HomeMy WebLinkAboutMinutes - June 19, 2001 SSCITY OF LODI
INFORMAL INFORMATIONAL MEETING
"SHIRTSLEEVE" SESSION
CARNEGIE FORUM, 305 WEST PINE STREET
TUESDAY, JUNE 19, 2001
An Informal Informational Meeting ("Shirtsleeve" Session) of the Lodi City Council was held Tuesday,
June 19, 2001 commencing at 7:02 a.m.
A.
B.
ROLL CALL
Present: Council Members — Hitchcock, Howard, Land, Pennino and Mayor Nakanishi
Absent: Council Members — None
Also Present: City Manager Flynn, City Attorney Hays and City Clerk Blackston
CITY COUNCIL CALENDAR UPDATE
City Clerk Blackston reviewed the weekly calendar (filed).
Announcement
City Manager Flynn informed the Council that he received a notice from the State Assembly that a
public hearing will be held at the State Capitol on June 22, at 11:00 a.m. to discuss redrawing district
lines.
C. TOPIC(S)
C-1 `Review of proposed 2001-03 Financial Plan and Budget"
Deputy City Manager Keeter noted that the Council has received an amended 2001-03 Financial
Plan & Budget / Capital Budget Detail by Activity summary sheet (filed). Additional Capital
Improvement Project reports include a $60,000 request for interim animal shelter improvements to
lease a trailer, purchase cat cages and dog kennels, and install exhaust fans. Two projects have
been included in the Wastewater Division: 1) Wastewater capital maintenance; and 2) White
Slough capital maintenance — both of which are general improvements and are funded through
the Wastewater fund. Public Works has requested various street maintenance projects including
the removal of the railroad tracks on Lodi Avenue. These projects will be funded through
Measure K, TDA, and federal and state monies. Downtown street improvements will be funded
through Electric Utility, CDBG, and other street funds. Major street expansion projects include
Lower Sacramento Road, Century Boulevard extension, Kettleman Lane increase from two to four
lanes between Ham Lane and Tienda Drive, and other miscellaneous widenings.
Ms. Keeter reviewed the 2001-03 Financial Plan and Summary / Changes in Fund Balance — All
Funds Combined (filed). Staff projects an overall increase in revenues, primarily from sales and
property tax. Electric Utility is expected to generate $8 million in fees.
City Manager Flynn stated that staff will be recommending increases in water and sewer rates this
summer.
In response to Council Member inquiries about bulk power costs, Electric Utility Director Vallow
stated that he is 100% confident that it will not negatively affect the General Fund.
In reply to Council Member Land, Ms. Keeter stated that there is an approximate 13% reserve in
the General Fund.
Council Member Hitchcock asked for an explanation of line 24, under Other Sources (Uses) for $4
million.
Continued June 19, 2001
Ms. Keeter explained that Other Sources (Uses) includes salary savings by budgeting at the E
step and hiring at the A step, carry over from the last two year budget, grants that are anticipated
to be received, the market cost adjustment for Electric Utility, and salary savings for "hire lag" —
the time between when a vacancy occurs and when it is filled.
City Manager Flynn noted that there is $13.6 million in Other Sources, of which $9 million is
proceeds from debt financing that has not yet been approved. It was reported in this way to offset
the proposed capital costs.
Council Member Hitchcock felt that showing more detail in this report would be beneficial,
particularly in describing Other Sources (Uses) and Operating Transfers In and Out.
Referencing page 2, Changes in Fund Balance — General Fund, Other Sources (Uses),
Ms. Keeter explained that the $5 million under Operating Transfers, incorporates the cost of
services and $3.5 million that is generated from water, sewer, electric, and transit funds. It also
includes $1 million from gas tax, $82,000 from street sweeping and sewer, $25,000 from water
and sewer for their injury and illness prevention plan, and $25,000 from Electric Utility for their
injury and illness prevention plan. Line 23, Operating Transfers Out, shows $1.5 million for the
capital outlay fund that will be used for the Public Safety Building. The balance would go towards
insurance. Line 24, $3.3 million represents carry over from the last budget, salary savings,
anticipated additional revenue from electric rates, and miscellaneous revenue such as anticipated
grants. Line 25 represents the cost of medical, dental, and vision benefits.
