HomeMy WebLinkAboutMinutes - December 21, 2005LODI CITY COUNCIL
REGULAR CITY COUNCIL MEETING
CARNEGIE FORUM, 305 WEST PINE STREET
WEDNESDAY, DECEMBER 21, 2005
C-1 CALL TO ORDER / ROLL CALL
The City Council Closed Session meeting of December 21, 2005, was called to order by Mayor
Hitchcock at 6:32 p.m.
Present: Council Members — Beckman, Hansen, Johnson, Mounce, and Mayor Hitchcock
Absent: Council Members — None
Also Present: City Manager King, City Attorney Schwabauer, and City Clerk Blackston
C-2 ANNOUNCEMENT OF CLOSED SESSION
a) Actual litigation: Government Code §54956.9(a); one case; People of the State of
California: and the City of Lodi. California v. M & P Investments, et al.; United States
District Court, Eastern District of California, Case No. CIV -S-00-2441 FCD JFM
C-3 ADJOURN TO CLOSED SESSION
At 6:32 p.m., Mayor Hitchcock adjourned the meeting to a Closed Session to discuss the above
matter.
The Closed Session adjourned at 6:50 p.m.
C-4 RETURN TO OPEN SESSION / DISCLOSURE OF ACTION
At 7:00 p.m., Mayor Hitchcock reconvened the City Council meeting, and City Attorney
Schwabauer disclosed that he received direction from Council, which he believed would allow the
City to resolve the final party in the southern plume; however, negotiation of the remainder of the
agreement still needs to take place.
A. CALL TO ORDER / ROLL CALL
The Regular City Council meeting of December 21, 2005, was called to order by Mayor Hitchcock at
7:00 p.m.
Present: Council Members — Beckman, Hansen, Johnson, Mounce, and Mayor Hitchcock
Absent: Council Members — None
Also Present: City Manager King, City Attorney Schwabauer, and City Clerk Blackston
B. INVOCATION
The invocation was given by Pastor Dale Edwards, Century Assembly.
C. PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Mayor Hitchcock.
D. AWARDS / PROCLAMATIONS / PRESENTATIONS
D-1 Awards — None
D-2 Proclamations — None
D-3 Presentations — None
E. CONSENT CALENDAR
In accordance with the report and recommendation of the City Manager, Council, on motion of
Mayor Pro Tempore Johnson, Beckman second, unanimously approved the following items
hereinafter set forth except those otherwise noted:
E-1 Claims were approved in the amount of $7,225,789.11.
Continued December 21, 2005
E-2 The minutes of November 8, 2005 (Shirtsleeve Session), November 15, 2005 (Shirtsleeve
Session), November 15, 2005 (Special Meeting), November 29, 2005 (Shirtsleeve Session),
December 6, 2005 (Shirtsleeve Session), and December 6, 2005 (Special Meeting) were
approved as written.
E-3 Adopted Resolution No. 2005-256 approving specifications for total station surveying
equipment with global positioning satellite capability and authorizing the City Manager to
approve the purchase from Haselbach Surveying Instruments as the sole supplier in an
amount not to exceed $64,000.
E-4 Adopted Resolution No. 2005-257 authorizing the City Manager to negotiate and purchase
five Type 2 Medium Bus (Dial -A -Ride) transit vehicles off of the state contract, authorizing
conversion of the five vehicles to compressed natural gas, and appropriating funds in the
amount of $425,000.
E-5 Adopted Resolution No. 2005-258 accepting the improvements at 2650 West Lodi Avenue.
E-6 Adopted Resolution No. 2005-259 approving the Disadvantaged Business Enterprise
Program and Established Overall Annual Disadvantaged Business Enterprise goal of 6% for
Federal Transit Administration -assisted projects for federal fiscal year 2005-06.
E-7 Adopted Resolution No. 2005-260 authorizing the City Manager to extend the current
contract with SBC, of Stockton, under the terms of the State of California CALNET contract
for three years for telephone services and hardware ending in November 2008 in the amount
of $231,333 per year.
E-8 "Adopt resolution ratifying the Purchasing Policies and Procedures" was removed from the
Consent Calendar and discussed and acted upon following approval of the Consent
Calendar.
E-9 Received notice of intent to issue annual payment in the amount of $27,917.96 to the
Mokelumne Rural Fire District as negotiated in the annexation agreement approved on
September 6, 2000.
E-10 Received for informational purposes annual Housing Element report for submittal to the
Department of Housing and Community Development.
ACTION ON ITEM REMOVED FROM THE CONSENT CALENDAR
E-8 "Adopt resolution ratifying the Purchasing Policies and Procedures"
Council Member Mounce stated that she felt the threshold amount of $20,000 for purchases
(before Council approval is required) was too high and she could not support this item for
that reason.
Mayor Pro Tempore Johnson recalled during previous discussions on this matter that there
was to be periodic reporting to Council on purchases.
