HomeMy WebLinkAboutOrdinances - No. 1043ORDINANCE NO. 1043
AN ORDINANCE REPEALING ORDINANCE NO. 1002 OF
THE CITY OF LODI AND ENACTING A NEW ORDINANCE
ESTABLISHING RATES FOR THE SALE OF ELECTRIC
ENERGY BY THE CITY OF MDI AND DECLARING THE
SAME TO BE AN URGENCY MEASURE.
THE CITY COUNCIL OF THE CITY OF LODI DOES ORDAIN AS FOLLOWS:
Section 1. Ordinance No. 1002 of the City of Lodi entitled "AN ORDINANCE
REPEALING ORDINANCES NO. 781, 801 hnd 988 OF THE CITY OF LODI AND ENACTING A
NEW ORDINANCE ESTABLISHING RATES FOR THE SALE OF ELECTRIC ENERGY BY THE CITY OF
LODI AND DECLARING THE SAME TO BE AN URGENCY MEASURE" is hereby repealed as of
the effective date of this Ordinance.
Section 2. 'ihc sale of electric energy by the City of Lodi shall be at
the rates hereinafter set forth.
Section 3. SCHEDULE EA DOMESTIC SERVICE - Domestic service is applicable to
domestic lighting, heating, cooking and single-phase domestic power service in
single-family dwellings and in flats and apartments separately metered by the City;
to single-phase service used in common for residential purposes by tenants in
multi-family dwellings; and to all single-phase farm service on the premises operated
by th2 person whose residence is supplied through the same meter.
RATES :
Per Meter
Per Month
Service Charge: ........................ $0.65
Energy Charge (to be added to Service Charge):
First 50 kwhr, per kwhr. ................ .0441
Next 50 kwhr, per kwhr. ................ .0333
Next 100 kwhr, per kwhr. ................. .0252
Next 100 kwhr, per kwhr. ................ .0180
Next 700 kwhr, per kwhr. ................ .0171
Over 1,000 kwhr, per kwhr. ................ -0153
Fuel Cost Adjustment:
A fuel cost adjustment will be included in each bill for service. The
adjustment amount shall be the product of the total kilowatt hours for which
the bill is rendered limes the adjustment amount per kilowatt hour. The
-1-
. _._ ,..-__ _- ........
~
adjustment amount per kilowatt hour will be the adjustment amount charged
the City by Pacific Gas & Electric Company for the previous month plus 5%
for energy losses.
SPECIAL CONDITIONS:
(a) When a business or commercial establishment is conducted in conjunction
with a residence and both are measured through one meter, this rate does not apply.
(b) Service on this schedule will be supplied at the single-phase secondary
voltage available - either 120/240 or 120/208 volts.
Section 4. SCHEDULE EB GENERAL SERVICE - General service is applicable to
single-phase or polyphase alternating current service, or to a combination thereof,
provided that all polyphase service to any customer on the same premises shall be
supplied through one meter. Service to each of two or more separate areas, but not
in the same building, and which do not overlap within the same premises, may be
individually metered.
Per Meter
RATES: Per Month
Single-Phase Service:
Service Charge: .................... $0.65
Energy Charge (to be added to Service Charge):
First 100 kwhr, per kwhr. ............ .0441
Next 200 kwhr, per kwhr. ............ .0387
Next 700 kwhr, per kwhr. ............ .0369
Next 2,000 kwhr, per kwhr. ............ .03 15
Over 3,000 kwhr, per kwhr. ............ .0216
Minimum Charge:
$0.65 per month, but not less than 65c per month per kva of connected
welder load.
Polyphase Service :
The single-phase rate plus $0.95 per meter per month.
Minimum Charge:
$1.60 per month, but not less than 65c per month per kva of connected
welder load and per horsepower of polyphase connected motor load.
Fuel Cost Adjustment:
A fuel cost adjustment will be included in each bill for service. The
adjustment amount shall be the product of the total kilowatt hours for which
the bill is rendered times the adjustment amount per kilowatt hour. The
-2-
~ .................... "". ............
adjustment amount per kilowatt hour will be the adjustment amount charged the
City by Pacific Gas & Electric Co. for the previous month plus 5% for energy
losses.
SPECIAL CONDITIONS:
(a) Annual Basis:
this schedule is applicable only on an annual basis.