General Fund Capital Outlay, page 8, shows a Transfer In of 30% of property taxes. Line 6,
Service Charges, includes $1.6 million in impact fees. Line 18 includes the design phase for the
Animal Shelter, $150,000 for Parks and Recreation general projects, $538,000 for the Skate Park,
$75,000 for the Information Systems computer replacement fund, and Community Development's
capital requests. in year two, there is $17.6 million for the construction of the Aquatics Center,
Indoor Sports Complex, Lodi Lake improvements, Animal Shelter, and DeBenedetti Park. Line 25
shows proceeds from debt financing. Line 30, Designated Reserve, includes $3 million set aside
for the Public Safety Building, and $4.6 million of impact fees and designated projects. In year two
it includes a total of $4.5 million for the Public Safety Building project.
Council Member Hitchcock pointed out that construction costs are shown for other projects, but
not the Public Safety Building, and felt that they should be reported in the same way. Mayor Pro
Tempore Pennino expressed agreement.
Ms. Keeter pointed out that the $67,000 under Changes in Fund Balance — Equipment Fund, is for
the City's non -rolling stock. Under the Debt Service Fund, $1.2 million represents the two
Certificates of Participation for the downtown area and Hutchins Street Square. Electric Fund,
line 16, shows $30.5 million for bulk power purchases. The proceeds from the debt financing are
almost doubling, and the fund balance is increasing in both year one and two.
Discussion ensued regarding how sales and purchases of power are reported. Finance Director
McAthie explained that it is shown as a net amount.
Ms. Keeter reported that the total fund balance for both Wastewater and Water is decreasing. A
Shirtsleeve Session will be scheduled in the near future to discuss possible rate increases.
Mr. Flynn explained that upgrading older infrastructure on the east side of the city needs to be
calculated into the rates.
Referencing page 14, Transit Fund, Ms. Keeter stated that the expenditures were adjusted to
reflect what will likely happen when the contract is renegotiated for the fixed route, Dial -A -ride, and
administration of the transportation system. The amount was increased to $2.3 million. The
Benefits Fund on page 15 includes medical, dental, vision, chiropractic, employee assistance
program, life insurance, long term disability and unemployment. Page 16, Self Insurance Fund,
includes general liability, Workers Compensation, and miscellaneous insurance. The Vehicle
Maintenance Fund on page 17 will be renamed 'Vehicle Replacement Fund" to better reflect its
2
Continued June 19, 2001
purpose. The Trust and Agency Fund on page 18 includes the business improvement district
downtown, debt service, and the private sector trust fund for the library.
Council Member Land pointed out that the fund balance in 1999-00 was $30 million and in the
2001-03 budget it is $38 million. He commended the City Manager for doing a good job.
D. COMMENTS BY THE PUBLIC ON NON -AGENDA ITEMS
None.
E. ADJOURNMENT
No action was taken by the City Council. The meeting was adjourned at 8:17 a.m.
ATTEST:
Susan J. Blackston
City Clerk
2001-03 FINANCIAL PLAN AND SUINUAARY
CHANGES IN FUND BALANCE - ALL FUND COMBINED
Revenues
I Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 Investment/Property Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
10 Public Utilities
11 Transportation
12 Leisure, Cultural and Social Services
D Community and Economic Development
14 General Government
15 Total Operating Programs
16 Bulk Power Purchase
17 Other Purchases
13 Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expenditures(Over/CJnder)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Transfers Out
24 Other Sources (Uses)
25 Proceeds from Debt Financing
26 Cost of' edical care/dental, vision,chire
27 Total Other Sources (Uses)
28 Fund Balance Beginning ofthe Yenr
2000.01
Revised
Actual
20,003,026
20,680,297
