Loading...
HomeMy WebLinkAboutMinutes - February 11, 2014 SSLODI CITY COUNCIL SHIRTSLEEVE SESSION CARNEGIE FORUM, 305 WEST PINE STREET TUESDAY, FEBRUARY 11, 2014 A. Roll Call by City Clerk An Informal Informational Meeting ("Shirtsleeve" Session) of the Lodi City Council was held Tuesday, February 11, 2014, commencing at 7:00 a.m. Present: Council Member Johnson, Council Member Mounce, Council Member Nakanishi, Mayor Pro Tempore Hansen, and Mayor Katzakian Absent: None Also Present: Interim City Manager Schwabauer, Interim City Attorney Magdich, and City Clerk Johl-Olson B. Topic(s) B-1 Downtown Liahtina Report (EU Electric Utility Director Elizabeth Kirkley provided a PowerPoint presentation regarding downtown lighting. Specific topics of discussion included current conditions, potential solutions, cost estimates, comparisons with other cities, and next steps. In response to Council Member Johnson, Ms. Kirkley stated underground wiring and conduit may be damaged due to a variety of factors including tree roots and water. In response to Council Member Nakanishi, Electric Utility Superintendent Charles Berry stated lighting maintenance would include inspection of outlets and mechanical connections, although the wire itself would not necessarily be tested unless there was an indication that it was not working. In response to Council Member Mounce, Ms. Kirkley confirmed that holiday lighting would continue to be available during the holiday season in downtown with any of the chosen options if the City Council so desired. In response to Mayor Pro Tempore Hansen, Ms. Kirkley stated there would be a need to hire a licensed electrician because the utility does not employ staff to handle this type of an electrical project. In response to Council Member Nakanishi, Engineering and Operations Manager Jay Marchesseault stated the cost for the current lighting if it was operational would be approximately $8,000, or three to four times the amount of the projected cost for the recommended energy efficient lighting usage as outlined in the presentation. In response to Council Member Johnson, Ms. Kirkley stated the City Council could consider options for retaining up lights if it so desired. A brief discussion ensued amongst the City Council and Ms. Kirkley regarding maintenance and safety considerations for lights that are installed in the ground. In response to Council Member Mounce, Lodi Chamber of Commerce Executive Director Pat Patrick stated that the vendors for the street faire and other similar events do not currently use the outlets because they are not working and are advised of the same prior to the events. In response to Council Member Johnson, Mr. Schwabauer stated there is no longer any assessment in the downtown area. Mr. Sandelin stated the active assessment included the downtown guidelines and lighting considerations. In response to Council Member Hansen, Construction Project Manager Gary Wiman provided an overview of the process for digging and replacing the existing wire and the cost estimate for the same, which included prevailing wage. Mr. Wiman stated he was not asked to review the Palo Alto approach to date. In response to Council Member Nakanishi, Interim City Manager Steve Schwabauer stated the City does not have a legal obligation to provide lighting but it can do so on a voluntary basis. Th City Council provided general direction to provide lighting on School Street in downtown on a year-round basis, including during the holiday season. Pat Patrick spoke in support of providing lighting in downtown on a year-round basis for safety and tourism purposes and encouraged the City to work with downtown property owners to find solutions for the same. Ed Miller spoke in support of lighting in downtown on a year-round basis and encouraged staff to utilize a different design for the project to ensure that the current