HomeMy WebLinkAboutMinutes - October 14, 2008 SSLODI CITY COUNCIL
SHIRTSLEEVE SESSION
CARNEGIE FORUM, 305 WEST PINE STREET
TUESDAY, OCTOBER 14, 2008
A. Roll Call by City Clerk
An Informal Informational Meeting ("Shirtsleeve" Session) of the Lodi City Council was held
Tuesday, October 14, 2008, commencing at 7:00 a.m.
Present: Mayor Pro Tempore Hansen, Council Member Hitchcock, Council Member Johnson,
Council Member Katzakian, and Mayor Mounce
Absent: None
Also Present: City Manager King, City Attorney Schwabauer, and City Clerk Johl
.. 01
B-1 Receive Presentation on Parks and Recreation Capital Improvement Projects
City Manager King briefly introduced the subject matter of Parks and Recreation Capital Projects.
Interim Parks and Recreation / Community Services Director Jim Rodems provided a PowerPoint
presentation regarding the Parks and Recreation capital projects. Specific topics of discussion
included Lodi park facts, current projects, priority playground replacement, low priority
playgrounds, major capitol projects, Pigs Lake riverbank project, Grape Bowl, Lodi Lake,
DeBenedetti/Pixley Parks, project prioritization, and current funding. In addition, estimates and
costs were provided for Armory Park, Beckman Park, Blakely Park, Candy Cane Park, Century
Park, Emerson Park, English Oaks Park, Grape Bowl, Hale Park, Henry Glaves Park, Katzakian
Park, Kofu Park, Lawrence Park, Legion Park, Lodi Lake Park, Peterson Park, Salas Park,
Softball Complex, Van Buskirk Park, Vinewood Park, Zupo Field, and Parks and Recreation
administration.
In response to Mayor Pro Tempore Hansen, Mr. Rodems confirmed that part-time staff is
included in the full-time equivalent number.
In response to Council Member Hitchcock, Mr. Rodems confirmed that the $9,065 amount does
not include administration and is only representative of straight maintenance. Mr. King stated this
is an estimated standard number, which gives the City an opportunity to compare with other
neighboring agencies.
In response to Council Member Hitchcock, Mr. King stated that, with respect to community
facilities districts, the basic assumption is that we want to maintain the current standard; although,
this is the type of number used along with other considerations.
In response to Council Member Hitchcock, Mr. King stated the primary reason for looking at this
subject area is for deferred maintenance purposes; although, coincidentally it may connect to the
General Plan as well due to timing.
In response to Mayor Pro Tempore Hansen, Mr. Rodems concurred that partnerships with
community members, such as Geweke and General Mills, will be key as staff continues to look for
funding opportunities for parks facilities.
In response to Council Member Johnson, Park Superintendent Steve Dutra stated the proposed
improvements to Pigs Lake are a temporary fix. Mr. King stated staff is not aware of any specific
Continued October 14, 2008
earmarked funds that may be used for this type of a project, but they are continuing to look at
grants and other funding sources.
Mayor Pro Tempore Hansen and Council Member Hitchcock suggested it may be worthwhile to
work with federal and state legislative representatives on the issue of repairs to Pigs Lake.
Myrna Wetzel requested that the Grape Bowl Committee supply more information to the public
about the needs of the facility.
In response to Mayor Pro Tempore Hansen, Mr. Rodems stated the current project at Lodi
Lake extends from the booth area to the Lake itself.
In response to Mayor Mounce, Mr. Rodems stated staff will continue to look at Community
Development Block Grant funds as a possible funding source for improvements as was done with
Blakely Park.
In response to Mayor Pro Tempore Hansen, Mr. Rodems stated Proposition 12 and Proposition
40 funds were utilized for the Lodi Lake project. Mr. King stated both propositions were voter
approved state park bonds, are not competitive grants, and certain rules must be followed to
obtain funding. Mr. King stated the goal is to get better at grant funding by spending per capita
grants in order to be competitive with other grants. He stated identifying the needs is important as
a result.
In response to Mayor Pro Tempore Hansen, Mr. King stated staff may have been a little bit slow
on the capital grants side previously because there may have been a strategy in place for
DeBenedetti Park. He stated when the buy -in power eroded over time, restroom improvements
were made at Beckman Park and Glaves Park instead. Mr. Rodems stated funding from the State
was approximately $514,000.