1,405,934
1,423,183
628,276
919,194
3,796,161
5,987,826
11,218,065
11, 879,932
54,105,389
54,123,878
2-089,65 l
399,197
93,246,502
95,413,507
10,703,171 1007,578
17,126,609 17,789,977
3,382,590
3,246,242
3,424,339
4,751,939
2,475,313
2,638,375
10,439,807
10,933,732
48,551,929
50,667,843
27,722,088
36,571,376
11,325,762
9,247,371
2,533,571
2,314,828
90,133,350
98,801,518
3,112,152 (3,388,011)
12,817,773
12,3 36,827
(12,817,773)
(12,336,827)
3,494,721
1,476,911
4,157,049
3,589,900
(1932,058)
(2,062,455)
2,562,663
4,004,356
2002-03
Proposed
22,192,477
22,710,612
1,484,670
1,502,445
702,245
749,310
4,157,049
4,174,270
12,347,271
14,748,131
62,133,737
61,037,361
462,535
468,220
103,479,984 1
105,390,349
12,918,125 I 13,480,725
18,070,315 18,072,963
4,343,843
4,593,761
5,082,495
5,135,270
3,261,635
3,255,215
12,709,195
13,032,600
567385,608
57,570,534
30,551,000
30,551,000
685,310
526,000
21,454,988
39,058,641
2,315,565
2,313,335
111,3 92,471 1
130, 019,510
(7,912,487) (2.1,629,161)
12,288,617
12,316,873
(12,288,617)
(12,318,306)
4,051,023
3,525,000
9,615,250
26,835,350
(2,776,295)
(2,774,525)
10,889,979
27,593,492
32,158,313 37,833,128 1 38,449,473 1 41,426,965
Fund Balance End of the Year
29 Reserved for Debt Service
30 Designated Reserve 28,983,135 21,849,033 26,266,206 31,249,059
31 Unreserved 8,839,993 16,600,430 15,160,760 13,143,238
32 Total Fund Balance 37,833,128 38,439,373 43,426,965 44,392,296
2001-03 FINANCIAL PLANT AND SUMMARY
CHANGES IN FUND BALANCE - GENERAL FUND
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 Investment/Property Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
11 Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
15 Total Operating Programs
16 Bulk Power Purchase
17 Other Purchases
18 Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expenditures (OverlUnder)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Transfers Out
24 Other Sources (Uses)
25 Cost of Medical care/dental, vision
26 Total Other Sources (Uses)
27 Fund Balance Beginning of the Year
Fund Balance End orthe Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
1999-2000 2000-01I 2001-02 I 2002-03
Revised Recommended Proposed
Actual Budget Budget Budget
16,587,340
17,413,412
1,405,93.1
1,423,183
628,276
919,194
369,537
417,364
3,600,032
3,638,750
1,521,571
1,796,378
215,808
58,861
24,328,498
25,667,142
10,626,409
11,3 07,578
1,678,050
1,735,092
3,396,116
3,628,447
2,475,413
2,638,375
6,433,291
7,114,874
24,609,279
26,423,366
24,609,279 26,424,366
(280,781) (757,224)
3,995,011
4,183,561
(1,123,745)
(2,216,055)
(199,406)
644,911
(1,483,004)
(1,669,565)
1,188,856
947,852
2,701,212 3,609,287
3,609.237 3,799,915
3,609,287 3,799,915
2
18,486,570
18,83 0,080
1,484,670
1,502,445
702,245
749,310
402,390
402,666
3,759,290
4,666,451
1,852,765
1,795,625
44,035
44,220
26,731,965
27,990,797
12,918,125
13,480,725
1,992,664
2,214,010
3,902,660
3,946,930
3,261,635
3,255,215
8,034,515
8,208,170
30,109,599
31,105,050
30,109,599 31,105,050
(3,377,634) (3,114,253)
5,058,295
5,008,296
(2,809,995)
(2,809,997)
3,392,024
3,221,000
(2,262,690)
(2,260,920)
3,377,634
3,158,379
3,799,915 1 3,799,915
3,799,915 3,844,031
3,799,915 3,849,031
2001-03 FINANCIAL PLAN AND SUIyfVIARY
CHANGES IN FUND BALANCE - LIBRARY FUND
1999-2000 2000-01
2001-02
2002-03
Revised
Recommended
Proposed
Actual Bud et
Budget
Budget
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 InvestmenVProperty Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
10 Public Utilities
11 Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
15 Total Operating Programs
16 Bulk Power Purchase
17 Other Purchases
IS Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expenditures(Over/Under)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Transfers Out
24 Other Sources (Uses)
25 Cost ofMcdical carddental, vision
26 Total Other Sources (Uses)
27 Fund Balance Beginning ofthe Year
Fund Balance End of the Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
986,367 1,022,347
16,304
