HomeMy WebLinkAboutAgenda Report - April 15, 1998 (49)COUNCIL COMMUNICATION
AGENDA TITLE: Award Contract for the Industrial Substation Transformer #3 Addition and Transfer of Funds
MEETING DATE: April 15, 1998
SUBMITTED BY: Electric Utility Director
RECOMMENDED ACTION: That the City Council award the contract for the Industrial Substation Transformer
#3 Addition to the lowest responsible bidder, Power Providers, Rancho Cordova,
CA in the amount of $777,159; authorize the transfer of sufficient funds to fully
fund this project and approve extension of agreement for Professional Services.
BACKGROUND:
Bidder
On March 10, 1998, bids were received and opened for this project. Three bids
were received with the results shown below.
Power Providers, Rancho Cordova, CA
T&H Joint Venture, Jamestown, CA
Amount
$ 777,159
Comments
$ 748,000 Did not acknowledge Addendum
Contra Costa Electric, Martinez, CA $1,077,804 Did not acknowledge Addendum
During the bidding process, at the request of one of the prospective bidders, an addendum was issued. The Instructions to
Bidders in the Bid Documents require that a bidder must acknowledge receipt of all addenda and include such
acknowledgment in the proposal together with the bid and bid bonds. Two of the bidders did not include such
acknowledgment with their bid, therefore, rendering the bids "not responsive".
On March 12, 1998, at 11:51 a.m. (2 days following the bid opening) T&H Joint Venture did contact the City to indicate that
they had received the addendum. The addendum had been forwarded to their estimating department but was not returned
to be included with their bid documents, nor was receipt acknowledge in the bid.
The lowest Monetary Bidder (T&H Joint Venture) has been notified of the recommendation to award this bid to the Lowest
Responsible Bidder including the reason for this recommendation and has been informed of the opportunity to address the
City Council prior to the award. The Engineer's Estimate for this project was $571,000. The discrepancies between the
Engineer's Estimate and the bids received have given rise to extensive analysis of the bids received as well as what reasons
may have caused this difference. The most significant reason for the difference is the market conditions at present and for
the foreseeable future in California. Since January 1998 the contracting market for this type of work has seen a massive
increase in requests for bids of this magnitude and much larger projects resulting in a shortage of skilled labor and a relatively
low response to this bid request by the City, considering bid documents (at a charge) were mailed to 10 interested contractors
and notices placed at several exchanges as well. The Engineer's Estimate underestimated the labor rates and the
mobilization charges which are directly attributable to the market conditions. Other line items in the bid are not as easily
identifiable between bidders. However, it has been learned that should the City elect not to award this bid and rebid, not
recommended, it is likely that fewer bids will be received but more importantly most probable at a higher price due to the
demand in the market.
Therefore, based on the conditions as they currently (and in the foreseeable future) exist and the fact that this improvement
to the City's electric system is critically needed to serve the industrial sector of the City under emergency conditions it is
Approved
H. Dixdl Flynn
City Manages
m
Date of Meeting: April 15, 1998
pg 2/2
recommended that the bid be awarded to the Lowest Responsible Bidder. It should also be noted that the power transformer
awarded October 15, 1997, will be arriving in Lodi in late July. In order to receive this transformer without additional costs,
a portion of this contract (the pad and oil containment) must be completed prior to arrival.
Two additional actions by the Council are recommended:
The City Council authorized the transfer of $365,000 from the Department's reserves to augment the budgeted
funds for this project.
The City Council approve the extension of the agreement with Power Engineers to include tasks 13 and 14 for
Construction Inspection Services and Commissioning (testing) of the substation as outlined in Power Engineers
proposal, Revision A, dated August 12, 1997, at a cost of $53,700.
Considering the importance of this substation the need to have skilled inspections throughout the construction
period cannot be over emphasized. The demand on existing staff from numerous other construction and
maintenance projects precludes consideration to perform inspection in house.
This project cost is shown below:
Design, construction contract, bid evaluation and
contractor selection (Power Engineers) $ 86,255
Power Transformer 392,287
Construction Contract (this action) 777,159
Inspection services and commissioning (this action) 53,700
Total project: $ 1,309,401
Funding Approval:
Funding required for this recommendation: ($777,159 + 53,700) $ 830,859
1997-99 Financial Plan and Budget:
Page E-19 Substation Construction High Voltage and Protection. $ 305,859
Page E-23 Distribution System Improvement 160,000
Transfer from reserves to augment budgeted funds: 365,000
Vicky McAthie, lFinance Director
Prepared by: Hans Hansen, Manager, Engineering and Operations
ANV/HH/lst
c: City Attorney
Purchasing Officer
Total $ 830,859
Alan N. Vallow
Electric Utility Director
CITY COUNCIL
.TACK A. SIEGLOCK, Mayor
KEITH LAND
Mayor Pro Tempore
ROBERT J. JOHNSON
STEPHEN J. MANN
PHILLIP A. PENNINO
MR. DENNIS W. LEDBETTER
TRI -TECHNIC INC
19218 RAWHIDE ROAD
PO BOX 829
JAMESTOWN CA 95327
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-0851
March 24, 1998
MR. STEVE HUMPHREY
HUMPHREY MASONRY
15142 CAVALIERI
SONORA CA 95370
City of Lodi, Industrial Substation Transformer #3 Addition, Bid Evaluation.