In response to Council Member Hitchcock, Mr. King stated the City will likely receive a request to
modify the related development agreement, which is not due to DeBenedetti Park itself, but rather
because of the housing slow down. A brief discussion ensued regarding the realistic possibility of
maintaining the five -acre standard based on the tax base and options to obtain additional funding.
In response to Council Member Johnson, Mr. Dutra stated 13 of the 28 parks are controlled with
Maxicom and the others are automated in some fashion. Mr. Rodems stated generally pumps
that push water over larger areas versus home irrigation systems require more
maintenance because of the greater areas they serve and the function of the equipment.
In response to Mayor Pro Tempore Hansen, Mr. King stated existing impact fees originally spoke
to new parks and development consistent with the original General Plan. He stated after adoption
there was a reduction in the impact fee program, which moved park improvements out and the
level of construction did not occur. Mr. King stated impact fees were originally based on specific
new parks.
In response to Council Member Hitchcock, Mr. King confirmed that the community facilities district
is to take care of ongoing maintenance with new development, while impact fees pay for new
facilities.
A brief general discussion ensued between the City Council regarding the process associated
with narrowing down the list through staff and the Parks and Recreation Commission to those
items that are of a greater priority than others and possible criteria for the same.
David Akin, representing the Parks and Recreation Commission, provided an overview of the list
2
Continued October 14, 2008
of prioritization, the history of the Commission's consideration of the same at the
Commission meeting, and the Commission's direction to staff to further prioritize the list based on
general criteria including health and safety, youth and adult recreation areas, and revenue.
In response to Council Member Johnson and Mayor Mounce, Mr. Rodems stated the
demographic study may provide valuable data and additional options for improvements.
In response to Council Member Hitchcock, Mr. King confirmed that the Parks and Recreation
deferred maintenance needs are a part of the broader deferred maintenance for the City in
general and will require a balancing act between delivering services through personnel and
capital equipment.
In response to Council Member Katzakian, Mr. King stated full rehabilitation could occur through
redevelopment in a project area and other cities have used it for these purposes.
In response to Mayor Mounce, Mr. Rodems stated staff will narrow down the list further for
Council based on certain criteria.
In response to Myrna Wetzel, Mr. King stated there is no specific reserve fund for vehicle
replacement or capital replacements in general at this time but the goal is to head that way.
C.
None.
D. Adjournment
No action was taken by the City Council. The meeting was adjourned at 8:25 a.m.
ATTEST:
Randi Johl
City Clerk
AGENDA ITEM IS_'
CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Receive Presentation on Parks and Recreation Capital Improvement Projects
MEETING DATE: October 14, 2008
PREPARED BY: Interim Parks and Recreation Director
RECOMMENDED ACTION: That the City Council receives a presentation on Parks and
Recreation Capital Improvement Projects priorities as well as
updates on current projects and potential capital issues.
BACKGROUND INFORMATION: The Parks and Recreation staff presented a modified project
overview at the August 19, 2008 shirtsleeve meeting in which staff
provided general information pertaining to the park system and
capital project needs for the future.
Currently, the city owns 372.84 acres of park property. There are 23 developed parks that encompass
275.34 acres and 97.5 acres of undeveloped park property. Our current system offers 4.33 acres of park
space per 1,000 residents.
For discussion will be a list of projects assembled by the Parks and Recreation staff that address health
and safety issues, mandated retrofit work, revenue generating projects, and upgrade and replacement
projects.
