HomeMy WebLinkAboutMinutes - February 19, 2003LODI CITY COUNCIL
REGULAR CITY COUNCIL MEETING
CARNEGIE FORUM, 305 WEST PINE STREET
WEDNESDAY, FEBRUARY 19, 2003
C-1 CALL TO ORDER / ROLL CALL
The City Council Closed Session meeting of February 19, 2003, was called to order by Mayor
Hitchcock at 5:32 p.m.
Present: Council Members — Beckman, Hansen, Howard, Land, and Mayor Hitchcock
Absent: Council Members — None
Also Present: City Manager Flynn, City Attorney Hays, and City Clerk Blackston
C-2 ANNOUNCEMENT OF CLOSED SESSION
a) Actual litigation: Government Code §54956.9(a); one case; Robinson v. Harper, et aL,
Superior Court of California, County of San Joaquin, Stockton Branch; Case No.
CV012406
b) Actual litigation: Government Code §54956.9(a); one case; City of Lodi v. Williams -
Anderson, et aL, San Joaquin County Superior Court Case No. CV 426433
C) Prospective acquisition of real property located at 402 E. Sargent Road, Lodi, CA
(APN #027-040-03); the negotiating parties are City of Lodi and Nobel D. Fore, II and
Millard L. Fore, Jr., Trustees of the Beckman Family Trust; Government Code §54956.8
d) Prospective acquisition of real property located at 21 E. Elm Street, Lodi, CA
(APN #043-082-03); the negotiating parties are City of Lodi and Craig C. and Ann H.
Peden; Government Code §54956.8
C-3 ADJOURN TO CLOSED SESSION
At 5:32 p.m., Mayor Hitchcock adjourned the meeting to a Closed Session to discuss the above
matters.
The Closed Session adjourned at 6:00 p.m.
C-4 RETURN TO OPEN SESSION / DISCLOSURE OF ACTION
At 7:00 p.m., Mayor Hitchcock reconvened the City Council meeting, and City Attorney Hays
disclosed the following actions.
In regard to Item C-2 (a), staff provided a report to Council.
In regard to Item C-2 (b), no report was given or action taken.
In regard to Item C-2 (c), Council gave direction to staff regarding the acquisition of property, a
portion of which would be used by the City for the proposed Aquatics Center.
In regard to Item C-2 (d), Council gave direction to staff as to how to proceed with negotiations for
the acquisition of property to be used by the City for the proposed Indoor Sports Complex.
A. CALL TO ORDER / ROLL CALL
The Regular City Council meeting of February 19, 2003, was called to order by Mayor Hitchcock
at 7:00 p.m.
Present: Council Members — Beckman, Hansen, Howard, Land, and Mayor Hitchcock
Absent: Council Members — None
Also Present: City Manager Flynn, City Attorney Hays, and City Clerk Blackston
B. INVOCATION
The invocation was given by Reverend Fred Chacon, Loving Hymn Ministries.
Continued February 19, 2003
A
PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Mayor Hitchcock.
AWARDS / PROCLAMATIONS / PRESENTATIONS
NOTE: The following presentations were given out of order.
D-1 Awards — None
D-2 (a) Mayor Hitchcock presented a proclamation to Patricia Sherman, President of Animal
Friends Connection, proclaiming Tuesday, February 25, 2003, as "Spay Day USA" in the
City of Lodi.
D-3 (a) Joey Nardinelli, member of the Greater Lodi Area Youth Commission, acknowledged the
Teen of the Month, Susan Cheng from Lodi Academy High School. Mr. Nardinelli
provided an update on the upcoming activities of the Commission.
D-3 (c) Mayor Hitchcock introduced Art Raab and presented Certificates of Recognition to the
following participants and winners of the Lodi Breakthrough Project's "Celebrate Diversity
Essay Contest':
Ist place Rajdeep Bhalaru (7`h grade), Delta Sierra Middle School
2nd place Megan Smith (8th grade), Houston Middle School
3`d lace Micho Khoury' (7"' grade), Morada Middle School
'was unable to attend the meeting
D-3 (d) Public Works Director Richard Prima and Thom Sanchez, representing Central Valley
Waste Services, gave a presentation regarding the City's compliance of the AB939
Diversion Mandate. Mayor Hitchcock presented Certificates of Recognition to the
following for their support and help in achieving this state -mandated diversion goal.
• Richard Prima, representing the City of Lodi Public Works Department;
• Thom Sanchez, representing Central Valley Waste Services; and
• Frank Alegre, representing Frank C. Alegre Trucking
D-3 (b) Scott Edward with the Delta Blood Bank presented a plaque to the Mayor for Lodi's
participation in the Mayor's Cup Challenge, which was held January 27 — 31, 2003.
E. CONSENT CALENDAR
In accordance with the report and recommendation of the City Manager, Council, on motion of
Council Member Land, Beckman second, unanimously approved the following items hereinafter
set forth:
E-1 Claims were approved in the amount of $5,087,392.90.
E-2 The minutes of January 15, 2003 (Regular Meeting), January 28, 2003 (Shirtsleeve
Session), and January 28, 2003 (Special Meeting) were approved as written.
E-3 Approved specifications for 100 post -top globe -style luminaires and authorized
advertisement for bids.
