000
40,000
40,000
42,000
43,000
45,000
47,000
-
-
208,000
22,000
225,000
23,000
100,000
2,000,000
104,000
2,163,000
-
-
-
625,000
-
-
-
-
-
700,000
-
-
-
-
56,304
-
-
-
-
-
-
-
100,000
1,000,000
-
-
-
100,000
-
-
-
1,100,000
-
-
-
-
-
-
-
200,000
2,000,000
-
75,000
-
-
-
-
-
75,000
545,000
104,000
162,000
169,000
175,000
-
270,000
-
-
-
-
-
2,000,000
-
-
-
-
-
300,000
-
-
-
-
-
-
-
500,000
-
-
30,000
-
31,000
-
34,000
-
30,000
-
-
-
-
-
-
600,000
-
-
-
-
-
750,000
-
-
-
-
30,000
-
-
-
-
-
35,000
-
-
-
-
-
8,000
-
-
-
-
-
20,000
-
-
-
-
-
10,000
-
-
-
-
-
12,000
-
-
-
-
-
10,000
1,000,000
-
-
-
-
-
130,000
-
-
-
-
80,000
45,000
-
-
-
-
-
-
780,000
1,622,000
-
-
-
1,200,000
-
-
-
-
-
-
-
-
1,800,000
-
-
1,200,000
-
-
-
-
-
-
26,000
-
-
29,000
90,000
-
-
-
-
-
300,000
-
-
-
-
-
130,000
-
-
-
-
-
100,000
100,000
104,000
108,000
112,000
117,000
1,571,304
13,712,000
1,535,000
4,958,000
5,424,000
432,000
7,767,857
52,285
1,113,714
252,143
424,571
DRAFT58956p"t014
Beginning Balance
Revenues
Transfer In from 170
Interest Earnings
Total Revenues
Expenditures
Transfer Out to 170 (for Debt Service)
Total Expenditures
Ending Balance
Restricted Debt Service Reserve
2007 COP Proceeds (w/ fiscal agent)
Cash Deficit (amt. owed for past DS)
Beginning Balance
Revenues
Wastewater IMF
Interest Earnings
Total Revenues
Expenditures
Transfer Out (to 170 for Debt Service)
Total Expenditures
Ending Balance
Owed to Fund 170 for Debt Service
Beginning Balance
Transfer In from 170
Total Revenues
Expenditures
Transfer Out to 170
Total Expenditures
Ending Balance
FY 13-14 1 FY 14-15 1 FY 15-16 1 FY 16-17 1 FY 17-18 1 FY 18-19
3,135,539
3,135,539
3,135,539
3,135,539
3,135,539
3,135,539
31,000
31,000
110,000
110,000
110,000
110,000
31,000
31,000
110,000
110,000
110,000
110,000
31,000
31,000
110,000
110,000
110,000
110,000
31,000
31,000
110,000
110,000
110,000
110,000
3,135,539
3,135,539
3,135,539
3,135,539
3,135,539
3,135,539
2,379,536
2,379,536
2,379,536
2,379,536
2,379,536
2,379,536
756,003
756,003
756,003
756,003
756,003
756,003
15,775
148,775
149,775
153,775
153,775
153,775
149,000
149,000
149,000
149,000
149,000
149,000
-
1,000
5,000
5,000
5,000
5,000
149,000
150,000
154,000
154,000
154,000
154,000
16,000
149,000
150,000
154,000
154,000
154,000
16,000
149,000
150,000
154,000
154,000
154,000
148,775
149,775
153,775
153,775
153,775
153,775
2,199,000
500,000
3,010,000
500,000
3,823,000
500,000
4,631,000
500,000
5,444,000
500,000
6,259,000
500,000
500,000
500,000
500,000
500,000
500,000 no
oDIA nn 14
FY 13-14 1 FY 14-15 1 FY 15-16 1 FY 16-17 1 FY 17-18 1 FY 18-19
Aggregate End -of -Year Balance
15,363,000
6,078,000
9,278,000
9,319,000
9,090,000
13,629,000
Operating Reserve (25%)
2,986,000
2,166,000
2,225,000
2,283,000
2,347,000
2,507,000