FISCAL IMPACT:
James M. Rodems
Interim Parks and Recreation Director
JMRRI
cc: James Rodems, Interim Parks and Recreation Director
Steve Dutra, Parks Superintendent
APPROVED: /� 1
ing, City Manager
LODI PARKS & RECREATION
CAPITAL IMPROVEMENT PROJECTS
(September, 2008)
FACILITY DESCRIPTION ESTIMATED COST
ARMORY PARK SITE TOTAL: $524.500.00
ARMORY PARK
REMOVAL & REPLACEMENT OF EXISTING RESTROOM FACILITY
$340,000.00
ARMORY PARK
PARK SIGN INSTALLATION
$3,000.00
ARMORY PARK
CONSTRUCT STORAGE & PARKING LOT AREA (DUMPSTER AREA)
$150,000.00
ARMORY PARK
REPLACE SCOREBOARD & UPGRADE ELECTRICAL
$30,000.00
ARMORY PARK
ADDRESS TRIP & FALL HAZARDS
$1,500.00
BECKMAN PARK
SITE TOTAL: $500.000.00
CANDY CANE PARK SITE TOTAL: $320,000.00
BECKMAN PARK
DESIGN / CONSTRUCT NEW PLAYGROUND MEETING ADA REQUIREMENTS
$450,000.00
BECKMAN PARK
INSTALLATION OF MAXICOM IRRIGATION EQUIPMENT
$35,000.00
BECKMAN PARK
INSTALLATION OF ADDITIONAL PICNIC AREAS
$15,000.00
BLAKELY PARK SITE TOTAL: $811.000.00
BLAKELY PARK
REPLACE PARK RESTROOMS & POOL RESTROOMS
$600,000.00
BLAKELY PARK
WEST BALL DIAMOND RENOVATION (FENCING/TURF/GRADING/IRRIGATION)
$85,000.00
BLAKELY PARK
REPLACEMENT OF EXISTING CHLORINE SYSTEM
$15,000.00
BLAKELY PARK
CONSTRUCT NEW STORAGE AREA FOR POOL EQUIPMENT (COVERS/LANE LINES) $85,000.00
BLAKELY PARK
REMOVAL & REPLACEMENT OF FRONT POOL GATE
$6,000.00
BLAKELY PARK
INSTALL ADDITIONAL PARK SECURITY LIGHTING
$20,000.00
CANDY CANE PARK SITE TOTAL: $320,000.00
GRAPE BOWL
CANDY CANE PARK
RE-HAB ENTIRE PARK SITE
$320,000.00
CENTURY PARK SITE TOTAL• $5,500.00
$800,000.00
CENTURY PARK
REMOVE EXISTING ASPHALT BASKETBALL PAD & VOLLEYBALL STANDARDS
$5,500.00
EMERSON PARK SITE
TOTAL: $197.000.00
$600,000.00
EMERSON PARK
REPLACEMENT OF CHAIN LINK FENCE AT BALL DIAMOND AREA
$7,000.00
EMERSON PARK
RETRO -FIT EXISTING SOUTH TOT LOT PLAY AREA BUILT PRIOR TO 1994
$130,000.00
EMERSON PARK
INSTALLATION OF MAXICOM IRRIGATION EQUIPMENT
$25,000.00
EMERSON PARK
RE-HAB EXISTING HORSESHOE AREA
$30,000.00
EMERSON PARK
ADDRESS TRIP & FALL HAZARDS
$5,000.00
ENGLISH OAKS SITE TOTAL: $279.000.00
ENGLISH OAKS
INSTALLATION OF IRRIGATION BOOSTER PUMP & MAXICOM EQUIPMENT
$60,000.00
ENGLISH OAKS
INSTALLATION OF (2) PARK SIGNS
$6,000.00
ENGLISH OAKS
INSTALLATION OF BOLLARDS
$8,000.00
ENGLISH OAKS
REPLACEMENT OF EXISTING PARK BENCHES
$5,000.00
ENGLISH OAKS
REPLACE EXISTING TOT PLAYGROUND EQUIPMENT BUILT PRIOR TO 1994
$200,000.00
GRAPE BOWL SITE TOTAL:
$3,056,000.00
GRAPE BOWL
FIELD RENOVATION - (GRADING/IRRIGATION/DRAINAGE/ARTIFICIAL TURF)
$1,500,000.00
GRAPE BOWL
REMOVAL & REPLACEMENT OF FIELD HOUSE STRUCTURE
$800,000.00
GRAPE BOWL
REMOVE BERM ALONG NORTH SIDE OF STADIUM
$UNKNOWN
GRAPE BOWL
CONSTRUCT NEW RESTROOMS/CONCESSIONS AT WEST END OF STADIUM
$600,000.00
GRAPE BOWL
CONSTRUCT WALKWAY FROM FIELD HOUSE TO SOUTH BLEACHER AREA
$45,000.00
GRAPE BOWL
