Loading...
HomeMy WebLinkAboutAgenda Report - November 1, 1995 PH (4)4` OR CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Public Hearing to consider the Planning Commission's recommendations that the City Council adopt the 1995 Growth Management Allocations MEETING DATE: November 1, 1995 PREPARED BY: Community Development Director RECOMMENDED ACTION: That the City Council conduct a Public Hearing to consider the Planning Commission's recommendations that the City Council adopt the 1995 Growth Management Allocations. BACKGROUND INFORMATION: The following data is included for the City Council's review: 1) Growth Management Methodology; 2) Growth Management Point System; 3) Growth Management Schedule; 4) An Overview of the Allocations from 1989 through 1994; 5) The Planning Commission's Recommendations for 1995; and 6) Maps of the Various Projects. FUNDING: Application Fees JB S/lw Attachments APPROVED: i THOMAS A. PETEF City Manager J s B. Schroe r mmunity Development Director %? recycled Paper DocumenQ cc -1 MEMORANDUM, City of Lodi, Community Development Department TO: Community Development Director FROM: Assistant Planner, Mark Meissner DATE: Thursday, August 24, 1995 SUBJECT: GROWTH MANAGEMENT SCORING & ALLOCATION SUMMARY The development plans submitted for review this year are all listed in the table below. This memo addresses the reasoning behind the scoring of each project and later explains the building permit allocations. The scoring of each development plan is based on Evaluation Criteria adopted as part of the City's Growth Management Ordinance. 1995 Development Plan Scoring Summary NOTE: PROTECTS WITH 100 PTS. FOR CRITERIA 'C'HAVEREQUESTED ALLOCATIONS FOR PRIORITY AREA TWO. -A COMMITMENT FROM DEVELOPERS TO FRONT FUNDS FOR THE INSTALLATION OF AMAJOR PUBLIC IMPROVEMENT IS NECESSARY. -CRITERIA DOES NOT APPLY TO SINOLE•FAMILY PROJECTS Towne Ranch, the first project on the list, is an existing and developing project located at 3032 West Turner Road. The project is at the North-West corner of Lodi, adjacent to Turner Road to the North, to Lower Sacramento Road to the East, to the developed Park West Subdivision to the South, and to the Woodbridge Irrigation District Canal to the West. The points shown are based on the approved development plan for the entire Towne Ranch project, not just the portion being considered for allocations this year. CRITERIA g ? i E 4 0 2 • a_ o �y 7 � 3 g c 9. y "a 8 .� '- � '. •� as � S �g1 < O z x x i F•n rn ii PROJECT A B C DI DZ : D3 D4 E*• F G::: TOTALS TO WNE RANCH 7 7 200 5 8 8 4 0 8 0 0 20 10 277 PARISIS PROPERTY 5 0 200 3 0 7 0 0 10 0 0$10100 250 THAYER PROPERTY 3 0 200 0 0 4 0 0 10 0 0 242 BRIDGETOWN 3 7 100 5 0 4 0 0 10 0 0 156 CENTURY MEADOWS 1 5 0 100 5 8 0 0 13 0 0 151 CENTURY MEADOWS 3 3 0 100 3 * 8 0 0 15 0 0 149 HELMLE PROPERTY 5 0 100 3 0 9 0 0 0 0 137 CENTURY MEADOWS 2 3 0 100 3 -1 0 01 01 10 0 01 101 10 136 NOTE: PROTECTS WITH 100 PTS. FOR CRITERIA 'C'HAVEREQUESTED ALLOCATIONS FOR PRIORITY AREA TWO. -A COMMITMENT FROM DEVELOPERS TO FRONT FUNDS FOR THE INSTALLATION OF AMAJOR PUBLIC IMPROVEMENT IS NECESSARY. -CRITERIA DOES NOT APPLY TO SINOLE•FAMILY PROJECTS Towne Ranch, the first project on the list, is an existing and developing project located at 3032 West Turner Road. The project is at the North-West corner of Lodi, adjacent to Turner Road to the North, to Lower Sacramento Road to the East, to the developed Park West Subdivision to the South, and to the Woodbridge Irrigation District Canal to the West. The points shown are based on the approved development plan for the entire Towne Ranch project, not just the portion being considered for allocations this year. • The Towne Ranch project received 7 points in category A., Agricultural Land Conflicts, for being adjacent to agricultural land on one side, the North side. Maximum points for this category is 10. • 7 points were awarded in category B., On-site Agricultural Land Mitigation, for designing the subdivision with reverse -frontage lots and, a solid wall with landscaping. Maximum points for this category is 10. • 200 points were awarded in category C., General Location, for being located within the Priority Area One boundary. Maximum points for this category is 200. • 5 points were awarded in category DI., Relationship to Existing Development, for abutting to existing development on two sides, the East and South. Maximum points for this category is 10. • 8 points were awarded in -category D2., Relationship to Public Services (Wastewater), for extending the Master Plan sewer line in Evergreen Drive within the project boundaries. The maximum points for this category is 10. • 8 points were awarded in category D3., Relationship to Public Services (Water), for extending the Master Plan water line in Evergreen Drive within the project boundaries. The maximum points for this category is 13. • 4 points were awarded in category D4., Relationship to Public Services (Drainage), since the project requires the expansion of Westgate Basin. The maximum points for this category is 10. • 0 points were awarded in category E., Promotion of Open Space, because this category does not apply to single-family residential projects. • 8 points were awarded in category F., Traffic (Street Improvements), for extending a Master Plan street (Evergreen Drive) within the project boundaries. • 0 points were awarded in category G., Housing (Affordability), because the development plan does not specify whether there will be any affordable housing units or programs to make the units more affordable. Maximum points for this category is 10. • 0 points were awarded in category H., Site Plan and Project Design, because this category does not apply to single-family residential projects. • 20 points were awarded in category I., Schools (Proximity). Five of the points were for being within one half of a mile from a proposed