Restricted DS Reserve
2,379,536
2,379,536
2,379,536
2,379,536
2,379,536
2,379,536
2007 COP Proceeds
756,003
756,003
756,003
756,003
756,003
756,003
Rate Stabilization Fund
500,000
500,000
500,000
500,000
500,000
500,000
Net Available for Capital Projects
8,741,461
276,461
3,417,461
3,400,461
3,107,461
7,486,461
City of Lodi -- Wastewater Utility
Financial Plan Assumptions
Financial Assumptions
General Inflation
Labor Inflation
Material/Energy Inflation
Construction Inflation
Interest Earnings
Cust. Growth (SSUs)
Wastewater Mitigation Impact Fee
Residential 3/4"
Non -Residential 3/4"
FY 13-14
FY 14-15
3.0%
3.0%
3.4%
3.4%
4.5%
4.5%
4.0%
4.0%
1.0%
1.0%
50
50
1,720
$ 1,720 $
4,225
4,225
FY 15-16
3.0%
3.4%
4.5%
4.0%
3.5%
50
1,720 $
4,225
FY 16-17
3.0%
3.4%
4.5%
4.0%
3.5%
50
1,720 $
4,225
FY 17-18
3.0%
3.4%
4.5%
4.0%
3.5%
50
1,720 $
4,225
FY 18-19
3.0%
3.4%
4.5%
4.0%
3.5%
50
1,720
4,225
DRAFT -- 5/6/2014
Exhibit B
City of Lodi -- Wastewater Utility
current ana rroposea wastewater nates
Notes:
(1) Winter water usage determined as average monthly usage from December through February.
Current
July 2014
Residential
Percent Increase
2.5
Flat Rates ($/month)
1 Bedroom
$
25.83
$
26.48
2 Bedroom
$
34.44
$
35.30
3 Bedroom
$
43.05
$
44.13
4 Bedroom
$
51.66
$
52.95
5 Bedroom
$
60.27
$
61.78
6 Bedroom
$
68.88
$
70.60
7 Bedroom
$
77.49
$
79.43
Usage -Based Rates
Service Charge ($/month for 3/4" water meter)
$
23.52
$
24.11
Usage Charge ($/CCF) (1)
$
2.68
$
2.75
Non -Residential ($/month)
Moderate Strength (per SSU)
$
34.44
$
35.30
High Strength
Flow (per MG, annual basis)
$
3,487.41
$
3,574.60
BOD (per 1,000 lbs, annual basis)
$
575.51
$
589.90
SS (per 1,000 lbs, annual basis)
$
359.85
$
368.85
Grease Interceptor & Septic Holding Tank
Waste within City Limits (per 1,000 gal.)
$
304.72
$
312.34
Septic (only) Holding Tank Waste
Outside City Limits (per 1,000 gal.)
$
646.89
$
663.06
Disposal to Storm Drain System (per MG)
$
320.09
$
328.09
Notes:
(1) Winter water usage determined as average monthly usage from December through February.
Exhibit C
City of Lodi
Notes:
(1) Multi -family includes duplexes, triplexes, fourplexes, apartments, condominiums, and mobile home parks.
(2) This rate schedule is revenue neutral relative to the proposed newly indexed July 2014 water rates, but includes the beginning of the
proposed 3 -year phased changes to the rate structure.
(3) These rate schedules reflect the second and third year of the 3 -year rate structure phasing, as well as the maximum potential rate
adjustment due to ENR indexing.
Current and Proposed
Usage -Based Water Rates
Future Rate Ceiling
Current
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
(Jan. 2014)
(July 2014)
(Jan. 2015)
(Jan. 2016)
(Jan. 2017)
(Jan. 2018)
(Jan.