ASPHALT IMPROVEMENTS - (SLURRY SEAL OR OVERLAY)
$85,000.00
GRAPE BOWL
INSTALLATION OF PARK SIGNS
$6,000.00
GRAPE BOWL
ADDRESS SIDE HILLS - (POSSIBLE REMOVAL OF TURF)
$UNKNOWN
GRAPE BOWL
INSTALLATION OF NEW P.A. EQUIPMENT AND SPEAKERS
$20,000.00
HALE PARK SITE TOTAL:
$143.000.00
HALE PARK
REMOVE LIGHTS FROM COURT AREAS & RELOCATE TO ANOTHER SITE
$90,000.00
HALE PARK
RENOVATION OF PARKING LOT PLANTER AREAS
$8,000.00
HALE PARK
RENOVATION OF LARGE TURF AREA BETWEEN PARKING LOT & COURTS
$10,000.00
HALE PARK
ASPHALT IMPROVEMENTS - (SLURRY SEAL OR OVERLAY)
$UNKNOWN
HALE PARK
RESURFACE BASKETBALL COURTS
$35,000.00
FACILITY DESCRIPTION ESTIMATED COST
HENRY GLAVES SITE TOTAL: $250.000.00
HENRY GLAVES
INSTALLATION OF MAXICOM EQUIPMENT
$35,000.00
HENRY GLAVES
REPLACE EXISTING PLAYGROUND EQUIPMENT BUILT PROR TO 1994
$165,000.00
HENRY GLAVES
REPLACE EXISTING FIBAR PLAYGROUND SURFACE MATERIAL
$50,000.00
KATZAKIAN PARK SITE TOTAL: $230.000.00
KATZAKIAN PARK
PLAYGROUND EQUIPMENT UP -GRADE
$100,000.00
KATZAKIAN PARK
PLAYGROUND SAFETY SURFACE REPLACEMENT (POUR -IN-PLACE)
$130,000.00
KOFU PARK SITE TOTAL:
$312.000.00
KOFU PARK
LIGHTING IMPROVEMENTS ALONG WALKWAY - (HAM LANE TO REC. BLDG.)
$20,000.00
KOFU PARK
ADDRESS SIDE HILL AREAS BETWEEN DUGOUTS & BLEACHERS
$25,000.00
KOFU PARK
INSTALLATION OF NEW WINDOWS FOR RECREATION BUILDING
$25,000.00
KOFU PARK
RESURFACE TENNIS COURTS
$40,000.00
KOFU PARK
ASPHALT IMPROVEMENTS - (SLURRY SEAL OR OVERLAY)
$15,000.00
KOFU PARK
INSTALLATION OF IRRIGATION BOOSTER PUMP
$60,000.00
KOFU PARK
INSTALLATION OF MAXICOM EQUIPMENT
$40,000.00
KOFU PARK
ADDRESS AREAS IN FRONT OF DUGOUTS
$30,000.00
KOFU PARK
INSTALL A/C & HEAT PUMP SYSTEM FOR REC BUILDING
$25,000.00
KOFU PARK
CONSTRUCT NEW DUG OUT SHADE STRUCTURES
$28,000.00
KOFU PARK
FIX TRIP & FALL HAZARDS (10)
$4,000.00
LAWRENCE PARK SITE TOTAL: $25.000.00
LAWRENCE PARK
INSTALLATION OF IRRIGATION & LANDSCAPE ALONG LOCKEFORD STREET
$25,000.00
LEGION PARK SITE TOTAL:
$105.000.00
LEGION PARK
ADDRESS CONCRETE AROUND RECREATION BUILDING
$50,000.00
LEGION PARK
INSTALLATION OF CONCRETE BOLLARDS ALONG VINE STREET
$20,000.00
LEGION PARK
RESURFACE TENNIS COURTS
$35,000.00
LODILAKE PARK SITE TOTAL: $10.702.000.00
LODI LAKE
DEVELOP SOUTH SIDE IMPROVEMENTS PER NORDSTROM MASTER PLAN
$3,500,000.00
LODI LAKE
RECONSTRUCT RIVER BANK ALONG PIG'S LAKE
$1,250,000.00
LODI LAKE
DEVELOP 13 ACRES — WEST BANK AREA
$3,000,000.00
LODI LAKE
REMOVE TOT LOT IN YOUTH AREA & CONSTRUCT NEW
$300,000.00
LODI LAKE
INSTALLATION OF NEW PARK LIGHTING & ELEC UPGRADE
$400,000.00
LODI LAKE
ASPHALT REMOVAL & REPLACEMENT — (TRIP& FALL HAZARDS)
$1,000,000.00
LODI LAKE
CONSTRUCT NEW BOAT RAMP FACILITY & NEW DOCKS
$275,000.00
LODI LAKE
UPGRADE ELECTRICAL SERVICES IN OVERFLOW AREA
$45,000.00
LODI LAKE
CONSTRUCT RESTROOMS FOR HUGHES BEACH AREA
$225,000.00
LODI LAKE
CONSTRUCT A NEW BEACH HOUSE WITH CONCESSIONS
$600,000.00
