Loading...
HomeMy WebLinkAboutAgenda Report - August 4, 1993 PHr— ` OR CITY OF (,_ODI COUNCIL COMMUNICATION for,00 AGENDA TITLE: Public Hearing for Curb Ramp Replacement Accessibility Project MEETING DATE: August 4, 1993 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council approve the priority list for the installation of handica accessible curb ramps in the public right-of-way (Exhibit A� and authorize the preparation of plans, specifications, and bidding using Block Grant funds. BACKGROUND INFORMATION: The City of Lodi has allocated $49,868 in Connunity Development Block Grant (CDBG) funds for the installation of handicap ramps. For the past few years, the Traffic Division has logged requests for handicap ramps. The list now totals over 70 locations with an approximate cost of $275,000. At locations where the request was for a ramp at a specific corner or corners, the calculated costs include retrofitting the entire intersection unless it is obviously not needed. Until now, the installation of handicap ramps at existing locations has been funded by the Street Capital Improvement Program. Annual funding for this portion of this Program was recently increased from $5,000 to $15,000. There has been no formal criteria or priority scheme established regarding the installation of these ramps. Most of the ramps installed under this Program have been near Lodi Memorial Hospital or at locations adjacent to sidewalk repairs. The City also installs handicap ramps as a part of most street projects and requires developers to install ramps with all new construction and to retrofit ramps on building projects value4 over $25,000. With the now available CDBG funding, the list of requested locations was prioritized based on several factors, including the type and location of pedestrian generator in the area, pedestrian volume factor, cost factor, and other factors. The role of each of these factors in determining the priority ranking is described below: Pedestrian Generator The types of pedestrian generators included in the ranking have been placed into five categories. In each of these categories, a numeric value has been assigned depending on where the pedestrian generator exists in relatiov,ship to the requested location. The closer the generator is to the requested location, the higher the number value assigned to the location. Listed below are the five categories and a description of the types of uses in each: APPRO THOMAS A. PETERSON City Manager t. «4 recycled coot, CC -1 CPHCURB/TXTW.02M (CO.COM) July 27, 1993 Public Hearing for Curb Ramp Replacement Accessibility Project August 4, 1993 ' Page 2 • Shopping Center - malls, grocery stores, and similar commercial uses (0 to 3 points) ° Government Facility - city hall, police and fire stations, courts, social security office, municipal service center, parks and recreation office, etc. (0 to 3 points) ° Public Use (including private) - churches, museums, libraries, parks, etc. (0 to 2 points) • Medical Facility - hospitals, medical offices, labs, pharmacies, etc. (0 to 4 points) • School - all schools (public and private) (0 to 3 points) Pedestrian Volume Factor Because pedestrian volume counts are not available for the majority of these locations, a ranking between . and 5 has been used based"on'the type and intensity of pedestrian generator in the area and the likelihood of pedestrian activity. A minimum score of 1 is used at locations where pedestrian volume would be expected to be minimal. The maximum score of 5 is for locations where high pedestrian activity would be expected. Cost Factor Another important factor to consider is the cost of