Loading...
HomeMy WebLinkAboutMinutes - August 28, 2001 SSCITY OF LODI INFORMAL INFORMATIONAL MEETING "SHIRTSLEEVE" SESSION CARNEGIE FORUM, 305 WEST PINE STREET TUESDAY, AUGUST 28, 2001 An Informal Informational Meeting ("Shirtsleeve" Session) of the Lodi City Council was held Tuesday, August 28, 2001 commencing at 7:03 a.m. A. ROLL CALL Present: Council Members — Hitchcock (arrived at 7:04 a.m.), Howard, Land, Pennino and Mayor Nakanishi Absent: Council Members — None Also Present: City Manager Flynn, Deputy City Attorney Schwabauer and City Clerk Blackston SPECIAL MEETING OF THE CITY COUNCIL At 7:05 a.m., Mayor Nakanishi adjourned the Shirtsleeve Session to a Special meeting of the City Council (NOTE: refer to the August 28, 2001 Special meeting minutes). B. CITY COUNCIL CALENDAR UPDATE At 7:09 a.m., Mayor Nakanishi reconvened the Shirtsleeve Session, and City Clerk Blackston reviewed the weekly calendar (filed). C. TOPIC(S) C-1 "Water/Wastewater Rates" Public Works Director Prima stated that at a previous Council meeting the question was raised as to what other cities have done in the way of water and wastewater infrastructure replacement and the associated cost. Mr. Prima reported that it is difficult to obtain data on this issue, and there is no industry standard because it is dependent on the city's particular conditions. Lodi has 14 miles of two-inch water pipe on both the east and west sides of the City, in addition to some three-inch pipe that needs to be replaced. Much of this pipe was installed in the 1920s through 1940s. Through the 1960s there was an insufficient number of valves installed. Fire hydrants were placed 1,000 feet apart, whereas current standards require hydrants to be placed 300 to 500 feet apart. Pipes, valves, and fire hydrant placement all need to be brought up to current standards. Mr. Prima reported that the City has an unknown amount of concrete or clay sewer pipes that need to be replaced using the bursting method. As part of the general plan update in the late 1980s, Public Works had a televised sampling done of the sewer pipes on the east side to determine capacity and condition. They discovered off -set joints and sags in the system. He explained that sewer pipes need to be installed on a gravity flow basis. Sewer pipes in Lodi were installed flat until the 1970s when lift stations were installed when needed and pipes were placed on a slope, which made them essentially self cleaning. Referencing documents presented to Council (filed), Mr. Prima explained that staff used a budget figure of $200 a foot per utility. The Stockton Street project was used as an example of costs, though Mr. Prima pointed out that this was not a typical infrastructure replacement because it was part of a street reconstruction project, which decreases the cost for water and sewer pipe replacement. Trunk lines run north and south, and mains that serve lots in this area run east and west. Services that tie into each house attach to the main lines. The contract price for water pipe replacement is $97 per foot and wastewater pipe is $122 per foot. In typical replacements (i.e. not done in conjunction with a street reconstruction project), the cost would increase an additional $190 a foot per Continued August 28, 2001 utility. More pipe may need to be installed than is removed, due to rerouting that would be necessary around lots, side streets, and interconnections in order to meet current standards. In response to Mayor Pro Tempore Pennino's request for clarification regarding costs, Mr. Prima justified his estimate by reporting that on a recent sewer replacement, which