E-4 Adopted Resolution No. 2003-22 awarding the bid for the purchase of three 1500 kVA
three-phase padmount transformers to the bidder whose proposal and equipment met
City of Lodi specifications and whose transformers are expected to yield the lowest overall
life -cycle costs, Western States Electric, of Portland, Oregon, in the amount of
$41,081.84.
2
Continued February 19, 2003
E-5 Adopted Resolution No. 2003-23 authorizing the purchase of lab safety equipment and
yearly physicals for five investigators of the Lodi Police Department using Asset Seizure
funds in the amount of $3,520.
E-6 Adopted Resolution No. 2003-24 authorizing the purchase of a surveillance
receiver/recorder system using Asset Seizure funds in the amount of $5,750.
E-7 Approved the standardization of standby electric generator systems for the
water/wastewater utility, water well, and sanitary sewer lift stations to Olympian as
supplied by Caterpillar.
E-8 Adopted Resolution No. 2003-25 appropriating $8,078.75 from the Contingency fund to
cover expenses incurred during the November 5, 2002, General Municipal Election and
$6,106.25 from the Redevelopment Agency account for expenses associated with the
referendum petition submitted against the Lodi Redevelopment Project No. 1.
E-9 Set public hearing for March 5, 2003, to consider and approve community input and
proposals for uses of the City's 2003/04 Federal allocation of Community Development
Block Grant and HOME Program funds and the reallocation of available funds from
previous program years.
F. COMMENTS BY THE PUBLIC ON NON -AGENDA ITEMS
Joyce Harmon updated Council on her efforts to eradicate mistletoe from the city's trees.
Since her presentation to Council on January 2, she has done the following:
➢ Addressed the Womens Club of Lodi who support her efforts and would like to make this
a community service project;
➢ On February 6 she spoke with the Garden Club of Lodi;
➢ On February 9 a newspaper article on the subject was published in The Record and
previously an article was published in the Lodi News -Sentinel;
➢ On February 9 she received an estimate from a tree company for $1,800 to remove the
mistletoe from 13 properties on Corinth Avenue;
➢ On February 13 she personally delivered letters to the 13 residents on Corinth Avenue,
from which she received four responses of support; and
➢ Another tree company provided an estimate of $300 to remove mistletoe from the worst
tree on the block (Corinth Avenue) and would discount the price to $235 if they could get
additional business from surrounding residents.
Ms. Harmon stated that she had been working on this issue for a year and had concluded that
there was little more she could do as an individual. She suggested that the Neighborhood
Watch groups begin a public education program on the problem. In addition, she
recommended that the City lead an effort for a group bid project with tree trimming companies
who would offer a discount to remove mistletoe on private property trees.
Council Member Hansen voiced support for the City developing a program to rid mistletoe
from the City's trees.
In reply, Public Works Director Prima reported that the City does regular tree pruning
including the removal of mistletoe. Last year the City had a specific project bid solely for the
purpose of mistletoe removal.
City Manager Flynn stated that after Ms. Harmon first spoke to Council on this topic, he asked
staff to assist her with development of a program.
Council Member Hansen suggested that the City send a letter encouraging citizens to address
the issue.
Continued February 19, 2003
Mayor Hitchcock encouraged Ms. Harmon to continue her efforts of educating the public
through the contact of service organizations.
• Frank Alegre asked the Council to make available to the public a City budget that lists each
department separately in an easy to read format. He also noted the Public Employees
Retirement System (PERS) invested in stocks and has lost a great deal of money. He
understood that the City now has to guarantee the losses.
Mayor Hitchcock reported that, though the City must begin contributing to PERS, over a
15 -year period the PERS interest rate has been 9.4%.
City Manager Flynn reported that in 2006-07 it is estimated that the City's contribution to
PERS for public safety fire will be 46% of payroll, public safety police will be 42% of payroll,
and 22% for miscellaneous. The City is contributing nothing today and in three years will be
paying $7 million annually. He stated that there are a lot of questions about PERS investment
policies. At a Shirtsleeve Session next month an actuary will be giving a presentation on this
topic.
Mr. Alegre criticized the City for not saving money in good years to cover the bad years.
Council Member Land was opposed to rate/taxpayers having to pay for the PERS losses. He
asked Mr. Flynn to provide Mr. Alegre with a full budget report, which lists each department
separately.
G. PUBLIC HEARINGS
G-1 Notice thereof having been published according to law, an affidavit of which publication is
on file in the office of the City Clerk, Mayor Hitchcock called for the public hearing to
consider appeal from Neumiller and Beardslee, on behalf of Legends Unlimited, regarding
the Planning Commission's decision to revoke Use Permit No. 99-02 for Legends
Unlimited.
Community Development Director Bartlam reported that he was informed yesterday by
the Alcoholic Beverage Control Board that the license was transferred on Friday.
City Attorney Hays stated that the person who was pursuing the appeal no longer owns
the license; therefore, the appeal is moot.
MOTION / VOTE:
The City Council, on motion of Council Member Land, Beckman second, unanimously
terminated the subject appeal.
H. COMMUNICATIONS
H-1 Claims filed against the City of Lodi — None
H-2 Reports: Boards/Commissions/Task Forces/Committees —None
H-3 Appointments
Council Member Land stated that he received a call from a citizen who was upset
because he was not informed of the Planning Commission vacancy. The individual did
not see a notice in the newspaper and had filed an application for the Commission in the
past.