installing handicap ramps. Since installation costs range from $2,500 to $4,500 for each ramp, cost can greatly affect the number of ramps that can be installed with the available Block Grant funds. This calculated factor is adjusted to give points in the 0 to 4 range. Other Factors Other factors that have an effect on the installation of handicap ramps have also been considered. These factors include facilities that were not covered in the preceding categories and locations where tha installation of handicap ramps can be funded as part of a construction project. At locations where "other" facilities exist, points were allotted based on similar factors used in the listed categories. At locations where the installation is funded as part of a construction project, the total scores were adjusted to equal zero. RECOMMENDATION Staff recommends that the City Council approve the priority ranking method for the installation of handicap ramps. Future requests for handicap ramps will be added to the list and the rankings will be adjusted. This will allow staff to advise those citizens requesting ramps roughly how soon they will be installed assuming this CDBG Program continues to be funded by the Council. CPHCURB/TXTW.02M (CO.COM) July 27, 1993 Public Hearing for Curb Ramp Replacement Accessibility Project August 4, 1993 Page 3 Staff also requests Council authorization to prepare plans, specifications, and go out to bid based on the priority list. The bid package will consist of a base bid for the installation of ramps based on the City's cost estimates plus an alternate bid for the installation of additional ramps in the event that more ramps than stz`f estimated can be installed with the available CDBG money. Dep -ding on the bids, available funds, and the cost of the remaining locations, we may need to skip an expensive location and do a lower-cost ramp. FUNDING: Costs to install as many handicap ramps as possible, plus engineering charges, using the $49,868 available in 1. CDBG funds. cwn� (ac L. Ronsko Vb c Works Director Prepared by Rick S. Kiriu, Senior Engineering Technician JLR/RSK/1m Attachments cc: City Attorney Chief of Police Street Superintendent Building and Equipment Maintenance Superintendent Community Development Block Grant Coordinator Associate Traffic Engineer Concerned citizens CPHCURB/TXTW.02M (CO.COM) July 27, 1993 CITY OF LODI HANDICAP RAMP PRIORITY / SCORING LIST Priority Factor / Score PUBLIC WORKS DEPARTMENT. REMISED DATE: July 27.1993 1 oft NCRALIP3XL$ Comm. Govern. Publio notion year Requested Shopping anent Use, Medial IV.1urn* Cost Total 0 Cost Location Requested Cornerlal Center Fecilit Church Facili School Factor Factor Other, ae noted Score COMMENTS romps Estimate Cum. Total HAM / VINE 1990, '93 ALL 0 0 0 4 3 5 0.8 2 Cotw. Rome 14.8 sig poles III boxes 4 $18,000 018,000 CHURCH / WALNUT 1988.1990. ALL 2 1 2 0 3 4 0.7 0 Non* 12.7 SE axlats,sig pole, i boxes spring 3 113,500 $31,500 1993131 91 HAM / SYLVIA 1990,'93 NESE 0 0 2 2 0 5 1.5 2 Conv. Harm 12.5 non* exists,SICB O SE 'T' int 2 18,500 $38,000 STOCKTON / ELM 1993 SE 0 1 1 2 1 0 0 3 4 2 Senior up 12.0. NE,NW.SW exists 1 {2,500 $40.600 FAIRMONT I WINDSOR 1992 NESE 0 0 0 4 0 5 2.5 0 Non* 11.6 SE exists.SIC6 O NE 'T" int 1 14,000 $42,000 PLEASANT I PI14L 1989 SE 3 2 0 0 0 2 4 0 None 11.0 SW exists, 'T' int 1 $2,500 144,500 FAIRMONT /SYLVIA 1990 ALL 0 0 2 4 0 3 0.9 1 Cores. Home 10.9 none exists.SICSOSE 4 $11.500 $56.000 LE SW "sts.none O north curb O L.00KEFORD / ORANGE 1992 N curb 0 0 0 0 3 3 2 2 he O wash. 10.0 2 4115.000 161.000 2 sch xwelks LOCKEFORD I CRESCENT 1992 SW 0 0 0 0 2 9 4 .sen 2 ho O wrh. 10.0 NE NW SE exists, 