Loading...
HomeMy WebLinkAboutMinutes - July 14, 2009 SSLODI CITY COUNCIL SHIRTSLEEVE SESSION CARNEGIE FORUM, 305 WEST PINE STREET TUESDAY, JULY 14, 2009 The July 14, 2009, Informal Informational Meeting ("Shirtsleeve" Session) of the Lodi City Council was canceled due to the lack of a quorum. Informal Council Sub -Committee Meeting Upon cancellation of the July 14, 2009, Informal Informational Meeting ("Shirtsleeve" Session), an informal sub -committee of the City Council, consisting of Mayor Hansen and Council Member Johnson, met at approximately 7:15 a.m. to receive general information regarding the water meter program. The minutes are as follows: Public Works Director Wally Sandelin provided a PowerPoint presentation regarding the water meter program. Specific topics of discussion included policy review, estimated costs in May 2007, estimated costs today, who will pay what and when, payment options, policy direction versus proposed, proposed meter installation program, budget, funding, and implementation. In response to Council Member Johnson, Mr. Sandelin stated the City Council previously decided that the purple area indicated on the map was going to pay $200 because they already had the box. In response to Mayor Hansen, Mr. Sandelin stated the proposal to charge everyone a flat rate of $300 was rejected previously by the City Council. City Manager King and Mr. Sandelin briefly reviewed the financing discussion the City Council had in March 2009 that excluded using the infrastructure replacement funds for water meter installation, which would have allowed for the flat rate. In response to Council Member Johnson, Mr. Sandelin stated there will still be services in the back because there are a number of pipes that will not be moved. In response to Council Member Johnson, Mr. Sandelin stated there will be two notices sent to property owners, one will detail the self -install option and the other will outline the City installation options. In response to Mayor Hansen, Mr. Sandelin stated there is some borrowing within the water fund but not outside of that fund. In response to Mayor Hansen, Mr. Sandelin stated part of the program includes providing rate payers as much data as possible on their water usage prior to the meter installation so that they will have an understanding of their current usage. In response to Mayor Hansen, Mr. Sandelin stated there is a huge difference between the currently monitored properties and the difference is primarily based on larger versus smaller landscaping areas. In response to Mayor Hansen, Mr. Sandelin stated all meters should be installed in the entire City by the end of 2013. In response to Mayor Hansen, Mr. Sandelin stated if everyone utilizes the three-year payment Continued July 14, 2009 option the City should break even in the middle of 2015. In response to Mayor Hansen, Mr. Sandelin stated there will be very little, if any, disruption to landscaping for property owners. He stated the only exception is for the few thousand property owners who have six inch or less mains in their backyard. The informal discussion of the subcommittee ended at approximately 7:50 a.m. ATTEST: Randi Johl City Clerk N AGENDA ITEM CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Report on Water Meter Installation Program MEETING DATE: July 14, 2009 (Shirtsleeve Session) PREPARED BY: Public Works Director B- 1 RECOMMENDED ACTION: Receive information on the Water Meter Installation Program, BACKGROUND INFORMATION: At the May 2,2007 meeting of the City Council, a policy was adopted regarding the installation of water meters within the City. Staff will present the recommended Program to implement that policy direction. Topics to be covered will include a review of the policy, estimated costs, assignment of costs, budget, and implementation schedule. FISCAL IMPACT: Not applicable. FUNDING AVAILABLE: Not applicable. FWSlpmf F. Wally Sc1melin Public Works Director APPROVED: Blair King, y Manager K:1WP1PROJECTSIWATER1M6t8rslCPmposedWtrMtrinstallProgram.doc 711012009 La 411 off Topics of Presentation ➢Policy Review Estimated Meter Costs Water Meter Program Budget and Implementation Policy Review Council Direction Given on May 2, 2007 Install Prepaid Meters in 4 Years Self -Installed Meters for 1 Year All Meters Installed by end of 4th Year Property Owners Pay for Meters Payment Terms — lump sum or extended terms Estimated Costs In May 2007 Meter Costs Service Number Unit Cost Cost (Mil.) Pre -1979 needing 11X0 17200 $13.2 service upgrade a meter s 2-2 mt $1, -DDD serwke $II_.D mil - 1979 -1992 meter 2x500 $450 $1.2 ready services 1992+ `meter 3200 $350 $1.1 paid" services fino less4DO pilaff metars) City -upgraded 500 $3500- Service.. Totals: 171200 $15.7 Estimated Costs Today Service Number Unit Cost Cost ($ million) Pre -1979 needing 107058 $1,200 $12.1 service upgrade 1979 — 1992 meter 27669 $450 $1.2 ready services 1992 + "meter paid" 624 $200 $0.1 services City -upgraded 936 $200 $0.2 services Estimated Total 147287 $13.6 Who Will Pay What and When r Paid by property owner ($200 - $1,200) r Separate billing from the Utility Bill for non -owner occupied properties Billing for meters begin January 1 of the construction year "City -upgraded Services" properties pay $200 Upgrades to repair leaking services Incidental to other City work at a parcel Infrastructure Replacement Projects 1 & 2 )�. Actual costs to be based upon contractor bids Payment Options 1. One time payment, or 2. 36 -month payment plan with interest — payment ranges from $5.60 to $33.58/month 0 No low income, senior, or disabled discounts 0 Hardship cases may require special funding Policy Direction vs. Proposed Approved Proposed May 2007 Today Self Installation 2008 2010 Period Install Pre -Paid 2011 2009 Meters Install All Meters 2011 2013 Usage Based Billing 2010-25900 2011 —25900 Implementation 2012 — 135000+ 2012-45900 2013-75700 2014 — 135000+ Proposed Meter Installation Program 4 years instead of 3 Install 14,287 new services by 2013 Accelerate replacement of water mains to 7 miles/year (backyard to front yard < 6 inches diameter) • Avoids duplicate meter installation ($3.5 million savings) • Lowers risk (cost) of adding meters to old services • Unknown condition of 30 — 90 yeas old service • Damage/Restoration of landscape and hardscape • Limits disruption of service ). Water Main Replacement Cost = $20.7 million Budget Program Years 2010-2013 Water Main Replacement $20.7 million Meter Installations $13. 6 million Total Estimated Construction Cost $34.3 million Funding FY 2009 Infrastructure $14.4 million Replacement Fund Balance Revenue from Infrastructure $8.8 million Replacement (FY 2010 — 2014) Property Owner Meter $13.5 million Payments Total Funding Available $36.7 million Deficit balance in subfund may exist through 2015 1 Implementation Self -Installation Period 2010 Adopt Usage Based W & WW Rates Nov 2009 Approve Contract for Design of Infrastructure Replacement Projects 4-6 Jan 2010 Construct Infrastructure Replacement Projects 4 - 6 2011 -2013 Issuance of Usage Based Utility Bills (and each successive January thereafter) Jan 2011 D 11P.Stlc