LODI LAKE
INSTALL NEW PARK SIGN AT THE CORNER OF TURNER & LAUREL
$12,000.00
LODI LAKE
INSTALL ACRYLIC GRAPHICS FOR TRIAL SYSTEM
$80,000.00
LODI LAKE
REMOVE CONCRETE WALKWAY AT SOUTH PLAYGROUND
$15,000.00
PETERSON PARK SITE TOTAL: $280.000.00
PETERSON PARK
REMOVAL & REPLACEMENT OF EXISTING PLAY EQUIPMENT (EAST SIDE)
$260,000.00
PETERSON PARK
RESURFACE TENNIS COURTS
$20,000.00
SALAS PARK SITE TOTAL:
$850,000.00
SALAS PARK
SPORTS LIGHTING REPLACEMENT
$600,000.00
SALAS PARK
INSTALLATION OF MAXICOM IRRIGATION EQUIPMENT
$55,000.00
SALAS PARK
ADDITIONAL LIGHTING FOR SOUTH TURF AREAS
$80,000.00
SALAS PARK
ADDRESS DRAINAGE PROBLEMS ALONG MAIN WALKWAY
$15,000.00
SALAS PARK
FENCE & MOW STRIP REPLACEMENT ALONG BASIN FENCE
$30,000.00
SALAS PARK
ASPHALT IMPROVEMENTS — (SLURRY SEAL OR OVERLAY)
$60,000.00
SALAS PARK
REMOVE (15) DEAD TREES (12 have been removed)
$2,000.00
SALAS PARK
ADDRESS TRIP & FALL HAZARDS
1
$8,000.00
FACILITY DESCRIPTION ESTIMATED COST
SOFTBALL COMPLEX SITE TOTAL:.. $873,000.0
SOFTBALL COMPLEX
ASPHALT IMPROVEMENTS TO PARKING LOT AND PARK INTERIOR
$140,000.00
SOFTBALL COMPLEX
REMOVAL & REPLACEMENT OF EXISTING CONCESSION STAND FACILITY
$400,000.00
SOFTBALL COMPLEX
REMOVAL & REPLACEMENT OF EXISTING RESTROOM FACILITY
$245,000.00
SOFTBALL COMPLEX
LANDSCAPE THE CORNER OF STOCKTON STREET & LAWRENCE AVENUE
$20,000.00
SOFTBALL COMPLEX
REPLACE SCOREBOARDS & UPGRADE ELECTRICAL
$60,000.00
SOFTBALL COMPLEX
ADDRESS TRIP & FALL HAZARDS
$8,000.00
VAN BUSKIRK SITE TOTAL:
$13.500.00
$40,000.00
VAN BUSKIRK
RE -PLANT LANDSCAPE AREA AT THE CORNER OF DAISY & PLEASANT
$2,000.00
VAN BUSKIRK
REPLACE WALL BENCHES AT PLAZA AREA
$4,000.00
VAN BUSKIRK
INSTALLATION OF NEW DRINKING FOUNTAIN
$6,000.00
VAN BUSKIRK
ADDRESS TRIP & FALL HAZARDS
$1,500.00
VINEWOOD PARK SITE TOTAL: $1,346.000.00
VINEWOOD PARK
REMOVAL & REPLACEMENT OF EXISTING RESTROOM FACILITY (NEW LOCATION)
$275,000.00
VINEWOOD PARK
REMOVE & REPLACE EXISTING IRRIGATION SYSTEM
$1,000,000.00
VINEWOOD PARK
INSTALLATION OF (2) PARK SIGNS
$6,000.00
VINEWOOD PARK
REPLACE EXISTING BALL DIAMOND BLEACHERS
$45,000.00
VINEWOOD PARK
REMOVE & REPLACE BALL DIAMOND FENCING AT (SW) FIELD
$20,000.00
ZUPO FIELD SITE TOTAL:
$1.217.000.00
ZUPO FIELD
REPLACE DUGOUTS —(TIE INTO RAMP SYSTEMS FOR BLEACHER ACCESS)
$40,000.00
ZUPO FIELD
ASPHALT IMPROVEMENTS
$25,000.00
ZUPO FIELD
REMOVAL OF EXISTING TICKET BOOTHS — INSTALL ENTRANCE GATEWAY
$30,000.00
ZUPO FIELD
REMOVE & REPLACE EXISTING CONCESSION STAND STRUCTURE
$450,000.00
ZUPO FIELD
PURCHASE & INSTALLATION OF NEW PROTECTIVE PADS BEHIND HOME PLATE
$15,000.00
ZUPO FIELD
INSTALLATION OF NEW HANDICAP ACCESSIBLE DRINKING FOUNTAIN
$6,000.00
ZUPO FIELD
INSTALLATION OF SHADE COVERS FOR BLEACHER AREAS
$50,000.00
ZUPO FIELD
INSTALLATION OF LANSCAPE AROUND PARK SIGN
$1,000.00
ZUPO FIELD
REMOVE & REPLACE EXISTING BLEACHERS ON 1a & 3RD BASE SIDES
$450,000.00
