Loading...
HomeMy WebLinkAboutAgenda Report - December 6, 1989 PH (12)CITY OF LORI PUBLIC WORKS DEPARTMENT COUNCIL COMMUNICATION T0: City Council FROM: City Manager MEETING DATE: December 6, 1989 AGENDA TITLE: Set Public Hearing for December 20, 1989 Regarding the Updating of Storm Drainage Fees RECOMMENDED AC,'EM That the City Council set a public hearing for December 20, 1989 to hear a report on the updated storm drain fees. BACKGROUND One year ago, the City adopted updated storm drain fees in accordance w i t h Assembly B i 11 1600. The ordinance and subsequent resolution called for an annual update of the fees. This update, i s being prepared and will be presented cn December 20, 1989. This hearing is required under the original ordinance and resolution adopted. It -As anticipated that this hearing will be very short. Following the hearing,'if there are no substantial changes, a resolution will be presented for adoption. It will be recommended that the fees go into effect on January 1, ;1990. ' Thu - previous storm drain fees were updated every six months i n accordance with the Engineering TbAs Record Construction Cost Index and it is anticipated that the increase this year will be corparable. kL& Jac L. Ronsko Publ c Works Director JLR/RCP/mt APPROVED: FILE NO. CSTORM5/TXTW.02M Novemhor 29, 1989 a i 3 . k� a i cosy OF LODI DEPARTMENT QE PUBLIC WORKS k� f cosy OF LODI DEPARTMENT QE PUBLIC WORKS C I T Y O F L 0 D I PUBLIC WORKS DEPARTMENT December 1989 1989 SET NO. / City o f Lodi Master Storm Drain System Capital Improvement Programa This document presents the background material for the expansion and funding of the City's Master Storm Drair System. The report consists of the following: Storm Drain Fee Calculation - summary of figures used to calculate fee Storm Drain Fee History - summary of fees collected. interest and expenditures Project Summary - list of projects and their total cost Master Storm Drain System Map - shows service area and projects Project Sheets - individual sheets describing the project with cost estimate Ordinance - Ordinance No. 1440 implex enting the storm drain fee Resolution - Resolution 88-165 setting the fee for 1989 and administrative procedures Update Resolution • the draft 1990 fee update resolution The City's Master Storm Drain system consists of an interconnected network of detection basins. PumP station: and trunk lines. The system is based on a plan described in the 1963 Master Plan prepared by Blair-Westfall Associates although the plan has been modified by various Council decisions since then. The basic system is shown on the attached Hap. Various inteconnecting lines and lines smaller than 30" are not shown. The Storm Drainage Fee is used to pay for these Master facilities. Fees collected are placed in a separate interest bearing fund (123.1). Funds are appropriated by the City Council as part of the annual Capital Improvement Program. 12/4/89 VSQ1NTR0.XLS All projects shown on the Master Storm Orain System Project SLnary Sheet: Less Fund Balance: Total : RMAinina Service Area Residential Acreage: 1129.5 (includes all areas with C -factor I of 0.5 or less; also excludes acreage covered by pre-existing ?9reements) Comweiai/Industrial Acreage: Total Acreage: Cost per Commercial/In6ustrial Acres 763.5 1893.1 1.333 times Cost per Residential Acre Residential Fee: $4.050 per acre x 1129.6 acres equals: $4,574,880 Coign'1& Industrial Fee: $5,400 per acre x 763.5 acres ?quals: $4,122,900 Total: 58.69,.780 Note: Acreage fee is rounded to nearest 510., thus total does not exactly agree with total cost. .2;a/89 FEE CtigO.XLS $8.688.000 (512.381);,•: 619" .,vi.,•. np i 1 Residential Fee: $4.050 per acre x 1129.6 acres equals: $4,574,880 Coign'1& Industrial Fee: $5,400 per acre x 763.5 acres ?quals: $4,122,900 Total: 58.69,.780 Note: Acreage fee is rounded to nearest 510., thus total does not exactly agree with total cost. .2;a/89 FEE CtigO.XLS 12/1/29 FEE N1STALS C i .ter of Lodi Master Storm Drain System Capital improvement Program Storm Drain fee History f .torm Dr+in Fund (AB 1600) - 123.1 �f Fiscal Year Beg. Balance Fees Collected Interest Expenditures End. Balance 1988/89 $ 0.00 S 30,185.00 $ 4,395.64 $ 22,200.00 S 12.380.64 canpleted ppro ect MSD019% deleted NSD�06. 