City Clerk Blackston reported that since November 19 a written notice had been posted in
the City Hall lobby, the Library, the City Clerk's Office, the City's Website on the Internet,
and at the official posting board location outside the Carnegie Forum. A notice was
published in the newspaper on December 21. Applications are retained for a two-year
period and included in the selection process when vacancies become available.
4
Continued February I9, 2003
The following postings/appointments were made:
a) The City Council, on motion of Council Member Land, Beckman second,
unanimously made the following appointment:
Planning Commission
Eduardo Aguirre Term to expire June 30, 2004
H-4 Miscellaneous
a) City Clerk Blackston presented the cumulative Monthly Protocol Account Report
through January 31, 2003.
REGULAR CALENDAR
1-1 "Update on State budget"
City Manager Flynn reported that he attended a city manager's conference last week, in
which the State Finance Director confirmed that the budget will not be approved on time
this year. An adjusted budget is due the week of May 11. The Governor's top priorities in
presenting the budget are debt service and schools, with Vehicle License Fees (VLF) at
the bottom. A representative from the California Reinvestment Redevelopment Agency
Association reported that based on the Governor's proposal, the Association will soon be
out of business. There are 360 cities out of 468 in California that have redevelopment
agencies, and the budget proposal represents a significant loss of money to these cities
and their general fund activities.
In response to Council Member Hansen, Mr. Flynn stated that, in essence, the State is
proposing to take all redevelopment funds. By taking the unallocated portion it stops all
planning of low and affordable housing. In reference to VLF, the State Finance Director
reported that they are not considering these funds for this year; however, it may be an
issue next year.
Council Member Howard pointed out that due to the recent actions of the State,
redevelopment agency monies that are paid by taxpayers, homeowners, and developers
will be reallocated to offset the deficit at the State level instead of a percentage coming to
the cities to reinvest back into local areas.
In reply to Council Member Beckman, Mr. Flynn predicted that the redevelopment agency
fee issue will be tested in court before any final decision is made.
MOTION / VOTE:
There was no Council action required on this matter.
1-2 "Presentation of various storm drain improvements to mitigate localized street flooding at
Lockeford Street near Loma Drive"
Public Works Director Prima displayed a map of the City's storm drain system near Mills
Avenue and Turner Road (filed). He reported that there is a large main that runs dawn
Mills Avenue straddling the B-2 and H areas, which includes the trouble spot for flooding.
The water in Mills Avenue can wind up going either way depending on the water levels at
the pump station, basin, and trunk system. Due to that complicating factor, it is very
difficult to analyze the area under conventional techniques. Because it is a low spot in the
street network, the hydraulic grade line is "popping up out of the ground" fairly frequently
at that location. A number of years ago the City rebuilt the street and lowered the crown
by two inches. A catch basin was moved to help improve the flow at that location. Roots
were removed from one of the 18 inch lines that had been 30% obstructed.
Mr. Prima recommended that a computer-based drainage plan be prepared for the B-2
basin area. Until better modeling and other engineering work is done, Mr. Prima stated
that he cannot offer Council a firm solution for the flooding at Lockeford Street near Loma
Continued February 19, 2003
Drive. He reported that the Lodi Lake Pump Station needs to be repaired and additional
pumps added. In addition there is a pipe that flows backwards out of the area down to
Elm Street, into the trunk line, and winds up in the basin at Glaves Park. If there is an
effect because of the basin, then modifying the basin inlets would help that situation as
well. Staff does not see this as a high priority for the specific problem on Lockeford Street
however. The budget estimate shown in the staff report was to put in a parallel pipe that
would shorten the path and provide additional capacity. Mr. Prima believed that if the
pump station was improved and improvements to the collection system were made, it
would probably result in a one in five-year protection for the area.
In reply to Council Member Hansen, Mr. Prima explained that improvements to the Lodi
Lake Pump Station would help a very large area drain more efficiently.
Council Member Hansen stated that he received a letter from citizens on Sweetwood
Drive who were concerned about the amount of water in the area during heavy rains.
Mayor Pro Tempore Howard inquired whether it would be beneficial to add a second
pump station at Lodi Lake closer in the area north of Howard Street or Loma Drive slightly
east of the existing pump station and better service the flow of water from the area
designated at H and part of B-2. The existing pump station could then be best utilized to
service the rest of B-2 and E, considering that there is planned growth west of E.
Mr. Prima recalled that at one time there were two pump stations. The original station
was at the end of Mills Avenue where it goes into Lodi Lake. It discharged directly into the
beach. Many years ago it was abandoned and connected to the station at Lodi Lake, and
later a discharge line was built from that pump station to the river. He explained that
everything south of Lodi Avenue is in a drainage area that flows south.
Council Member Land asked what the City is doing for residents on Lockeford Street
during heavy storm periods.
City Manager Flynn reported that when a storm is forecasted, employees in the Public
Works Streets Division are assigned to be on standby. If flooding occurs they will close
the street to traffic and assist residents.
Council Member Land noted that only five areas in the City have been identified by Public
Works to have flooding. He agreed that before the pump station is upgraded, the study
should be done as outlined in option A in the staff report. He asked Mr. Prima how often
the lines are checked for blockage.
Mr. Prima acknowledged that in the past the larger diameter lines have not been checked,
and this should be addressed. He reiterated his recommendation to move forward on
updating the basin drainage plan, after which staff will return to Council with a solution for
implementation before next winter.