ZUPO FIELD
REPLACE OUTFIELD FENCE
$150,000.00
P & R STAFF/OFFICE TOTAL: $965.000.00
P & R STAFF/OFFICE
OFFICE UP -GRADES FOR PARKS & RECREATION STAFF
$750,000.00
P & R STAFF/OFFICE
UPGRADE OFFICE PHONE SYSTEM
$60,000.00
P & R STAFF/OFFICE
INSTALL SCREENING MATERIAL TO EXISTING FENCE LINE AROUND PROPERTY
$20,000.00
P & R STAFF/OFFICE
ASPHALT IMPROVEMENTS IN CORP YARD
$75,000.00
P & R STAFF/OFFICE
APPLY NEW ROOF WATER PROOF COATING (ANNEX BUILDING)
$60,000.00
TOTAL: $23,004,500.00
275.34 developed acres, 97.5
undeveloped acres
State industry standard: 3 to 5 acres pe r
1,000 residents
Lodi: 4.33 acres/1,000 residents
Annual maintenance cost/acre: $9,065
Lodi has 1 FTE/17.48 acres
We have approximately 5 acres of
contracted maintenance property
Lodi Lake Boat House Project: $3879250
Blakely Pool Deck Resurface: $ 957000
Skate Park repair: $ 257000
Roof replacement Salas Concession: $ 12,000
Salas park lighting: $ 157000
Repairs to Grape Bowl Field House: $ 15,000
Installation of an additional cricket pitch at
Beckman Park: $ 47000
Lodi Lake information kiosks: $ 3,000
DeBenedetti/Pixely Parks - Drawings $ NA
Candy Cane Park
Emerson Tot Lot
English Oaks
North Lodi Lake
Varying scope of work for each playground
Range between $20,000 and $300,000
Working with community groups for funding
Potential for a reduce cost in playground
equipment
Demographic survey underway for all
priority playgrounds
6 Playgrounds: Legion Park, Van Buskirk,
Peterson East, Henry Glaves, Lodi Lake
South, English Oaks Common
$100,000 to repair all six
Relatively minor repairs
Currently funding repairs up to $20,000
within Parks Budget
Pigs Lake
Grape Bowl
Lodi Lake
DeBenedetti
Pixely
Site inspection was completed including
site survey and schematic site map
Received final engineer's report
Engineer contacting State and Federal
agencies regarding preliminary repair work
Investigate funding
Selected architect for first phase
Deadline for drawing down county funding
is April 2009
Must start construction to qualify
First phase estimated cost is $1.7 million
Once we start ... we can't stop
General upgrades to the park infrastructure
on the south side of the lake
Road bed, drainage, electrical, lighting, and
irrigation all need to be updated
Will require some tree removal
Can work off the 1995 preliminary plan
Primary funding through impact fees
Additional storm water program funding
DeBenedetti:
Pixely:
Approx. $8 million
Approx. $9.5 million
Can phase in portions of these parks?
All park projects have been listed by site
Currently working on a task -oriented project
I i st
Staff has prioritized these projects through
the first 30 items
Does not preclude additional projects being
added to address future infrastructure
issues
Total cost for capital projects: $23,004,500
Potential funding sources?
General Fund
State Grants
Donations
Revenues