involved pipe bursting, the price was $46 per foot. In addition, restoration of alleys in the older parts of the City will be necessary. In those areas both water and sewer lines are in the alley, and it is not practical to move the sewer from the alley to the street due to the way the houses were plumbed. In situations where the water and sewer lines are in a rear easement, the water line would need to be moved to the street, which would cause the additional work of street trenching and repair. Further, the split lots are problematic, where water and sewer lines run through one lot and serve another parcel. This may result in the need to place additional pipe in the alley and the street. Discussion ensued regarding the difference between `project' cost versus the 'per foot of pipe installation' cost, and the variances that are expected to occur with the infrastructure replacement project. In reply to Mayor Nakanishi, Mr. Prima explained that the 2 -inch pipe represents 10% of the City's system. Council Member Hitchcock asked for an explanation of the factors involved in the 30% contingency cost. Mr. Prima responded that the contingency cost includes engineering, staff, outside contractors to do the design work, split lots, restoration of rear yards, additional work required for the pipe bursting process, and unforeseen conditions such as when services are under a resident's garage floor or other inconvenient location. Council Member Hitchcock questioned whether staff took into account the period of time the project would cover, and projected what the present value of those future dollars would be. Mr. Prima reported that the cost estimate was done at the current dollar value. Staff projected out two years and added cost inflaters for that period only. He did not recommend projecting rates beyond the two-year period. Rates will need to be adjusted periodically over time. In answer to Mayor Nakanishi's suggestion to consider using City crews, Mr. Prima explained that the replacement project is seasonal and much of the work is specialized (e.g. pipe bursting) requiring certain equipment and expertise. The current water rate for a three-bedroom home is a flat monthly rate of $12.45. Of that amount, $10.68 is for operations and maintenance — crews, engineering staff, power for pumps, lab work, etc; $0.90 is for capital maintenance and equipment. Staff is recommending an increase of $0.87 for the water pipe replacement program. Customers with a three-bedroom home are currently billed $8.90 per month for sewer service. Of that amount, $7.79 is for operations and maintenance; $0.80 is for capital maintenance equipment. Staff is recommending an increase of $0.31 for the sewer pipe replacement program. In terms of an alternate water supply, Mr. Prima stated that if staff were to complete all the filings and proceed with the environmental and preliminary design work, the cost would potentially be $2 million a year for the next several years. He presented this for information only and did not recommend adding that cost into the rates at this time. Reporting on the wastewater treatment plant, Mr. Prima stated that $370,000 has been included for each year of the 2001-03 budget to work on improvements at the plant. When a decision is made to go to tertiary, or other method, the total project cost is 2 Continued August 28, 2001 estimated to be $34 million. Mr. Prima stated that 70% of the cost would be borne by rates, with the remaining 30% in a connection or impact fee. Using the rule of thumb of 10% for debt service, this amounts to $2.38 million per year. Mr. Prima presented this for information