In answer to Mayor Hitchcock, Mr. Prima stated that if the pump station worked the way it
is supposed to, then doing the repairs as identified in items B and D would provide a five -
to ten-year protection.
In reply to Council Member Land, Mr. Prima estimated that the study would take four to
five months, and following that the design work would take four to five months. He
suggested that during the fall, some piping improvements could be made in the area.
Council Member Beckman asked what kind of improvement the basin operations
modifications would make, as outlined in item C.
Mr. Prima explained that it would allow water to get into the basins sooner than it does
now. From the standpoint of groundwater recharge it would not make any difference
because of the City's program to get water out of the basins to allow them to be used for
recreation purposes. It would, however, help get water off the street faster.
C7
Continued February l9, 2003
PUBLIC COMMENTS:
• Treacy Elliot emphasized that the flooding on Lockeford Street is not an annual
occurrence; it happens two to four times every year. The residents in the area need
some relief. He pointed out that if the study takes four to five months, it will be July
and there may not be time to get even minor improvements completed before the
next rainy season. He asked whether the study could be expedited.
• Gary Buzunis stated that he is the project manager for the First Baptist Church
project. He reported that there was a foot of water in the parking lot of the new
church after the last storm. He explained that the site was not retaining water, it was
receiving it from the south and becoming a catch basin. He warned that the new
middle school that is being constructed in the area will worsen the problem. He
encouraged Council to expedite this project.
MOTION:
Council Member Land made a motion, Beckman second, to direct staff to perform the
study as described in item "A" in the staff report (and shown below):
"Updated Basin Drainage Plan: Staff will prepare a computer-based drainage plan for the
B-2 basin area. The plan will construct a computer replica of the collection, storage, and
pumping facilities serving the basin. Operating assumptions (such as runoff coefficients,
rainfall intensity, and hydraulic performance) will be tested and calibrated to measured
field conditions. It is not uncommon for an agency to have such a model to not only
establish new facility sizes but to also test the impact on the system resulting from
development scenarios different from the base line assumptions built into the model. This
will allow testing of the system under different storm conditions (i.e., 2 -year design storm
with nearly full basin, 5 -year and 10 -year storms with empty basin). Staff would be
responsible for creating the model and calibrating it to existing conditions. Outside
consultant oversight would provide technical support, quality control, and quality
assurance in the final product. Approximate cost: $35,000, plus staff time."
DISCUSSION:
In answer to Council Member Beckman, Mr. Prima explained that staff would be looking
at the drainage area as part of the study, which would include some preliminary work as
to what kind of piping improvements might be necessary. He expected to be in a position
to bid a pipe project by next fall. Staff will return to Council with a recommendation
sometime during the summer regarding what improvements to undertake in the interim
and during the fall, as well as further recommendations on the pump station and other
improvements that would take place in subsequent years.
Mayor Pro Tempore Howard encouraged Mr. Prima to request adequate funding for these
improvements in the upcoming 2003-05 budget.
VOTE:
The above motion carried by a unanimous vote.
RECESS
At 9:02 p.m., Mayor Hitchcock called for a recess, and the City Council meeting reconvened at
9:14 p.m.
REGULAR CALENDAR (Continued)
1-3 "Review the estimated revenue projections for the 2003-05 Financial Plan and Budget'
Finance Director McAthie emphasized that given the State fiscal uncertainty the estimated
revenue projections are subject to change as additional information becomes available.
The City Manager is not recommending any new taxes in the 2003-05 budget. The
estimates are based on analysis of historical data and discussions with other
7
Continued February 19, 2003
departments, outside agencies, e.g. the County Tax Collector, State Treasurer, etc., and
consultants such as Hinderliter del Lamas and Associates (HdL), the City's tax consultant,
and Public Financial Management (PFM), the City's financial advisor. The City has
diverse sources of revenue and it is this diversity that helps lessen the impact to the City
during uncertain times. The largest category of revenue is from service fees and
charges, which represent 64% of the total revenue. Tax revenue represents 25% of the
City revenue. Projections for revenue from others has dropped from 13% to 6% of the
total, due mainly to the Vehicle License Fees and other monies coming from the State.
The balance of City revenue sources is from licenses and permits at 2%, fines and
forfeitures 1%, investment in property revenue 2%, and other revenue 1%. Property
taxes represent 15% of the tax revenue category. The estimate of $6.4 million was based
on information from the County on current assessed value of property within Lodi. As of
last month property receipts were 53% of the amount estimated for the current fiscal year,
so the trend for the 2003-04 estimate is consistent. Staff is not projecting any Educational
Revenue Augmentation Funds (ERAF) for the 2003-05 budget. The largest single source
of tax revenue is $8.7 million in sales and use tax, which represents 41 % of the category,
and is based on discussions with HdL. The projection is $200,000 lower than the current
fiscal year estimate. HdL anticipates that the Citys current fiscal year estimates will come
in closer to $8.4 million, rather than the projected $8.9 million. State maintenance sales
tax for 2003-04 is estimated at $838,370 per Steve Dial, Director of Administration, Chief
Financial Officer, for the San Joaquin Council of Governments. The Transient
Occupancy Tax estimate is lower than the current fiscal year by $140,000 to reflect the
decrease in the tax rate to 6%. The estimate of $24,805 in industrial franchise is based on
4.8% of gross receipts from Delta Container and Central Valley Waste. Gas and electric
franchise information will not be available until March or April from Pacific Gas and
Electric, so staff used a conservative amount based on prior year actuals. Cable TV
franchise is slightly lower, about $9,000, due to internet fees ruled in March 15, 2002, not
subject to local cable franchise by the Federal Communications Commission. The in -lieu
franchise fees are based on 12% of prior year revenues in the enterprise funds. The
Electric in -lieu is estimated to be approximately $5.8 million. This was calculated on the
Electric Utility 2002-03 charges for services, less the public benefits, and multiplied by
12%. The Sewer is estimated to be $755,040, and Water is estimated to be $715,080.
