HomeMy WebLinkAboutMinutes - November 29, 2016 SSLODI CITY COUNCIL SHIRTSLEEVE SESSION CARNEGIE FORUM, 305 WEST PINE STREET TUESDAY, NOVEMBER 29, 2016 A. Roll Call by City Clerk An Informal Informational Meeting ("Shirtsleeve" Session) of the Lodi City Council was held Tuesday, November 29, 2016, commencing at 7:02 a.m. Present: Council Member Mounce, Council Member Nakanishi, Mayor Pro Tempore Kuehne, and Mayor Chandler Absent: Council Member Johnson Also Present: City Manager Schwabauer, City Attorney Magdich, and City Clerk Ferraiolo B. Topic(s) B-1 Tour Harney Lane Grade Separation Project (PW) Following a brief introduction by Public Works Director Charlie Swimley, City Council, staff, and the public were invited to board a bus for a tour of the Harney Lane Grade Separation Project. The Public Works Department, along with project contractor Derrick Hansen with DeSilva Gates Construction, provided a guided tour of the site. Topics discussed included current status of the project, work performed to date, anticipated completion date, project oversight, traffic control, intersection improvements and signalization, and recap of how the concept began to formalize in 2012. Mr. Swimley stated the project is possible due to the team effort of the following entities and individuals: contractor DeSilva Gates Construction; design engineers Mark Thomas & Company; Union Pacific Railroad; Construction Project Manager Gary Wiman; former Public Works Director Wally Sandelin; San Joaquin Council of Governments; and Caltrans Local Assistance. C. Comments by Public on Non -Agenda Items None. D. Adjournment No action was taken by the City Council. The meeting was adjourned at 8:03 a.m. ATTEST: Jennifer M. Ferraiolo City Clerk AGENDA ITEM 13601 CITY OF LODI COUNCIL COMMUNICATION •Y TM AGENDA TITLE: Tour Harney Lane Grade Separation Project MEETING DATE: November 29, 2016 (Shirtsleeve Session) PREPARED BY: Public Works Director RECOMMENDED ACTION: Tour Harney Lane Grade Separation Project. BACKGROUND INFORMATION: The Harney Lane Grade Separation Project started in April of 2016 and is nearing the halfway point of the construction schedule. The completed project includes a bridge over the Union Pacific Railroad and widening Harney Lane to four lanes between Hutchins Street and Stockton Street. The bridge structure is being constructed in two separate phases to minimize traffic impacts within the project area. The south two lanes of the bridge, as well as intersection improvements at Hutchins Street and Stockton Street, and a substantial portion of the underground improvements associated with the project, are nearing completion. The south two lanes are scheduled to be open for two-way traffic next month. Over the next 11 months, the contractor is scheduled to complete construction of the north two lanes of the bridge along with the lighting, landscape, and remaining soundwall elements of the project. Weather permitting, the project is expected to be complete by October 2017. The Public Works Department, along with the contractor, DeSilva Gates Construction, LP, will provide a guided tour of the site. The tour, which leaves the Carnegie Forum at 7 a.m., is intended to provide the Council an opportunity to observe the project's current stage of construction, as shown in Exhibit A, and for staff to answer questions. A City transit bus will provide transportation. FISCAL IMPACT: Not applicable. FUNDING AVAILABLE: Not applicable. Charles E. Swimley Jr. Public Works Director CES/CES/tdb cc: City Engineer/Deputy Public Works Director Construction Manager APPROVED: S c , City Manager K:\WP\PROJECTS\STREETS\HarneyGradeSeparation\Project\CC shirtsleeve tour Harney lane grade sep.doc 11/17/16 La I �� f i rill f r t ! F PTI , * r kF Grade Separation Harney Lane @ UPRR Overhead Project November 29, 2016 Current Status: The Stage 1 Bridge Deck is in place. Placement of the sidewalk, concrete barrier, and fence railing along the south side is needed to complete this stage of the bridge structure. The new roadway, along with sidewalk, curb, and gutter needs to be installed prior to traffic being switched to the new bridge section. This was originally scheduled to occur on December 1, 2016 but weather has caused us substantial delays. Once the traffic is switched to the Stage 1 Bridge we can demolish the existing Harney Lane roadway and begin importing soil for the Stage 2 Bridge. Our current schedule has us completing the project in October 2017. We are anticipating weather will cause additional delays to the schedule. Work performed to date: • Imported 99,500 cubic yards of dirt to build slopes + Placed 4,500 lineal feet of 10 -inch water pipe • Placed 5,300 cubic yards of aggregate base. • Placed 4,600 tons of asphalt. • Placed 351,958 pounds of steel reinforcing at Stage 1 Bridge Deck. • Placed 930 cubic yards of concrete at Stage 1 Bridge Deck. r. Placed 9,600 square feet of sound wall. Project Area oo -,f l 3 Lr lHARWY LANE - CITY OF LODI HARNEY LANE/UPRR EXHIBIT - ALTERNATIVE 1 OVERHEAD (SLOPE EMBANKMENTS) MAU THOMAS A lOMPW 7V Rendering from July 24, 2012 Shirtsleeve Meeting SLOPE EMBAWMENTS �--pit•