MOTION / VOTE:
The City Council, on motion of Mayor Pro Tempore Johnson, Beckman second, adopted
Resolution No. 2005-261 ratifying the Purchasing Policies and Procedures with the addition
of the quarterly reporting requirement, as outlined in Lodi Municipal Code Section 2.12.060
(T), "For contracts of not less than $5,000 nor greater than $20,000, the City Manager shall
quarterly prepare for the City Council a report, which includes a list of the contracts into
2
Continued December 21, 2005
which the City has entered during the previous three months." The motion carried by the
following vote:
Ayes: Council Members — Beckman, Hansen, Johnson, and Mayor Hitchcock
Noes: Council Members — Mounce
Absent: Council Members — None
F. COMMENTS BY THE PUBLIC ON NON -AGENDA ITEMS
None.
G. COMMENTS BY CITY COUNCIL MEMBERS ON NON -AGENDA ITEMS
oo Council Member Beckman recalled that at the December 20 Shirtsleeve Session it was
suggested that joint meetings of the Planning Commission and City Council be held to consider
matters related to the L.pdate of the City's General Plan. He recalled that the City Clerk had
forwarded information to Council pointing out that three Council Members constitute a quorum
and can take action at meetings. In addition, all meetings of the Council are to be attended by
Council appointees and minutes must be prepared. He expressed concern with the suggestion
on December 20 that three members of the Council attend the Planning Commission meetings,
as action could then be taken by those Council Members. He asked that this matter be placed
on a future agenda.
oo Mayor Hitchcock thanked Nicolas and Noah Carniglia for their comments sent to her in a
Christmas card.
H. COMMENTS BY THE CITY MANAGER ON NON -AGENDA ITEMS
oo City Manager King introduced Ruby Paiste who will serve in the capacity of Interim Finance
Director, as former Finance Director, Jim Krueger, has now assumed the position of Deputy
City Manager/Internal Services Director. Mr. King mentioned that a newspaper article was
recently published in The Record on the subject of who authorizes flags being lowered to half
staff. He clarified that in Lodi the City Manager directs staff as to when the flag is to be flown at
half staff; however, he does not exercise independent discretion. Directives are received from
the President, Governor, and Mayor.
PUBLIC HEARINGS
None.
J. COMMUNICATIONS
J-1 Claims filed against the City of Lodi — None
J-2 Appointments — None
J-3 Miscellaneous
a) City Clerk Blackston presented the cumulative Monthly Protocol Account Report
through November 30, 2005.
K. REGULAR CALENDAR
K-1 "Approve Downtown Lodi Business Partnership 2005-06 Annual Report, adopt Resolution of
Intention to levy annual assessment, and set public hearing for January 4, 2006"
City Manager King explained that at tonight's meeting Council can either approve the
Downtown Lodi Business Partnership's (DLBP) Annual Report as filed, or modify it. He
noted that the report includes a Special Events Policy for Council's consideration.
3
Continued December 21, 2005
Mary Wallace, President of the DLBP, stated that downtown revitalization is an investment
in the future health of the entire community. Investors, prospects, and potential residents
often look at a city's downtown area as an indication of the quality of life offered by the
community. Over the past seven years, Lodi's downtown has become a source of great
civic pride and accomplishment. The DLBP has an Executive Director with the
responsibilities of: 1) serving as an advocate for the downtown, 2) developing and
conducting ongoing public awareness and educational programs, 3) providing day-to-day
oversight of projects, 4) acting as a point person for all downtown related issues, and 5)
fostering and maintaining a cooperative working relationship with existing business owners,
prospective developers, and government agencies. During the past year, the DLBP has
formed an economic development committee to coordinate with the City's program. The
DLBP has also developed an event policy, contract, and fee schedule. The DLBP has
formed a relationship with the Lodi Conference and Visitors Bureau, the Chamber of
Commerce, the Wine Grape Commission, Hutchins Street Square, and the City of Lodi. A
subgroup entitled "Destination Lodi" has a marketing focus on the wine appellation area and
Lodi's downtown. Ms. Wallace reviewed events that have occurred during the past year.
She thanked Kevin Bell of the Finance Department for his efforts and noted that there has
been 100% compliance in the collection of assessments. She felt it was critical that the
City continue to fund the DLBP to ensure its future success. Ms. Wallace introduced
Chuck Easterling, newly elected DLBP Board President for 2006, and Jaime Watt newly
hired DLBP Executive Director.
Council Member Hansen commented that the Annual Report has been received late and
hoped it would be filed in a more timely manner in the future. He noted that last year's
budget had a $16,000 surplus and the proposed budget, ending in six months, has a zero
balance.
Nancy Byer-Hauan, DLBP Treasurer, explained that surpluses are reinvested back into the
community and downtown area.