1 12,500 163,500 CHURCH I OAK Istall 1992 SE.SW 2 1 2 0 1 3 0.7 0 Nene 9.7 non* axists,SICB NW,SW,SE, 4 114 600 {78,000 .w vest si x on ce.n*n WALNUT /PLEASANT 1988 NE.NW 1 0 1 0 2 2 t.5 2 Public Health O}} 9.5 SE,SW exists;SICS O NE 2 {6.500 184,500 non* exists' SICK O NW,SIC8 8 PINE / LEE 1993 NE.I.W 1 1 2 0 0 2 0.7 2 Conv. Homs 8.7 4 113,500 $98.000 meN+olo ONE FAIRMONT / YORK 1992 NESE 0 0 0 2 O 3 2.6 1 Rib' 6.6 NE existo.SICB SE. NO 1 $4,000 1102,000 Hoa SIDDYALK 0 S 'T' int. WIMBLEDON / 1987 NE 0 0 0 0 2 2 4 0 Non* 8.0 NW }xaete,rorr on south curb 1 12.500 $104,500 SCARBOROUGH hch xw lk 'T' int TURNER O LODI LAKE 1992. 1993 N curb 0 0 2 0 O 4 1 C Non* 7.0 none exists O entrance or exit 4 $10.000 6114,500 Wets. NO SIDEWALK O SE, TURNER I SACRAMENTO 1991 NE.NW 2 0 0 0 0 1 4 0 NOM 7.0 1 {2,503 $117,000 'TW At ELM / LEE 1988 SE o 2 2 0 0 2 0.7 1 0 Non* 8.7 non* sxlats,61C8 O NE.NW,SE 4 $14,500 $131.500 LOCUST I LEE 1991 SE,SW 0 1 2 0 O 1 2 0 Non* 0.0 nen* exists. 'T" int,91-92 tip 2 15,000 $136,500 TURNER / LINCOLN 1991 NE.NW 0 0 1 0 0 2 0.9 2 Ct.nv. Home 5,9 Dowhosp.roll 0 SE,SICS 0 4 111,500 {.148.000 NWr TURNER / HAM 1991 NE.NW 0 0 0 0 3 2 0.6 0 Nona 6.0 none exists,aig poles 6 boxes 4 $16.000 0160,000 TURNER I LAKEWOOD 1991 NE.NW 0 0 0 0 2 1 2 0 Non* 5.0 ncneexists. 'T'int 2 $5.000 $171.000 LOWER SAC / DiABLO 1992 SE 0 0 0 0 0 1 1 4 0 Non* 5.0NE exists, NO SIDEWALK TO $2,500 $173,500 int1 LOWER SAC IT OK AY 1992 NE 0 0 0 0 0 1 4 0 None 5.0 0E exists. WO CROSSING, *T* int 1 12,500 $176,000 TURNER / EDGEW000 199t NE,NW 0 0 1 O 0 1 1.3 0 None 3.3 SE SW sudsts,51C8 O NE,NW 2 $8,000 $181,500 1 oft NCRALIP3XL$ § Lu \ § � k g a. k \ § k e � k e | ■ � 2 B a \ § ) § § § § § 2 ( § o 7 § § § ■ 2 § )! Ja! a 2 = ; _ ; � - 0 2 ° ■ � � ! z ■ 2 � }00 u 30 z |k # 22 2; 2 2 2 2 2 2 2; a @ ■ ■ � ■ # ! :!2|�!'}` ■ ! a,■!a� ! �» |■ �! ! ! |;|■|■ _ |, ,t |� , o f - , 2 - f� |-- 2|7 0, 0 o 0, o 0 0 , i}} o- o, o a..0 o, } z \ z k _ & ] 2 } ( § § ) \ 7 § 2. \ k S 7 K }) 2 a; a o k e | ■ � 2 B a Mailing List for Handicap Ramp Installation 7193 Hazel Perfetto P.O. Box 1394 Woodbridge, CA Sandra Fitch 421 W. Pine St Lodi, CA Pastor Harmon >kilien St. Anne's Catholic Church 215 W. Walnut St Lodi. CA Tom Fr vem 20849 N. DeVries Rd Lodi. CA John Rice 915 Wimbledon Dr Lodi, CA Violet Bowman 317 Chestnut St Lodi, CA William Dary Christian Scientist Church 322 W. Elm St Corey Wright Vienna Convalescent Home 368-7141 James & Jean Wilson 1336 S. Church St Lodi, CA Lauren Griffin St. Anne's Catholic Church 215 W. Walnut St Dr. Rappaport 840 S. Fairmont Ave Ste.9 Lodi. CA Bemie Vigil 1042 Yokuts Ct Lodi, CA MAIL.DOC t :-, CITY OF LODI 221 WEST PINE STREET LODI, CALIFORNIA 95240 ADVERTISING INST'RIICTIONS SUBJECT: NOTICE OF PUBLIC HEARING - CURB RAMP REPLACEMENT ACCESSIBILITY PROJECT PUBLISH DATES: SATURDAY, JULY 10, 1993 TEAR SHEETS WANTED: THREE AFFIDAVIT AND BILL TO: JENNIFER M. P RRIN, CITY CLERIC DATED: JULY 7, 1993 ORDERED EY: P8 N�LINx DEPUTY CITY CLERK DECLARATION OF MAILING On July 14, 1993 in the City of Lodi, San Joaquin County, California, I deposited in the United States mail, envelopes with first-class postage prepaid thereon, containing a copy of the Notice attached hereto, marked Exhibit "A"; said envelopes were addressed as is more particularly shown on Exhibit "B" attached hereto. There is a regular daily communication by mail between the City of Lodi, California, and the places to which said envelopes were addressed. I declare under penalty of perjury that the foregoing is true and correct. Executed on July 14, 1993, at Lodi, California. Jennifer M. Perrin City Clerk PegWWicolini Deputy City Clerk DHC#01/TXTA.FRM