The Electric Utility Market Cost Adjustment and Sewer and Water infrastructure funds are
included in these calculations. The public benefits are not included. The total tax
revenue category estimate of $25.4 million represents a 4.9% increase over the current
year estimate, which is consistent with prior year averages. The two-year average
increase was 4.6%, five-year average was 5.24%, and eight-year average was 4.15%.
In answer to Council Member Beckman, City Manager Flynn explained that the decrease
in the Wastewater in -lieu franchise was due to a reduction in the amount of the transfer
from 17% and 20% down to 12%.
Ms. McAthie continued her report and noted that the license and permits category is
projected to decrease $100,000 from the current fiscal year estimate, mainly in the permit
category. As of January 31, 80% of the fiscal year estimate has been received and is
consistent with prior years at the same time. The 2003-04 estimates are based on a
conservative 2% per year growth. $4,000 was the estimated revenue for alarm permits in
the current fiscal year; however, as of January 31, $11,500 has been collected. The
conservative estimate for 2003-04 is projected at $16,950 based on the number of
permits issued. The bulk of the decrease in the license and permit revenue category is in
the building permits area. As of January 31, $400,000 was received, so the Community
Development Department feels that the current fiscal year estimate of $636,000 is
expected to come in closer to $500,000. Consequently, the 2003-04 estimate of
$530,000 would bring the calculations into alignment with the prior actuals and where
Community Development expects the current year actuals to wind up. Electric permits
are expected to come in closer to $60,000 in the current fiscal year, so the 2003-04
estimate of $61,000 is consistent with this projection. Due to the closing of lot B-2 in the
downtown area and free parking at the garage, fewer parking permits are being issued;
therefore, the estimate has been reduced $25,000 in the current fiscal year. The total
licenses and permits revenue category projections for 2003-04 is $1,555,905.
Continued February 19, 2003
Ms. McAthie reported that the fines and forfeiture revenue category is estimated to
decrease by approximately $33,000. The 2003-04 estimate for vehicle code fines is more
consistent with prior year actuals. As of January 31, the current year revenue is ahead of
prior year revenue; however, that only represents 35% of the estimate. Staff is projecting
a more conservative estimate for the next two-year budget. The current fiscal year
parking fines estimate of $56,000 was based on having one parking enforcement officer.
During the current year a contract officer was hired and the hours and enforcement were
increased to include Saturdays. As of January 31, receipts have totaled $49,000, or 87%,
of the yearly estimate; based on that, the 2003-04 estimate is $80,000, which is more in
line with the revised current year estimates. The late payments and utility bills are
estimated to be slightly lower than the current fiscal year estimate. The total 2003-04
estimated revenue for the fines and forfeiture category is $727,290.
In answer to Council Member Hansen, Ms. McAthie explained that the projections for
false alarms is not ready at this time.
Ms. McAthie stated that the investment of property revenue category is estimated to be
down substantially due to the current interest rate environment. Also in the current year,
the City had larger amounts of dollars to invest from the Electric capital outlay account
and the bond coverage fund. In addition, in the current fiscal year the City had some
longer term investments, which have now matured, and the interest rate that it is
reinvested in is much lower. The total 2003-04 estimate in property and investment
revenue is approximately $2 million based on an average pool of $17 million as of
December 31, with an average rate of return of 2.614%. Staff used the figures shown on
the fax sheet from the state controller's office for the Vehicle License Fee (VLF) estimate.
The 2003-04 VLF estimate is approximately $1.2 million, as compared to the $3.5 million
in 2002-03. The total revenue from other categories is estimated at $6.4 million, as
compared to $15 to $20 million in past years.
Ms. McAthie reported that the largest percentage of revenue needed to offset City
services is generated in the categories of service fees and charges. Electric Utility
operating revenues is projected to increase 3% over the current fiscal year estimate of
$50 million. These estimates, prepared by Electric Utility, include an estimated $850,000
Market Cost Adjustment. As shown on the blue sheet (filed) distributed to Council, the
correction for the 2003-04 total wastewater operating revenue estimates were increased
approximately $2.1 million for infrastructure replacement fees, which were not included in
the total at the time the original presentation was prepared. This will bring the estimated
total to approximately $6.6 million in 2003-04 and $6.8 million for 2004-05, which will be
more in line with the current fiscal year estimate. Also shown on the blue sheet, the
2003-04 water operating revenue estimates were increased for infrastructure replacement
fees in the amount of $1.9 million. This will bring the estimated total to approximately
$5.6 million for 2003-04 and $5.8 million for 2004-05, which will be more in line with the
current fiscal year estimate. Non-operating utility revenue includes such items as contract
work for others, sewer and water tap fees, industrial sewer billing and lift station
reimbursement. Transit fee estimates are flat lined. Parks and Recreation fee estimates
are lower than the current fiscal year due to loss of rental income. Community Center and
Community Development estimates are slightly lower than current year estimates, but are
consistent with prior year estimates. Public Works fee estimates are 42% higher in the
current fiscal year estimate. These fees include the various development impact fee
accounts, which account for the bulk of the increase. Administrative fees include items
such as returned checks and utility connections, which are estimated to have little or no
change from prior year actuals. There is no estimate shown for the next two-year budget
for benefits and insurance fees. This is no longer a revenue item. The method of
accounting for this item was changed in the last two-year budget to an interfund transfer.