(b) Voltage: Service on thi5 schedule will be supplied at the secondary
For customers who use service for only part of the year,
voltage available. Single phase for lighting will be either 1201240 or 1201208
volts. Three-phase power service will be 1201208, 240, 2771480 or 480 volts.
Combination light and power will be supplied as a four-wire service of 1201240,
1201208 or 2771480 volts.
Section 5. SCHEDULE DA GENERAL POWER - MAXIMUM DEMAND BASIS - General power -
maximum demand basis is applicable to alternating current used in motors, heating
and cooking devices, and rectifiers for battery charging; but is not applicable to
current used for lighting, either directly or through transforming or converting
equipment, except incidental lighting (as defined in Special Condition (c) below)
combined with power on the same meter. This schedule is applicable only to cus-
tomers of record on May 1, 1973 who thereafter maintain continuous service at the
same location under this schedule.
RATES: Rate per kwhr for Monthly Consumption
per kw of the Billing Demand
First Next Next All Over
Billing Demand
kw
100 kwhr 100 kwhr 100 kwhr 300 kwhr
per kw per kw per kw per kw
0-18 ........... .0408 -0212 .0153 .0136
19 - 37 ............ .0366 .0187 .0136 .0128
38 - 74. .......... .0340 .0153 . 0 136 .0111
75 and over ........... .0289 . 0 144 .0128 .0102
Minimum Charge:
$62.00 per month for the first 40 kw or less of the billing demand plus
$1.05 per kw for any excess, accumulative annually.
Fuel Cost Adjustment:
A fuel cost adjustment will be included in each bill for service.
adjustment amount shall be the product of the total kilowatt hours for which
the bill is rendered times the adjustment amount per kilowatt hour. The
The
-3-
adjustment amount per kilowatt hour will be the adjustment amount charged the
City by Pacific Gas & Electric Co. for the previous month plus 5% for energy
losses.
SPECIAL CONDITIONS:
(a) Billing Demand: For the purpose of this schedule the billing demand is
the maximum demand made by the customer's equipment for electrical power during
the month for which bill is rendered, but not less than 50% of the highest such
demand in the preceding eleven months nor less than the diversified resistance
welder load. The maximum demand in any month will be the maximum average power
taken during any 15-minute interval in the month; provided, that in cases where
the use of energy is intermittent or subject to violent fluctuations, a 5-minute
interval may be used.
(b) Guaranteed Load: Any customer may obtain the rates and conditions of
service for a billing demand greater than his actual demand by guaranteeing the
charges (including the minimum charge) applicable to such greater demand. Such
guaranteed demand may not be changed more than once per year.
(c) Incidental Lighting: For the purpose of this schedule, incidental light-
ing is any lighting on the premises of an industrail (as distinguished from com-
mercial) plant operated by power supplied on this schedule, except lighting in
dwellings or in buildings used primarily for trade or for any purpose not essential
to the operation of such plant.
(d) Voltage: Any standard distribution voltage, single or polyphase at the
customer's choice, but not more than one will be supplied on this schedule.
Section 6. SCHEDULE ED GENERAL POWER - CONNECTED LOAD BASIS - General power -
connected load basis is applicable to alternating current used in motors, heating
and cooking devices, and rectifiers for battery charging; but is not applicable to
current used for lighting, either directly or through transforming or converting
equipment. This schedule is applicable only to customers of record on May 1, 1973
who thereafter maintain continuous service at the same location under this schedule.
RATE (A) - Monthly Basis:
Rate per kwhr for Monthly Consumption of
Energy Charge: First 50 Next 50 Next 150 All Over
H.P. of ' kwhr kwhr kwhr 250 kwhr
Connected Load in hp. per hp. per hp. per hp. per hp.
2 - 9.9 hp. . . . . . . .0561 .0298 .0170 .0136 ..
10 - 24.9 hp. . . . . . . .0502 .0289 .0153 .0136
25 hp. and over . . . . . .0416 .0264 .0144 .0128
-4-
.. - .^. .
Minimum Charge: Per H.P.
Per Month
First 50 hp. of connected load .............. $1.35
All over 50 hp. of connected load. ............ .90
The minimum charge will be accumulative annually.
RATE (B) - Annual Basis:
Demand Charge: Per H.P.
Per Year
First 10 hp. of connected load .............. $9.00
All over 10 hp. of connected load. ............ 6.00
The demand charge is payable in five equal monthly installments.