Council Member Beckman recalled that during his three years on the Council, the DLBP
has been having significant and continual problems. He asked under what authority and
direction the DLBP developed the Special Events Policy. He reported that the most
common complaint he has heard from DLBP members is that the assessment fee schedule
is not equitable. Each year, the DLBP Presidents have promised to resolve the matter, yet
it has never been accomplished. Mr. Beckman stated that he would not vote in favor of the
continued levy of assessments until the issue of inequities is addressed.
Ms. Wallace replied that the Special Events Policy was created to standardize processes
and promote the safety, health, and well being of the property downtown. In addition, the
Policy was developed in an effort to influence the type of events that are held in the
downtown area. There had been criticism in the past that some events competed with
downtown businesses (e.g. sold the same merchandise). The Policy also clarifies
responsibilities of the DLBP and the applicant. In response to Council Member Beckman,
Ms. Wallace stated that the Policy was optional, and that it could not be enforced without
the City's authority to do so, nor could fees be changed without the City's approval. In
reference to the inequities of the assessment fee schedule, Ms. Wallace agreed that it
should be reviewed.
In answer to Mayor Hitchcock, City Attorney Schwabauer reported that Council's
responsibility is to review and approve the DLBP's budget, including its sources of income
and proposed expenditures. It is Council's oversight of the process that allows the DLBP to
issue what, in essence, is a tax. He suggested that the DLBP should also be asked to
report back annually on how the assessment money is spent. There is an agreement
between the City and DLBP that provides them some measure of authority over events that
occur in the downtown. It does not, however, give them the authority to charge permit fees
0
Continued December 21, 2005
as is proposed in the Special Events Policy. The Policy should be considered and acted
on by Council tonight.
Mayor Pro Tempore Johnson recalled that it was expressed previously by the DLBP,
Chamber of Commerce, and Lodi Conference & Visitors Bureau that these organizations
would wean themselves off City funding and work toward becoming self supporting.
Ms. Wallace replied that she felt the DLBP could become self sufficient in the future.
City Manager King commented that the City's funding to the DLBP has remained
unchanged over the past two years.
Council Member Mounce agreed that the DLBP should become self supporting. She noted
that a balance sheet was not attached to the financial statement and asked that it be
submitted. She inquired as to whether the DLBP had an outside auditor, to which
Ms. Wallace answered in the affirmative. She pointed out that there was a large credit
under "payroll other," to which Ms. Byer-Hauan stated she would review the matter and
report back.
Council Member Hansen stated that next year he would not support the continued levying
of assessments unless the inequities in fees and boundaries were resolved.
Mr. King stated that staff has questioned whether it was Council's intention that the DLBP
would stand as gatekeeper over the City's right of way and use the control of a public asset
to generate revenue for their activities.
Mayor Hitchcock recalled that each year a new DLBP President stands before Council and
promises to review inequities in assessments and boundaries. It appears that the matter
never gets addressed the to the lack of continuity on the Board. She was opposed to
approving the Special Events Policy before the longer standing issue of inequities was
resolved.
Ms. Wallace acknowledged that a better job of orienting new DLBP Board members should
be accomplished. She reviewed the recruitment process undertaken for the selection of the
Executive Director position. She commented that independent business owners are used
to autonomy and have strong wills, which may account for occasional discord on the DLBP
Board.
In reply to Council Member Johnson, Mr. Schwabauer confirmed that a vote of businesses
in the Downtown Lodi Business Improvement Area would be required before a change in the
assessment or boundaries could be made.
MOTION:
Council Member Mounce made a motion, Johnson second, to approve the Downtown Lodi
Business Partnership 2005-06 Annual Report (including the Special Events Policy), adopt
Resolution No. 2005-162 of Intention to levy annual assessment, and set public hearing for
January 4, 2006.
DISCUSSION:
Council Member Beckman suggested that the concept of the Business Improvement
District be expanded to incorporate the Kettleman Lane District, Cherokee Lane District,
Lodi Avenue District, etc. into a larger entity that could divide the workload and revenue
generation. He believed this would be a good discussion for Council to have in the future.
He felt that the Special Events Policy should have been submitted and considered
separately from the DLBP's Annual Report.
Continued December 21, 2005
PUBLIC COMMENTS:
oo Pat Patrick, President of the Chamber of Commerce, stated that the Street Fair is
grandfathered in and not subject to the Special Events Policy permit fees. He
commended Mary Wallace for her work on the DLBP.
oo Chuck Easterling believed it would be difficult to conduct the process and obtain the
necessary votes to change the assessment amounts and boundaries. Mr. Easterling
stated that his priority was to bring the wine industry and other businesses to the
downtown area. He commented that seven years ago there was a 70% occupancy rate
downtown and it is now over 95%. He felt that more needs to be done to revitalize
Sacramento Street.