2019)
Rate Increase -->
(2)
3.0%(3)
3.0%(3)
3.0%
3.0%
3.0%
USAGE -BASED RATES
Monthly Service Charge
Single Family
Up to 3/4" meter
$
24.37
$
23.26
$
22.80
$
21.65
$
22.30
$ 22.97
$
23.66
1" meter
$
39.57
$
37.38
$
36.26
$
34.01
$
35.03
$ 36.08
$
37.16
1 1/2" meter
$
77.31
$
72.45
$
69.63
$
64.62
$
66.56
$ 68.56
$
70.62
2" meter
$
122.78
$
114.71
$
109.84
$
101.52
$
104.57
$ 107.71
$
110.94
Multi -Family and Non -Residential (1)
Up to 3/4" meter
$
24.37
$
23.26
$
22.80
$
21.65
$
22.30
$ 22.97
$
23.66
1" meter
$
39.57
$
37.38
$
36.26
$
34.01
$
35.03
$ 36.08
$
37.16
1 1/2" meter
$
61.75
$
62.08
$
64.28
$
64.62
$
66.56
$ 68.56
$
70.62
2" meter
$
77.15
$
84.29
$
94.17
$
101.52
$
104.57
$ 107.71
$
110.94
3" meter
$
108.01
$
132.74
$
162.18
$
187.65
$
193.28
$ 199.08
$
205.05
4" meter
$
138.90
$
193.14
$
254.80
$
310.67
$
319.99
$ 329.59
$
339.48
6" meter
$
200.57
$
333.69
$
480.82
$
617.94
$
636.48
$ 655.57
$
675.24
8" meter
$
262.31
$
494.23
$
747.94
$
986.82
$
1,016.42
$ 1,046.91
$
1,078.32
10" meter
$
324.00
$
674.61
$
1,056.08
$
1,417.30
$
1,459.82
$ 1,503.61
$
1,548.72
Usage Rates ($/CCF)
Single Family
Tier 1 (0-10 CCF)
$
0.94
$
0.94
$
0.97
$
0.96
$
0.99
$ 1.02
$
1.05
Tier 2 (11-50 CCF)
$
1.41
$
1.35
$
1.33
$
1.27
$
1.31
$ 1.35
$
1.39
Tier 3 (>50 CCF)
$
1.87
$
1.76
$
1.70
$
1.59
$
1.64
$ 1.69
$
1.74
Multi -Family and Non -Residential (1)
All water usage
$
0.94
$
1.00
$
1.09
$
1.14
$
1.17
$ 1.21
$
1.25
Notes:
(1) Multi -family includes duplexes, triplexes, fourplexes, apartments, condominiums, and mobile home parks.
(2) This rate schedule is revenue neutral relative to the proposed newly indexed July 2014 water rates, but includes the beginning of the
proposed 3 -year phased changes to the rate structure.
(3) These rate schedules reflect the second and third year of the 3 -year rate structure phasing, as well as the maximum potential rate
adjustment due to ENR indexing.
City of Lodi -- Water Utility
Financial Plan Summary
Ending Balance
Operating Reserve (25%)
Available Balance
Debt Service Coverage (min. 1.25)
Beginning Balance
Revenues
Operating Transfers In
Interest Earnings
Retrofit Meter Install. Charge
Debt Proceeds
Total Revenues
Expenditures
Water Meter/Main Install. Project
Water Taps
Miscellaneous Water Mains
Commercial Meter Replacements
Financial System Replacement
City Hall Annex
GAC & Meter Repl (DBCP)
UWMP Update
6,734,640
FY 13-14
FY 14-15
FY 15-16
FY 16-17
FY 17-18
FY 18-19
1,631,000
2.5%
2.5%
2.5%
3.0%
3.0%
3.0%
5,033,668
Jan. 2014
Jan. 2015
Jan. 2016
Jan. 2017
Jan. 2018
Jan. 2019
WATER OPERATING FUND (180)
3.31
3.45
5,545,755
6,047,000
6,017,000
8,505,000
Beginning Balance
7,038,455
6,734,640
7,795,229
6,711,668
3,287,607
2,910,996
Revenues
324,000
300,000
300,000
300,000
300,000
300,000
Water Sales