Energy Charge (to be added to Demand Charge):
The energy rates applicable to Rate (A) above.
NOTE :
The Minimum Charge in Rate (A) and the Demand Charge in Rate (B) shall be
based on a connected load of at least 2 hp. for single-phase service and at least
3 hp. for three-phase service.
Fuel Cost Adjustment:
A fuel cost adjustment will be included in each bill for service. The
adjustment amount shall be the product of the total kilowatt hours for which
the bill is rendered times the adjustment amount per kilowatt hour.
adjustment amount per kilowatt hour will be the adjustment amount charged the
The
City by Pacific Gas & Electric Co. for the previous month plus 5% for energy
losses.
SPECIAL CONDITIONS:
(a) Connected Load: For the purposes of this schedule, connected load is the
sum of the capacities of all of the customer's equipment that may be connected to
the City's lines at the same time.
(b) Guaranteed Load: Any customer under Rate (A) may obtain the rates and
conditions of service for a connected load larger than his actual connected load
by guaranteeing the charges (including the minimum charge) applicable to such
larger connected load. Such a guaranteed load may not be changed more than once
per year.
-5-
... ..............
(c) Voltage: Any standard distribution voltage, single or polyphase at the
customer's choice, but not more than one will be supplied on this schedule.
Section 7. SCHEDULE S-I GENERAL SERVICE - DEMAND METERED - General service -
demand metered is applicable to single-phase or polyphase alternating current service,
or to a combination thereof, provided all polyphase power service to any customer on
the same premises shall be supplied through one meter. Service to each of two or
more separate areas, but not in the same building, and which do not overlap within
the same premises may be individually metered.
RATE :
Per Meter
Energy Charge: Per Month
First 5,000 kwhr or less ................. $160.00
For all excess over 5,000 kwhr:
First 100 kwhr per kw of billing demand, per kwhr . . .0225
Next 200 kwhr per kw of billing demand, per kwhr . . .0123
All excess, per kwhr. ................ .0071
Minimum Charge, per month:
$160.00 but not less than $1.08 per kw of billing demand.
Fuel Cost Adjustment:
A fuel cost adjustment will be included in each bill for service. The
adjustment amount shall be the product of the total kilowatt hours for which
the bill is rendered times the adjustment amount per kilowatt hour. The
adjustment amount per kilowatt hour will be the adjustment amount charged the
City by Pacific Gas & Electric Co. for the previous month plus 5% for energy
losses. (The fuel cost adjustment amount is not subject to any adjustment
for voltage or power factor.)
SPECIAL CONDITIONS:
(a) Maximum Demand: The~maximum demand in any month will be the maximum
average power taken during any 15-minute interval in the month, but not less than
the diversified resistance welder load. However, when the recorded montly maximum
demand has exceeded 400 kw for three consecutive months and thereafter until it has
fallen below 300 kw for 12 consecutive months, a 30-minute interval will be used.
In cases where the use of energy is intermittent or subject to violent fluctuations,
-6-
. -- -.( . .. . . . . .
a 5-minute interval may be used.
reset after a definite time interval may be used.
A thermal type of demand meter which does not
(b) Billing Demand: The billing demand to be used in computing charges will
be the mean of the actual maximum demand as determined under Special Condition (a)
above for the current month and the highest such demand occurring in the year
ending with the current month.
(c) Off-peak Demand: Any customer whose billing demand has exceeded 400 kw
for 3 consecutive months and thereafter until it has fallen below 300 kw for 12
consecutive months may, upon request, for billing purposes, have demands ignored
which occur between 10:30 p.m. and 6:30 a.m. of the following day and on Sundays
and the following holidays: New Year's Day, Washington's Birthday, Memorial Day,
Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day,
as said days are specified in Public Law 90-363 (U.S.C.A. Section 6103).
(d) Voltage: Service on this schedule will be supplied at the secondary
voltage available or, at the option of the customer, at the primary voltage avail-
able. Where secondary voltage is desired and polyphase power is to be combined
with single phase, a four-wire service will be supplied.