5,577
148,617
106,941
107,967
76,336
1,259,255
1,211 201
3
973,223 1,123,492
978,223 1,123,492
978,223 1,123,492
281,032 87,709
(50,000) (50,000)
(61,747) (68,175)
(111,747) (118,175)
9,664 178,949
178,949 148,483
178,949 148,483
1,153,645
13,480
206,455
66,000
1,439,580
1,188,340
1,188,340
270,000
1,458,340
(18,760)
(49,408)
270,000
(101,095)
119,497
214,090
314,827
314,827
2001.03 FINANCIAL PLAN AND SUMNL4RY
CRINGES IN FUND BALANCE - STREET FUND
1999-2000 2000-01
2001-02
2002-03
Revised
I
Recommended
I
Proposed
Actual Budget
Budget
Budget
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 Investment/Property Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
10 Public Utilities
11 Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
l5 Total Operating Programs
16 Bulk Power Purchase
17 Other Purchases
18 Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expenditures(Over/Urtder)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Transfers Out
24 Other Sources (Uses)
25 Cost oflvredicalcare/dental,vision
26 Total Other Sources (Uses)
27 Fund Balance Beginning orthe Year
Fund Balance End or the Year
28 Reserved for Debt Service
29 Designated Rcscrve
30 Unreserved
31 Total Fund Balance
747,630 711,000
173,905
164,000
2,811,394
4,408,000
1,338,869
691,000
158,500
5,230,298
5,974,000
4,062,324
4,062,324
1,167,974
5,974,000
1,179,837
883,780
(1,972,309)
(1,373,500)
(792,472)
(489,720)
3,698,648
4,074,150
4,074,150
9,558,430
4,074,150
9,558,430
4
795,690
175,810
5,760,225
368,000
7,099,725
8,518,500
8,518,500
(1,418,775)
827,035
(1,423,268)
(596,233)
7,584,267
5,569,259
5,569,259
2001-03 FINANCI.4.L PLAN AND SUWNIARY
CIi4NGES IN FUND BALANCE - TRANSPORTATION DEVELOPMENT ACT FUND
1999-2000 2000.01
2001-02 1
2002-03
Revised
1
Recommended
, Proposed
Actual Budect
Bud¢et
Budget
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 InvestmentiProperty Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
10 Public Utilities
I l Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
15 Total Operating Programs
16 Bulk Power Purchase
17 Other Purchases
18 Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expenditures(Over/lTnder)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Transfers Out
24 Other Sources (Uses)
25 Proceeds from Debt Financing
26 Total Other Sources (Uses)
27 Fund Balance Beginning orthe Year
Fund Balance End orthe Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
(17,988) 2,000
1,772,629 1,728,241
3,210
1,757,850 1,730,241
30,743
30,743
1,727,107
1,730-141
102,376
(3,435,331)
(3,332955)
1,727,107
1,727,107
124,393
1,727,107
124,393
5
(18,185)
2,000,000
1,981,815
1,981,815
(2,073,437)
(2,073,437)
106,209
14,587
14,587
2001-03 FINANCLAL PLAN AND SUMMARY
CHANGES IN FUND BALANCE - CDBG FUND
1999-2000 2000-01
2001-022002-03
Revised
I
Recommended
Proposed
Actual Budget
Budget
Budget
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 Investment/Property Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
10 Public Utilities
11 Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
15 Total Operating Programs
16 Bulk Power Purchase
17 Other Purchases
IS Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expenditures (Over/Under)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Transfers Out
24 Other Sources (Uses)
25 Cost of (Medical care/dental, vision
26 Total Other Sources (Uses)
27 Fund Balance Beginning of the Year
Fund Balance End of the Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
6
526,816
526,816
526,816
(0)
(0)
951,000
951,000
951,000
951,000
975,000
865,691
865,691
109,309
(109,309)
(109,309)
(0)
(0)
(0)
2001-03 FLNANCIAL PLATY AND SU WNLARY
CHANGES IN FUND BALANCE - POLICE SPECIAL REVENUE FUND
1999-2000 2000-01
2001-02
2002-03
Revised
I
Recommended
I
Proposed
Actual
Budeet
Budget
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 Investment/Property Revenues
18,107 14,000
5 Revenue from Others
65,020 25,000
6 Service Charges
7 Other Revenue
8 Total Revenue
83,127 39,000