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City .attorney
ALICE M. REIMCHE
Citv Clerk
The City Council is scheduled to award the contract for the Industrial Substation Transformer #3
Addition to the Lowest Responsible Bidder, Power Providers of Rancho Cordova, CA at the regular
meeting on April 15, 1998.
Although your bid is the Lowest Monetary Bid, your bid has been rejected as a "not responsive" bid
based on sections 6.6 and 6.8 of "Part IB - Instructions to Bidders". These sections state:
6.6 "The Bid shall contain an acknowledgment of receipt of all Addenda".
and
6.8 "Each proposal shall include all Addenda or clarifications issued during the bidding
period acknowledged by the bidder's signature thereon. Failure to so include or
acknowledge an Addendum or clarification will result in the proposal being rejected
as not responsive".
You will be afforded the opportunity to address the City Council at the meeting prior to the award,
should you so desire.
The meeting will be held at: Carnegie Forum
305 West Pine Street
Lodi CA
April 15, 1998, beginning at 7 P.M.
H:\USER\-kDMINTqui pment-Materials\Spec-Bidlxrormer\BidRej mdonLtr. wpd
March 25, 1998
Page 2 of 2
If you have any questions, feel free to contact me at (209) 333-6769.
1 will be away from the office April 2-8, 1998, inclusive.
Hans Hansen
Manager, Engineering and Operations
HHtlst
c: City Manager
City Attomey
City Clerk ✓
Electric Utility Director
File
H. IUSER%ADMIMEquipme t.MaterialslSpec-Bidtxformer\BidRejectimLtr.wpd
04/07/1998 1:1:32 209-333-68:39 LGDI-ELEC. UTILITY PAGE 01
71
Td-Technic Inc..
3-37-98
City of Lodi
Electric Utility Dept.
1331 S. Ham Ln.
Lodi, CA. 95242-3395
209-333-6769
209-333-6839 (fax)
Attn- Mr., Hans Hansen, Director of Engineering & Operations.
Dear Mr. Hansell,
Industrial Substation
Transformer 43
Addition Project.
Today, we received your notice of award letter dated 3-2498, informing us that our bid has been rejected
as aw-responsive due to our failure to include a proper acknowledgment of addenda with our bid. We
acknowledge that this finding is correct. Due to an oversight on our part, we did not include a copy of the
addeudwn. properly acknowledged. As confirmed to you over the phone, and also formally herein, we did
indeed receive the addendum in question, we simply did not properly acknowledge this with our bid.
Although we acknowledge the technicality of this oversight, we respectfully request that the City
reconsider their action regarding the rejection of our bid and subsequent award of this contract to the
second bidder, as provided for under section 18. 1, of Pari 1B. This section states that the City has the right
"...to waive any and all informalities not involving price, time or changes in the work...", we feel that this
situation exactly fits this section and is tate reason for it's existence. T & H, 7.V.; Tri -Technic & Humphrey
lblasonry; worked hard to submit a very competitive and comprehensive bid for this project. We feel that
rejection of our bid based ona specification technicality does not serve the best interests of the City of
Lodi, nor is it fair to T&H, T. V.. It would be a different story if the subject reality made a real. material
diflercuce in the efficacy of our bid or our ability to complete the project, but it doesn't.
Please reconsider; is this technicality worth tens of thousands of dollars to the City? Does this decision
exhibit the best and most prudent stewardship of rate payers' dollars. Wiry should the City pay non-
competitive pricing for the salve project? We apologize for our oversight and realize that, had we more
carefully prepared our bid package for submission that we would not now be facing this challenge, if I
could go back and change it, I certainly would. Thank you for your thoughtful considerations of Ns matter.
I respectfully request that this letter be submitted to the decision snaking body of the City Council and that
I may have opportunity to address the Council at the time and place designated in your letter. Please
confirm receipt of this request and that our petition will be placed on the City Council's meeting agenda.