(e) Voltage Discount: (1) When delivery hereunder is made at the same volt-
age as that of the line from which the service is supplied, or (2) when sufficient
capacity is not available in distribution facilities existing in the area to supply
the customer's requirements, and the City has elected to supply service from a
transmission line for its operating convenience by means of City-owned transformers
on the customer's property, a discount of 4% will be allowed on the above charges,
including the minimum charge, provided, however, the City is not required to supply
service at a non-standard voltage. When service is supplied directly without
transformation from a transmission line of 60 kv or higher, a discount of 5% will
be allowed. The City retains the right to change its line voltage at any time,
after reasonable advance notice to any customer receiving a discount hereunder and
affected by such change, and such customer then has the option to change his system
so as to receive service at the new line voltage or to accept service (without
voltage discount) through transformers to be supplied by the City.
(f) Power Factor: When the billing demand has exceeded 400 kw for three
consecutive months and thereafter until it has fallen below 300 kw for twelve
-7-
.. ....... ,-A... .............
consecutive months, bills will be adjusted for weighted monthly average power
factor as follows:
The total charge (except the minimum charge) for any month as computed on the
above rates will be decreased or increased, respectively, by 0.1% for each 1% that
the average power factor of customer's load in the month was greater or less than
85%, such average power factor to be computed (to the nearest whole per cent) from
the ratio of lagging kilovolt ampere hours to kilowatt hours consumed in the month.
Section 8. SCHEDULE S-I1 GENERAL SERVICE - DEMAND METERED - General service -
demand metered is applicable to polyphase alternating current service provided all
power service to any customer on the same premises shall be supplied through one
meter. Service to each of two or more separate areas but not in the same building
and which do not overlap within the same premises may be individually metered.
RATE :
Demand Charge:
Per Meter
Per Month
First 1,000 kw of billing demand ............ $1,700.00
Over 1,000 kw of billing demand per kw. ........ 1.125
Energy Charge (in addition to the Demand Charge):
First 100 kwhr per kw of billing demand, per kwhr. ... .0122
Next 200 kwhr per kw of billing demand, per kwhr. ... .0077
All excess, per kwhr .................. .0061
Minimum Charge:
The Demand Charge constitutes the minimum monthly charge.
Fuel Cost Adjustment:
A fuel cost adjustment will be included in each bill for service. The
adjustment amount shall be the product of the total kilowatt hours for which
the bill is rendered times the adjustment amount per kilowatt hour.
adjustment amount per kilowatt hour will be the adjustment amount charged the
City by Pacific Gas & Electric Co. for the previous month plus 5% for energy
losses.
for voltage or power factor.)
The
(The fuel cost adjustment amount is not subject to any adjustment
SPECIAL CONDITIONS:
(a) Maximum Demand: The maximum demand in any month will be the maximum
average power taken during any 30-minute interval in the month, provided that in
cases where the use of energy is intermittent or subject to violent fluctuations,
either a 5-minute or a 15-minute interval may be used.
-8 -
(b) Billing Demand: The billing demand to be used in computing charges
will be the mean of the actual maximum demand as determined under Special Condition
(a) above for the current month and the highest such demand occurring in the year
ending with the current month, but not less than 1,000 kw.
(c) Off-peak Demand: Any customer may, upon request, for billing purposes,
have maximum demands ignored which occur between 10:30 p.m. and 6:30 a.m. of the
following day and on Sundays and the following holidays: New Year's Day,
Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day,
Thanksgiving Day and Christmas Day, as said days are specified in Public Law
90-363 (U.S.C.A. Section 6103).
(d) Voltage: Service on this schedule will be supplied at the transmission
or the primary distribution voltage available or, at the option of the customer,
at the secondary voltage available.
(e) Voltage Discount: (1) When delivery hereunder is made at the same
voltage as that of the line from which the service is supplied, or (2) when
sufficient capacity is not available in distribution facilities existing in the
area to supply customer's requirements, and the City has elected to supply service
from a transmission line for its operating convenience by means of City-owned
transfonners on the customer's property, a discount of 4% will be allowed on the
above charges, including the minimum charge, provided, however, the City is not
required to supply service at a non-standard voltage. When service is supplied
directly without transformation from a transmission line of 60 kv or higher, a
discount of 5% will be allowed. The City retains the right to change its line
voltage at any time, after reasonable advance notice to any customer receiving a
discount hereunder and affected by such change, and such customer then has the
option to change his system so as to receive service at the new line voltage or
to accept service (without voltage discount) through transformers to be supplied
by the City of Lodi.
(f) Power Factor: The total charge (except the minimum charge) for any month
as computed on the above rates will be decreased or increased, respectively, by
0.1% for each 1% that the average power factor of customer's load in the month
was greater or less than 8.577, such average power factor to be computed (to the
nearest whole percent) from the ratio of lagging kilovolt ampere hours to kilowatt
hours consumed in the month.
