HomeMy WebLinkAboutAgenda Report - June 19, 1998Public Safety Building Remodel June 1998 Update ❖ Background D Building Problems • Inadequate support systems — HVAC, electrical • Crowded conditions — Dispatch, Records • Outdated — Facilities to accommodate females, dormitory, ADA • Worn out — 31 years of round-the-clock use with no major renovations or space improvements (except moving Detectives to Carnegie Forum basement) ❖ 1997 Master Plan Study D 30 -year plan, 2%/year population growth (101,500 in 2027) D Police — Current space (w/o 4,000 SF at Carnegie): 27,500 SF Projected need (including Detectives): 53,000 SF consists of 12,500 SF in current need and 13,000 SF in growth Total approximately 41,000 SF w/o Detectives • Fire —Current space (w/o Administration/Elm Street house: 2,400 SF): 11,000 SF, including apparatus room Projected need: 20,500 SF total D Developed four options: • 1) New Police building N/Elm Street, renovate PSB for Fire - $22,800,000 • 2) New Fire and Court buildings N/Elm, renovate PSB/Court for Police - $22,200,000 • 3) New Fire building, renovate/add to PSB for Police - $21,500,000 • 4) New Court building, renovate/add to PSB for Police and Fire - $22,700,000 D Short-term option — renovation of existing PSB for current users - $2,800,000 ❖ Problems with Short -Term Project D Actual scope of work initially approved found to be inadequate to meet immediate needs • Extent of bathroom/lighting work • Lobby, Court HVAC not included • Questions regarding outcome of partial HVAC work D No room for additional workstations other than in Dispatch, interview rooms • Estimated 5- to 7 -year life not realistic without additional work • Locker facilities inadequate to meet current needs D Better alternative available: Moving Fire Station to new location more advantageous • $200,000 to $300,000 cost for Fire remodel wasted unless we build new Police facility and leave Fire Station as is • No capacity for incremental growth with current project • Space gained in PSB nearly matches growth needs projected in Master Plan • With new Fire Station, we have much flexibility on how to grow Police facilities • Use of impact fees related to growth makes funding more practical ❖ Details of Problems: Major Deficiencies per Master Plan Executive Summary Seismic upgrade Upgrade electrical system Replace existing lighting Replace fire alarm system Replace HVAC head -end equipment PSBUPDATE698 Short -Term Project Not addressed Partially addressed Only in work areas Modify in work areas Yes Alt. Project — Move Fire Station, Renovate All or Portion of PSB May address Could do more Replace all Replace all Yes Major Deficiencies per Master Plan Executive Summary Upgrade ductwork, interior system Upgrade plumbing Add fire sprinklers Other Deficiencies per Master Plan §4 Replace single -glazed windows w/dual Remove overhang roof/replace w/gutter Replace flat roofs Interior finishes replacement Replace telecommunications system General code compliance ADA compliance Exterior security/sally port Parking Jail upgrades Space planning/furniture Short -Term Project Partial Partial No Yes No No Partial No Partial Partial Yes No (lose stalls) No No Alt. Project — Move Fire Station, Renovate All or Portion of PSB Yes Partial/maybe all May do all Yes Probably not Yes Yes Yes Yes Yes Yes Improved, less demand No Yes Recommendations Y Drop current short-term project Y Initiate plans based on moving Fire Station to new location Y Plan on design/build process for Fire Station — can meet same time frame as short-term project Y Interview the other two architectural firms considered for the Master Plan; return to Council with proposal for remaining work Y Target budget: $5,000,000, including PSB and Fire Station Fire Station Location Issues » Whether three or four stations are needed; as long as we know Station 1 is moving, we can proceed on PSB project ).- New site location decision doesn't affect this decision other than project schedule Y Four stations provides proper coverage for General Plan growth limits Y Downtown -area station needed due to occupancy/hazards • Potential sites somewhat limited unless we combine lots, buy house/buildings: * Southwest corner Lockeford/School streets — vacant, good access * Northeast corner Lockeford/Sacramento streets — vacant (unimproved used -car lot); however, lot is immediately adjacent to RR tracks * Southeast corner Lodi Avenue/Sacrarnento Street — City owned, also adjacent to RR tracks Funding ✓ Fire Station move — use Police impact fees since project is providing Police space Y PSB Renovations — use combination of Police impact fees (growth related) and General Fund capital (existing deficiencies); consider CDBG for ADA compliance and General City Facilities for telecommunications Y Debt financing — project will need Certificates of Participation or other borrowing PSBUPDATE698