VOTE:
The above motion carried by the following vote:
Ayes: Council Members — Hansen, Johnson, and Mounce
Noes: Council Members — Beckman and Mayor Hitchcock
Absent: Council Members — None
K-2 "Introduce ordinance adding Chapter 15.65 to the Lodi Municipal Code establishing the San
Joaquin County Regional Transportation Impact Fee Program and set public hearing for
January 4, 2006, to consider adoption of the fee"
NOTE. Due to a potential conflict of interest related to his employment with the Building
Industry Association of the Delta, Council Member Beckman abstained from discussion
and voting on this matter and vacated his seat at dais.
Andrew Chesley, Executive Director of the San Joaquin Council of Governments (SJCOG),
reported that the cities of Escalon, Tracy, Manteca, and Lathrop have adopted their
Regional Transportation Impact Fee (RTIF) programs. Stockton, Ripon, and the County are
scheduled to consider their RTIF programs in January.
Public Works Director Prima explained that the RTIF is a fee that would be imposed on new
development and would go toward regional transportation improvements. The genesis of the
fee comes from Measure K, which included a requirement that all agencies have a
transportation impact fee and are encouraged to develop a regional fee. Lodi's proposed
RTIF is $2,500 for a single-family dwelling unit, $1,500 for a multi -family unit, $1 per square
foot for retail buildings, $1.25 per square foot for office space, and 75 cents per square foot
for industrial buildings. Mr. Prima stated that the RTIF would be adopted by resolution
following adoption of the ordinance. Of the funds generated from the RTIF, Lodi will retain
75%, and the remaining 25% would be split between transit, the County, and SJCOG.
MOTION / VOTE:
The City Council, on motion of Council Member Hansen, Mounce second, introduced
Ordinance No. 1767 adding Chapter 15.65 to the Lodi Municipal Code establishing the San
Joaquin County Regional Transportation Impact Fee Program and set public hearing for
January 4, 2006, to consider adoption of the fee. The motion carried by the following vote:
Ayes: Council Members — Hansen, Johnson, Mounce, and Mayor Hitchcock
Noes: Council Members — None
Absent: Council Members — None
Abstain: Council Members — Beckman
RECESS
At 8:42 p.m., Mayor Hitchcock called for a recess, and the City Council meeting reconvened at 8:50
p.m.
3
Continued December 21, 2005
K. REGULAR CALENDAR (Continued)
K-3 "Adopt resolution eliminating early lock -in date for Development Impact Fees established in
Resolution 2004-238 and establishing that Development Impact Fees established by
Resolution 2004-238 will not be locked in until the time required by California law"
City Attorney Schwabauer recalled that, at the December 13 Shirtsleeve Session, the topic
of development agreements was discussed. He stated that under the City's existing
ordinance developers are allowed to lock in impact fees earlier than what is required by
California law. This exposes the impact fee programs to increases in costs that accrue
during the period between the time the fees are paid and the time the impact fee program
improvements are constructed. Those increases are then paid for through City funds,
instead of the development that spurred the need for the impact fee program. Staff
recommends that Council amend Resolution 2004-238 to provide that the fee increases
established in that resolution are not locked in until the latest date allowed by California
law.
City Manager King stated that this matter came to staff's attention from a developer
applicant who sought to pay fees prior to the end of this year in order to lock them in. That
developer may be several years away from pulling a building permit.
MOTION / VOTE:
The City Council, on motion of Council Member Hansen, Mounce second, unanimously
adopted Resolution No. 2005-263 eliminating early lock -in date for Development Impact
Fees established in Resolution 2004-238 and establishing that Development Impact Fees
established by Resolution 2004-238 will not be locked in until the time required by California
law.
K-4 "Adopt resolution approving SBC Encroachment Permit Condition (Video Programming
Limitation) for new facilities installations"
City Manager King reported that SBC is seeking to conduct work on its infrastructure
system, which would allow it to deliver cable television type of programming to customers
via phone lines. The Federal Communications Act allows cities to impose franchise fees on
cable companies. Staff is concerned that, if phone companies or other entities like SBC
were to begin providing cable services, they would operate outside of a franchise
agreement. The proposed resolution puts language in the encroachment permit that SBC
agrees on behalf of itself and its affiliates that it will not provide video programming cable
service without obtaining a franchise agreement from the City.
In answer to questions posed by Council, Mr. King stated that he did not believe this would
inhibit the City's ability to provide cable services if it chose to. Wireless providers are
similar to standard television service, which is not covered by the Federal Communications
Commission. In accordance with Federal law, Lodi's cable franchise is non-exclusive.