elementary school, ten of the points were for being within one half of a mile from a proposed middle school, and the remaining 5 points were for also being within two miles of an existing high school. Maximum points for this category is 10. .3 • 10 points were awarded in category J., Fire Protection (Proximity), for being within a three minute emergency vehicle driving time from the nearest fire station. The Automatic Aid Agreement between the City of Lodi and the Woodbridge Rural Fire District has recently brought this project within the three minute emergency vehicle driving distance. Maximum points for this category is 10. The Towne Ranch development plan received a total of 277 points, placing it at the top of the list with the greatest development potential. Parisis Property, the second project on the list is a new project located at 3883 East Harney Lane. The project is near the south-east corner of Lodi, adjacent to Stockton Street on the West, to Harney Lane on the South, to the undeveloped Richards Ranch subdivision to the North, and the proposed Thayer Property Project to the West. The Parisis Property project received 5 points in category A., Agricultural Land Conflicts, for being adjacent to agricultural land on two sides, the South and East sides. Maximum points for this category is 10. • 0 points were awarded in category B., On-site Agricultural Land Mitigation, for not providing a buffer between the project and adjacent agricultural land. Maximum points for this category is 10. 200 points were awarded in category C., General Location, for being located within the Priority Area One boundary. Maximum points for this category is 200. 3 points were awarded in category D1., Relationship to Existing Development, for abutting to existing development on one side, the West. Maximum points for this category is 10. • 0 points were awarded in category D2., Relationship to Public Services (Wastewater), since the project requires the extension of wastewater lines from Bluejay Way in the Iohnson Ranch subdivision to Stockton Street through the proposed Richards Ranch and Thayer Property developments and an undeveloped parcel north of the project site. The necessary right-of-way has not been acquired. The maximum points for this category is 10. • 7 points were awarded in category D3., Relationship to Public Services (Water). This score represents the average of 10 points for being adjacent to the existing Master Plan water main in Stockton Street designed to serve the project and 4 points for requiring the extension of a Master Plan line outside the project boundaries but within existing right-of-way (Harney Lane). The maximum points for this category is 13. • 0 points were awarded in category D4., Relationship to Public Services (Drainage), since the project requires the extension of storm drain lines from Bluejay Way in the Johnson Ranch subdivision to Stockton Street through the proposed Richards Ranch and Thayer Property developments and an undeveloped parcel north of the project site. The necessary right-of-way has not been acquired. The maximum points for this category is 10. • 0 points were awarded in category E., Promotion of Open Space, because this category does not apply to single-family residential projects. MGM C:ILIBRARI^.GRO%TH\(A1GM95REPO.DOC 3 • 10 points were awarded in category F., Traffic (Street Improvements), will widen and improve existing facilities (Harney Lane and Stockton Street). The maximum points for this category is 15. • 0 points were awarded in category G., Housing (Affordability), because the development plan does not specify whether there will be any affordable housing units or programs to make the units more affordable. Maximum points for this category is 10. • 0 points were awarded in category H., Site Plan and Project Design, because this category does not apply to single-family residential projects. • 15 points were awarded in category I., Schools (Proximity). Ten of the points were for being within one quarter of a mile from a proposed elementary school, and the remaining 5 points were for also being within two miles of an existing high school. Maximum points for this category is 30. • 10 points were awarded in category J., Fire Protection (Proximity), for being within a three minute emergency vehicle driving time from the nearest -fire station. Maximum points for this category is 10. The Parisis Property development plan received a total of 250 points, placing it second on the list. Thayer Property, the third project on the list is a new project located at 3921 & 3953 East Harney Lane. The project is near the south-east corner of Lodi, adjacent to the proposed Parisis Property project on the West, to Harney Lane on the South, to the undeveloped Richards Ranch subdivision to the North, and agricultural land to the East. • The Thayer Property project received 3 points in category A., Agricultural Land Conflicts, for being adjacent to agricultural land on three sides, the South, East, and West sides. Maximum points for this category is 10. • 0 points were awarded in category B., On-site Agricultural Land Mitigation, for not providing a buffer between the project and adjacent agricultural land. Maximum points for this category is 10. • 200 points were awarded in category C., General Location, for being located within the Priority Area One boundary. Maximum points for this category is 200. • 0 points were awarded in category D 1., Relationship to Existing Development, because the project is surrounded by undeveloped land. Maximum points for this category is 10. • 0 points were awarded in category D2., Relationship to Public Services (Wastewater), since the project requires the extension of wastewater lines from Bluejay Way in the Johnson Ranch subdivision to Stockton Street through the proposed Richards Ranch and Parisis Property developments and an undeveloped