HomeMy WebLinkAboutAgenda Report - May 7, 1997 (94)a a r CITY OF NODI COUNCIL, COMMUNICATION a' AGENDA TITLE: Purchase of Padmount Transformers ($88,578.05) MEETING DATE: May 7, 1997 PREPARED BY: Electric Utility Director RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the bid for the purchase of 7 padmount transformers to the bidder whose proposal and equipment met City of Lodi specifications, and whose transformers are expected to yield the lowest overall life- cycle costs, Western States Electric of Portland, Oregon, in the amount of $88,578.05. BACKGROUND INFORMATION: On April 2, 1997, the City Council approved specifications and authorized advertisement for bids for seven padmount transformers, including four 1500KVA units to be installed at Arkay Industries, Inc. On April 16, 1997, bids were opened and total life -cycle costs were evaluated. Life -cycle costs are the combined total of purchase price plus cost of operation based on estimated power loss during the projected life of the transformer. Proposals are also evaluated on the basis of compliance with equipment and bid specifications. Failure to comply with both may lead to disqualification of the bid. A summary of the bid evaluation is attached. As discussed in the council communication for the meeting of April 2, timely delivery of the 1500KVA transformers is critical to meet the installation schedule for start-up at Arkay Industries. Accordingly, the Council authorized the Electric Utility Director to order the 1500KVA units if the manufacturer's leadtime exceeded ten weeks. Since Western States' leadtime was quoted at 12 weeks, the Director ordered the four units. Delivery is expected during the week of July 14. The 500- and 750-KVA transformers will be used for the Hotel Lodi project, and to upgrade facilities in the downtown area. The order for these units will be placed following adoption of the resolution. FUNDING: Electric Utility Operating Fund Vicky McAthieApance Director e:�& //� Alan N. Vallow, Electric Utility Director Prepared by Joel Harris, Purchasing Officer cc: Director, Engineering and Operations APPROVED: H. Dixon Flynn -- City anager PAD CM DOC 04/18/97 TRANSFORMER BID EVALUATION April 16,1997 Tax (factor) 1.0775 No load loss $/watt 6.00 Load loss $/watt 2.00 Bid Opening: April 16, 1997 500 KVA, 20BY1120 Volt, Padmount Number of units: 2 Vendor Unit Extended Price No load Load loss No load Load loss Cost of Life cycle Delivery Height Weight Price Price wttax loss (watts) (watts) loss value value Losses Cost weeks Western States 7,645.00 15,290.00 16,474.98 606 2987 7,272.00 11,948.00 19,220.00 35,694.98 12 64 G E Supply 9,732.00 19,464.00 20,972.46 254 3361 3,048.00 13,444.00 16,492.00 37,464.46 6 77 ABB 6,355.00 12,710.00 13,695.03 654 3999 7,848.00 15,996.00 23,844.00 37,539.03 9 58.5 Cooper 7,396.00 14,792.00 15,938.38 810 3277 9,720.00 13,108.00 22,828.00 38,766.38 16 59 750 KVA, 208YI120 Volt, Padmount Number of units: 1 Vendor Unit Extended Price No load Load loss No load Load loss Cost of Life cycle Delivery Height Weight Price Price w/tax loss (watts) (watts) loss value value Losses Cost weeks Western States 11,089.00 11,089.00 11,948.40 728 4793 4,368.00 9,586.00 13,954.00 25,902.40 12 69 ABB 11,813.00 11,813.00 12,728.51 780 4869 4,680.00 9,738.00 14,418.00 27,146.51 9 70.5 G E Supply 14,717.00 14,717.00 15,857.57 293 4834 1,758.00 9,668.00 11,426.00 27,283.57 6 87 Cooper 9,607.00 9,607.00 10,351.54 931 6181 5,586.00 12,362.00 17,948.00 28,299.54 16 77 1500 KVA, 480YI277 Volt, Padmount Number of units: 4 Vendor Unit Extended Price No load Load loss No load Load loss Cost of Life cycle Delivery Height Weight Price Price w/tax loss (watts) (watts) loss value value Losses Cost weeks Western Electric 13,957.00 55,828.00 60,154.67 1191 7909 28,584.00 63,272.00 91,856.00 152,010.67 12 69 ABB 13,290.00 53,160.00 57,279.90 1694 7934 40,656.00 63,472.00 104,128.00 161,407.90 9 66.5 G E Supply 19,370.00 77,480.00 83,484.70 554 