The total estimated revenue for the service fees and charges category is slightly more
than $69.9 million.
E
Continued February 19, 2003
In the other revenue category, under donations, the current year actual receipts as of
January 31 are higher than the current fiscal year estimate. Included in this line item are
payments such as the Veterans Monument payments. The 2002-04 figure of $48,130 is
consistent with the actual receipts that are expected in the current year. Revenue no
other category includes items such as the DBCP reimbursement of $244,000, Workers
Compensation reimbursement of $200,000 and other minor items. Reimbursable
charges includes work done for others. Revenue by transfer was the account used for
transfer of Community Development Block Grant (CDBG) grant administrative funds to
offset a portion of the Community Improvement Officer's salary. This is no longer done
as a revenue. It is handled as interfund transfers between CDBG grant and the general
fund. The total for other revenue category is $788,895. The revised grand estimated
revenue for the various categories reviewed is $106,956,700.
Ms. McAthie announced that the next budget reports will be made on March 19 and April
2 to review the significant expenditures and staffing requests.
Mayor Hitchcock noted that overall, the City has approximately $14 million less than the
previous year. The investment revenue is $2.7 million less than the previous year.
City Manager Flynn stated that with regard to the general fund he anticipates $3 million
less next year than this year. He noted, however, that the Lowe's project is expected to
break ground in June and open January 31, 2004, which is worth $1 million a year to the
City. The Redevelopment Agency is also expected to move forward next year.
Recruitments have been suspended and there is a 25 position hiring freeze in effect.
Deferral on capital projects will be recommended, from which $1.5 million is set aside. In
total, this amounts to $4 million. The Parks and Recreation Director will be coming
forward with recommendations to save money and generate some additional revenue.
Over the past ten years the City's total operation cost has increased 41 %, the population
has increased 25%, and revenues in total have increased 116%. After adjusting
(removing) for one-time grant monies, the City still has 60% more revenue today than ten
years ago. Mr. Flynn cautioned that until the State makes a decision about the budget,
any actions the City takes now would merely be reacting to rumor.
Ms. McAthie interjected that the one-time money for grants was reinvested and the
investment earned went back into the projects.
In answer to Council Member Land, Ms. McAthie explained that the decrease in the waste
removal franchise tax was based on prior year actuals. The current year estimate is not
being met.
Council Member Land read the following statement from a Wells Fargo report on the
economic outlook for the Central Valley: "A longer term positive is the above average
growth in the region's labor force — Stockton, Lodi, Bakersfield, and Fresno stand out as
particularly fast growers. This will keep demand for housing, retail trade, and services
robust."
Council Member Hansen suggested that a 1511% reserve fund "floor" policy be established
and instituted in the next fiscal year.
Mayor Hitchcock agreed; however, she noted that it would be very difficult to do now and
might involve layoffs to achieve. She stated that the time to increase reserves is during
the good years.
Council Member Beckman concurred with Mr. Hansen and hoped that a 15% reserve
could at least be a target during the next fiscal year.
MOTION / VOTE:
There was no Council action required on this matter.
10
Continued February I9, 2003
1-4 "Adopt resolution reallocating a portion of the Community Development Block Grant
(CDBG) funds from the 2002/03 Lodi Lake Handicap Accessible Pedestrian/Bicycle
Corridor Project to the 2002/03 Lodi House Project and the 2001/02 Women's Center
Project"
Community Development Director Bartlam recalled that on January 15 Council awarded a
bid on the Lodi Lake project. The award of the bid was lower than the estimated cost of
the project, leaving nearly $110,000 in block grant funds available for other projects. He
recommended that $8,000 of the unexpended funds be reallocated to the Women's
Center roofing project.
Mayor Pro Tempore Howard commented that the staff report indicates that the Women's
Center was unable to find contractors willing to do the project for the original $9,000 that
was awarded to them, due to the additional paperwork involved that was necessary for a
CDBG-funded project. She asked whether the $8,000 requested this evening is, in effect,
going toward paying for the paperwork.
Mr. Bartlam replied that the contractor had underestimated the amount of work that
needed to be accomplished.
Mayor Pro Tempore Howard commented that the paperwork and what type of labor is
used, likely contributes to the increased cost of CDBG-funded projects, to which
Mr. Bartlam agreed.
Council Member Hansen reported that the Lodi Women's Center has been identified as
one of the ten best rated centers in the State. It provides a tremendous resource to
women and children of the community that are victims of abuse.
PUBLIC COMMENTS:
• Joelle Gomez, Executive Director of the Women's Center, thanked the Council for its
support.
MOTION #1 /VOTE:
The City Council, on motion of Council Member Hansen, Beckman second, unanimously
adopted Resolution No. 2003-26 reallocating a portion of the CDBG funds ($8,000) from
the 2002/03 Lodi Lake Handicap Accessible Pedestrian/Bicycle Corridor project to the
2001/02 Women's Center project.