parcel north of the project site. The right-of-way has not been acquired. The maximum points for this category is 10. • 4 points were awarded in category D3., Relationship to Public Services (Water), for extending a Master Plan water line outside its boundaries, but within existing right-of-way (Harney Lane). The maximum points in this category is 13. • 0 points were awarded in category D4., Relationship to Public Services (Drainage), since the project requires the extensibn of storm drain lines from Bluejay Way in the Johnson Ranch subdivision to Stockton Street through the proposed Richards Ranch and Parisis Property developments and an undeveloped parcel north of the project site. The right-of-way has not been acquired. The maximum points for this category is 10. • 0 points were awarded in category E., Promotion of Open Space, because this category does not apply to single-family residential projects. • 10 points were awarded in category F., Traffic (Street Improvements), for widening and improving an existing facility (Harney Lane). The maximum points in this category is 15. • 0 points were awarded in category G., Housing (Affordability), because the development plan does not specify whether there will be any affordable housing units or programs to make the units more affordable. Maximum points for this category is 10. • 0 points were awarded in category H., Site Plan and Project Design, because this category does not apply to single-family residential projects. • 15 points were awarded in category I., Schools (Proximity). Ten of the points were for being within one quarter of a mile from a proposed elementary school, and the remaining 5 points were for also being within two miles of an existing high school. Maximum points for this category is 30. • 10 points were awarded in category J., Fire Protection (Proximity), for being within a three minute emergency vehicle driving time from the nearest fire station. Maximum points for this category is 10. The Thayer Property development plan received a total of 242 points, placing it third on the list. Bridgetown, the fourth project on the list is a new project located at 451 East Turner Road. The project is at the North-West corner of Lodi, adjacent to the Woodbridge Irrigation District Canal on the North and West, the City on the East, and Turner Road on the South. The Bridgetown project received 5 points in category A., Agricultural Land Conflicts, for being adjacent to agricultural land on two sides, the East and North sides. Maximum points for this category is 10. 7 points were awarded in category B., On-site Agricultural Land Mitigation, for providing a_ buffer between the project and adjacent agricultural land. Maximum points for this category is 10. h1G4f C:\LIHRARY'�GRO%VTHNf.41G,%195REPO.DOC 5 • 100 points were awarded in category C., General Location, for being located within the Priority Area Two boundary. Maximum points for this category is 200. • 5 points were awarded in category D1., Relationship to Existing Development, for abutting to existing development on two sides, the South and East. . Maximum points for this category is 10. • 0 points were awarded in category D2., Relationship to Public Services (Wastewater), since the project requires extension of wastewater lines through planned projects in the Towne Ranch development south of Turner Road. The necessary right-of-way in Towne Ranch has not yet been acquired. The maximum points in this category is 10. • 4 points were awarded in category D3., Relationship to Public Services (Water), for extending Master Plan water lines outside its boundaries, but within existing right-of-way (Turner Road). The maximum points in this category is 13. • 0 points were awarded in category D4., Relationship to Public Services (Drainage), since the project requires extension of storm drain lines through planned projects in the Towne Ranch development south of Turner Road. The necessary right-of-way in Towne Ranch has not yet been acquired. The maximum points in this category is 10. • 0 points were awarded in category E., Promotion of Open Space, because this category does not apply to single-family residential projects. • 10 points were awarded in category F., Traffic (Street Improvements), for improving an existing facility (Turner Road). The maximum points in this category is 15. • 0 points were awarded in category G., Housing (Affordability), because the development plan does not specify whether there will be any affordable housing units or programs to make the units more affordable. Maximum points for this category is 10. • 0 points were awarded in category H., Site Plan and Project Design, because this category does not apply to single-family residential projects. • 15 points were awarded in category I., Schools (Proximity). Five of the points were for being within one half of a mile from a proposed elementary school, and the remaining ten points were for being within one half of a mile from a proposed middle school. • 10 points were awarded in category J., Fire Protection (Proximity), for being within a three minute emergency vehicle driving time from the nearest fire station. The Automatic Aid Agreement between the City of Lodi and the Woodbridge Rural Fire District has recently brought this project within the three minute emergency vehicle driving distance. Maximum points for this category is 10. The Bridgetown development plan received a total of 156 points, placing it fourth on the list. Century Meadows 1, the fifth project on the list is an existing and developing project located at 2081 West Harney Lane. The project is near the South-West corner of Lodi, adjacent to the Century Meadows Two subdivision on the West, Century Boulevard on the North, Harney Lane on the South, and the WID canal and the City on the East. • The Century Meadows 1 project received 7 points in category A., Agricultural