1989/90 12,380.64 12/1/29 FEE N1STALS C i t y o1F Lodi I Plaster Storm Drain System Capital Improvement Program Project Summary P o.iect Number Pro.iect Title Update Cost for: Jan -90 MSDO01 C -Basin Development (Pixley Park) $ 691.000 RiDO02 Calaveras St. Storm Drain Lockeford to Turner 120.000 MSDO03 Turner Rd./Guild Ave. Storm Drain 213.000 MSDO04 Pine St. Storm Drain Guild Ave. to BOO' E/Guild 42,000 MSDO05 Thurman St. Storm Grain 70,000 MSDO06 Vine St. Storm Drain 400' E/Guff Ave. to Guild Ave. none MSDO07 C -Basin Southeast Area Storm Drain 172.000 MSDO08 Evergreen Dr. Storm Drain White Oak WaV to 500' N/Turner Rd. 129.000 MOODS Evergreen Dr. Storm Drain Bayberry Dr to 1400' S/Bayberry 63,ODD MSDO10 E -Basin Expansion (Westgate Park) 1.244,000 MSDO11 F -Basin Development 2.168.000 MSDO12 F -Basin North/South Storm Drain 366.000 MSDO13 Kettleman Lane Storm Drain East of G -Area Trunk Line 148,000 MSDO14 Kettleman Lane Storm Drain Vest of G -Area Trunk Line 184,000 MSDO15 G -Basin Southeast Area Storm Drain 260.000 MSDO16 Orchis Drive Storm Drain West cf Sylvan Wal 63,000 MSDO17 G -Basin Development (future family golf center) 2,673,000 MSDO18 Master Storm Drain System Engineering 82,OCO C MSDO19 Lodi kve. Storm Drain 600' E/Cluff Ave. to Guild Ave. no:ie L Refer to individual project sheet: for details. indicates completed project Total Cost: $ 8,688,000 i;JU/L+_' RS V. U, -,AL: •ni;;;;■ Mtiilil■O,7 111111M.M.0 nu Lun .!gn,,�:=c Hfi ■ ifil ff { C i t y o f Loci! C -Basin Development Capital Improvement Prograll (Pixley Park) P Dem i f This project included the expansion and development of the C -Basin according to the Master Plan adopted in �:...-,,..•.`_. 1988 (Dwg 88EO03). the estimates are for Master Storm Crain improvements only. Park improvements are estimated separately. The basin will be developed in phases as shown. Excavation will be over a period of approximately 3 years. I It is assumed the landscape architect who prepared the Master Plan will be retaioed to participate in th€ design of_the grading, landscaping and irrigation. imatedCosts Date of ENR Item Amount.. Estimate Index - Prelim Eng: EIR: Rights of Way: Easements: Consultants: 13igler, design 4,000 concepts. landscaping) Gesign Eng.: Ccnstruction: a) Excavation, fence budgeted 88/89 b) Street Improv's 171.000 Jun -88 4525 c) Interior drainage 72.000 Dec -86 4348 d) Control/Pump Str. 140.000 Jun -88 4525 e) Landscape/Irrig. 284.700 Jun -88 4525 Other: 176.000 $ 77,000 $ 144,000 294,OOA Total Cost: $ 691,000 lemarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not. it is included in construction. Construction includes contract administration 6 inspection unless shown otherwise. Estimated Costs Date of ENR AmounL Estimate Index Prelim Eng: EIR: Rights of Way. Easements: Consultants: Design Eng.: 5.000 Jun -88 4525 Construction: 108,000 Jun -88 4525 Other: Via. , ..:...,,.. , .....::. Total Cost: $ 120,000 emarks Design Engineering shown separately if anticipated to be budgeted prior to construction: if not. it is included in construction. Construction includes contract administration 5 inspection unless shown otherwise. Project Number slft2 < t Updated Cost for: - Jan -90 ENR Index:¢¢ ' i. Via. , ..:...,,.. , .....::. Total Cost: $ 120,000 emarks Design Engineering shown separately if anticipated to be budgeted prior to construction: if not. it is included in construction. Construction includes contract administration 5 inspection unless shown otherwise. Design Eng.: Construction: Other: 206,700 Jun -88 4525 213.00 f. '.. 11 - .. - - Tota) Cost: $ 213,0001 !ema rks Design Engineering shown separately if anticipated to t:� budoeted prior to construction; if not. it is included in construction. Construction includes contract admi istration & inspe:;tion uniess shown otherwise. i k l City of Logi Pine St. Storm Drain 3 1 Cdpi tal Improvewnt Prograp, Guild Ave. to 800' E/Gui l d iiect Description This project includes the installation of approxiirately 800 LF of 30" storm drain and manholes The project will be phased to accomodate adjacent development. , elated Protects. E>t imated costa Date oT ENR Item 8Munt_ Estimate Index . Pre im Eng: EIR: Rights of Way. Easements: Consultants: Design Eng.: Constriction: 40.600 Jun -88 4525 Other: Tota] Cost: $ 42,000 emarks Design Engineering shown separately if anticipated to be oudget:�d prior to construction; if not it is included in construction. Construction includes contract administration & inspection unless shown otherwise. i is ,i Project° Number: 14S0004 Updated Jan -90 n6 OR .T1ex- ex is. 3 42.00( Tota] Cost: $ 42,000 emarks Design Engineering shown separately if anticipated to be oudget:�d prior to construction; if not it is included in construction. Construction includes contract administration & inspection unless shown otherwise. City o f L od i [Thurman St. ;:orm Drain Capital Improvement Program iect Description This project includes the installation of approximately 1250 LF of 36" storm drain and manholes. The line will extend east from the existing 54" trunk line located in an easement along the extension of C1e Ave . The project will be phased to accomodate adjacent development. Phase 1 - across Industrial Substation Frontage (535') Phase 2 - florin Substation to Guild Ave timated Costs Date of ENR Item Amount Estimat Index Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: Phase ' 29,000 Jun -88 4525 Phase 2 39,000 Jun -88 4525 Other : Project Number: HSD005 Updated Cost for: ENR Index:. Jan -gip 4665 $ 30,000 $ 40.000 rotal Cost: 70,000 Design Eno ineering shown separately if anticipated to be budgeted prior to construction; if not. it is included in construction Construction includes contract administration & 'nspection unless shown otherwise i!'30/b� MSD004.X! S g, t City o f L octf Vine St. Storm Drain i ripital Improvement Program 400' E/Cluff Ave. to Guild Ave. !