HomeMy WebLinkAboutAgenda Report - October 7, 1992 PH (6)of
d
CITY OF LODI COUNCIL COMMUNICATION
AGENDA TITLE: Public Nearing for East Side Street Lighting Program
MEETING DATE: October 7, 1992
PREPARED BY: Community Development Director
RECOMMENDED ACTION: That the City Council conduct a public hearing which will
allow the residents of the areas to be lighted the
opportunity to speak and also to hear recommendation from
staff.
BACKGROUND INFORMATION: This project will install street lights at four public
sites in the east side. City staff has determined that
in order to sufficiently illuminate the streets and
intersections surrounding the sites, not only should new
lights be added, but some of the old standards should be replaced. Comments from
the public are expected to be related to the type of light, the brightness, and the
location. Community Development Block Grant (CDBG) funds will be used to pay for
this project.
FUNDING: Originally Budgeted: 1992
Budgeted Fund: CDBG
Current Appropriation: $70,572.67
Total Project Estimate: Approximately $71,250
�&r
�eBch
Development Director
Prepared by Eric W. Veerkamp, Assistant Planner
JBS/EWV/cg
cc: City Attorney
Parks and Recreation Director
Paula Fernandez
Mel Grandi
APPROVE:
THOMAS A. PETERSON „cyc„a ostia
City Manager
CCCD92.24/TXTD.01C
CC -1
t
In the area of Heritage School on Garfield St. between Hilborn and
Eden Streets, on Eden St. between Garfield St. and Cherokee Ln.
In the area of Van Buskirk Park on Pleasant Ave. between Forest and
Daisy Ave., on Daisy Ave. between Pleasant Ave. and Church St.
In the area of John Blakely Park on Mission and Poplar Sts. between
Stockton and Washington Sts., on Washington St. between Mission and
Poplar Sts.
In the area of Hale Park on Washington Street between Locust and
Elm Streets.
HILSORN STREET
W Z
K J
H
N
_J
t
1
1
1
t Neritoge
1
1 ScAool
1
O 1
W 1
� 1
tl
1
STREET
rnt-T
LEGEND
¢' EXISTING 100 MATT SIGH PRESSURZ SODIUM
LUNINAIRE OH A STEEL STANDARD
Q- EXISTING 70 MATT SIGN PRESSURE SODIUM
LUMINAIRE ON A CONCRETE STANDARD
0 EXISTING 200 MATT HIGH PRESSURE SODIUM
LUNIMAIRS ON A MOOD POLE
a MOOD ROLE M12H A RISEN
+- PROPOSED 100 WATT HIGH PRESSURE SODIUM
LUNIHAIRS ON A STEEL STANDARD (6 TOTAL)
O 100 . 200
SCALE IN FEET
MISSION STREET
W
W
h
John
810ke/y
Pork
O
Y
v
0
I• -
N
POPLAR STREET
�cew
o 1
J N
W
W
[CONCORD
STREET
M
b
2
x
3
LEGEND
�- EXISTING 100 WATT HIGH PRESSURE SODIUM
LUMINAIRE ON A STMM STANDARD
EXISTING 250 WAST HIGH PRESSURE SODIUM
LUMINAIRE ON A WOOD POLE
C> WOOD POLE WITH A RISER
+- PROPOSED 100 WATT RIGH PRESSURE SODIUM
LUNIKAIRE ON A STEEL. STANDARD (12 TOTAL)
• PROPOSED 100 WATT 2205 PRESSURE SODIUM
LUNIXAIRE ON A WOOD POLE (2 TOTAL)
o�-+�---moo
SCALL IM PEST
}
yy'' • Y K
op Y
W
b N
LOCUST STREET
Hott Poi�F
= o
0
Y 2
N
ELM STREET
I
LEGEND
O' EXISTING 70 MATT RICH PRESSURE SODIUM
LUMINAIRE ON A CONCRETE STANDARD
EXISTING 100 MATT RIGH PRESSURE SODIUM
LUMINAIRE ON A STEEL STANDARD
Ob MOOD POLE WITH A RISER
}" PROPOSED 100 MATT RICH PRESSURE SODIUM
LUtIMAIRE ON A STEEL STANDARD (S TOTAL)
vm 9009K PAZ
FORREST AVENUE
w
z w
W E
YON
Buskirk
o goo
a
Sau in par� Pont• _
6 V
DAISY AVENUE'
LEGEND
O- EXISTING 100 WATT HIGH PRESSURE SODIUM
LtOnNAIRE ON A HOOD POLE
PROPOSED 100 WATT HIGH PRESSURE SODIUM
LUMINAIRE ON A WOOD POLE (3 TOTAL)
fH PROPOSED 100 WATT HIGH PRESSURE SODIUM
LUMINAIRE ON A NEW WOOD POLE
Total (with Opt. 1) $71,150
Total (with apt. 2) $71,250
EASTSTRE
09/29/92
East Side Street Lighting
92-93 Program Year
Estimated Project Cost
Contract City of Lodi
Wood/Steel
Heritage School
$19,500 $ 300
0/6
Van Buskirk
3,800
4/0
Blakely Park
241700 2,700
2/12
Hale Park
(Opt. 1 - Steel)
19,500 650
0/8
(Opt. 2 - Concrete/Steel)
17,600 2,650
3 concrete
6 steel
Total (with Opt. 1) $71,150
Total (with apt. 2) $71,250
EASTSTRE
09/29/92