Land Conflicts, for being adjacent to agricultural land on one side, the South side. Maximum points for this category is 10. • 0 points were awarded in category B., On-site Agricultural Land Mitigation, for providing no buffer between the project and adjacent agricultural land. Maximum points for this category is 10. • 100 points were awarded in category C., General Location, for being located within the Priority Area Two boundary. Maximum points for this category is 200. • 5 points were awarded in category D 1., Relationship to Existing Development, for abutting to existing development on two sides, the North and East. Maximum points for this category is 10. • No points were awarded in category D2., Relationship to Public Services (Wastewater), because a commitment from the developer/s of the Century Meadows 1 project to front funds for the installation of a major public improvement is necessary. The project requires the installation of the Harney Lane sewer trunk line and a lift station at the future intersection of Harney Lane and Mills Avenue. Funds are not available in the Sewer Development Impact Mitigation Fee Fund. The maximum points for this category is 10. • 8 points were awarded in category D3., Relationship to Public Services (Water), for extending a Master Plan water line within the project boundaries from Harney Lane to the proposed Lexington Drive. The maximum points in this category is 13. • 0 points were awarded in category D4., Relationship to Public Services (Drainage), since the storm drains to serve this project will have to be extended to Mills Avenue through the Century Meadows Two and Century Meadows Three projects. The necessary right-of-way has not been acquired. The maximum points for this category is 10. • 0 points were awarded in category E., Promotion of Open Space, because this category does not apply to single-family residential projects. • 13 points were awarded in category F., Traffic (Street Improvements). This score represents a combination of 10 points for widening and improving an existing facility (Harney Lane) and 3 points for improving circulation by providing additional access from Harney Lane to adjacent development (proposed Muirfield Drive). The maximum points in this category is 13. MGM CALIBRARrGROkVTH%1A\Ghf95REPO. DOC 7 • 0 points were awarded in category G., Housing (Affordability), because the development plan does not specify whether there will be any affordable housing units or programs to make the units more affordable. Maximum points for this category is 10. • 0 points were awarded in category H., Site Plan and Project Design, because this category does not apply to single-family residential projects. • 10 points were awarded in category I., Schools (Proximity). Ten points were for being within one mile of an existing high school, Tokay High. • 10 points were awarded in category J., Fire Protection (Proximity), for being within a three minute emergency vehicle driving time from the nearest fire station. Maximum points for this category is 10. The Century Meadows 1 development plan received a total of 153 points, placing it fifth on the list. Century Meadows 3, the sixth project on the list is an existing and developing project located at 1933 West Harney Lane. The project is near the South-West corner of Lodi, which is near the South-West corner of Lodi, adjacent to the Century Meadows Two subdivision on the East, Century Boulevard on the North, Harney Lane on the South, and agricultural land to the West. • The Century Meadows 3 project received 3 points in category A, Agricultural Land Conflicts, for being adjacent to agricultural land on three sides, the South, East and West sides. Maximum points for this category is 10. • 0 points were awarded in category B., On-site Agricultural Land Mitigation, for providing no buffer between the project and adjacent agricultural land. Maximum points for this category is 10. • 100 points were awarded in category C., General Location, for being located within the Priority Area Two boundary. Maximum points for this category is 200. • 3 points were awarded in category D1., Relationship to Existing Development, for abutting to existing development on one side, the North. Maximum points for this category is 10. • No points were awarded in category D2., Relationship to Public Services (Wastewater), because a commitment from the developer/s of the Century Meadows 3 project to front funds for the installation of a major public improvement is necessary. The project requires the installation of the Harney Lane sewer trunk line and a lift station at the future intersection of Harney Lane and Mills Avenue. Funds are not available in the Sewer Development Impact Mitigation Fee Fund. The maximum points for this category is 10. • 8 points were awarded in category D3., Relationship to Public Services (Water), for extending a Master Plan water line within its boundaries in the future Mills Avenue and Lexington Drive. The maximum points in this category is 13. • 0 points were awarded in category D4., Relationship to Public Services (Drainage), since the project requires extension of storm drain lines to the west through the Century Meadows Four project or the undeveloped parcel south of the Century Meadows Four project. The necessary right-of-way has not been acquired. The maximum points for this category is 10. • 0 points were awarded in category E., Promotion of Open Space, because this category does not apply to single-family residential projects. • 15 points were awarded in category F., Traffic (Street Improvements), This score represents a combination of 10 points for widening and improving an existing facility (Harney Lane) and 5 points for improving circulation to adjacent development by extending Mills Avenue to Harney Lane. The maximum points in this category is 15. • 0 points were awarded in category G., Housing (Affordability), because the development plan does not specify whether there will be any affordable housing units or programs to make the units more affordable. Maximum points for this category is 10. • 0 points were awarded in category H., Site Plan and Project Design, because this category does not apply to single-family residential projects. • 10 points were awarded in category I., Schools (Proximity). Ten points were awarded for being within one mile of an existing high school, Tokay High. • 10 points were awarded in category 7., Fire Protection (Proximity), for being within a three minute emergency vehicle driving time from the nearest fire station. Maximum points for this category is 10. The Century Meadows 3 development plan received a total of 149 points, it project sixth on the list. Helmle Property, the seventh project on the list is a new project located at 2109 West Kettleman Lane. The project is adjacent to the Roget property (future park) on the West, to the Sunwest subdivision on the North, to Tienda Drive on the South, and Agricultural land to the East. • The Helmle Property project received 5 points in category A., Agricultural Land Conflicts, for being adjacent to agricultural land on two sides, the South and East sides. Maximum points for this category is 10. • 0 points were awarded in category B., On-site Agricultural Land Mitigation, for providing no buffer between the project and adjacent agricultural land. Maximum points for this category is 10. • 100 points were awarded in category C., General Location, for being located within the Priority Area Two boundary. Maximum points for this category is 200. MGM C:%LIBRARrGROWTHXtA%GM95REPO.QOC 9 • 3 points were awarded in category D 1., Relationship to Existing Development, for abutting to existing development on one side, the North. Maximum points for this category is 10. • No points were awarded in category D2., Relationship to Public Services (Wastewater), because a commitment from the developer/s of the Helmle Properties to front funds for the installation of a major public improvement is necessary. The project requires the extension of the Mills Avenue sewer trunk line and construction of a lift station at the future intersection with Mills Avenue on the north side ofKettleman Lane. The necessary right-of-way has not been acquired and funds are not available in the Sewer Development Impact Mitigation Fee Fund. The maximum points in this category is 10. • No points were awarded in category D3., ReIationship to Public Services (Water), since the water line will have to be looped to Tienda Drive or Kettleman Lane through adjacent parcels. The right-of-way has not been acquired. The maximum points in this category is 13. • 9 points were awarded in category D4., Relationship to Public Services (Drainage) This score represents the average of 10 points for being adjacent to a Master Plan storm drain line designed to serve the Project (existing 60" trunk line) and 8 points for requiring the extension of a Master Plan storm drain line within its boundaries in the future Tienda Drive. The maximum points in this category is 10. • 0 points were awarded in category E., Promotion of Open Space, because this category does not apply to single-family residential projects. • 0 points were awarded in category F., Traffic (Street Improvements), since the project requires extension of a Master Plan street (Tienda Drive) outside the project boundaries and right-of-way has not been acquired. The maximum points for this category is 15. • 0 points were awarded in category G., Housing (Affordability), because the development plan does not specify whether there will be any affordable housing units or programs to make the units more affordable. Maximum points for this category is 10. • 0 points were awarded in category H., Site Plan and Project Design, because this category does not apply to single-family residential projects. • 10 points were awarded in category I., Schools (Proximity). Five points were awarded for being within one mile of an existing middle school, Senior Elementary, and the remaining five points were awarded for being within two miles of an existing high school, Tokay High. • 10 points were awarded in category I., Fire Protection (Proximity), for being within a three minute emergency vehicle driving time from the nearest fire station. Maximum points for this category is 10. The Helmle Property development plan received a total of 137 points, placing it seventh on the list. 10 Century Meadows 2, the eighth project on the list is an existing and developing project located at 1817 West Harney Lane. The project is near the South-West corner of Lodi, which is adjacent to the Century Meadows One subdivision on the East, to the Century Meadows 3 subdivision on the West, to Century Boulevard on the North, and Harney Lane to the South. • The Century Meadows 2 project received 3 points in category A., Agricultural Land Conflicts, for being adjacent to agricultural land on three sides, the South, East and West sides. Maximum points for this category is 10. • 0 points were awarded in category B., On-site Agricultural Land Mitigation, for providing no buffer between the project and adjacent agricultural land. Maximum points for this category is 10. • 100 points were awarded in category C., General Location, for being located within the Priority Area Two boundary. Maximum points for this category is 200. • 3 points were awarded in category D 1., Relationship to Existing Development, for abutting to existing development on one side, the North. Maximum points for this category is 10. • No points were awarded in category D2., Relationship to Public Services (Wastewater), because a commitment from the developer/s of the Helmle Properties to front funds for the installation of a major public improvement is necessary. The project requires the