� ilo�ggcriotion This project includes the installation of approximately 650 LF of 30" storm drain and manholes. A portion of this project was completed as part of adjacent industrial development which was subject to the previous Master Storm Drain fee. thus some of the project was funded fry that account. The project is being shown for the 1990 fee update to provide a record of the project. Item Prelim Eng: ESR: Rights of Way: Easements: Consultants: Design Eng.: Construction: a) 444' E/Cluff to 750' E/Cluff b) 750' EiCluff to Guild Other: Date of ENR Mwunt Estimate Index completed completed Total Cost: $ none remarks Design Engineering shown separately anticipated to be budgeted prior to construction: if net, it is included in cno:truction. Construction includes cc.:tractao. inistr.,tion g inspecrion unless shown otherwise. C1 ty o f Locf i C -Basin Southeast Area Storm Drain Capital Improvement Program This project includes the installation of 42" and 30" storm drains and manholes south and east of C -Basin (Pixley Park) to Guild Ave The project will include an inlet structure at the southeast corner of the basin. Exact alignment of the stoian drain will depend on the street layout of the area. The project will be phased to accomodate adjacent development. stimated Costs Date of ENR _Item_ Amount Estimate Index Prelim Eng. EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: 167,000 Jun -88 4525 Other: ect Number: "440007 Updated Cost Por: Jan -90 ENR lndeii: AM S 172.000 Total Cost: $ 172,001 emar s Design Engineering shown separately if anticipated to be budgeted prior to construction. if not, it is included in construction Construction includes contract administration R inspection unless shown otherwise 11/30/89 HSDODi.Xt City o f Lodi Evergreen Dr. Storm Drain Capita? improvement Program White Oak Way to 500' N/Turner Rd. f pjo.iect Descriotice This project includes the installation of 36" and 30" storm drains and manholes north of the Parkwest Subdivision. The line will connect to the existing trunk line in Evergreen Dr. to E -Basin (Westgate Park), The project will be phased to accmdate adjacent development. Item Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Cc,nstruct ion Other: Date of ENR Amount Estimate index 125.000 Jun -88 4525 Number:. 1410008 Updated Cost for: ENR index' Jan -90 .... 44%L P mom $ 129.00'0 1 Tota] Cost: $ 129,W01 Design Engineering shown separately if anticipated to be buogete�; prior to construction: iF not.. it is included in construction. Construction includes contract administration B ;nspection unless shown otherwise. C! t of L ocY 1 Evergreen Dr. Storm Drain Capital Improvement Program Bayberry Dr to 1400' 5/Bayberry Prosect Description This project includes the installation of 36" and 30" storm drains and manholes south of the Parkwest Subdivision. The line will connect to the existing trunk line in Evergreen Dr. to E -Basin (Westgate Park). The project will be phased to accomodate adjacent development. Bslated ProJec-t-s Project Number: NSDO09 Estimated Costs Date of ENR Updated Cost for: Jan -90 Item Amount Estimate Index Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: 61.300 Jun -88 4525 S 63.000 Other: Total Cost: $ 63,000 Reim-rks Design Engineering shown separately if anticipated to be budgeted prior to construction, if not. it is included in construction Construction includes contract administration & inspection unless shown otherwise 11,"30/89 MSD009.XL5 roiect DescriDt ion This project includes the expansion and development of the E -Basin according to the Naster Plan adopted in 1986 (Dwg 88E002). The estimates are for Master Storm Drain improvements only. Park improvements are estimated separately. i The basin expansion will be needed when either of the areas north or south of the Parkwest Subdivision develop. It is assumed the excavation will be done at no net cost to the City. IPrelimE g: EIR: Rights of Way. (15.5 Ac 8 $42.000/ac) Easements: Date of ENR Amount Estimate index 651,000 Jan -90 4665 Consultants: (appraisal) 3,000 Design Eng. : Construction: a) Fence 62,920 b) Street Improv's 140.400 c) Interior drainage 100.750 d) Control/Pump Str. (existing) e) Landscape/Irrig. 