NOTE: Due to a potential conflict of interest related to his service on the Lodi House
board of directors, Council Member Land abstained from discussion and voting on the
issue involving the Lodi House funding.
Community Development Director Bartlam reported that Lodi House had a surplus from
the CDBG funds that were allocated toward its project last year. It applied for CDBG
funding in the coming year for new playground equipment and associated improvements.
He recommended that $25,000 be reallocated to Lodi House to accelerate its project.
Mayor Hitchcock asked whether staff has put these projects ahead of others, as they
have been selected without coming through the typical competitive process and review by
Council.
Mr. Bartlam replied that these were projects that would have had staff's recommendation
either utilizing current program reallocation funds or during the next year's program. They
were selected because the projects were ready to begin immediately, whereas others
must go through the design and bid processes before beginning construction.
PUBLIC COMMENTS:
• Suzanne Mangum, Executive Director of Lodi House, introduced Jenna Donald, a
high school student, who has been assisting Lodi House for her senior project.
11
Continued February I9, 2003
Ms. Donald reported that she had been volunteering for Lodi House during the past year.
She emphasized the need for the children's playground area at the facility and noted that
two bids for the project have been received.
In reply to Council Member Hansen, Ms. Mangum explained that Lodi House received
$10,000 for a fencing project. Labor was contributed by Emanuel Lutheran Church, which
saved $5,000 on the fencing project and can now be put toward installation of the
children's playground.
City Manager Flynn added that a playground area mural will also be painted by high
school students.
MOTION #2 /VOTE:
The City Council, on motion of Council Member Howard, Hansen second, adopted
Resolution No. 2003-27 reallocating a portion of the CDBG funds ($25,000) from the
2002/03 Lodi Lake Handicap Accessible Pedestrian/Bicycle Corridor project to the
2002/03 Lodi House project. The motion carried by the following vote:
Ayes: Council Members — Beckman, Hansen, Howard, and Mayor Hitchcock
Noes: Council Members — None
Absent: Council Members — None
Abstain: Council Members — Land
1-5 "Adopt resolution regarding request of G -REM, Inc., to rescind approvals for the Vintner's
Square Subdivision, a 27 -lot, 33 -unit single-family residential project, located on 5.68
acres at the southwest corner of Lower Sacramento Road and Taylor Road"
Community Development Director Bartlam recalled that on November 6, approval of this
project occurred that included the growth management development plan, 33 residential
allocations for the project, and certification of the mitigated negative declaration. Since
that time the project proponent has undertaken a reconfiguration of the adjacent property,
which has an impact on the approvals of their project and, therefore, they are requesting
that those previous approvals be rescinded because they are of no more use to G -REM,
Inc.
MOTION /VOTE:
The City Council, on motion of Council Member Hansen, Land second, unanimously
adopted Resolution No. 2003-28 rescinding the approvals related to the Vintner's Square
Subdivision as requested by the project applicant, G -REM.
1-6 "Approve scope of work for transit operations contract and authorize advertisement for
requests for proposals (Grapeline and Dial -A -Ride)"
Tiffani Fink, Transportation Manager, explained that the transit contract is for the drivers
and operations service. Ms. Fink handles the administration. The previous contract was
done seven years ago, which was originally a three-year contract with two one-year
extensions. In the Request for Proposal (RFP) scope of work, the contractor is asked to
pick up any cost not covered by California Transit Insurance due to accidents. In addition,
increased reporting requirements have been included in an effort to allow the City to
better troubleshoot problem areas and improve customer service. There is a provision
that preference be given to current employees. Interior and exterior bus cleaning is
required to be increased. A provision related to compressed natural gas (CNG) training
and responsibility was also included in the RFP, as well as the preparation of tickets, ride
guides, and schedules.
Council Member Hansen reported that he had met with Ms. Fink, Public Works Director
Prima, and City Manager Flynn regarding delayed response times. Data indicates that
during one period there were 133 citizens who had wait times ranging from one and a half
hours to over two hours, which he considered to be unacceptable service. He noted that
many of the Dial -A -Ride customers are senior citizens. He hoped that the increased
reporting requirements would serve to improve the response time and suggested that
staff consider recording the dispatchers.
12
Continued February 19, 2003
Ms. Fink replied that the issue of recording dispatchers would be addressed during
negotiations with contractors. She stated that she has been working with the project
manager regarding the possibility of positioning a fleet to better cover areas, due to the
complexity of the system being both subscription and demand response.
Mayor Hitchcock suggested that restriction of services only to the elderly and disabled on
Dial -A -Ride be considered to alleviate the response time delays.
Ms. Fink responded that staff will be evaluating statistics related to the passenger make
up and whether restriction of services would prove beneficial in improving the response
time.
Mayor Pro Tempore Howard noted that the RFP gives Lodi the continued option to look at
fares, which she felt was important, as well as the ability to adjust the schedule of pick
ups and drop offs as needed.
In reply to Council Member Land, Ms. Fink reported that during 2001-02 there was an
increase of nearly 8,000 passengers on Dial -A -Ride and 80,000 on Grapeline. This has
put a large demand on the system in a short period of time. Dial -A -Ride has both
subscription and demand response, in which an attempt is made to accommodate
passengers within 45 minutes. Ms. Fink stated that 95% of the time, the 45 -minute
response time is met.