12,716,000
13,059,000
13,412,000
13,807,000
14,286,000
14,744,000
Interest Earnings
136,000
144,000
144,000
99,000
61,000
129,000
Other Revenues
791,070
2,580,400
269,000
272,000
275,000
278,000
Transfer From/(To) RSF (18x)
(500,000)
-
-
-
-
-
Transfer from Fund 182 for Debt Service
-
109,000
109,000
109,000
109,000
109,000
Total Revenues
13,143,070
15,892,400
13,934,000
14,287,000
14,731,000
15,260,000
Expenditures
Transfer Out to General Fund (Cost of Services)
780,000
780,000
780,000
780,000
780,000
780,000
Transfer Out to Capital Fund 181 for projects
4,500,000
6,000,000
6,000,000
8,500,000
5,700,000
1,000,000
To Capital Fund 181 (Depreciation)
-
-
-
-
-
-
Personnel Services
2,093,000
2,028,000
2,098,000
2,170,000
2,244,000
2,320,000
Utilities
755,000
664,000
693,000
723,000
754,000
787,000
Supplies, Mat'ls., Services & Other
2,963,000
3,052,000
3,140,000
3,230,000
3,324,000
3,419,000
Debt Service
Net 2010 Rev. Bond Payments
2,355,886
2,307,811
2,306,561
2,308,061
2,305,611
2,307,111
Total Expenditures
13,446,886
14,831,811
15,017,561
17,711,061
15,107,611
10,613,111
Ending Balance
Operating Reserve (25%)
Available Balance
Debt Service Coverage (min. 1.25)
Beginning Balance
Revenues
Operating Transfers In
Interest Earnings
Retrofit Meter Install. Charge
Debt Proceeds
Total Revenues
Expenditures
Water Meter/Main Install. Project
Water Taps
Miscellaneous Water Mains
Commercial Meter Replacements
Financial System Replacement
City Hall Annex
GAC & Meter Repl (DBCP)
UWMP Update
6,734,640
7,795,229
6,711,668
3,287,607
2,910,996
7,557,885
1,648,000
1,631,000
1,678,000
1,726,000
1,776,000
1,827,000
5,086,640
6,164,229
5,033,668
1,561,607
1,134,996
5,730,885
3.25
4.08
3.14
3.20
3.31
3.45
1
3,809,103
3,268,379
1,493,379
185,379
308,379
291,379
4,549,755
6,000,000
6,000,000
8,500,000
5,700,000
1,000,000
70,000
47,000
17,000
5,000
6,000
8,000
926,000
-
-
-
-
-
5,545,755
6,047,000
6,017,000
8,505,000
5,706,000
1,008,000
4,780,000
5,487,000
6,177,000
7,264,000
2,848,000
-
75,000
75,000
77,000
79,000
82,000
84,000
50,000
-
51,000
53,000
54,000
56,000
5,000
5,000
5,000
5,000
5,000
6,000
250,000
250,000
-
-
-
-
-
625,000
-
-
-
-
324,000
300,000
300,000
300,000
300,000
300,000
-
-
51,000
-
-
-
FY 13-14 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19
Fire Station 2 Water Main
25,000
-
-
-
-
Meter Fixed Network
-
-
-
-
-
MSC/Kofu Parking Lot
75,000
-
-
-
-
Debenedetti Enclosure
30,000
-
-
-
-
Sacramento Street
127,479
-
-
-
-
Southwest Gateway Water Tank
-
-
-
200,000
2,000,000
Surface Water Treatment Plant PS Generator
-
-
300,000
-
-
Well 1
-
-
166,000
-
-
Well 2 -Replace Motor
-
-
103,000
-
-
Well 6R -Pump Rehab/Rept
116,000
-
-
-
-
Well 5 -Pump Rehab & Electrical Upgrade
-
145,000
-
-
-