(7vxoz 91 0i[1=vzs I=Zs V No TNIYNINO'T
NOIOOf MISS3:1I4 ROIN ZZY14 OOT OISOd01Id
(IVZ" E)OYtmmxz 3Z9MON00 Y NO YUIYN2N07
N1100S 9110SS=a 8028 ZZV14 OL 07SOdONd -40
V2SIll K BZI14 XWd 00014 b
NOIOOS SrdnSNa NO 8 ZZY14 OOT O$IlZSZXZ '¢
QNK0NY= 2X29ONOO S NO 411IVNINO'T
NOIQOS MMSS211d NOIR ZZY14 OL ONIZSIIB -Q
ON3931
133a1S W13
s T'"'
N 0
S A
Z 7c
1
= 2
40 ryiod a�oH
133HIS 15f»pl
31 a
9 0 OIA40
MW MIN
RESOLUTION NO- 92-172
xaxasxasasaasxsaxaxax
A RESOLUTION OF TEM LODI CITY COUNCIL
APPROVING THE SASTSIDB LIGHTING PROGRAM
FOR THE INSTALLATION OF STREET LIGHTS AT VARIOUS SITES
ON THE EAST SIDE OF THE CITY OF LODI
aaaaaaaaaaxaassaasssaaossaaasaaaaasaaaaaasaaaxaaaaxaaxaasxxxasasxasxaxas
WHEREAS, the Lodi City Council at its October 7, 1992 meeting did
conduct a public hearing to discuss the Eastside Lighting Program and
to receive comments frog► the&residents of the areas to be lighted and to
hear recommendations from staff;
NOW, TMM"ORE, BE IT RESOLVED, that the Lodi City Council does
hereby approve the Eastside Lighting Program, Option 1 for the
installation of street lights at four public sites in the east side, as
shown on Exhibit A attached hereto, with funding in the approximate
amount of $71,250 to cane from Coaaaunity Development Block Grand funds.
Dated: October 7. 1992
I hereby certify that Resolution No. 92-172 was passed and
• adopted by the Lodi City Council in a regular meeting held October 7,
1992 by the following vote:
Ayes: Council Members ' Hinchman, Penniro, Sieglock, Snider
and Pinkerton (Mayor)
Noss = Council Members - None
Absent: Council Manbas - None
RES92172/7%TA.02J
Alice M. Reimche (cG t
City Clerk
o�oo
*CALK IN FEET
MLE PAK
®P4'Uo0 9
W W
W W
N
LOCUST STREET
Ho% Park
z
z O
o �
VX Z
O =
N
e
3
"",—ELM STREET
LEGEND
O' EXISTING 70 WATT HIGH PRESSURE SODIUM
LUNINAIRE ON A CONCRETE STANDARD
ElISTING 100 MATT RICH PRESSURE SODIUM
LUNINAIRE ON A STEEL STANDARD
Q VW)M POLE WITH A RISER
} PROPOSED 100 MATT RIO" PRESSURE SODIUM
LUMINAIRE ON A STEEL STANDARD (S TOTAL)
NOTICE OF CONTINUED PUBLIC HEARING
NOTICE IS HEREBY GIVEN that on Wednesday, October 7, 1992 at the hour of 7:30
P.m., or as soon thereafter as the matter may be heard, the Lodi City Council
will conduct a continued Public Hearing at the Carnegie Forum, 305 West pine
Street, Lodi CA, to hear the following matter:
a) Eastside Lighting Program which project would include the installation
of street lights at the following four sites in the east side:
In the area of Heritage School on Garfield Street between Hilborn and
Eden Streets, on Eden Street between Garfield Street and Cherokee Lane.
In the area of Vali Buskirk Park on Pleasant Avenue between Forest and
Daisy Avenue, on Daisy Avenue between Pleasant Avenue and Church
Street.
In the area of John Blakely Park on Mission and Poplar Streets betueen
Stockton and Washington Streets. on Washington Street between Mission
and Poplar Streets.
In the area of Hale Park on Washington Street between Locust and Elm
Streets.
Detailed infonuation concerning this project is on file in the City
Clerk's office and can be retrieved during regular business hours.
All interested persons are invited to present their views and comments on this
matter. Written statements may be filed with the City Clerk at any time prior
to the hearing scheduled herein and oral statements may be made at said hearing.
z
If you challenge the subject. matter in court, you may be limited to raising
only those issues you or someone else raised az the Public Hearing described in
this notice, or in written correspondence delivered to the City Clerk. 221 West
Pine Street, Lodi, California, at or prior to, the Public Hearing.
Dated: September 2, 1992
By Order of the Lodi City Council
ahAJ1-h ��rn
Alice M. Reimche \�
City Clerk J ►u
a� fo
I. /
Bobby W. McNatt
City Attorney
l