Council Member Land requested that passenger comments be forwarded to the Council
for informational purposes.
Council Member Hansen concurred with Ms. Hitchcock's earlier suggestion to consider
restricting service on Dial -A -Ride to the elderly and disabled, in an effort to improve
service for these individuals.
MOTION / VOTE:
The City Council,. on motion of Council Member Land, Howard second, unanimously
approved the scope of work for the transit operations contract and authorized staff to
advertise for request for proposals.
1-7 "Adopt resolution authorizing staff to advertise and obtain informal quotes and award bid
for the urgent purchase and installation of pool heater for Enze Pool at Blakely Park, 1050
S. Stockton Street; and appropriate $26,000 for the project"
Parks and Recreation Director Baltz explained that the heater on the large pool at Blakely
Park needs to be replaced. Due to time constraints, he requested that staff be authorized
to go through an informal bid process. Installation of the pool heater will also require
expanding a concrete area, as well as additional fencing. He noted that the new heater
would allow the large pool to be utilized on a year round basis if needed.
Mayor Hitchcock asked Mr. Baltz if he was aware the Lodi Unified School District (LUSD)
was planning to close the high school swimming pools during the winter as a cost saving
measure.
Mr. Baltz replied that he was aware and noted that the main user of the LUSO pools
during the winter is the Lodi City Swim Team.
In answer to Council Member Beckman, Mr. Baltz explained that a formal bid process
would include advertisement and return to Council for approval to award the bid. The
informal bid process would decrease the time to complete the project by two or more
weeks. The parts for the heater must be manufactured, which will take five to six weeks
after they have been ordered. The installation and related work is expected to take ten
days. The swimming season begins on Memorial Day.
13
Continued February 19, 2003
Council Member Hansen noted that he and Mr. Beckman serve on the 2x2 Committee
with LUSD. At the last meeting LUSD commented that they were considering closing the
pools during the winter; however, no decision had been made. City staff and Council
Members expressed their disapproval of the idea. Mr. Hansen voiced opposition to the
bid process requested by staff without a sole -source alternative.
In reference to LUSD's consideration of closing its pools during the winter, Mayor Pro
Tempore Howard stated if that does take place, the joint use agreement should be
updated accordingly. Addressing Mr. Baltz, Ms. Howard stated that if the Blakely pool is
used year round, the fees charged should take into account the added time for heating
and additional costs.
MOTION:
Mayor Pro Tempore Howard made a motion, Land second, to adopt Resolution No.
2003-29 authorizing staff to advertise and obtain informal quotes and award bid for the
urgent purchase and installation of pool heater for Enze Pool at Blakely Park, 1050 S.
Stockton Street; and appropriate $26,000 for the project.
DISCUSSION:
Council Member Beckman did not believe that the two-week time savings justified
deviating from the formal bid process. Council Member Hansen concurred.
Mayor Hitchcock asked Ms. Howard to amend her motion to include a formal bid process,
to which Mayor Pro Tempore Howard declined.
Steve Dutra, Parks Superintendent, stated that if the request is not approved tonight, it
would require staff to return to Council on March 19 with a request to proceed with a
formal bid process, a two-week advertisement period would follow, with award of bids
taking place sometime in April. Subsequent to that would be the four- to six-week
manufacture time for the heater, followed by a ten-day installation period. In this
scenario, the pool would not be ready in time for the swim season.
Council Member Beckman expressed disappointment that staff did not allow Council an
option to select either the formal or informal bid process for the procurement of the pool
heater.
In answer to Mayor Hitchcock, City Attorney Hays advised Council that they could not
change the action requested under the agenda item description. He informed Council
Member Beckman that staff could have brought forward the request with an option for
Council to select the type of bid process.
Council Member Hansen stated that he would vote in favor of the motion due to the time
constraint issue and the need to have the pool ready in time for the beginning of swim
season.
VOTE:
The motion carried by the following vote:
Ayes: Council Members — Hansen, Howard, Land, and Mayor Hitchcock
Noes: Council Members — Beckman
Absent: Council Members — None
Mayor Hitchcock stated that at some point Council must begin denying requests for
expenditures from the contingency fund.
14
Continued February l9, 2003
VOTE TO CONTINUE WITH THE REMAINDER OF THE MEETING
Council Member Hansen made a motion, Hitchcock second, to continue with the remainder of the
meeting following the 11:00 p.m. hour. The motion failed by the following vote (Note: this issue
requires a 4/5 vote of the City Council):
Ayes: Council Members — Hansen, Howard, and Mayor Hitchcock
Noes: Council Members — Beckman and Land
Absent: Council Members — None
REGULAR CALENDAR (Continued)
1-8 "Review and take appropriate action, if necessary, regarding frequency and scheduling of
City Council meetings and Informal Informational `Shirtsleeve' Sessions" was continued
to the regular meeting of March 5, due to the failed vote on the motion to continue
with the remainder of the meeting.
ORDINANCES
None.
K. COMMENTS BY CITY COUNCIL MEMBERS ON NON -AGENDA ITEMS
None.
L. COMMENTS BY THE CITY MANAGER ON NON -AGENDA ITEMS
None.
M. ADJOURNMENT
There being no further business to come before the City Council, the meeting was adjourned at
11:20 p.m.
ATTEST:
Susan J. Blackston
City Clerk
15