problems do not reoccur in the future. Council Member Johnson, in concurrence with Mayor Pro Tempore Hansen and Council Member Mounce, requested information regarding utilizing local businesses for City projects, power washing or repainting downtown areas, and bidding for the Hutchins Street Square carpet replacement project. In response to Council Member Nakanishi, Ms. Kirkley stated there is enough funding in the street light budget to maintain existing street lights but not decorative lighting. C. Comments by Public on Non-Aaenda Items None. D. Adjournment No action was taken by the City Council. The meeting was adjourned at 7:55 a.m. ATTEST: Randi Johl-Olson City Clerk CITY OF LODI �a 9<I�OR�COUNCIL COMMUNICATION TM AGENDA TITLE: MEETING DATE: PREPARED BY: Downtown Lighting Report February 11, 2014 Electric Utility Director AGENDA ITEM e) -I RECOMMENDED ACTION: Receive Downtown Lighting Report. BACKGROUND INFORMATION: Several years. ago decorative lighting and electrical outlets were installed in tree wells downtown Lodi along School, Oak and Elm streets as part of a downtown beautification project. The lights and most of the outlets are no longer functioning. The City Manager requested staff investigate options for restoring decorative lighting in the downtown corridor. This report will provide an overview of current conditions, potential solutions, funding considerations, as well as practices in other cities. Staff desires further direction from the City Council for enhancing Lodi's downtown lighting along with making necessary repairs to the electrical outlets. FISCAL IMPACT: FUNDING AVAILABLE: APPROVED: Not applicable. Not applicable. FBI e el�l- / //� E izabeth. irkley Electric Utility Director City Manager ' - ilr' - • —• Tr }•� 1 r— _ 1�1� •� _..4 1{ _ ti� 9r . _ ? 1. Ir• �. - r. 'r YO,Ue wrT urufy�OWnetl%lfjilNfy' Fn P �19!fop r wwntown.,Ljqnvnc o Current Conditions o Potential Solutions k Cost Estimates p Other Cities o' Photos E Next Steps o Questions 2 UIloilo[* o Existing tree well up lights ■ Non-functional ■ Inefficient, outdated design. E Receptacles Damaged ■ Unsafe if energized o Substructure ■ Compromised wiring ■ Potential conduit damage ■ Maintenance (dirt, water, tree roots) A� 9 �rt r • 1 L en, X�m h 1 J 1 I 1• LEGEND v r 1 1 CHURCH Sr. r♦ FUNCTIONAL • NON-FUNCTIONAL • RELOCATE REMOVE ® METER PEDESTAL v — o 111 10] 10.5 101 a of 121 1x1 t] , — L13 xta zea I qr JW is Pm Post U.S. 1� 1rL NN f 4k- �7' - � •r� 1 wp-�N K �• � .'IS ti` tis �� • ¢� • v .'til. s c �N� SCALE r -1W est Estimate o Estimate for licensed electrical contractor ($225,700) ■ Remove existing up lights ■ Replace, relocate, remove existing receptacles ■ Repair, replace substructure Wiring 13 *Conduit, as needed ■ Install new energy efficient lighting (*not included in engineering estimate) o Operation & Maintenance ■ Energy cost ($235 monthly, $2,820 annually) ■ String, restring lights ($10,600 annually) ■ Maintenance ($16,600 annually) W. Palo Alto ,4 Roseville Santa Clara Truckee Ukiah i ■ r � d r ■ & NA White LED Decorative Post White LED Top Flood Lights Contracted White LED LLD fees White LED NA White LED Yes donated by utility (PBF) Yes NA Business District Contracted Public Works Parks Public Works Public Works Public Works Parks Public Works Downtown Downtown Association Association Main Street Utility 4 Parks Program 6 U 2" rel re, z,•�:� �`+ � Truckb Roseville Alameda Palo Alto r• {`�' T # 1r r 5 ' -•t ti •�r u Ff i a i �,` . �n� ■ J � F 7 o Proceed with RFP? o Funding sources? ■ Energy efficient lighting Allowable use of Public Benefits Funds SB1037 Report • Remove existing up lights ($20,000) • Install new energy efficient lighting ($15,700)mg repair, ■ Reainin air replacement work? ■ Ongoing O&M? o New lighting? ■ Where? ■ What? o Other issues? J 1 _ f•• J •Tr � - � - 'rte --• y9F 'f. 'rte f • r • - T'• • -f • f