MOTION / VOTE:
The City Council, on motion of Council Member Hansen, Beckman second, adopted
Resolution No. 2005-264 approving SBC Encroachment Permit Condition (Video
Programming Limitation) for new facilities installations. The motion carried by the following
vote:
Ayes: Council Members — Beckman, Hansen, Mounce, and Mayor Hitchcock
Noes: Council Members — Johnson
Absent: Council Members — None
7
Continued December 21, 2005
K-5 "Adopt resolution authorizing the City Manager or his designee to execute a Project
Development Agreement to fund due diligence assessments associated with the Resource
500 generation project (not to exceed $61,875)"
Interim Electric Utility Director Dockham reported that Lodi has a need for 30 average
megawatts of capacity starting in 2007 and growing to 38 average megawatts of capacity in
2013. Participation in the Resource 500 generation project will address the City's need.
The project will be available by June 2006. He recommended diversification by participating
in this project as well as the White Slough project. The funding requested at this time
would provide for continued due diligence negotiations, engineering assessment of the
viability of the plant, and development of the project agreement. The total cost for all the
participants in this project at this phase is $1.5 million. If the negotiating team is able to
obtain an agreement with a counter party for sale of the plant, then there would be another
need for a higher level of investment to keep the project moving forward. The goal is to
conclude negotiations in four months and make the transaction such that energy can begin
being delivered to project participants in late June 2006. The White Slough project has not
yet been licensed by the California Energy Commission. The earliest the White Slough
plant could begin delivering energy would be in 2009. Mr. Dockham stated that he reserved
a 25 megawatt allocation in the Resource 500 plant for Lodi; although, he believed the City
should participate in the project at a level of 15 megawatts for a cost of $56,250. To
participate at a 25 megawatt level, there would be an additional cost of $37,000.
In answer to questions posed by Council, Mr. Dockham acknowledged that the City would
lose its initial investment if the project did not come to fruition. He confirmed that there
would be a cost savings if a transmission line were built from White Slough.
Boris Prokop, consultant for Electric Utility, commented that the most significant, and
expensive, decision will be in four months as the project moves forward.
PUBLIC COMMENTS:
oo Pat Patrick questioned whether investing in the Resource 500 project would make a
negative impression to potential investors of the White Slough project. He asked what
the possibility was of building a transmission line from White Slough.
Mr. Dockham replied that it is clearly understood that Lodi is extremely interested in
the White Slough project. He believed that controversy surrounding the transmission
line could be overcome.
MOTION / VOTE:
The City Council, on motion of Council Member Beckman, Mounce second, unanimously
adopted Resolution No. 2005-265 authorizing the City Manager or his designee to execute
the Resource 500 Development Agreement with the Central Valley Project Corporation, or
its assignee, at 25 megawatt level in substantially the form on file with the City Clerk with
such changes, insertions, and omissions as may be approved by the official executing the
agreement and the City Attorney in an amount not to exceed $102,575 and authorizing the
City Manager or his designee to approve any changes in the Resource 500 Project
Development budget up to 10% without further consideration by the City Council.
K-6 "Provide preliminary and non-binding policy direction regarding electric rate design/structure
for future adjustment to base rates by transferring rates from Market Cost Adjustment
charges to Base Rate charges, i.e. `Truing up the Electric Rates"'
With the aid of an overhead presentation (filed), Interim Electric Utility Director Dockham
explained that the Market Cost Adjustment (MCA) is temporary and the Utility's cost
structure is permanent. The Utility needs to replace the temporary structure with a long-
term permanent solution. The MCA represents one-third of the total income. The income
8
Continued December 21, 2005
should be derived from base rates. The electric rate "true up" will eliminate the MCA
component and transfer it to a base rate component. The goal is to collect sufficient
revenues from each of the classes to support overall Utility service operations, which will be
done according to a cost of service study.
Mayor Hitchcock asked if any other electric utilities offer rates to industrial customers that
are less than the cost, to which Mr. Dockham stated the information would be researched
and provided at a later time.
Mr. Dockham reported that Pacific Gas & Electric (PG&E) uses a five -tiered rate structure.
At certain levels of consumption, increasingly higher rates are charged. Lodi has a two-tier
rate structure. There are seasonal rates within the tiers. Mr. Dockham stated that if Lodi
wants to compare its rates to PG&E, it should go to a five -tier structure.
In reply to Council Member Mounce, Mr. Dockham confirmed that with the two-tier rate
structure, a higher electric rate is paid at lower levels of consumption.
City Manager King commented that rating agencies compare Lodi Electric Utility against
PG&E.
Mayor Hitchcock and Council Members Hansen and Mounce expressed a preference for a
five -tier rate structure.
Mr. Dockham reviewed the following residential discount programs:
➢ Fixed Income is eligible to qualifying seniors who have an annual income of $45,000 or
less. It provides a 5% discount, there are 90 accounts, and the annual cost of the
program is $5,000.
➢ Medical Rider Program is eligible to those who are dependant on life support devices or
have a medical condition that requires extra heating and cooling needs. Eligible
customers receive an additional 500 kilowatt hours at the lowest baseline rate. It
provides an 8% discount, there are 354 accounts, and the annual cost of the program
is $134,000.