268,060 Other: Jan -90 4665 Project Number: KSDO10 Updated Cost for: J ENR Index: Jun -88 f' $ 65.00 Jun -88 4525 $ 145.00 t Jun -88 an -90 )„ Jun -88 4525 $ 276.00 S 651.00 i 3.00 Jun -88 4525 $ 65.00 Jun -88 4525 $ 145.00 Jun -88 4525 S 104.00 Jun -88 4525 $ 276.00 — —1-- _ _ - Tota? Cost: $ 1,244,001 temarks Design Engineering shown separately if anticipated to be budgeted prior to construction: if not, it is included in construction. Construction includes contract administration & inspection unless shown otherwise X City o f L od i F -Basin Development Capital improvement Program This project includes the development of the F -Basin to be located north of Kettleman Lane, west of Loma- Sacramento Road. No detailed plan has been adopted for this park. The basin will be needed when the area west of Lower Sacramento Road between Kettleman Lane and the WID canal: develops. It is assumed the excavation will be done at no net cost to the City. Item Prelim Eng: EIR: Rights of Way: (25 Ac @ $42,000/ac) Easements: Consultants: (appraisal) Design Eng.: Date of ENR Amount Estimate Index $ 5,000 Jun -88 4525 1,050,000 Jan -90 4665 3,000 Jan -90 4665 Construction: a) Fence 119,600 Jun -88 4525 L` Project Number: ' MSD011': b) Street Improv's `� 4 Jun -88 Updated Cost for: 'Jan90 S ENR Index: 4 c) Interior drainage 162,500 Jun -88 4525 S 1.050.000 t $3.10001 i Construction: a) Fence 119,600 Jun -88 4525 $ 123,000 b) Street Improv's 244,400 Jun -88 3525 S 252,OOC c) Interior drainage 162,500 Jun -88 4525 $ 168,000 d) Control/Pump Str. 117.000 Jun -88 4525 $ 121:000 e) Landscape/Irrig. 432.250 Jun -88 4525 $ 446.000 Other: L,.. Total Cost: $ 2,168,000 terra rk s Design Engineering shown separately if anticipated to oe budgeted prior to construction: if not. it is included in construction. Construction includes contract administration B inspection unless shown otherwise. 11/30/89 MSD011.ALS City of Lod i F -Basin North/South Storm Drain to piW Improvewnt Program This project includes the installation of 54 48". 42- and 30" storm drains and manholes north of F -Basin. Exa.,t alignment and lengths of the storm drains will depend on the street layout of the area. The project will be phased to accomodate adjacent development. jtimated Costs Date of ENR Item Amount Estimate Index Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: 355,000 Jun -88 4525 Other: Updated Cost for: ENR _Index: . Total Cost: $ 366,6 emarks Design Engineering shown separately if anticipated to be budgeted prior tc construction; if not. it is included in construction. Constrcction includes contract administration & inspection unless shown otherwise. C i t y o1F Lod i Capital Improvement Program Kettl eman Lane Storrs Drain East of G -Area Trunk Line This project includes the installation of 36" and 30" storm drains and manholes ncrth of Kettleman Lane easterly from the existing 54" trunk line. Exact alignment and lengths of the storm drains will depend on the street layout of the area. The project will be phased to accomodate adjacent development. Project Number: NSDO13 ' Date of ENR Updated Cost for: Jan -90 Its Amount EstimateENR Index: n Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: 144,000 Jun -88 4525 S 148,000 Other: r — Total Cost: $ 148,0001 emarks Design Engineering shown separately if anticipated to be budgeted Prior to construction; if not it is included in construction. Construction includes zontract dministration & inspection unless shown otherwise. 3. XL City o f L od i Kett)eman Lane Storm Drain Capita7 Improvement Program West of 6 -Area Trunk Line t :ri This project includes the installation of a 30" storm drain and manholes north of Kettleman Lane westerly from the existing 54" trunk line to the future F -Basin. Exact alignment and lengths of the storm drains will depend on the street layout of the area. The project will be phased to accomodate adjacent development. The estimate included jacking pipe across Lower Sacramento Road. d Projects stied Costs Date of ENR Item Amount Estiwte Index Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng.: Construction: 178,000 Jun -88 4525 Other: Proiect Number: MSDO14 f M., Total Cost: $ ReEg,rks Gesign Engineering shows separately if anticipated to be budgeted prior to construction; if not, it is Included in construction. Construction includes contract administration & inspection unless shown otherwise. L 11/30/89 $ 184.000 184,00+ City of Lodi G -Basin Southeast Area Storni Drain Capital Improvement Program This project includes the installation of 48" and 36" storm drains and manholes south and east of the A second inlet will be added to the 6 -Basin at the southeast corner. Exact al ignment and lengths of the storm drains w i I I depend on the street layout of the area. The project will be phased to accomodate adjacent development. 1 Pros Prelim Eng: EIR: Ri;hts of Warr. Easements: Consultants: Design Eng.: Construct ion: Other: Date of ENR Amount Estimate Index_. 