.... grocer ... __. .. ....... ---
Damis Ledbetter - Projects Manager
14218 Rauhilte FA... P.O.13vx 82<t, J&=sWwn. CA. 95327 Phone: 209-984-3277: Fax 2i)9 W,1448: E-mail: lri'uVto&.c m
fiPR-07-1998 12:29 209 333 6839 P.01
RESOLUTION NO. 98-60
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE BID FOR THE INDUSTRIAL
SUBSTATION TRANSFORMER #3 ADDITION
WHEREAS, in answer to notice duly published in accordance with law and the
order of this City Council, sealed bids were received and publicly opened on March 10,
1998 at 11:00 a.m. for the Industrial Substation Transformer #3 Addition, described in the
specifications therefore approved by the City Council on February 4, 1998; and
WHEREAS, said bids have been compared, checked, and tabulated and a report
thereof filed with the City Manager as shown below:
Bidder/Location Amount
Power Providers, Rancho Cordova, CA $ 777,159
T&H Joint Venture, Jamestown, CA $ 748,000 -
Contra Costa Electric, Martinez, CA $1,077,804*
Note: Did not acknowledge Addendum
WHEREAS, the City Manager recommends award of the bid for the Industrial
Substation Transformer #3 Addition be made to the lowest responsible bidder, Power
Providers of Rancho Cordova, CA; and
NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of
the bid for the Industrial Substation Transformer #3 Addition, be and the same is hereby
awarded to Power Providers of Rancho Cordova, CA the lowest responsible bidder in the
amount of $777,159.00.
Dated: April 15, 1998
---------------------------------------------------------------------
--------------------------------------------------------------------
I hereby certify that Resolution No. 98-60 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held April 15, 1998, by the following vote:
AYES: COUNCIL MEMBERS - Land, Pennino and Sieglock (Mayor)
NOES: COUNCIL MEMBERS - Johnson and Mann
ABSENT: COUNCIL MEMBERS - None
ABSTAIN: COUNCIL MEMBERS - None
, CH
ALICE M. RE MCHE
City Clerk
CITY COUNCIL
JACK A. SIEGLOCK, Mayor
KEITH LAND
Mayor Pro Tempore
ROBERT J. JOHNSON
STEPHEN J. MANN
PHILLIP A. PENNINO
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 SHAM LANE
LODI, CALIFORNIA 95212-3995
(209)333-6762
FAX (209) 339-0851
April 20, 1998
Contra Costa Electric, Inc.
Michael S. Dias, Executive Vice -President
P. O. Box 2523
Martinez CA 94553
Re: Industrial Substation Transformer 93 Addition
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attornev
ALICE M. REIMCHE
City Clerk
At the City Council meeting of April 15, 1998, the Lodi City Council awarded the bid referenced
above to Power Providers of Rancho Cordova, CA. the lowest responsible bidder. The bids received
for this project are tabulated below:
Bidder Amount Comments
Power Providers, Rancho Cordova, CA $ 777,159
T & H Joint Venture, Jamestown, CA $ 748,000 Did not acknowledge Addendum
Contra Costa Electric, Martinez, CA $1,077,804 Did not acknowledge Addendum
The bid bond you submitted with your proposal for this project is hereby returned.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we will
welcome proposals from you in the future
Sincerely,
44- AC�j
Hans Hansen
Manager, Engineering and Operations
Enclosure (I)
c: Electric Utility Director
City Clerk
Purchasing Officer
CITY COUNCIL
JACK A. SIEGL CK. Mavor
KEITH LAND
Mayor Pro Tempore
ROBERT J. JOHNSON
STEPHEN J. MANN
PHILLIP A. PENNING
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 SHAM LANE
LODI. CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-0851
April 20, 1998
T & H Joint Venture
Dennis W. Ledbetter, Tri -Technic Inc.
P. O. Box 829
Jamestown CA 95237
Re: Industrial Substation Transformer #3 Addition
H. DIXON FLYNN
City Manaeer
RANDALL A. HAYS
City Attornev
ALICE M. REIMCHE
City Clerk
At the City Council meeting of April 15, 1998, the Lodi City Council awarded the bid referenced
above to Power Providers of Rancho Cordova, CA. the lowest responsible bidder. The bids received
for this project are tabulated below:
Bidder Amount Comments
Power Providers, Rancho Cordova, CA $ 777,159
T & H Joint Venture, Jamestown, CA $ 748,000 Did not acknowledge Addendum
Contra Costa Electric, Martinez, CA $1,077,804 Did not acknowledge Addendum
The bid bond you submitted with your proposal for this project is hereby returned.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we will
welcome proposals from you in the future
Sincerely,
Hans Hansen
Manager, Engineering and Operations
Enclosure (1)
c: Electric Utility Director
City Clerk
Purchasing Officer