Expenditures
Operating Programs
9 Public Safety
76,762
10 Public Utilities
11 Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
15 Total Operating Programs
76,762
16 Bulk Power Purchase
17 Other Purchases
1S Capital Projects
7,734
19 Debt Service
20 Total Expenditures
84,496
21 Revenues/Expenditures (Over/Under) (1,369) 39,000
Other Sources (Uses)
22 Operating Transfers In 9,184
23 Operating Transfers Out (41,184)
24 Other Sources (Uses)
25 Cost of tledical careldental, vision
26 Total Other Sources (Uses) (32,000)
27 Fund Balance Beginning orthe Year
Fund Balance End or the Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
7
173,676 140,307
140,307 179,307
140,307 179,307
18,305
18,305
18,305
179,307
197,612
197,612
2001-03 FINAYCIAL PLAN AND SU,vL LARY
CHANGES IN FUND BALANCE - CAPITAL OUTLAY FUND
1999-2000 2000-01
2001-022002-03
1,816,365
Revised
I
Recommended
. Proposed
Actual Budget
Budget
Budget
Revenues
1 Tait Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 Investmentaoperty Revenues
5 Revenue from Others
6 Service Charges
7 Otter Revenue
8 Total Revenue
Expenditu res
Operating Programs
9 Public Safety
10 Public Utilities
1l Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
15 Total Operating Programs
16 Bulk Power Purchase
17 Other Purchases
18 Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expeaditures (Over/Under)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Transfers Out
24 Other Sources (Uses)
25 Proceeds from Debt Financing
26 Cost of Medical care/dental, vision
27 Total Other Sources (Uses)
28 Fund Balance Beginning ofthe Year
Fund Balance End of the Year
29 Reserved for Debt Service
30 Designated Reserve
31 Unreserved
32 Total Fund Balance
1,479,551 1,533,538
217,866 171,885
129,578
1,803,555 725,000
493,336
4,123,884 2,430,423
1,816,365
662,000
1,816,365
662,000
2,307,519
1,768,423
2,721,153 1,896,194
(3,833,397) (1,989,745)
8
(1,122,244) (93,551)
1,900,534 3,085,809
3,085,809 4,760,681
3,085,809 4,760,681
1,729,470
243,550
934,000
2,907,020
17,634,000
17,634,000
(13,726,980)
1,850,000
(1,692,895)
9,000
17,375,000
17,541,105
7,619,861
10,433,986
10,433,986
2001-03 FINANCIAL PLAN AND SUNZ4ARY
CHANGES IN FUND BALANCE - EQUIPMENT FUND
1999-2000 2000-01
2001-022002.03
Revised
I
Recommended
, Proposed
Actual Budget
Budget
Budget
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 Investment/Property Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
10 Public Utilities
11 Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
15 Total Operating Programs
16 Bulk Power Purchase
17 Other Purchases
18 Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expenditures (Over/Under)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Transfers Out
24 Other Sources (Uses)
25 Cost of Medical care/dental, vision
26 Total Other Sources (Uses)
27 Fund Balance Beginning of the Year
Fund Balance End of the Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
9
20,000
20,000
(20,000)
20,000
20,000
2001-03 FINANCIAL PLAN AND SUKNIARY
CIIANGES IN FUND BALANCE - DEBT SERVICE FUIND
1999-2000 2000-01
2001-02
2002-03
Revised
I
Recommended
Proposed
Actual Bud et
Bud et
Budget
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 Invcstment/Property Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
10 Public Utilities
ll Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
15 Total Operating Programs
16 Bull: Power Purchase
17 Other Purchases
18 Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expeaditures(Over/Under)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Transfers Out
24 Other Sources (Uses)
25 Cost ofivledical care/dental, vision
26 Total Other Sources (Uses)
27 Fund Balance Beginning ofthe Year
Fund Balance End of the Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
1,282,352
1,283,745
1?8'_',352
1,283,745
(1,'_82,352)
(1,283,745)
1,282,352
1,283,745
1,283,745
2,282,352
10
1,267,895
1,267,895
(1,267,895)
1,267,895
1267,895
2001-03 FLYANCIAL PLAN AM) SUNWARY