installation of the Harney Lane sewer trunk line and a lift station at the future intersection of Harney Lane and Mills Avenue. Funds are not available in the Sewer Development Impact Mitigation Fee Fund. The maximum points for this category is 10. • 0 points were awarded in category D3., Relationship to Public Services (Water), since this project requires the looping of water lines through the Century Meadows One or Century Meadows Three projects for which right-of-way is not available. The maximum points in this category is 13. • 0 points were awarded in category D4., Relationship to Public Services (Drainage), since this project requires the extension of storm drain lines to Mills Avenue through the Century Meadows Three project. The necessary right-of-way has not been acquired. The maximum points in this category is 10. • 0 points were awarded in category E., Promotion of Open Space, because this category does not apply to single-family residential projects. • 10 points were awarded in category F., Traffic (Street Improvements), for widening and improving an existing facility (Harney Lane). The maximum points in this category is 15. • 0 points were awarded in category G., Housing (Affordability), because the development plan does not specify whether there will be any affordable housing units or programs to make the units more affordable. l laximum points for this category is 10. • 0 points were awarded in category H., Site Plan and Project Design, because this category does not apply to single-family residential projects. Maximum points for this category is 20. IOM C:\L1BR.ARY1GRow'TH%1A\GN195REPO. Doc 11 • 10 points were awarded in category I., Schools (Proximity). Ten points were awarded for being within one mile of an existing high school, Tokay High. Maximum points for this category is 30. • 10 points were awarded in category J., Fire Protection (Proximity), for being within a three minute emergency vehicle driving time from the nearest fire station. Maximum points for this category is 10. The Century Meadows 2 development plan received a total of 136 points, placing it eighth on the list. 12 i� tz ` 'b m Cr7 r m � m 0 �.. ►Z-3 H ►z-3 d C) btri N W `--• w v, w v, v, w v, J ><;<'`Agricultural Land Conflicts (Adjacency) 7� 0 0 0 o J o o J :' ::On-site Agricultural Land Mitigation (Buffer) > r-' 0 0 --• 0 0 0 0 r - 0 0 -- 0 0 N 0 N 0 N 0 -° -. General Location (Priority Area) w w w LA v, o w v, r ' : ` Relationship to Existing Development -C7 N' �r * 0 0 0 w ...Relationship to Public Services (Wastewater) v W: o �0 00 00 A A. J oo : '.''Relationship to Public Services (Water) v' ;A 0 0 0 0 0 0 0 A. ;"Relationship to Public Services (Drainage) 0 0 10 0 0 0 0 0 `> '` 'Promotion of Open Space (Percentage) 0 0 v, w p o 0 00 ' `- <Traffic (Street Improvements) 0 0 0 0 0 0 0 0_. Housing (Affordability) 0 0 0 0 0 0 0 0 `s :::'Site Plan and Project Design 0 0 0 0 LA v, v, o Schools (Proximity) ...Fire Protection (Proximity) h .-. �. --• .-. N N N. ON J %0 r-` ON N O J i� City of Lodi Residential Growth Management Schedule Adopted: September 18, 1991 under Ordinance #1521 Year Population 2% Pop. projection Persons/ Household Total units per year Single Fam.Q 65% Med density @ 10% High Density Q 25% '• Sep -89 50,990 1,020 2.572 397 258 40 99 Sep -90 52,010 1,040 2.567 404 263 40 101 Sep -91 53,050 1,061 2.630 403 262 40 101 Jan -92 53,186 1,064 2.664 399 259 40 100 Jan -93 53,701 1,074 2.680 401 261 40 100 Jan -94 53,903 1,078 2.680 402 261 40 101 094 .69 SMEOL400 Jan -96 55,788 1,116 EsL 2.697 416 270 42 104 Jan -97 56,904 1,138 EsL 2.697 425 276 43 106 Jan -98 58,042 1,161 Est 2.697 433 281 43 108 Jan -99 59,203 1,184 EsL 2.697 442 287 44 111 Jan -00 60,387 1,208 EsL 2.697 451 293 45 113 Jan -01 61,595 1,232 Est 2.697 460 299 46 115 Jan -02 62,827 1,257 ESL 2.697 469 305 47 117 Jan -03 64,084 1,282 Est 2.697 478 311 48 120 Jan -04 65,366 1,307 EsL 2.697 488 317 49 122 Jan -05 66,673 1,333 ESL 2.697 497 323 50 124 Jan -06 68,006 1,360 EsL 2.697 507 330 51 127 Jan -07 69,366 1,387 Est 2.697 518 337 52 130 TOTALS: 1 8,398 I 5,459 ( 840 1 2,100 I •' Sep'89 population number equals 2/3 of the population difference of )an '89 and Jan '90 added to )an '89. NOTE: Population and persons per household from *89 to 195 per State Departmentof Finance. Actual percentage increases in population may be higher or lower than 2%. Calculation of building permit allocations is based on a 2% increase of the current year population figure. 10/3/95 GMALL95.) LS CITY COUNCIL AWARDED BUILDING PERMIT ALLOCATIONS 1989 -1994 TOTAL RESIDENTIAL UNITS ALLOCATED (1989 - 1994) = 2,406 SINGLE FAMILY 65% =1,564 UNITS PROJECT # OF UNITS • IN SUBDIVISION ALLOCATION TOTALS BANG'S RANCH 123 123 CENTURY MEADOWS 1 * 201 48 CENTURY MEADOWS 2 * 162 105 CENTURY MEADOWS 3 * 201 102 CENTURY MEADOWS 4 120 120 COLVIN RANCH 60 60 FUGAZI BROTHERS 5 5 JOHNSON RANCH 2 173 173 LODI WEST 284 284 LODI ESTATES 65 100 RICHARD'S RANCH 114 34 RIVERPOINTE 44 44 TOWNE RANCH 403 366 11 1,95511 1,564 • Projects with land in Priority Arca 2. MEDIUM DENSITY 10% = 241 UNITS PROJECT BANG'S RANCH ** # OF UNITS IN SUBDMSION 36 ALLOCATION TOTALS 0 LODI WEST 57 57 BRIDGEHAVEN 50 50 LODI ESTATES ** 22 0 WOODHAVEN PARK 75 75 240 F 182 ' In'93 the Planning Commission awarded 40, 1994 medium density allocations to the Lodi West project " The Bangs Ranch and Lodi Estates projects each were awarded single family allocations in place oftheir medium density allocations. HIGH DENSITY 25% = 602 UNITS # OF UNITS ALLOCATION PROJECT IN SUBDIVISION TOTALS BENNETT & COMPTON * 144 0 144 0 ' The Bennett and Compton project was awarded 75 medium density allocations under the project name of Woodhaven Paris 10/3/95 GhIALL95_XLS LODI, PLANNING COMMISSION RECOMMENDED BUILDING PERMIT ALLOCATION SCHEDULE 1995 TOTAL RESIDENTIAL UNITS TO BE ALLOCATED FOR 1995 = 408 SINGLE FAMILY 65% = 265 PROJECT ALLOCATIONS RECEIVED 89-54 ALLOC. NEEDED TO COMPLETE REQUESTED ALLOC.1995'it99 =�!P'iP,.i�"'l i} �t .ill RUfl'311)'19411, TOWNE RANCH 366 37 37 , . .. PARISIS PROPERTY 0 39 38 THAYER PROPERTY 0 34 34 BRIDGETOWN 0 123 62x CENTURY MEADOWS 1 48 153 113 1" CENTURY MEADOWS 3 102 99 99 HELMLE PROPERTY 0 61 61 } CENTURY MEADOWS 2 105 58 58 62111 60411 502 iii»� yfw iSS$i��»i»a " a33'u� • ONE SINGLE FAMILY ALLOCATION FROM 1996 WAS GRANTED TO THE PARISIS PROPERTY PROJECT MEDIUM DENSITY 10% = 41 UNITS No projects have requested any of the 41, 1995 allocations for medium density units. HIGH DENSITY 25% = 99 + 101 + 101 + 100 + 100 + 101 + 102 = 704 UNITS No projects have requested any of the 102, 1995 allocations for high density units. Allocations from the previous years ('89-'94) are all available. 