252.500 Jun -88 4525 Project Number: MSDO15 Update kit for: J 0 GRR n ex; $ 260.000 Total Cost: $ 260,00 lemarks Design Engineering shown separately if anticipated to be budgeted prior to construction; if not it is included in ctnstruction. Construction incudes contract administration 6 inspection unless shown otherwise. v City of Lodi Orchis Drive Storm Drain Capita7 Improvement Program I ( West of Sylvan Hay L This project includes the installation of 36" and 30" storm drains and manholes west and north from the existing 36" storm drain in Orchis Way. Exact alignment and lengths of the storm drains will depend on the street layout of the area. The project will be phased to accomodate adjacent development. "ltem Prelim Eng: EIR: Rights of Way: Easements: Consul tents: Design Eng.: Construction: Other: Date of ENR Amount Estimate Index 60,800 Jur;-88 4525 Number: MSDO16 Updated Cost for: Jan -90 ENR Index: L` $ 63,000 Tota) 6: biIvoo remarks Design Engineering shown separateia, if anticipated to be budgeted prior to construction; if not. it is included in construction. Construction includes contract adininistration 3 inspection uniess shown othc.wise, City of Lod i 6 -Basin Deve7opment Capital Improvement Prlog= (futurefami7y golf center) i !1 1Project Description This projecc includes the expansion and development of the 6 -Basin according to the family golf center concept. The estimates are for Master Storm Drain improvements only. Golf course improvements are estimated separately. The basin will be developed in phases as shown. Excavation will be over a period of approximately 3 years with no net cost to the City. It is assumed a golf course architect will be retained to participate in the design of the grading, and irrigation. RLn'arc c e ?� tinted Costs Date of ENR Item Amount fginate ,�u"n Prelim Eng: EIR: Rights of Way: (24 Ac 0 $42,000/ac) 1,008,000 Jan -90 4525 Easements: Consultants: (design concepts, 6,000 Jun -88 4525 l andscap ingI Design Eng.: (reappraisal! 3,000 Jan -90 4525 Construction: a) Excavation. fence 160,160 Jun -88 4525 b) Street Improv's 374,400 Jun -88 1525 c) Interior drainage 135.000 Jun -89 4593 d) Control/Pump Str. 117.000 Jun -88 4525 e) Landscape/Irrig. 803.400 Jun -89 4593 Other: Project Number: NSDO17 temarks Design Engineering shown separately if anticipates to be budgeted prior to construction; if not. it is included in construction. Construction includes contract administration & inspection unless shown otherwise. 13Oi89 MSUG17..xL C i t y a i= L aa' 7 Master Storm Drain System Engineering Capital Improvement Program This prcject includes engineering and administration of the Master Storm Drain system which consists of planning, system studies, map updating, storm drain fee calculations and updates. This engineering will include development of additional projects needed to mitigate the impact of infill development and conversion of land to higher runoff developments. The projects may include: o increasing basin capacity o extension of Haster Plan trunk lines o improvement of flow regulation /control system as the system grows and becomes more complex sated Proiects Pro.iect Number: MSD018 City o f Lodi Lodi Ave. Storm Drain Capital Improvement Program 6001 E/Cluff Ave. to Guild Ave. roieat Description This project included the installation of approximately 600 LF of 30" storm drain and manholes. This project has been redesigned and completed as part of the Griffin Industrial Park. The project is being shown for the 1990 fee update to provide a record of the project. 'elated Pro,iects E _ i r Project Number: MSDO19 f A imated L= Date of ENR Updated Cost for: Jan -90 Item Amount Estimate yjndgx ENR Index: 4665 Prelim Eng: EM ; Rights of Way: Easements: ! Consul tants Design Eng.: Construction: completed Other: Total Cost: $ none Emarks Design Engineering shown separately if anticipated to be budgeted prior tc ccnstruction. if m. it is included in construction. Construction ;ncludes contract administrat ion 8 inspection unless shown stherwise ORDINANCE NO. 1440 AN CRDMANT. OF THE LODI CITY OJUN L ESTABLE ING A STORM ERANAM FEE FOR DEVELOPMENTS WITM THE CITY OF LORI BE IT ORDAND BY THE LSI CITY OJJNCI., AS FOLLOWS: SECTION 1. PURPOSE. In order to implement the goals and objectives of the City of Lodi's General Plan, and to mitigate the impacts upon the drainage system of the City caused by future development, certain public drainage improvements or facilities must be or have been required to be constructed. The Lodi City Council has determined that a development impact fee is necessary and appropriate in order to finance these public drainage improvements and to pay for each development's fair share of the construction costs of such improvements. In establishing the fee described in the following sections, the City Council has found the fee to be consistent with its General Plan, and pursuant to Government Code 465913.2, has considered the effects of the fee with respect to the City's housing needs as established in the Mousing Element of the General Plan. The City Council also finds that the City's storm drain system, which consists of an interconnected network of pumping stations, retention basins and trunk lines has been planned as a unified system and constructed in stages since 1963 using a combination of funding sources including a Master Storm Drain Fee. The City Council finds that it is in the best interest of the entire City that properties that are to be developed pay the cost of additional storm drain facilities in accordance with the Storni Drain Master Plan so said costs will not become a burden on City taxpayers. NJ SBCHON 2. ESTABLISI-IMENT OF THE STORM DRAINAGE FEE -i 1 There is hereby established, upon issuance of all building, use or occupancy permits and subdivision maps for development in the City of Lodi, a Storm Drainage Fee. This fee is established to pay for public drainage improvements. 