Well 8 -Pump Rehab, Electrical Upgrade & Chlorination
-
245,000
-
-
-
Well 10 - Pump Rehab
-
120,000
-
-
-
Well 11
-
-
-
175,000
-
Well 12 -Pump Rehab/Rept
-
-
-
264,000
-
Well 13 -Pump Rehab & Electrical Upgrade
-
135,000
-
-
-
Well 14 -Pump Rehab/Rept
-
-
-
-
181,000
Well 15 -Pump Rehab/Rept
-
-
-
-
190,000
Well 16 -Pump Rehab/Electrical Upgrade
-
-
-
-
-
Well 17 -Pump Rehab/Electrical Upgrade
-
-
-
-
-
Well 18 -Pumpb Rehab/Electrical Upgrade
-
40,000
-
-
-
Well 19 -Pump Replacement
4,000
-
-
-
-
Well 20 -Pump Rehab/Electrical Upgrade
-
145,000
-
-
-
Well 24 - Pump Rehab & Electrical Upgrade
135,000
-
-
-
-
Well Site Improvements
-
100,000
-
-
-
Vehicles/Equipment
90,000
150,000
95,000
42,000
63,000
Total Expenditures
6,086,479
7,822,000
7,325,000
8,382,000
5,723,000
Balance
Beginning Balance
Revenues
Water Impact Mitigation Fees
Interest Earnings
Total Revenues
Expenditures
Transfer to Fund 181 for Well 27
Transfer to Operations Fund 180 for Debt Service
Total Expenditures
Ending Balance
Owed Fund 180 for Debt Service
79
224,000
207,000
45,000
922,000
.379 185,379 308,379 291,379 377,379
(6,846) 52,399 53,399 54,399 55,399 56,399
109,000 109,000 109,000 109,000 109,000 109,000
- 1,000 1,000 1,000 1,000 1,000
109,000 110,000 110,000 110,000 110,000 110,000
49,755 - - - - -
- 109,000 109,000 109,000 109,000 109,000
49,755 109,000 109,000 109,000 109,000 109,000
52,399 53,399 54,399 55,399 56,399 57,399
5,345,000 6,775,000 8,204,000 9,634,000 11,062,000 12,491,000
Beginning Balance
Revenues
Transfer In from 180
Total Revenues
Expenditures
Transfer Out to 180
Total Expenditures
Ending Balance
FY 13-14 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19
- 500,000 500,000 500,000 500,000 500,000
500,000 - - - - -
500,000 - - - - -
500,000 500,000 500,000 500,000 500,000 500,000
City of Lodi -- Water Utility
Financiai Pian Assumptions
Financial Assumptions
Aggregate End -of -Year Balance *
12,411,000
11,698,000
9,307,000
6,007,000
5,615,000
10,349,000
Operating Reserve (25%)
1,648,000
1,631,000
1,678,000
1,726,000
1,776,000
1,827,000
Restricted DS Reserve
2,356,000
2,356,000
2,356,000
2,356,000
2,356,000
2,356,000
2010 COP Proceeds
-
-
-
-
-
-
Rate Stabilization Fund
500,000
500,000
500,000
500,000
500,000
500,000
Net Available for Capital Projects
7,907,000
7,211,000
4,773,000
1,425,000
983,000
5,666,000
City of Lodi -- Water Utility
Financiai Pian Assumptions
Financial Assumptions
General Inflation
3.0%
3.0%
3.0%
3.0%
3.0%
3.0%
Labor Inflation
3.4%
3.4%
3.4%
3.4%
3.4%
3.4%
Material/Energy Inflation
4.5%
4.5%
4.5%
4.5%
4.5%
4.5%
Construction Inflation
2.5%
2.5%
2.5%
3.0%
3.0%
3.0%
Interest Earnings
2.0%
2.0%
2.0%
2.0%
2.0%
2.5%
Customer Account Assumptions
No. of DUs/Accounts
23,506
23,556
23,606
23,656
23,706
23,756
No. of 3/4" Eq. Mtrs.