➢ SHARE (Single Household Alternate Rate for Energy) Program is eligible to low-income
customers and is based on the number of residents in the home. It provides a 30%
discount from the standard rate, there are 1,700 accounts, and the annual cost of the
program is $400,000.
Mr. Dockham reported that there are 159 accounts receiving combined discounts, which
provide a 36% reduction from standard rates and costs $50,000 annually.
Council Member Mounce recommended that more effort be made to promote the Fixed
Income Program.
Council Members Hansen and Mounce expressed support for retaining the existing electric
rate discount programs as currently designed.
Council Member Beckman felt that the discounts were too high.
MOTION / VOTE:
No Council action was taken on this matter.
E
Continued December 21, 2005
K-7 "Adopt resolution awarding contract to Rosendin Electric Inc., of San Jose, CA, for the
reconstruction of Killelea Substation and the addition of 60kV power circuit breakers at
Industrial Substation, accepting bid withdrawal of Diede Construction, and transferring funds
($4,231,874)"
Mel Grandi, Electric Services Manager, reported that the Killelea Substation was
constructed in 1961 as a 12kV receiving and distribution station. In 1969, it was upgraded
to a 60kV receiving station, with distribution continuing at 12kV. In 1994, it was
reconfigured to a standard station. The equipment life expectancy is 35 years. The
proposed upgrade would fully modify the station. The equipment will be replaced and the
station will be expanded for adequate maintenance needs.
Mr. Grandi stated that the Industrial Substation was built in 1990. The proposal is to add
two more breakers to increase the capacity necessary for the growth that has occurred.
In reply to Council Member Hansen, Mr. Grandi explained that the proposed substation
improvements will make the transformers more efficient and there will be increased
efficiency in restoring power after an outage. It will increase overall reliability of the system.
The project is anticipated to be completed by May 2007.
MOTION / VOTE:
The aty Council, on motion of Council Member Hansen, Beckman second, unanimously
adopted Resolution No. 2005-266 awarding the contract to Rosendin Electric Inc., of San
Jose, CA, for the reconstruction of Killelea Substation and the addition of 60kV power
circuit breakers at Industrial Substation, accepting bid withdrawal of Diede Construction,
and transferring funds in the amount of $4,231,874.
K-8 "Ratify employment agreement entered into between City Manager, Blair King, and Deputy
City Manager/Internal Services Director, James Krueger, and receive for information only a
report on the reorganization of the Finance Department and City Manager's Office"
Employment Agreement
Council Member Mounce commended James Krueger and expressed support for his
selection to fill the position of Deputy City Manager/Internal Services Director; however, she
was opposed to the severance package in the agreement and stated she would vote
against the matter for that reason.
City Manager King explained that the Lodi Municipal Code charges the city manager to
make selections of subordinate employees; however, the severance pay provision in the
proposed agreement is above his authority, therefore he has brought this matter before
Council. Mr. King stated that he intends to provide standard two-year employment
agreements to all department heads that are hired henceforth. In Mr. Krueger's agreement,
the amount of compensation ($119,556) is at the high end of the range ($81,985 to
$99,652). It includes a provision for a six-month notice before the expiration of the contract
if it will not be renewed. The severance package includes a cash payment equal to six
months' aggregate salary and the City's cost of six months' health insurance benefits if the
employee is terminated without cause. The agreement also stipulates that a 5% salary
increase may be granted by the City Manager after twelve months of employment.
Mr. King noted that if the additional 5% increase is granted, he would bring the matter back
to Council.
In reply to Mayor Hitchcock, City Attorney Schwabauer stated that the reason the
employment agreements are set up for two-year terms is to allow the option of terminating
an employee without having any severance obligation. If it is decided not to renew the
agreement there is no legal basis for the employee to sue and claim they were terminated
inappropriately.
10
Continued December 21, 2005
Mayor Hitchcock expressed concern that two-year employment agreements would not
attract the best candidates to apply for positions in Lodi.
Mr. King countered that employees without a contract have no assurance of any term of
service. He explained that for typical employees the two-year agreements would be rolled
over for another two years. It also provides an opportunity for renegotiation. Mr. King did
acknowledge that if there were a change in management, a new city manager could choose
to allow all the contracts to expire.
Council Members Hansen and Beckman supported the concept of two-year employment
agreements and felt that it offered more stability.