'The City Council shall, in a Council resolution adopted after a duly noticed public hearing, set forth the specific amount of the fee, describe the benefit, list the specific municipally -owned improvements to be financed, describe the estimated cost of these facilities, describe the reasonable relationship between this fee and the various types of ruw developments, and set forth the time for payment. As described in the fee resolution, this development fee shall be paid by each developer as specified it Government Code §53077.5, referring to time of collection. On an annual basis, the City Council shall review this fee to determine whether the fee amounts are reasonably related to the impacts of developments and whether the described public drainage facilities are still needed. Said Resolution and associated studies shall be available to the general public for a period of at least fourteen days prior to the public hearing. SECTION 3. LIMITED USE OF FEE REVENUES. The revenues raised by payment of these fees shall be placed in a separate and special account, and such revenues, along with any interest earnings on that account, shall be used solely to: •;4'l (a) Pay for the City's future construction of drainage facilities described in the resolutions enacted pursuant to Section 2 above, or to reimburse the City for those described or listed facilities constructed by the City with funds advanced by the City from other sources, or; (b) Reimburse developers wln have been required or permitted by Section 4 hereunder to install such listed facilities which are oversized, with supplemental size, length, or capacity. (c) To pay for and/or reimburse costs of program development and ongoing administration of the fee program for such public facilities. SECTM 4. DEVELOPER CON ON OF FACILITIES. Whenever a developer is required, as a condition of approval of a subdivision map or development permit, to construct a public drainage facility described in a resolution adopted pursuant to Section 2 above, which facility is determined by the City to have supplemental size, length, or capacity over that needed for the impacts of that development, and when such construction is necessary to insure efficient and timely construction of the facility's network, a reimbursement agreement with the developer and a credit against the fee, which would otherwise be charged pursuant to this ordinanceon the development project, shell be offered. The reimbursement amount shall not include the portion of the improvement needed to provide services or mitigate the burdens created by the development. -3- a Attest: 41&7h-&,7xe& ALICE M. REWHE City Clerk Passed ovember, 1988 -4- s SECTION 5. APPEALS ` Any appeal from the imposition of fees under this ordinance shall be done in substantial conformance with the procedures found in Lodi Municipal Code § 13.12.590. SECTION 6. EFFECTIVE DATE OF FEE This ordinance was adopted at a noticed public hearing, at which tines the City Council also considered the initial development impact foe resolution. This fee shall apply to the issuance of any building„ use off' occupancy permit, or for any develcpment approval issued after thirty days following this ordinance's passage. 1 y � a SECTION 7. PUBLICATION { j r This ordinance shall be published once within fifteen days of i is j adoption in the "Lodi News Sentinel", a daily newspaper of general ' circulation printed And published in the City of Lodi. Attest: 41&7h-&,7xe& ALICE M. REWHE City Clerk Passed ovember, 1988 -4- State of California County of San Joaquin, s s . I, Alice M. Reimche, City Clerk of the City of Lodi , do hereby certify thax Ordinance No. 1440 was introduced at a regular meeting of the City Council '! of the City of Lodi held November 2, 1988 and was thereafter passed, } adopted and ordered to print at a regular meeting of said Council held November 16, 1988 by the following vote: Ayes: Council Members - Hinchman, Olson, Reid, Snider and i P i nkerton (Mayor) Noes : Council Members - Name Absent: Council Members - Ncne E u ;:ra;:•,; Abstain: Council Members - None I further certify that Ordinance No. 1440 was approved and signed by the Mayor on the date of its passage and the same has been published pursuant ` t o law, M. ALICE