o. CITY 0 LODI OTICE OF PUBLIC HEARING Date: August 4, 2993 CARNEGIE FORUM 7:00 p.m. 305 West Pine Street, Lodi Time: For information regarding this Public Hearing Please Contact: Jennifer M. .Perrin City Clerk Telephone: 333.6702 NOTICE OF PUBLIC HEARING August 4, 1993 NOTICE IS HEREBY GIVEN that on Wednesday, at the hour of 7*0 p.m., or as soon thereafter as the matter may be heard, the City Council will conduct a public hearing to consider the following matter: a) Curb ramp replacement accessibility project. Information regarding this item may be obtained in the office of the Community Development Director at 221. West Pine Street, Lodi, California. All interested persons are invited to present their views and comments on this matter. Written statements may be filed with the City Clerk at any time prior to the hearing scheduled herein, and oral statements may be made at said hearing. If you challenge the subject matter in court, you may be limited to raising only those issues you or someone else raised at the Public Hearing described in this notice or In written correspondence delivered to the City Clerk, 221 West Pine Street, at or prior to the Public Hearing. - By Order Of the Lodi City Council: Jebftifex Ny. Perrin City Clerk July 7, 1993 Dated: Approvedras �to form: W ` �' Bobby W. McNatt City Attorney PUBLIC HEARING FOR CUr-,RAW REPLACEMENT ACCESSIBILITY PPnJECT August 4, 1993 City Council Meeting Mailing List for Handicap Ramp installation Hazel Perfetto P.O. Box 1394 Woodbridge. CA Sandra Fitch 421 W. Pine St Lodi, CA Pastor Hannon Skillen St. Anne's Catholic Church 215 W. Walnut St Lodi, CA Tom Favero 20849 N. DeVries Rd Lodi. CA John Rice 915 Wimbledon Or Lodi. CA Violet Bowman 317 Chestnut St Lodi, CA William Dary Christian Scientist Church 322 W. Elm St Corey Wright Vienna Convalescent Home = Atht-AAA- .i°oW ?!u4 0 368-7141 James & Jean Wilson 1336 S. Church Sl Lodi, CA Lauren GdMn St. Anne's Catholic Church 215 W. Walnut St Dr. Rappaport 840 S. Fairmont Ave Sle.9 Lodi, CA Bemie Vigil 1042 Yokuts Ct Lodi, CA MAIL.DOC 7/93 MEMORANDUM To: Mayor City Council City Manager From: Peggy Nicolini, Deputy City Clerk Date: July 19, 1993 Subject: Curb Ramp Replacement Accessibility Project Mr. Rudy Peden, 919 S. Church Street called regarding the 30-40 year old tree that is being taken down in front of his residence. He thinks the City should be able to work around it. He and his neighbors think it is very wrong to tear down a perfectly healthy tree. Mr. Peden said he called the City and spoke with someone named "Kay". Mr. Peden very sarcastically said Kay "does all his evaluating from his desk". He said several times that Davenport is a good Councilman, and the only Councilman who listens to the people. He also said that he was not at all in favor of the entire Council being recalled, but now with this incident, will do everything in his power to help with the recall of everyone but Davenport. Mr. Peden requested that I relay the message to the Mayor and ask him to call, I did so via voice mail. Mr. Peden continued on to say that he would notify the newspapers, radio, TV etc. Mr. Peden indicated that he would be attending the Council meeting. MTREES/TY.TA.02J CITY COUNCIL PHILLIP A PENNINO. Mavor JACK A. SIEGLOCK Mayor Pro Tempore RAY G. DAVENPORT STEPHEN J MANN JOHN R (Randvl SNIDER THOMAS A PETERSON CITY O F L O D I, Cky Manager �• f IENNIFER A1. PERRIN RE • � `1.: i 1 City Clerk CITY HALL. 2211 %VEST PINE STREET ti H �1cNATT P.O BOX 3006 Ir if �. LOOI. CALIFORNIA 95241.1910 ' Cdv Attorney ` (209) 334-5634 dt . _ FAXC09i2U-b79S July 28, 1993 SUBJECT: PUBLIC HEARING FOR CURB RAMP REPLACEMENT ACCESSIBILITY PROJECT Dear Concerned Citizen: Enclosed is a copy of background information on an item that is on the City Council agenda of Wednesday, August 4, 1993, at 7:00 p.m. The meeting will be held in the City Council Chamber, Carnegie Forum, 305 West Pine Street. The Council will conduct a public hearing on this item. You are welcome to attend and speak at the appropriate time. If you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. 0. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street. If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions about communicating with the Council, please contact Jennifer Perrin, City Clerk, at (209) 333-6702. If you have any questions about the item itself, please call at (209) 333-6706 or Eric Veerkamp at (209) 333-6711. viej" Uack Ronsko P Works Director JLR/im Enclosure cc: City Clerk - CPHCURB.NCC/TXTW.02M Richard Prima John Rice 915 Wimbledon Dr. Lodi, CA 95240 Violet Bowman 317 Chestnut St. Lodi, CA 95240 William Dary Christian Scientist Church 322 W. Elm St. Lodi, CA 95240 Corey Wright' Vienna Convalescent Home 800 S. Ham Lane Lodi, CA 95242 368-7141 James & Jean Wilson 1336 S. Church St. Lodi, CA 95240 Lauren Griffin St. Anne's Catholic Church 215 W. Walnut St. Lodi, CA 95240 Dr. Rappaport 840 S. Fairmont Ave., Ste. 9 Lodi, CA 95240 Bemie Vigil 1042 Yokuts Ct. Lodi, CA 95240 MAIL.DOC Mailing List for Handicap Ramp Installation 7/93 Hazel Perfetto Mr. Antwon Smith P.O. Box 1394 c/o Lodi Memorial Hospital Subacute Unit Woodbridge, CA 95258 P. O. Box 3004 Sandra Fitch Lodi, California 95241 421 W. Pine St. Lodi, CA 95240 M. Michele Louvailler c/o Lodi Memorial Hospital Subacute Unit Pastor Hannon Skillen P. O. Box 3004 St. Anne's Catholic Church Lodi, California 95241 215Walnut St. Lodi.. C CA 95240 m._ Kowaski Kennedy c/o Lodi Memorial Hospital Subacute Unit Tom Favero P. O. Box 3004 20849 N. DeVdes Rd. Lodi, California 95241 Lodi, CA 95242 John Rice 915 Wimbledon Dr. Lodi, CA 95240 Violet Bowman 317 Chestnut St. Lodi, CA 95240 William Dary Christian Scientist Church 322 W. Elm St. Lodi, CA 95240 Corey Wright' Vienna Convalescent Home 800 S. Ham Lane Lodi, CA 95242 368-7141 James & Jean Wilson 1336 S. Church St. Lodi, CA 95240 Lauren Griffin St. Anne's Catholic Church 215 W. Walnut St. Lodi, CA 95240 Dr. Rappaport 840 S. Fairmont Ave., Ste. 9 Lodi, CA 95240 Bemie Vigil 1042 Yokuts Ct. Lodi, CA 95240 MAIL.DOC 11-3 Saint Anne's Catholic Churci LORI (209) 368.2472 MWfing Address: FONTANA (714)822-2213 (800) 692-3431 P.O. BOX 1270 (800) 442-4944 FAX (209) 369-28M LODI, CALIFORNIA 85241 Lodi City Council City of Lodi P.O. Box 3006 Lodi, Ca. 95241-1910 Re: Public Hearing to Consider Transportation Permit Fees... I am writing concerning your consideration of adopting the Caltrans fee schedule for transportation permits. First I would like to acknowledge the good job your staff has done in preparing to implement this plan. Whin I first contacted Jeannie she was very open to meeting with our company to get our input on the permit process and the various permit procedures that we see throughout the state. After seeing the three alternatives that the staff came up with we have concluded that the best alternative would be the #I2 the Modified Caltrans Procedure, IF a provision can be made to limit the cost of an annual permit to an amount no more that twice the regular permit price. I will go into my reasoning for this shortly. First let me point out the strong points of this procedure. Faxed Applications and Faxed Permits Faxing applications and faxing back the completed permit would be a simple procedure for our staff and yours. We