MOTION / VOTE:
The City Council, on motion of Council Member Hansen, Beckman second, ratified the
employment agreement entered into between City Manager, Blair King, and Deputy City
Manager/Internal Services Director, James Krueger. The motion carried by the bllowing
vote:
Ayes: Council Members — Beckman, Hansen, and Johnson
Noes: Council Members — Mounce and Mayor Hitchcock
Absent: Council Members — None
Reorganization of the Finance Department and City Manager's Office
City Manager King explained that line functions are typically defined as those departments
that deliver services to the public such as Police, Fire, and Public Works. Support or
Internal Service functions are services that support line functions in performing their work,
such as Human Resources, Information Systems, and many of the Finance Department
functions. The reorganization will consolidate the support services under one direction in an
effort to improve communications and efficiencies. Mr. King stated that he would like to
decrease the number of department heads in the City. The Deputy City Manager will have
direct report functions to include Human Resources, Information Systems, and the Finance
Department. The Finance Director position will be removed and the Finance Department
will have two divisions: 1) budget, revenue, and purchasing and 2) accounting and customer
service functions. There will be an overall reduction of one position in the Finance
Department.
VOTE TO CONTINUE WITH THE REMAINDER OF THE MEETING
The City Council, on motion of Mayor Pro Tempore Johnson, Mounce second, unanimously voted to
continue with the remainder of the meeting following the 11:00 p.m. hour, with the exception of
agenda Item K-10.
K. REGULAR CALENDAR (Continued
K-9 "Introduce ordinance amending Lodi Municipal Code relating to the establishment of
wastewater development impact fees by amending Lodi Municipal Code Title 13 — Public
Services — Chapter 13.12, "Sewer Service," by repealing and reenacting Sections 13.12.020
(5) and (45), 13.12.180 (A), and 13.12.190; and further amending Title 15 — Buildings and
Construction — Chapter 15.64, "Development Impact Mitigation Fees," by amending Section
15.64.10 — adding new paragraph "F" and relettering paragraphs (G) and (H) — repealing and
reenacting Sections 15.64.030 (A) and 15.64.040, amending Section 15.64.060 — adding
paragraph "C" — and repealing and reenacting Section 15.64.070 (B)"
Public Works Director Prima explained that the proposed ordinance combines the sewer
impact fee and sewer capacity fee. The fees will be collected at the time of the building
permit. The only exceptions would be for the few cases in which improvements that trigger
fee payment do not require a building permit, or as may be otherwise provided in a
development agreement.
11
Continued December 21, 2005
MOTION / VOTE:
The City Council, on motion of Council Member Mounce, Hansen second, unanimously
introduced Ordinance No. 1768 amending Lodi Municipal Code relating to the establishment
of wastewater development impact fees by amending Lodi Municipal Code Title 13 — Public
Services — Chapter 13.12, "Sewer Service," by repealing and reenacting Sections 13.12.020
(5) and (45), 13.12.180 (A), and 13.12.190; and further amending Title 15 — Buildings and
Construction — Chapter 15.64, "Development Impact Mitigation Fees," by amending Section
15.64.10 — adding new paragraph "F" and relettering paragraphs (G) and (H) — repealing and
reenacting Sections 15.64.030 (A) and 15.64.040, amending Section 15.64.060 — adding
paragraph "C" — and repealing and reenacting Section 15.64.070 (B).
K-10 "Discuss and select project nominations for San Joaquin Council of Governments' One
Voice trip" was pulled from the agenda pursuant to the above vote.
K-11 "Approve expenses incurred by outside counsel/consultants relative to the Environmental
Abatement Program litigation and various other cases being handled by outside counsel
($111,268.43) and approve Special Allocation covering general litigation matter expenses
($10,066.11)"
City Attorney Schwabauer reviewed invoices as outlined in the staff report and delineated
below.
MOTION / VOTE:
The City Council, on motion of Council Member Hansen, Mounce second, unanimously
approved expenses incurred by outside counsel/consultants relative to the Environmental
Abatement Program litigation and various other cases being handled by outside counsel in
the amount of $111,268.43 and approved Special Allocation covering general litigation
matter expenses in the amount of $10,066.11, as detailed below:
Folger Levin & Kahn - Invoices Distribution
Total
Matter
Invoice Date
Description
Amount
No.
No.
8001
91583 10/31/05
General Advice/Environmental Matters
$ 190.36
8002
91556 10/31/05
People v M&P Investments
$18,631.79
($805.00)
8003
91559 10/31/05
Hartford Insurance Coverage Litigation $26,245.25
($470.00)
8005
91560 10/31/05
Unigard Insurance
$ 1,008.20
8006
91561 10/31/05
Fireman's Fund/Unigard Appeal
$ 557.83
8008
91562 10/31/05
Envision Law Group
$54,268.88
$99,627.31
Kronick Moskovitz Tiedemann & Girard - Invoices Distribution
Total
Distribution
Matter
Invoice Date
Description Amount
100351.7323 183453.7
No.
No.
11233.001
222267 10/25/05
General advice 405.00
405.00
11233.019
222267 10/25/05
Claims by 1,096.00
1,096.00
Environ. Cons.