R IMCHE Approved as to Form City Clerk E., E BOBBY W. MCNA7 I City Attorney i —5— A RESOLUTION OF THE LODI CITY 0JLNCL ESTABLfKT A STORM ERAINAM FEE FOR ALL DEVELOPMENTS WIEFIN THE CITY OF LORI WHEREAS, the Lodi City Council has adopted Ordinance No. 1440, creating and establishing the authority for imposing and charging a Storm Drainage Fee i n the City of Lodi; and WHEREAS, studies have been made and data gathered on the impact of contempla�'ed future development on existing public drainage facilities in the City of Lodi, along with an an analysis of the need for new public drainage facilities and improvements required by new development was conducted, and said ordinance and study set forth the relationship between new development, the needed facilities, and the estimated cost(s) of those improvements. This study, entitled Master Storm Drain System was prepared by the City of Lodi Public Wo& Department, Engineering Division and is dated November 1988; and WHEREAS, such infnrmation was available for public inspection and review fourteen days prior to the public hearing; and WHEREAS, the City Council finds as follows: The purpose of this fee is to finance Master Drainage facilities and to reduce the impacts of flooding and related problems caused by new development, within the City of Lodi; The Storm Drainage Fees collected pursuant to this resolution shall be used to finance only the public facilities described or identified in the project summary of said study, attached hereto as Exhibit 1; 3. After considering available information and data, and the testimony received at the public hearing, the Council approves said study and incorporates such study herein, and further finds that rew development within the City of Lodi will generate additional drainage impacts within the impacted area described in the map attached hereto as Exhibit 2 and will contribute to the degradation cf the existing drainage facilities and the overall quality of life in that area; 4. There is a need in this described impact area for such drainage facilities which have not been constructed or have been constructed, but new development has not contributed its fair 'share toward these facility costs and said facilities have been called for in or are consistent with the City of Lodi's General Plan, and/or Master Drainage Plan. 5. The facts and evidence presented establish that there is a reasonable relationship between the need for the described public facilities and the impacts of the types of development described in paragraph 3 above, for which the corresponding fee is charged, and, also there is a reasonable relationship between the fee's use and the type of development for which the fee is charged, as these reasonable relationship s or nexus are in more detail described in the studies and data referenced above; 6. It is approprizte to establish the fee on a city-wide basis in order to construct facilities in a timely and cost effective manner and reduce the need for replacement of existing facilities in order to accommodate rev development; 7. The cost estimates set forth in Exhibit 1 are reasonable costs estimates for constructing these facilities, and the fees expected to be generated by rev development will not exceed the total of such costs; a. The City has appropriated funds and established a Capital Improvement Program which includes a portion of the projects shown in Exhibit 1; NOW, THEREFORE, IT IS RESOLVED by the Lodi City Council that: 1. DEFHVITIONS. (a) 'New development" shall mean the filing of a Final Subdivision Map or the construction or reconstruction of any residential, commercial, industrial or other nonresidential improvements, or other improvements such as parking or storage lots or the installation of storm drsins . Nov development shall not include reconstruction of improvements on property for which a Storm Drainage Fee has already been paid except as provided in Section 2 (c ) of this Resolution. For purposes of this Resolution, "previous Storm Drainage Fee" refers to Master Storm Drainage Fees per Resolution 3618, or per this Resolution. (b) "Gross acre" shall mean the area of the development plus street frontage computed to the centerline of the street or forty (40) feet from the ultimate right-of-way, whichever is less. 2. FEES. STORM DRAINAGE FEE . The City Council hereby repeals Resolution Nc. 3618, "Master Drainage Program Fee", adopted April 5, 1972, and Resolution No. 4394, "Intract Drainage Fee", adspted September 21, 1977, and herein provides for a unified fee st -ucture for such Storm Drainaoe Fees as follows: -c- (a) For new residential develcpment, the Storm Drainage Fee shall be $3620.00 per gross acre, and (b) For each new commercial or industrial development, the Storm Drainage Fee shall be $4830.00 per gross acre, and (c) For each conversion of residential development to commercial or industrial development, where a Storm Drainage Fee was previously paid, the Storm Drainage Fee shall be $1210.00 per gross acre. The fee shall not apply to City projects, other projects exempted by law, nor to reconstruction of, or additions to single family dwellings. 