CHANGES IN FUND B.UANCE - ELECTRIC FUND
1999-2000 2000-01
2001-02
2002-03
Revised
I
Recommended
Proposed
Actual Budget
Budget
Budget
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fincs and Forfeitures
4 InvestmenVProperty Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
10 Public Utilities
11 Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
li Total Operating Programs
16 Bulk Power Purchase
17 Other Purchases
18 Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expenditures (Over/Under)
27 Fund Balance Beginning of the Year
Fund Balance End of the Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
2,601,585 4,695,000
38,937,804 39,880,000
1,213
41,540,602 44,575,000
10,104,147 11,084,305
10,103,147
Other Sources (Uses)
22
Operating Transfers In
23
Operating Transfers Out
24
Other Sources (Uses)
25
Cost of Medical care/dental, vision
(2,127,133)
Proceeds from Debt financing
26
Total Other Sources (Uses)
27 Fund Balance Beginning of the Year
Fund Balance End of the Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
2,601,585 4,695,000
38,937,804 39,880,000
1,213
41,540,602 44,575,000
10,104,147 11,084,305
10,103,147
11,084,305
27,722,088
36,571,476
459,912
4,589,900
37,826,235
52 245,681
3,714,367
(7,670,681)
1,441,065
(3,838,076)
(1,919,258)
459,912
(190,033)
(210,660)
4,589,900
(2,127,133)
2,459,982
14,308,528 15,895,762
15,895,762 10,685,063
15,895,762 10,685,063
2,943,830
46,649,680
2,000
49,595,510
11,930,403
11,930,403
30,551,000
435,000
10,244,450
53,160,853
(3,565,343)
(2,294,159)
(286,395)
9,470,450
6,889,896
13,743,285
17,067,838
17,067,838
2001-03 FINANCIAL PLAN AND SUiNDIARY
CHANGES IN FUND BALANCE - WASTEWATER FUND
1999-2000 2000-01 2001-02
2001-02
2002-03
Revised Requested
I
Recommeaded
Proposed
Actual Budget Budget
Budget
Budge
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 Investment)Property Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
10 Public Utilities
11 Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
15 Total Operating Programs
16 Bulk Power Purchase
17 Other Purchases
18 Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expenditures(Over/Under)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Transfers Out
Other Sources (Uses)
25 Cost of Medical care(dental, vision
26 Total Other Sources (uses)
27 Fund Balance Beginning orthe Year
Fund Balance End of the Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
281,356
305,000
268,983
4,058,245
4,447,000
4,515,805
114,857
92,000
116,000
4,454,457
4,844,000
4,900,788
3,009,068 3,272,570 3,378,200
3,009,068
3,272,570
3,378,200
46,000
635,736
944,000
853,025
806,770
803,070
812,385
4,451,574
5,019,640
5,089,610
2,883
(175,640)
(188,8=2)
161,779
(726,749) (580,301) (751,845)
173,591
(125,809) (83,100) (118,300)
(517,188) (663,401) (870,145)
3,832,966 3,318,661 2,479,620
3,318,661 2,479,620 1,420,654
3,318,661 2,479.620 1,420,654
12
268,983
4,229,925
116,000
4,614,908
3,401,135
3,401,135
71,000
476,000
817,465
4,765,600
(150,692)
(739,525)
(118,300)
(857,825)
1,371,664
363,147
363,147
2001-03 FLN- AINCIAL PLAN AND SUNLVIARY
CI-LANGES IN FUND BALANCE - WATER FUND
1999-2000 2000-01
2001-02
2002-03
Revised
I
Recommended
Proposed
Actual Budget
Bud et
Bud et
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 Investment/Property Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
10 Public Utilities
11 Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
15 Total Operating Programs
16 Bulk Power Purchase
17 Other Purchases
18 Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expenditures (Over/Under)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Transfers Out
24 Other Sources (Uses)
25 Cost of Medical care/dental, vision
26 Total Other Sources (Uses)
27 Fund Balance Beginning of the Year
Fund Balance End of the Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
93,540
68,000
3,966,830
3,843,000
776,290
172,000
4,836,660
4,083,000
4,013,394 3,433,102
4,013,394 3,433,102
1,649,809
1,603,471
226,946