25,554
25,604
25,654
25,704
25,754
25,804
No. of New Connections
50
50
50
50
50
50
Customer Growth Rate
0.20%
0.20%
0.19%
0.19%
0.19%
0.19%
Water Mitigation Impact Fee
Residential $ 1,263 $
1,263 $
1,263 $
1,263 $
1,263 $
1,263
Non -Residential 3,103
3,103
3,103
3,103
3,103
3,103
Please immediately confirm receipt
of this fax by calling 333-6702
CITY OF LODI
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
ADVERTISING INSTRUCTIONS
SUBJECT: PUBLIC HEARING SETTING PRE -APPROVED ENGINEERING
NEWS RECORD INDEX FOR WASTEWATER RATES AND
RESTRUCTURED WATER RATES FOR RESIDENTIAL,
COMMERCIAL, AND INDUSTRIAL CUSTOMERS
PUBLISH DATE: SATURDAY, JUNE 7, 2014
TEAR SHEETS WANTED: One (1) please
SEND AFFIDAVIT AND BILL TO:
LNS ACCT. #0510052
DATED: THURSDAY, JUNE 5, 2014
ORDERED BY: RANDI JOHL-OLSON
CITY CLERK
10.0 ZPAR
RANDI JOHL-OLSON, CITY CLERK
City of Lodi
P.O. Box 3006
Lodi, CA 95241-1910
MARIA DITMORE
ADMINISTRATIVE CLERK
Verify Appearance of this Legal in the Newspaper — Copy to File
forms\advins.doc
DECLARATION OF POSTING
PUBLIC HEARING SETTING PRE -APPROVED ENGINEERING NEWS
RECORD INDEX FOR WASTEWATER RATES AND RESTRUCTURED WATER
RATES FOR RESIDENTIAL, COMMERCIAL, AND INDUSTRIAL CUSTOMERS
On Thursday, June 5, 2014, in the City of Lodi, San Joaquin County, California, a Notice
of Public Hearing setting pre -approved Engineering News Record index for wastewater
rates and restructured water rates for residential, commercial, and industrial customers
(attached and marked as Exhibit A) was posted at the following locations:
Lodi City Clerk's Office
Lodi City Hall Lobby
Lodi Carnegie Forum
I declare under penalty of perjury that the foregoing is true and correct.
Executed on June 5, 2014, at Lodi, California.
4NNIFERLM. ROBISON, CMC
ASSISTANT CITY CLERK
N:\Administration\CLERK\Forms\DECPOSTPW.DOC
ORDERED BY:
RANDI JOHL-OLSON
CITY CLERK
MARIA DITMORE
ADMINISTRATIVE CLERK
s' . •. CITY OF LODI
e Carnegie Forum
`• - 305 West Pine Street, Lodi
NOTICE OF PUBLIC HEARING
Date: July 16, 2014
Time: 7:00 p.m.
For information regarding this notice please contact:
Randi Johl-Olson,
City Clerk
Telephone: (209) 333-6702
NOTICE OF PUBLIC HEARING
NOTICE IS HEREBY GIVEN that on Wednesday, July 16, 2014, at the hour of
7:00 p.m., or as soon thereafter as the matter may be heard, the City Council will
conduct a public hearing at the Carnegie Forum, 305 West Pine Street, Lodi, to consider
the following matter:
a) Resolution setting pre -approved Engineering News Record index for
wastewater rates and restructured water rates for residential, commercial,
and industrial customers.
Information regarding this item may be obtained in the Public Works Department,
221 West Pine Street, Lodi, (209) 333-6706. All interested persons are invited to
present their views and comments on this matter. Written statements may be filed with
the City Clerk, City Hall, 221 West Pine Street, 2nd Floor, Lodi, 95240, at any time prior
to the hearing scheduled herein, and oral statements may be made at said hearing.
If you challenge the subject matter in court, you may be limited to raising only those
issues you or someone else raised at the public hearing described in this notice or in
written correspondence delivered to the City Clerk, 221 West Pine Street, at or prior to
the close of the public hearing.
B er of the Lodi City Council:
Rbrrdi4ofil-Olson
City Clerk
Dated: June 4, 2014
Approved as to form:
i
` -_ Janice.D. Magdich
Interim City Attorney
N:1Administration\CLERK\PubHear%NOTICES\NotPW.doc CLERK\PUBHEARINOTICES1NotMdoc 6/3/14