( 54.00)
-54.00
11233.026 222267 10/25/05
Lodi First v. 1,008.11
1,008.11
City of Lodi
11233.027 222267 10/25/05
Citizens for 449.35
449.35
Open Govt.v.Col
2,904.46
1,862.46 1,042.00
12
Continued December 21, 2005
Kronick Moskovitz Tiedemann & Girard - Invoices Distribution
8,736.66 8,203.65 533.01
L. ORDINANCES
None.
M. ADJOURNMENT TO AGENCY MEETINGS
M-1 "Meeting of the Lodi Public Improvement Corporation"
At 11:22 p.m., Mayor Hitchcock adjourned the City Council meeting to conduct the meeting
of the Lodi Public Improvement Corporation. Following the call to order, Secretary
Blackston recorded roll.
MOTION / VOTE:
The Corporation, on motion of Director Beckman, Mounce second, unanimously adopted
Resolution No. LPIC2005-01 electing the new officers to the Lodi Public Improvement
Corporation for calendar year 2006.
There being no further business, the meeting was adjourned at 11:22 p.m.
M-2 "Meeting of the Industrial Development Authority"
At 11:23 p.m., Chairperson Hitchcock called to order the meeting of the Industrial
Development Authority, and Secretary Blackston recorded roll.
MOTION / VOTE:
The Authority, on motion of Member Johnson, Mounce second, unanimously adopted
Resolution No. IDA -27 electing the new officers to the Industrial Development Authority for
calendar year 2006.
There being no further business, the meeting was adjourned at 11:23 p.m.
M-3 "Meeting of the Lodi Financing Corporation"
At 11:24 p.m., President Hitchcock called to order the meeting of the Lodi Financing
Corporation, and Secretary Blackston recorded roll.
MOTION / VOTE:
The Corporation, on motion of Director Beckman, Mounce second, unanimously adopted
Resolution No. LFC-14 electing the new officers to the Lodi Financing Corporation for
calendar year 2006.
There being no further business, the meeting was adjourned at 11:24 p.m.
13
Total
Distribution
Matter Invoice
Date
Description
Amount
100351.7323
183453.7323
No. No.
11233.001 222698
11/25/05
General advice
124.94
124.94
11233.019 222698
11/25/05
Claims by
533.01
533.01
Environmental Cons.
11233.026 222698
11/25/05
Lodi First v.
7,667.60
7,667.60
City of Lodi
11233.027 222698
11/25/05
Citizens for Open
411.11
411.11
Govt.v.Col
8,736.66 8,203.65 533.01
L. ORDINANCES
None.
M. ADJOURNMENT TO AGENCY MEETINGS
M-1 "Meeting of the Lodi Public Improvement Corporation"
At 11:22 p.m., Mayor Hitchcock adjourned the City Council meeting to conduct the meeting
of the Lodi Public Improvement Corporation. Following the call to order, Secretary
Blackston recorded roll.
MOTION / VOTE:
The Corporation, on motion of Director Beckman, Mounce second, unanimously adopted
Resolution No. LPIC2005-01 electing the new officers to the Lodi Public Improvement
Corporation for calendar year 2006.
There being no further business, the meeting was adjourned at 11:22 p.m.
M-2 "Meeting of the Industrial Development Authority"
At 11:23 p.m., Chairperson Hitchcock called to order the meeting of the Industrial
Development Authority, and Secretary Blackston recorded roll.
MOTION / VOTE:
The Authority, on motion of Member Johnson, Mounce second, unanimously adopted
Resolution No. IDA -27 electing the new officers to the Industrial Development Authority for
calendar year 2006.
There being no further business, the meeting was adjourned at 11:23 p.m.
M-3 "Meeting of the Lodi Financing Corporation"
At 11:24 p.m., President Hitchcock called to order the meeting of the Lodi Financing
Corporation, and Secretary Blackston recorded roll.
MOTION / VOTE:
The Corporation, on motion of Director Beckman, Mounce second, unanimously adopted
Resolution No. LFC-14 electing the new officers to the Lodi Financing Corporation for
calendar year 2006.
There being no further business, the meeting was adjourned at 11:24 p.m.
13
Continued December 21, 2005
M-4 "Meeting of the City of Lodi Redevelopment Agency"
At 11:25 p.m., Chairperson Hitchcock called to order the meeting of the City of Lodi
Redevelopment Agency, and Secretary Blackston recorded roll.
MOTION / VOTE:
The Agency, on motion of Member Beckman, Hansen second, unanimously adopted
Resolution No. RDA2005-01 electing the new officers to the City of Lodi Redevelopment
Agency for calendar year 2006 and waiving compensation for the December 21, 2005,
meeting.
There being no further business, the meeting was adjourned at 11:25 p.m.
Mayor Hitchcock reconvened the City Council meeting at 11:26 p.m.
N. ADJOURNMENT
There being no further business to come before the City Council, the meeting was adjourned at
11:26 p.m.
ATTEST:
Susan J. Blackston
City Clerk
14