-9 -
, . . . -_ .,. . , ... , . .
r
(9) Annual Basis: This schedule is available on an annual basis only.
Any customer may obtain the rate and conditions of service existing on this
schedule by guaranteeing the monthly minimu% charge for a period of at least
twelve consecutive months.
Section 9. SCHEDULE EL OUTDOOR DUSK-TO-DAWN LIGHTING - Outdoor dusk-
to-dawn lighting is applicable to City-owned and maintained outdoor overhead
lighting' service where street light service is not available.
RATE :
For each 175-watt Mercury Vapor lamp - $4.15 per month.
For each 400-watt Mercury Vapor lamp - $6.20 per month.
Fuel Cost Adjustment:
A fuel cost adjustment will be included in each bill for service.
The adjustment amount shall be the product of the total kilowatt hours
for which the bill is rendered times the adjustment amount per kilowatt
hour.
amount charged the City by Pacific Gas & Electric Co. for the previous
month plus 5% €or energy losses.
for the 175-watt lamp the energy used is 73 kwhr and €or the 400-watt
lamp, 162 kwhr is used.
The adjustment amount per kilowatt hour will be the adjustment
Average monthly kwhr will be used;
CHARACTER OF SERVICE:
Lamps shall be approximately 175-watt or 400-watt Mercury Vapor with
luminaire and bracket, as specified by City of Lodi Utility Department, and
shall be supported on City-owned poles which are used to carry distribution
system circuits for other City purposes and shall be at locations approved by
City of Lodi.
so as to give approximately 4,300 hours of lighting service annually.
Lamps will be controlled to burn from dusk to dawn each night
LAMP SERVICING AND RELOCATIONS:
Upon receipt of notice from customer of failure of light to operate as
scheduled, the City of Lodi Utility Department will, within a reasonable period
of time, make the necessary repairs.
City of Lodi will, at customer's request, relocate existing outdoor
lighting service equipment, provided customer reimburses the City for the net
expense to City incurred therewith.
Any additional facilities required other than mentioned in character of
-10-
,~- ~ ..... ./. . . . .. . . . .
service shall be at customer's expense prior to installation.
Section 10. URGENCY REVENUE MEASURE. This ordinance is hereby declared
to be an urgency measure for the imediate preservation of the public peace,
health and safety, and a measure fixing an amount of money to be raised by
taxation, all within the meaning of Section 36937 of the Government Code of
the State of California and Article IV, Section 1, of the Constitution of the
State of California. The facts concerning such declaration are:
(a) The City of Lodi owns and operates an electric distribution system,
presently purchasing electric energy in bulk from the Pacific Gas and Electric
Company. The contract under which such electrical energy is purchased has
been modified by the Federal Power Commission of the United States of America
and on August 24, 1974 a new and substantially higher rate was imposed by the
Company. Lack of additional revenue to the City, commencing on the date on
which the higher rate is imposed upon the City, will result in a reduction in
the governmental and proprietary services furnished the public by the City to
the detriment of the public peace, health and safety.
(b) Partial reliance upon electric revenues for the provision of other
governmental and proprietary services has made it impracticable to make complete
provision for the operation of Municipal facilities in the fiscal year 1974-75
pending determination of electric costs and revenues. Assurance of safe and
reasonable service levels requires the adjustment of such costs and revenues
at the earliest possible moment.
Section 11. EFFECTIVE DATE. The Ordinance is being published one time
in the "Lodi News-Sentinel," a daily newspaper of general circulation printed
and published in the city of Lodi and shall be in force and take effect with
respect to all electric bills for service furnished on and after September 24,
1974.
y of September, 1974
City Clerk I/
State of California,
County of San Joaquin, ss.
-11-
I, Alice M. Reimche, City Clerk of the City of Lodi do hereby certify
that Ordinance No. 1043 was introduced at a regular meeting of the City Council
held September 4, 1974, and was thereafter passed, adopted and ordered to
print at a regular meeting held September 18, 1974, by the following vote: '
Ayes: Councilmen -
I further certify that Ordinance No. 1043 was approved and signed by
the Mayor on the date of its passage and the same has been published
pursuant to law.
& 2j1. (iLwL/
Alice M. Reimche
City Clerk.
-12-