would be saved the time spent to travel to city hall, waiting for the permit, paying fees, and returning to our office. Your staff would be saved from having to stop their other work to process a permit whenever a permit applicant walks in the door. If you accept faxed applications we could (upon setting up an account) be able to stay at our office, fax you the application, allow your staff a couple of hours to process it, and receive the application back via fax. The companies who do not regularly apply for permits in Lodi and do not have an account set up could enlist the services of one of tha various permit services that exist. The permit service could fax the application to the city, receive the faxed permit back from the city, have the permits billed to the permit service and then bill the trucker themselves for the permit fee and their own service fee. This is presently a common practice in the industry, Annual Permits The idea of issuing annual permits would be a time and money saving option. If annual permits were issued for items such as extra legal height, width and length up to a given size the permit itself would only have to be written once per year. These types of loads would not cause any extra wear and tear on city streets or cause any safety problems. This brings me to the cost of these annual permits. Your staff has stated that permits cost the city about $18.00 per permit to process. I feel that the cost of producing an annual permit shouldn't be any more than it costs to process a single trip permit. In fact the annual would begin saving the city money the second time It was used. This is because, according to the staffs figures, the city would be losing $2.00 each time they process a permit if they charged the S16-00 Caltrans figure. Now I grant you that Caltrans charges $90.00 per annual permit, and by law so could Lodi, but then again if the permit doesn't cost $90.00 to create but instead only $18.00, why should the city be making $72.00 per permit? Are transportation permits supposed to be a revenue generating device. I don't think so, and I don't think the city government of Lodi thinks that way. There are many governments and bureaucracies out there who choose to use the trucking industry as a revenue source but I think Lodi has more of a pro-business attitude than that. I think keeping the Annual Permit cost at no more than twice the single trip level could be beneficial for both the city and the Trucking companies who would be buying permits here. For the trucking companies who would be buying annual permits anyway, it would of course be a great savings to buy an annual permit for $32.00 instead of $90.00. For the city, you may find that it actually increases revenue to charge the lower figure. To illustrate how this may happen lets use the example of an out-of-town trucking company buying a permit to haul an overwidth load out of an auction yard. If they were to buy the $16.00 single trip permit, the city, according to your staffs figures, would lose $2.00. If however an annual permit were available at only $32.00 the trucker may take the chance that they will use the permit again In the following year and buy the annual permit instead of the single. This would result in the city making $14.00 instead of losing $2.00. In the following year the permit could be used several times without costing the trucker any more money and without costing the city any more money. The above scenario relies on the premise that an annual permit would not cost the city anymore than a single trip permit, and as long as the permit was not for overweight loads or for loads that require