purposes only and did not recommend adding that cost into the rates at this time. In answer to Council Member Hitchcock's request for clarification on sustaining a fund balance, Mr. Prima explained that the budget policies specify that the Department maintain a minimum of 15%. Staff feels that maintaining only the minimum would not be prudent and suggest 15%, plus an amount for a capital replacement. Mr. Prima also reported that the City has $2 to 3 million in debt to the state for a loan taken a few years ago related to dibromochloropropane (DBCP). City Manager Flynn added that the City borrowed approximately $12 million for wastewater system improvements and currently owes $10 million on that loan. Returning to his report on rate increases, Mr. Prima recommended adjusting the water rate, but not changing the base charge for a meter. He also reported that all three utilities pay an in -lieu tax to the general fund: Electric Utility pays 12%, Water 17%, and Sewer 20%. Beginning the next fiscal year, he recommended adjusting the in -lieu tax so that all utilities pay 12%. In reply to Mayor Pro Tempore Pennino, Mr. Prima explained that the proposed rate increases take into account the approximate $605,000 difference to the general fund that the in -lieu tax change would make, which would result in no change in the net amount to the general fund. Mr. Prima recommended the following rate increases take place October 1, 2001 and July 2002: • Water — 3 bedroom home, increase $3.11; additional increase of $3.89 in July 2002 • Wastewater — 3 bedroom home, increase $3.12; additional increase of $4.20 in July 2002 Note: These increases amount to 25% for water and 35% for sewer. Discussion ensued regarding equity in charging customers, the advantages and disadvantages of meters, and possible future issues. In response to Mayor Pro Tempore Pennino for examples of rates spread out over five years and/or in a tiered effect, Mr. Prima advised against projecting further than two years due to uncertainties. Council Member Hitchcock asked for information related to funds deducted from the water fund to pay for attorney fees related to PCE/TCE. She emphasized that these fees should not be recaptured through the water and wastewater rates. Mr. Prima assured Ms. Hitchcock that the rate increase recommendation does not include costs related to PCE/TCE attorneys' fees. He indicated that he would look into Ms. Hitchcock's request and supply the information. Mayor Nakanishi asked Mr. Prima to include rate information on Stockton, Manteca, Escalon, and the County for comparison purposes at the August 29, 2001, special Town Hall meeting. D. COMMENTS BY THE PUBLIC ON NON -AGENDA ITEMS None. Continued August 28, 2001 E. ADJOURNMENT No action was taken by the City Council. The meeting was adjourned at approximately 8:29 a.m. ATTEST: Susan J. Blackston City Clerk Mayor's & Council Member's Weekly Calendar WEEK OF AUGUST 28, 2001 Tuesday, August 28, 2001 7:00 a.m. Shirtsleeve Session 1. Water/Wastewater Rates 7:00 a.m. Special Meeting 1. Authorize the City Manager to provide San Joaquin County Council of Governments with a letter of support for its proposal to host a League of California Cities 6rassroots Coordinator in its Stockton office 5:30 p.m. Land. Lodi Sister City Committee Membership Appreciation Annual Picnic, Lodi Lake Park - Parson Point. Wednesday, August 29, 2001 7:00 p.m. Town Holl Meeting 1. City Council review of electric, water, and wastewater rates and discussion regarding reverse frontage walls Thursday, August 30, 2001 4:00 - 5:30 p.m. Lodi Lake Nature Area Docent Council Discovery Center Open House, Lodi Lake Discovery Center. 