3. 'DAVE OF PAYMENT. In accordance with Government Code § 53077.5 (b) , such Storm Drainage fees shall be paid prior to the Final Subdivision Map filing; or, in cases of Parcel Maps or other developments, prior to the issuance of a building or other permit, by all non -exempted new aevelopment in this area. The Public Works Director shall determine the type of development, area to be charged, and the corresponding fee in accordance with this Resolution. 4. USE OF FEE. The fee shall be solely used to pay (1) for the described public facilities to be constructed by the City; (2) for reimbursing the City for the developer's fair share of those capital improvements already constructed by. the City; or (3) to reimburse developers who have constructed public facilities described in Exhibit 1 attached hereto, where those facilities were beyond that needed to mitigate the impacts of the developer's project(s), 5. FEE REVIEW. The Public Works Director shall, on an annual basis, review the estimated cost of the described capital improvements, the continued need for those improvements, and the reasonable relationship between such need and the impacts of the various types of development pending or anticipated and for which this fee is charged. The Public Works Director shall report his findings to the City Council at a noticed public hearing and recommend any adjustment to this fee or other action as may be needed. G. JUDICIAL ACTION TO CHALLENGE THIS RESOLUTION. Any judicial action or proceeding to attack., review, set aside, void or annul this resolution shall be brought within 120 days following its adoption. PASSED AND ADOPTED THIS 21st day of December, 1988. I hereby certify that Resolution No. 88-165 was passed and adopted by the City Council of the City of Lodi in a regular meeting held December 21, 1988 by the following vote: Ayes: Council Members - Hinchman, Olson, Reid, Snider and Pinkerton (mayor) Noes: Council Members - None Absent: Council Members - None *ce' �- �M.-Rei the City Clerk +} (ATTACHMENTS: 1) Exhibit 1 List of Public Facilities to be financed. > 2) Exhibit 2 Map cf Impacted Areas. 88-165 -4- (c) For each conversion of resldenti3l development to commercial or industrial deve'opment where a storm drainage fee eras pre0ousiy paid, the storm drainage fee shall be $1350 per gross acre. RESOLUTION NO. 89- A RESOLUTION OF THE LODI CITY COUNCIL AMENDING 1HE- STOM DRAINAGE FEES FOR ALL DEVELOPMENTS WITHIN THE CJTY OF LODI AS ESTABLISHED BY ORDINANCE 1440 AND RESOLUTION 88-165.`` f i t aox=x=aaae:.r=ca..aaaa==a=amee====ac.ae_==os=e.n===eoe:s.ca mea-ec==a=ea ...:,.:. WHEREAS, in compliance with State law, the City of Lodi on 4 November 16, 1988 adopted Ordinance 1440, setting in place a procedure , for the establishment of storm drainage fees; and WHEREAS, pursuant to Ordinance 1440 and Resolution 88-165 adopted thereunder, the Public Works Director is required to annually review such fees and make recommendaticns for adjustments; and.. i s. WHEREAS, the Public Works Director has conducted such review and made certain recommendations for adjustment of storm drainage flees;' NOW, Tf�EREFORE, BE IT RESOLVED BY THE LODI CITY COUNCIL AS FOLLOWS: SECTION 1. Following noticed public hearing and due consideration of evidence presented, that portion of Resolution 88-165, Section 2, establishing fees for certain types of development, is hereby amended to read as follows: (a) For new residential development, the storm drainage fee shall be $4050 per gross acre, and (b) For Each new commercial or industrial development, the storm drainagr fee shall be $5400 per gross acre, and (c) For each conversion of resldenti3l development to commercial or industrial deve'opment where a storm drainage fee eras pre0ousiy paid, the storm drainage fee shall be $1350 per gross acre. i .,-... ..... _. _.._ ..,.,.:.., .,. .............+r.,..,.:arr,.,-::on..t.rvnv...rW..c-:-K.,;•rr.X',F'.[i93ri7.a;+d i�;F:i.Jr Mfy. The fee shail become effective January 1, 1990. The fee shall not apply to City project(s), other projects ( ; exempted by law, nor to reconstruction of, or additions to single fami ly dwellings All remaining portions of Resolution 88-165 shall remain in full force and effect. SECTION 2. PUBLICATION. This resolution shall be published one time in the Lodi News Sentinel, a daily newspaper of general circulation printed and published in the City of Lodi. r>' h (K4 Dated: - 1 I hereby certify that Resolution No. was passed and r: adopted by the City Council of the City o f Lodi in a regular meeting held by the following vote: Aye; : Council Members - Noes : Council Members - Absent: Council Members - Alice M. Reimche City Clerk RESAB160.0/TXTA.01if