1013/95 GMALL95MS eye A.LISN30 M07 - 7d/1N301fab ro Z'OW to{n ?Iro'11.33M � , 1 r we Z W e. Z NW 71 � a.. a�aoa- JeQa{ai•aaa Z4--I---f''-f- al r : al.; a �.i ` �„ i a • wee a ,\.. 3 �'.'' " ��l �1� I ' �I • •r. �,Qa. 7 t' � i J / r ?.; W>� O } �, «�r � , '`° lea 51 _ �• I _p I �— f �'� '-�R �•'^moi I - � •' _— '� :..- RT or 0,-6 .w W QI >� t♦ w �a w I w I w �' �.i ` �„ i a • wee a ,\.. 3 �'.'' " ��l �1� I ' �I • •r. �,Qa. 7 t' � i J / r ?.; W>� O } �, «�r � , '`° lea 51 _ �• I _p I �— (3SAOHN33,Y9) 37Jn17/17/al9a rise f �'� '-�R �•'^moi I - � •' _— '� :..- -71 w I \ 1 ?VM 17MSIC NO11t-owl ]90!?16000N (3SAOHN33,Y9) 37Jn17/17/al9a rise C 2 's. ---tea—, Lj sDi— �E - • «., � x _ iia 'I� I r+ I i e —tea ' c N z`zz zi arrrae arun..r � = i L O g a� y ' L Oy p -z a W O N o�� r Yp( y�epo r+ I i e —tea ' c N z`zz zi arrrae arun..r � = i L TILL Wt - 1LI IL nae® ru - u r A®2to um - 11 221 .,w1AN 6rR fa116161 611Y1166L . 0.1.0. CANAL Its I1 IIT /le; 111 • In 1 1fli kin 21 26 n n " L 2/ 11 • n 111 } 1 111 �, •'0/ w e1 ti ; 1/ W /1 /O ` n SO 34 35 34 17 r.39 20 30 to AS d I __.. Irt _._ ;. b • AI I 1 _ 112 +1 • N w 11 -n /� •Ian 1 O 1 t1 11 Ir j h 11 I t 66 w 11 166 I I•r`-._.....z Y .. . b 12 43 101 5 � -/1 67 Y 11 _ 1 i [� q iI__wr. r. -� r. 12 to t 106,\\'� d' 60 N r 61 11 40 46 41 ,66 10 101 ��� . 1, i r-�- -. .... -. ♦ � 106 � ---/ /I�1 ; w---�--- . ' �' . '. M ■ V I..a.10 NAt• t• II I 162 ?; as Iw� 66 �. M �' n !� of r t [ 2 • A so• 0 at 6 6 6 6 1 1 ruitHi — — — BOLD - mw6 6wq N/O . ITA!• . 161Iia r..r A1�6 _ n" 6 ' 1995 DEVELOPMENT PLAN 1 BRIDCETO WNE A PORnoN or rmr sourmasr puARfrR Or SVC170N ]I T.1 A. A/ L. N.0.O.km., CITY Or LOOP SAN JOAOUIM COUNTY, CALJrORNG NAr, /96E SCALP: 1' - 100' PREPARED POA PREPARED DY.. PACO RLITIL .1.1 DAUNLCN N PIAZZA. INC. 217 RST LODI IYINU[ 322 F. PLN STAI[r LODL CA MAIN LODI. CA 27210 (l01) M7-111/ (lo!) -28/-1818 PROPOSED PHASING AND LAD USE - I!!! I1f0U[Sf[N ALL"CITION - It UNITS R-1 ZONING rVnW ALLOCATION - 11 VMS A P.N.: 011-420-2/ A S[ ArUS AOOACSS: 1A/ Lir ruANtx ROAD PJIOPCS[N IMI ALLOCATION CONTAINS SI./ ACRCS. rUTURf ALLOCATION CONTAINS 110.3 ACACS. OAUMr[AC11 ® •S PIAZZA / 1 cwI♦ •ael.1 ■�r1N DEVELOPEMENT PLAN LAND USE c-11, OnN /MI �:►'�� : 6.1089 DIVILOPIrlNT PLAN - 1995 ALLOCATION CENTURY MEADOWS ONE A PORTION OI TNI SOUTNRIST QUARTIA OP SECTION 11, T.9 N..8.9 l.. N.A.B.& if.. CITY Of LODI. SAN JOAQUIN COUNTY. CLUrORNLA ILLY, 1995 SCALL: t'-100' PI/wM Jsr, P—d fl: (ills MOYr9 Or I••II'OANIA AIUMNCM A, I4224 ro !01 tflrls it) 91sT ILM !fust SACAAMIMTO. CA 0!011 LON. CA a,t10 111q ass -sats LaNI aN-llle mposso Mason Ia1I AWSSTID AILOLArtaN - LIA UNITS, 0-1 20MINo starts: I. 1I1, ALAAC&FIM C"rJJMa t. a ACMs J. Arm. O,1-are-oa smis 80OWS: 8091 MAMIT LMo LOOT. Is, naso `--_ 2Z ,CALU F -I I I I 1 F. t .« , - � '» •� "' Isrrlwstlr rlrrlr nr w , ` M I D 1 C A N A L of Is. us ur m as - •«-- - ,« I ❑ri E -- 11 3 1. , II w� 1 rN rn� rl is r w - 51 y -1 Jt...tl.i.n..r_.'>•__� l'-•�I II W' « I IN ! ra1' « .at r tarrr ~ !1. i ••w II IIAI Nr L L'• OAI ri 1 i� Lea I I IN 1 RI I I sle 1 A' '-�• ;Irs;__._._�_i�. �. _.._ 1st ue ut rut - .« f! IN 1 + I III 1 IN 1 k 1 '48_ r ► a Lar Ift . rlrnm r "••e1Ar uu . J r 91,9 6•J949 ra ,2.1 to ' .. n 1 9 112 1a0 1 I IIs j " M I D C A N A L ! rr - term DRIVI t �-, • ! _ , II. 11. , , L,1 I ' : r - I • • y-';, _')1 a' Te .. !. !T! ft 1 4 N .! ; Its It! 1.' 11 . " , ,,III as a, of :, f! tt L !1; s0 a; ar _ ._IY. _ + r it K. - • « L.- . I , aft / • " - I —wlrm e« —,---�_ ! 4 I 4 e !1 If I 4 4 , M "I ` I IMI 1 \ 1��1—,1 JI •I ,r Il ,. ., C I N A I A O[ _ N u! — rf' J w, N '. ' lop rl! V y 112 ` 1T Iii Al 111 '! as I I IISI11 a. 01 L•`. C. .1 r t II ,a I t I mata 1 e' LI1 e M' - II n I Y- = e ..� n S Lf� •!'"1}�cr, !, !• 'o , as » r ■ ( n N n, w ue r- - I 1 !' l� So as as - - , �HN'rtM r 1«J.r11 I.« Ow� �' it '•'»' ' '-I - -- . '�. • s 1 I ) s I ». ", _ ! 11 t !a 11 'r! 11 If ` 1 F. 1 III.I 1 r ,Nii-A.a1 s�I —J • �— -J 1 —c�--r—L--.�—r:-'---1--rrr�—.MOrArrrc! rrA — — — J-- 1 oDrrr eA1ISIrI rl reg, r•I • (_ d • ! ( =1 —-______. -... I wr rl•r rslr r, _• . .... � o.l It IAOroSte IA11r I ' ~ 11 ' ' ' •. Err rrs l ■AUMOACH C. 1`IAZ2A eun ve e,r.wweolweue ®.uw DWELOPEMENT PLAN LAND USE rlrnm r "••e1Ar uu . J r 91,9 6•J949 N r, 1 J N 17 J s N Y I M a 71 rYf i IfYaJalJ a � q ��.• I- o i5w �« MUM ;ash fz '1—i•_�-_l.. — �Yf 'ff �N/lf7 M2'C.�.o at 7- wIw ON,{/ r jr oil- _- - _ •7_N • b I: �—i e I J-1 =o ' - - _. �`� � " 4sL''- S !+-s. ' I 8 I i I -M ;, •. I �1 7��` or JA _ F•2 _ ''II�g, ' tS �' fi I! � __�_� ! s. a —�� I I Olui CA al f.ltaa sAolsrnrr Isj• I a .! I• l J N S a r e a it Ar, I.CA ! a II L L �_j I w"i 1. I Yfi I la l I-'-=• -•'Ilcl�+i �Y�; "� —rr? �I ala nit w ��� i I It - It ,L = �.'r wYo xJlanrraJ I I , + L i 7 f. J Y N 1 N SO I ! ! 1 7 . •, I I I " � I 1 i:.eI'll '%rs d f .z 51TUS ADDRESS' PROPOSED LAND USE. 1313 E. NWT. RTE 12 1995 REOLIESTED ALLOCATION - 60 LNTS LODL CA. 45240 AREA' 1D.7 ' ACRES A.P.N.