investigation by city staff this premise should be correct. An annual permit could be written for a maximum width of 12 feet; a maximum height that will keep the load under any overhead lines lights or underpasses on the STAA routes through Lodi; and a maximum length that could travel safely on any STAA route in Lodi. The only costs that these loads should present to the city are the initial costs of processing the permit. As far as any increased safety hazard that these loads may present let me make two points: I. Our company has hauled 12' wide loads throughcut the state of California for many years and have never had any -accidents or Incidents that were caused by the extra width of these loads. 2. Before most cities will issue transportation permits they require that the carrier provide them with a certificate of insurance showing the city as an additional insured so that if any damage was done to city property by an over dimension load would be covered by the carriers insurance. In brief, there should be no difference to the city in the cost of a permit that is used once or a dozen times or more if the permit was only written once. The exception to this would be if a load was overweight and therefore caused more wear on city streets. In closing let me again state ray gratitude to your staff for allowing us to have some input in this process. We hope that you will take the comments in this statement into consideration and come up with a process that is easy to use and does not place undue financial burden onto local truckers such as ourselves who would be purchasing annual permits. Please do not charge the excessive fees that State law allows for annual permits just because you can. Charge just what you need to cover your costs and you will find that it will be beneficial for all of us. Thank you for your time, Anthony Todd Teresi ob August 4, 1993 RE: Public hearing for curb ;asap repI.:ccement accessibility project Hr. Mayor, City Councilmembers, Hr. Peterson and 14r. Ronsko: I am here tonight representing 388 rpwi.dents of the city..of Lodi. These residents reside at institutional settings; .:Vienna' Conv. Hosp. (1.50 beds), Lodi Health Care renter (151: beds),:.` Fairmont Rehabilitation Hospital (59 beds) and Crescent -Court Nursing Home (28 beds). On any given day tnany of these rn nidnntn make visits' -to physiciansr dentists, .podiatrists and Lodi Memorial .Hospital for exams, treatments, tests and check -lips: More, so than' not ''these.residents Travel to thesevarious locations by wheelchair as'!all of th'ene services are within 2 to 3 blocks in distance. I hiqhly recommend char. r.hP f.nllowing cline locations be given th.e4 utmost consideration for upgrade to wheelchair accessibility. Nam/Vine (all corners) Ham/Sy;.via (NE, SHS corners) Fairmont/Sylvia (all corners) The Fairnont/syl v ia. i nrrr sec tion is 7t.h an the priority nc:or'ing list and if this is the final order of construction r.hen this intersection :ill not be completed clurinc; this allocation period. The factor for scoring C:onv. Ho;sLis. (2) and only (1) for the Fairmont/Sylvia intersection is to low. The: need for whF!Plrhair accessible curbs is just as great for t:onv. Nonps. as they -ire for an Acute Care Hospital which carries a weight of (4). I feel that four Nursing Horses wi rhi.n threo bI nrk t of each or.her warrartrhi gher scoring. Again, I would like to recommend to the city council and public-. works department r.h:ir.. the thit:N intersections that. I have mentioned be given the highest priority for upgrade. Tha.:k you- Corey ou_Corey ;•rr. _-;ht Assistant'. Administrator, Vienna Convalescent Hospital