8623 13,296.00 68,984.00 82,280.00 165,764.70 6 89 Cooper 15,625.00 62,500.00 67,343.75 1621 8544 38,904.00 68,352.00 107,256.00 174,599.75 16 82 iRNSEVL3.WK4 RESOLUTION NO. 97-53 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BID FOR THE PURCHASE OF SEVEN PADMOUNT TRANSFORMERS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council sealed bids were received and publicly opened on April 16, 1997 at 11.00 a.m. for the purchase of seven Padmount Transformers, described in the specifications therefore approved by the City Council on April 2, 1997 and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached; and WHEREAS, the City Manager recommends award of the bid for the purchase of seven Padmount Transformers, be made to the bidder whose proposal and equipment meet City of Lodi specifications, and whose transformers are expected to yield the lowest overall life -cycle costs, Western States Electric of Portland, Oregon; and NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of the bid for the purchase of seven Padmount Transformers, be and the same is hereby awarded to the bidder whose proposal and equipment meet City of Lodi specifications, and whose transformers are expected to yield the lowest overall life -cycle cost, Western States Electric of Portland, Oregon in the amount of $88,578.05. Dated: May 7, 1997 -------------------------------------------------------------------- -------------------------------------------------------------------- I hereby certify that Resolution No. 97-53 was passed and adopted by the City Council of the City of Lodi in a regular meeting held May 7, 1997, by the following vote: AYES: COUNCIL MEMBERS - NOES: COUNCIL MEMBERS - ABSENT: COUNCIL MEMBERS - ABSTAIN: COUNCIL MEMBERS - JENNIFER M. PERRIN City Clerk 97-53 TRANSFORMER BID EVALUATION 11,089.00 11,089.00 11,948.40 728 Bid Opening: April 16, 1997 April 16,1997 9,586.00 13,954.00 25,902.40 12 Tax (factor) 1.0775 11,813.00 11,813.00 12,728.51 780 4869 4,680.00 9,738.00 14,418.00 No load loss $/watt 6.00 70.5 G E Supply e0" 14,717.00 15,857.57 293 4834 1,758.00 Load loss $/watt 2.00 27,283.57 6 87 500 KVA, 208Y/120 Volt, Padmount Number of units: 2 931 6181 5,586.00 12,362.00 17,948.00 Vendor Unit Extended Price No load Load loss No load Load loss Cost of Life cycle Delivery Height Weight Price Price w/tax loss (watts) (watts) loss value value Losses Cost weeks Western States 7,645.00 15,290.00 16,474.98 606 2987 7,272.00 11,948.00 19,220.00 35,694.98 12 64 G E Supply 9,732.00 19,464.00 20,972.46 254 3361 3,048.00 13,444.00 16,492.00 37,464.46 6 77 ABB 6,355.00 12,710.00 13,695.03 654 3999 7,848.00 15,996.00 23,844.00 37,539.03 9 58.5 Cooper 7,396.00 14,792.00 15,938.38 810 3277 9,720.00 13,108.00 22,828.00 38,766.38 16 59 750 KVA. 208YI120 Volt, Padmount Number of units: 1 Vendor Unit Extended Price No load Load loss No load Load loss Cost of Life cycle Delivery Height Weight Price Price w/tax loss (watts) (watts) loss value value Losses Cost weeks Western States 11,089.00 11,089.00 11,948.40 728 4793 4,368.00 9,586.00 13,954.00 25,902.40 12 69 ABB 11,813.00 11,813.00 12,728.51 780 4869 4,680.00 9,738.00 14,418.00 27,146.51 9 70.5 G E Supply 14,717.00 14,717.00 15,857.57 293 4834 1,758.00 9,668.00 11,426.00 27,283.57 6 87 Cooper 9,607.00 9,607.00 10,351.54 931 6181 5,586.00 12,362.00 17,948.00 28,299.54 16 77 1500 KVA, 4BOY1277 Volt, Padmount Number of units: 4 Vendor Unit Extended Price No load Load loss No load Load loss Cost of Life cycle Delivery Height Weight Price Price w/tax loss (watts) (watts) loss value value Losses Cost weeks Western Electric 13,957.00 55,828.00 60,154.67 1191 7909 28,584.00 63,272.00 91,856.00 152,010.67 12 69 ABB 13,290.00 53,160.00 57,279.90 1694 7934 40,656.00 63,472.00 104,128.00 161,407.90 9 66.5 G E Supply 19,370.00 77,480.00 83,484.70 554 8623 13,296.00 68,984.00 82,280.00 165,764.70 6 89 Cooper 15,625.00 62,500.00 67,343.75 1621 8544 38,904.00 68,352.00 107,256.00 174,599.75 16 82