4:00 - 7:00 p.m. Open House hosted by Sorac ino- Kirby- Snow, 980 Ninth Street, Suite 1480, Sacramento. Friday, August 31, 2001 10:00 -2:00 p.m. Open House for Frank Pepper, retiring Parks Supervisor, Parks Division Office. Saturday, September 1, 2001 Sunday, September 2, 2001 Monday, September 3, 2001 Reminder Labor Day. City Hall closed. Disclaimer. This calendar contains only in formation that was provided to the ON Clerk's office counci hmisclmcalndr.doc t-l� S1, a e -o Water/Wastewater Utility Issues (In Two Parts) Part 1 — July 31, 2001 Shirtsleeve ■ Declining Fund Balance ■ Budget Objective #7- To Provide Resources to Maintain City's Infrastructure ■ Regulatory & Other Requirements ■ Direction/Next Steps ■ Rates ➢ History ➢ Other Agencies Part 2 — August 28, 2001 Shirtsleeve ■ Infrastructure Replacement Issues ■ Cost of Replacements ■ Revenue Requirements ■ Proposed Rates I .Infrastructure Replacement Issues ■ No "Industry Standard" ■ Useful Life of Pipe Varies Considerably ➢ Pipe Material ➢ Soil Conditions ➢ Customer Demands ■ Lodi's Problem ➢ 2" Steel Pipe Watermains ✓ Size is fine by 1930's standards, inadequate today ✓ Prone to leakage, breaks ✓ Other appurtenances a problem —valves, hydrants ✓ 14 miles in our system ✓ 10 years to replace at total system I% replacement rate ➢ Concrete & Clay Sewer Pipe ✓ Size is minimally adequate, corrosion a problem ✓ Pipe breakage, joint leakage ✓ Quantity unknown K N Cost of Replacements ■ Budget Estimate Approx. $200 per ft. Each for Water & Sewer ($400 total) ■ Stockton Street Project — Street Reconstruction w/ Trunk Line Replacement ➢ Includes Replacing 1,300 ft. Each of Water & Sewer Trunk Mains ➢ Work Is Entirely in Street, as Part of Street Reconstruction (shared costs) ➢ Contract Cost for Both: $219 per ft. ➢ For Typical Replacement Project, Need to Add: ✓ Trench/Street Restoration - $18 per ft. ✓ Water & Sewer Services to Each Parcel - $55 per ft. ✓ Engineering & Contingencies (30%) - $88 per ft. ✓ Total Cost Estimate - $380 per ft. ($190 for each utility) ✓ Does Not Include Easements & Related Construction for Split Lots. ■ Typical Eastside Project ➢ Includes Replacing Water & Sewer Mains in alleys or rear yards ➢ Work Is Mainly in Yards and New Water Main in Street ➢ Assumed No Cost for Easements ➢ Mission & Watson Streets Project Estimates: ✓ Wastewater - $187 per project foot A $171 per foot of main pipe installed ✓ Water - $ 285 per project foot $ 140 per foot of main pipe installed 3 STOCKTON STREET (TOKAY TO LODI AVE.) WATER & WASTEWATER INFRASTRUCTURE REPAIR COST COMPARISON (PER PROJECT FOOT) Dell Engineering Granite Construction Average , Item No. Description Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 Traffic Control LS 1 $ 1,751 $ 1,751 $ 45,000 $ 45,000 $ 23,376 $ 23,376 2 Excavation Safety LS 1 $ 9,959 $ 9,959 $ 5,000 $ 5,000 $ 7,480 $ 7,480 3 6 inch WW Pipe LF 233 $ 23 $ 5,359 $ 75 $ 17,475 $ 49 $ 11,417 4 10 inch WW Pipe LF 1327 $ 31 $ 41,137 $ 55 $ 72,985 $ 43 $ 57,061 5 48 inch WWMH EA 7 $ 2,083 $ 14,581 $ 2,200 $ 15,400 $ 2,142 $ 14,991 6 Abandon WW Pipe LS 1 $ 32,402 $ 32,402 $ 12,000 $ 12,000 $ 22,201 $ . 