- 027 - 010 - 64 DENSITY- 3.2 U.P.A. . ZONNC' 9-2. LOW DENSITY RESIDENTIAL • aw.Ev. , n w. +j. F;PH. A.ao, 8 1H9At [ENGINEER-DA116N r PIAZZA. NL. is 323 W. ELM STREET LODL CALIFORNIA C2CMU3G6-GGl5 OWNER' I E.rrt . rvwt a F.C.P. DEVELOMPICHT ASSOC. ! I • • a - x. 4 • nx x • w I KCSZLER-DAKCR. CTRL. ' I FAIC[l 1 I CSO zFFREY KIRSI P.O DOX 1299 WOODwmGC. CA 95255 auw PM. C209) 334-OG70 I ( ' ' " • • 1995 DEVELOPMENT PLAN HELMLE PROPERTY ■ t I r L f w A x L•" C E Surf n ,All of is 1 _p �rt6' tO"• - A PORTION OF THE WC. 15 tfC. " SOUTHEAST QUARTER OF SEC. 10. T.3N.. R,6E.. M.D.B.+M. CITY OF LOPI, SAN JOAQUN COUNTY. CALIFORNIA. -AA It Ak IIw b. f ' ' lM[Yrr[ xl1E{ 11[I "0.I • . MAY. 1995 SCALE' 1'100' aaw SAUMNACM & r1A22A '•« « ®aWl NaN.RRwr DEVELOPEMENT PLAN LAND USE eltr ruwvwow• 16Q/ •7 ob PAell Ylle ® cell ssn arm NMId r6M3A8d073A3a ....»,o». ,11111 I •zz7rw a Narownvi �R—w.----r-•^ . v an-ot lor/ 9.0 -rot /6or1 01896 n'feel *raft n 1907 J"", Nis art. ret ANr7 Al Ne IN ALIT 1111 M., . Na1YNa II NLn 618111 oYP1 A,YrI. l,n 1111 •IInr.I .M1, T 11.111.1»'Y.I 1 P-4"P-4":�/ P11N.y a-- -m 1111 1 N.I1Y ! .001-• UMIS 4661 AYR a r/Nr0317r3 '< 'A1Nno3 NIn0r0l NYS •1007 40 Al/J ^ ' N 760 M' J Sir' N C A 't l 1101433S JO At y N31rrA0 1S3eN1nOS JO A•OU110d r 911/30 aaY16 r-6 •ru.w n -Y .a.m .ur».n ».1 OM1 •M 0 0 Y 3 N A Y01 N)10 1Yn..+nrwwl MOUV0077Y 4661 - MY7d JM3Rd073A30 -- ]� — SAM .arra n JAn6 www".altos urmaw rare, f. 1. r rr Ir Al r.a ,. a..1 r. J r _ 1I u • a I« 1 ` ;aJl Jrr rel Irl ill ri1 tri Oil; 1` lrl I i ; )el roll IA rot i1 oll 1«I 189 �i89 1' • ; 11 P it_ �� " '1 P :111 • Jr II �i rl 11 1 o i i i • I i'♦ 1 { `- - : �� �� -- — •�: i f r cst i l n tp 1-- h- �'- I % " h �l_.�= _�- ----i =_1 _.r- t. - v +• :>I. • ! _-G-_. '._. t--��.:•f-.=v y , .� Wil. - `, QJI a L_ - • ~ 1 or; ; rA196 tl M r as a 0a y I -of Ila )AI re x01 v t, T� i, ♦i ,.0 11_ V P I ` o iN G 6 1 '1 _ _{tS:,._.L=1:. r7 cc • '1 �"-=-1_•11-j, 77 - of t I)I .1 • J a r l• KA Y1- I_ I i` I Ij tr 11' (1 OA ' r- -- - - -- -- ---'\ e i b r T-.: -1.... e n _ _r a r� Ael to AI 011 or s0! Ir rr I. - 1 {L `1.' _ I J /1 Crf I Irl •I'I+ l a 1 1. { 16 �' — IL i. , II Ir_...... ti 201 f 1 w 61-1 I e 1 I I I I I i• . - '- I_ rT , of a Jr_i' a rrA i « ' ! 1 1 •n l of 1 �• •w' •.r- yr-� 1.- e r j. ) y; w , Ut 111 011 !I/ sal IIr 111 I 1 I n r Lr ;-• rI 1 « IM -- „i/U Jrr eel to to Ir Ls rn: n' n 111 1 ' _ ; i - 1{^ 1 irIt ' it :.--{-:. ' �- -- l- '-�=--I-_-i--� _I =J1--H� -J� i at « �,o i u b '^ ' I err 1 a ` 1 r ,, r r r a s r l r r r r a . � 1; At ' I -- I` i' s i` t 0 ': rr ' I e • --- - 1 `tl e rt, i . ell "41 1 1 QI CII ! I ^ ' n 1 b to/ {i 1 --1 _- 1 1. y'1 Ir Ir 111. II Or to ; r I AA t el 64 lot ro i r) I) . i i) i JI' A►1r 1 �1, e 1 911 rI.f. .r, )r# 1 'trl t 771 1 , ell Irl la I I 1 r—� .,r L f . l 1 I ( . 11 , rill rI �, . 9 —'--' . )rl . rel I I Ill tl1 ' ~ -11''- a'r-r y •�� - r ' -' s-; w'': , it it 1 it « i R 1 1 r e ell ' 1 I 1 1• 1 . _ 4._� 1fI 111 --t e l/l ] rt Ir '01 It i Il at 1 lrI rr1 1 i All eI ' 4 i• 1 1 Ir; CITY OF LODI NOTICE OF PUBLIC HEARING q Date: November 1, 1995 Carnegie Forum . 305 West Pine Street, Lodi Time: 7:00 p.m. For information regarding this notice please contact: Jennifer M. Perrin City Clerk Telephone: (209) 333-6702 NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN that on Wednesday, November 1, 1995 at the hour of 7:00 p.m., or as soon thereafter as the matter may be heard, the City Council will conduct a Public Hearing to consider the following matter: a) Consider Planning Commission's recommendation that City Council adopt the 1995 Growth Management Allocations. Information regarding this item may be obtained in the office of the Community Development Director at 221 West Pine Street, Lodi, California. All interested persons are invited to present their views and comments on this matter. Written statements may be filed with the City Clerk at any time prior to the hearing scheduled herein, and oral statements may be made at said hearing. If you challenge the subject matter in court, you may be limited to raising only those issues you or someone else raised at the Public Hearing described in this notice or in written correspondence delivered to the City Clerk, 221 West Pine Street, at or prior to the Public Hearing. By Order of the Lodi City Council: .-Perrin i Clerk L/ Dated: October 5, 1995 Appr��d as�o form: �„�// f� John Luebberke Deputy City Attorney JACITYCLRMFORMMNOTCDD.DOC 1013195 OF O 07`QDECLARATION OF 4C/FORS - Public Hearing -1995 Growth Management Allocations On October 5, 1995 in the City of Lodi, San Joaquin County, California, I deposited in the United States mail, envelopes with first-class postage prepaid thereon, containing a copy of the Notice attached hereto, marked Exhibit "A"; said envelopes were addressed as is more particularly shown on Exhibit "B" attached hereto. There is a regular daily communication by mail between the City of Lodi, California, and the places to which said envelopes were addressed. I declare under penalty of perjury that the foregoing is true and correct. Executed on October 5, 1995, at Lodi, California. Jennifer M. Perrin City Clerk J lin L. TaylCi Clerk decmaWforms it II III111111, I I l l l l l I l l l 111111 I II Delmar Batch 1767 E. Harney Lane Lodi, CA 95240 111111,11111111/111111/111111111 Lewis Homes of California 9216 Kiefer Blvd. Sacramento, CA 95827 I! 111„!III„I,1, I, I !III„I I I1, I Fred Baker & Chris Keszler 317 W. Lodi Avenue Lodi, CA 95240 II11111I111,11111111111111111111 Angelos Parisis 9949 Fernwood Road CtnAtnn r A Q5717 II11111III I111�I..I IIII IIIII II II Lee Developments c/o Robert L. Lee P.O. Box 3116 San Leandro, CA 94578 i I i IlI111111111111111111111LI11111 J. Jeffrey Kirst P.O. Box 1259 Woodbridge, CA 95258 I 111111111,111111111111111111111 Dennis Bennett P.O. Box 1597 Lodi, CA 95241 III If I I IIL, I I1left 1 IIl1/111/111 BALINMACH & PIAZZA M23I, W.ELM STREET CA 95240 11111 11111/441 ................. STOCKTON RECORD ATTN: RICH HANNER 101 W. LOCUST ST. 94 LODI, CA 95240