22,201 7 Abandon WWMH EA 5 $ 1,938 $ 9,690 $ 1,000 $ 5,000 $ 1,469 $ 7,345 8 Install 4 inch WW Service EA 21 $ 565 $ 11,865 $ 1,200 $ 25,200 $ 883 $ 18,533 Total WW Infrastructure Costs $ 126,744 $ 198,060 $ 162,402 10 6 inch Water Pipe LF 195 $ 11 $ 2,145 $ 48 $ 9,360 $ 30 $ 5,753 11 8 inch Water Pipe LF 66 $ 16 $ 1,056 $ 60 $ 3,960 $ 38 $ 2,508 12 12 inch Water Pipe LF 1328 $ 35 $ 46,480 $ 57 $ 75,696 $ 46 $ 61,088 13 6 inch Water Valve EA 10 $ 539 $ 5,390 $ 900 $ 9,000 $ 720 $ 7,195 14 8 inch Water Valve EA 2 $ 752 $ 1,504 $ 1,100 $ 2,200 $ 926 $ 1,852 15 12 inch Water Valve EA 7 $ 1,258 $ 8,806 $ 1,900 $ 13,300 $ 1,579 $ 11,053 16 Install 1 inch Water Service EA 15 $ 518 $ 7,770 $ 1,200 $ 18,000 $ 859 $ 12,885 17 Install 1 inch Water Service w/o Meter Box EA 3 $ 622 $ 1,866 $ 1,100 $ 3,300 $ 861 $ 2,583 18 Fire Hydrant EA 4 $ 2,478 $ 9,912 $ 2,500 $ 10,000 $ 2,489 $ 9,956 19 Temp. B.O. EA 11 $ 292 $ 3,212 $ 1,200 $ 13,200 $ 746 $ 8,206 20 Abandon WM & Valves LS 1 $ 2,739 $ 2,739 $ 10,000 $ 10,000 $ 6.370 $ 6,370 Total Water Infrastructure Costs $ 90,880 $ 168,016 $ 129,448 Total Project Footage 1,330 LF Water Improvements Per Project Foot $ 97 WW Improvements Per Project Foot $ 122 Subtotal Water & WW Improvements Per Project Foot for this Project $ 219 $ 219 Additional Costs For a Typical Planned Project: Trench Repair @ $15/foot (Estimated) $ 15 Water Services to Each Lot (Avg. $ / Block Ft.)' $ 20 Sewer Services to Each Lot (Avg. $ / Block Ft.) $ 35 Street Repair (Slurry Seal After Construction - $ / Block Ft.)' $ 3 Subtotal Additional Costs ($ / Block Ft.) $ 73 $ 73 Subtotal of Estimated Project Costs ($ / Block Ft.) $ 293 Engr. & Contingencies (30%) $ 88 Total Estimated Project Costs ( $ / Block Ft.) $ 380 Cost Per Utility at 50% Each ( $ / Block Ft.): $ 190 'Not included: costs associated with adjacent blocks; costs of acquiring easements;relocation of water services from rear yard to front yard; property restoration after construction; traffic control; etc. c_— C) O N .j co 0 N N / ff4w, 3t rc)- C- CD M roro wi 0 Lrl/ I LJ LJ 0 M / z w 0 FA i j f I ' CIO - O o t`� to - 1 Ll . w r- ' . j r nd j j ited Sewer ' B LAI r Main g"W j A Water Main j Nater Main ---------- j Note Qte : Storm Drain & Gas nioundry — �— By � wm 'ROJkT i iron 9 #1 EASTSIDE WATER& WASTEWATER REPLACEMENT PROJECT BLOCKS F-5 & G6 (Blocks Between Mission and Watson • E. of Stockton Street - No Ailey) PRELIMINARY COST ESTIMATE - FUND DISTRIBUTION • Including Costs Associated with Adjacent Blocks (Water Improvements 6 Street Repair) " Not Including Costs Associated with Adjacent Blocks (Water Improvements & Street Repair) Engineses Estimate I Fund Distribution Item No. Description Unit Quantity Unit Price Total Price WW Main Replacement W Main Replacement Miscellaneous 17.1 18.1 Traffic Control LS 1 $ 10,000 $ 10,000 $ 4,000 $ 6,000 Excavation Safety LS 1 $ 5,000 $ 5,000 $ 2,000 $ 3,000 Mobilization/Demobilization LS 1 $ 20,000 $ 20,000 $ 8,000 $ 12,000 Construction Photography LS 1 $ 1,500 $ 1,500 $ 800 $ goo Subtotal Miscellaneous $ 36,500 S 14,600 $ 21,900 Wastewater 6inch WW Pipe LF 1300 $ 50 $ 65,000 $ 65,000 flinch WW Pipe LF 170 $ 60 S 10,200 $ 10,200 48 inch WWMH FA 4 S 3,000 $ 12,000 $ 12,000 Abandon WWMH LS 1 $ 1,500 $ 11500 $ 1,500 Install 4 inch WW Connections w/ Service & Cleanouts EA 42 $ 1,200 S 5OA00 S 50,400 Subtotal Wastewater $ 139,100 $ 139,100 Water 8 inch Water Pipe LF 2750 $ 40 $ 110,000 $ 110,000 6 inch Water valve EA 4 $ 750 $ 3,000 $ 3,000 8 inch Water Valve EA 8 $ 1.000 $ 8,000 $ 8,000 Install 1 inch Water Service EA 72 $ 660 $ 61,920 $ 61,920 Fire Hydrant EA 2 $ 2,500 $ 5,000 $ 5,000 Abandon WM & Valves EA 1 $ 5,000 $ 5,000 $ 5,000 Connect Services to Buildings EA 42 $ 500 $ 21,000 $ 21,000 Subtotal Water S 213,920 $ 213,920 Backyard Reconstruction Replace existing landscape and improvements if damaged by work EA 42 $ 750.00 $ 31,500 $ 12,600 $ 18,900 Adjust MH rims and cleanouts to grade LS 1 $ 2,000 $ 2,000 $ Boo $ 1,200 Subtotal Alley Reconstruction $ 33,500 $ 13,400 S 20,100 Street Reconstruction (Mlssion.Washington & Watson) Patch Pave Water Main Trench SF 14,500 $ 4.00 S 58,000 $ 23,200 S 34,800 Slurry Seal Streets SF 85,000 $ 0.10 $ 8,500 $ 3,400 $ 51100 ,dJ Subtotal Street Reconstruction $ 66,500 S 26,600 S 39,900 Project Subtotal of Construction Costs $ 489,520 $ 193,700 $ 295,820 Contingencies (15%) $ 73,428 $ 29,055 $ 44,373 Engineering and Administration (15%) $ 73,428 $ 29,055 $ 44,373 Total Estimated Project Cost $ 636,376 $ 251,810 S 384,566 S 636,376 TOTAL PROJECT FOOTAGE 1350 LF NOTES: Install water in the street, abandon water in backyards Gross $ / Project Fool' Rehab wastewater in backyards Wastewater Water Combined Indiividually serve each address with own service S 187 $ 285 $ 472 Rebuild backyard area as required after construction Slurry Seal Mission and Watson Streets after installation of water main and services Net $ / Project Foot Wastewater Water Combined $ 187 $ 166 $ 353 $ / Foot of Pipe Installed' Wastewater Water Combined $ 171 $ 140 $ 311 • Including Costs Associated with Adjacent Blocks (Water Improvements 6 Street Repair) " Not Including Costs Associated with Adjacent Blocks (Water Improvements & Street Repair) $14.00 $12.00 E $10.00 0 L C $8.00 M d 0� $6.00 t r-+ C 0 $4.00 $2.00 E: Water Rate Components DOperations & Maintenance M Capital Maintenance & Equipment ❑ Infrastructure Replacement Program Avg. 2001103 i $10.00 HM ME a) E $7.00 0 m $6.00 M $5.00 TA >% $4.00 t o $3.00 $2.00 $1.00 Wastewater Rate Components 13 Operations & Maintenance ® Capital Maintenance & Equipment ❑ Wastewater Treatment Improvements ❑Infrastructure Replacement Avg. 2001103 Budget E:3 Increased Revenue Requirements Water Utility Component Sustain Fund Balance w/Reserve Replace Infrastructure Alternate Water Supplies Total: Wastewater Utility Sustain Fund Balance w/Reserve Replace Infrastructure Wastewater Treatment Upgrades Total: Grand Total: $ Per Year Recommended Potential Program Program $45,000 $ 45,000 $2,200,000 $2,200,000 $20,000 $2,000,000 $2,265,000 $4,245,000 $ 245,000 $ 245,000 $ 2,000,000 $ 2,000,000 $ 370,000 $ 2,380,000 $ 2,615,000 $ 4,625,000 $ 4,880,000 $ 8,870,000 V, Proposed Rate Adjustment Concepts ■ Two Smaller Increases Rather Than One Large One ■ Adopt Both Increases Now To Allow Planning ➢ October 2001 ➢ July 2002 ➢ Reconsider during FY 2002/03 for Future Years ■ Water — Adjust Flat Rates and Water Usage, Leave Base Meter Charge As Is ➢ Encourage Conservation ➢ Rates More In Line With Other Cities ■ Reduce In -Lieu Charge Starting FY 2002/03 ➢ Reduce Water from 17% to 12% ➢ Reduce Sewer from 20% to 12% ➢ Both will then be same as Electric ➢ Continuing practice from last Water increase in 1995 10 Proposed — Water/Wastewater Rates October July Water 2001 2002 $/month — 3 Br. Home Existing Rate: $ 12.45 $15.56 Increase: $3.11 $3.89 Total: $ 15.56 $ 19.45 $/1000 gal/mo. Metered: (no change in base chg.) Existing Rate: $ 0.40 Increase: $0.14 Total: $ 0.54 Wastewater $/month — 3 Br. Home Existing Rate: $ 8.90 Increase: $3.12 Total: $ 12.02 Y Y I1 $ 0.54 0.17 $ 0.71 $ 12.02 4.20 $ 16.22 $25.00 $20.00 0 E 0 m $15.00 M d $10.00 S C O a $5.00 Water Rate Components 0 Operations & Maintenance ® Capital Maintenance & Equipment [3Infrastructure Replacement Program Avg. 2001103 Proposed July 2002 IL $30.00 $25.00 a) E _ $20.00 L in M $15.00 w 0: a $10.00 0 2 $5.00 Wastewater Rate Components 13 Operations & Maintenance ®Capital Maintenance & Equipment p Wastewater Treatment Improvements 0Infrastructure Replacement Avg. 2001/03 Budget Proposed July 2002 Potential 2003 13 Next Steps ■ Questions/Comments from Council ■ Town Hall Meeting August 29 • City Council Meeting September 19 14