228,013
5,890,149
5,264,586
(1,053,489)
(1,181,586)
16,975
(655,739)
(655,545)
2,388,534
832,000
(65,690)
(25,295)
1,684,080
151,160
13
1,618,075 2,248,666
2,248,666 1,218,240
2,248,666 1,218,240
69,701
3,830,605
240,000
4,140,306
2,741,425
2,741,425
545,000
227,975
3,514,400
625,906
(770,497)
25,000
(745,497)
630,487
510,896
510,896
2001-03 FINANCIAL PLAN AND SUNLNLARY
CHANGES IN FUND BALANCE - TFLAINSIT FUND
1999-2000 2000-01
2001-02
22-03
Revised
I
Recommended
1
Pro00posed
Actual Budget
Budget
Budget
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 Investment/Property Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
10 Public utilities
II Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
15 Total Operating Programs
16 Bulk Power Purchase
17 Other Purchases
18 Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expenditures (Over/Under)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Tcansfors Out
24 Other Sources(Uses)
25 Cost of Medical care/dental, vision
26 Total Other Sources (Uses)
27 Fund Balance Beginning orthe Year
Fund Balance End of the Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
(123,347)
11,000
2,118,279
675,000
212,274
222,000
10,881
(5,660)
2,218,087
908,000
1,703,540 1,511,150
7704,540 1,511,150
2,070,386
3,774,926 1,511,150
(1,556,839) (603,150)
288,307
2,449,176
(467,164)
(93,804)
1,741,470
(5,774)
(5,660)
1,556,839
2,349,712
14
(0)
(0) 1,746,562
(0) 1,746,562
(116,110)
1,080,000
248,500
1,212,390
2,379,751
2,379,751
100,000
'+,479,751
(1,267,361)
1,172,965
(355,811)
(7.815)
809,339
1,978,159
1.520,137
1,520,137
2001-03 FLXlA.NCI.4.L PLAN .ND SUNIVi fARY
CHANGES INC FUND BALANCE - BENEFITS FUND
1999-2000 2000-01
2001-02
2002-03
Revised
I
Recommended
1
Proposed
Actual Budget
Budget
Budget
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 Invcstmen6'Property Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
10 Public Utilities
11 Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
15 Total Operating Programs
16 Bulk Power Purchase
17 Other Purchases
18 Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expenditures (OverfUnder)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Transfers Out
24 Other Sources (Uses)
25 Cost of Medical careldantal, vision
26 Total Other Sources (Uses)
27 Fund Balance Beginning of the Year
Fund Balance End orthe Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
(16,763)
2,266,242 2,519,500
3.1,543
2,284,023 2,519,500
15
2,731,975 2.596,985
2,731,975 2,596,985
2,73t,975 2,596,985
(337,952) (77,485'
339,900 339,895
91,187
331,087 339,895
(527,492) (543,357)
(544,357) (281,937)
(533,357) (281947)
2,981,026
2,981,026
3,266,885
3,266,885
3,266,885
(285,859)
357,887
357,887
(231,669)
(159,641)
(159,641)
2001-03 FIiNANCIAL PLAN AND SUMMARY
CHANGES I\ FUND BALANCE - SELF INSURANCE FUND
1999-2000 2000-01
2001-022002-03
Revised
I
Recommended
. Proposed
Actual Budget
Bud et
Bud et
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 Investment/Property Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
10 Public Utilities
11 Transportation
12 Leisure. Cultural and Social Services
13 Community and Economic Development
14 General Government
15 Total Operating Programs
16 Bulk Poorer Purchase
17 Other Purchases
18 Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expenditures (Over/Under)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Transfers Out
24 Other Sources (Uses)
25 Cost of Medical care/dental, vision
26 Total Other Sources (Uses)
27 Fund Balance Beginning of the Year
Fund Balance End of the Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
16
151,991 134,000
45,700 150,000
173,045
370,736 284,000
1,274,531 1,221.873
1,273,541 1,221,873
1,274,541 1,22L,873
(903,805) (937,873)
821,100 82L, 100
(160,567)
660,533 821,100
2,931,090 2,697,818
2,697,818 2,581,045
2,697.8IS 2,581,045
153,655
60,000
213,655
1,557,545
1,557,545
1,557,545
(1,343,890)
1,407,795
1,407,795
2,794,700
2,858,605
2,858,605
2001-03 FINANCIAL PLAN AND SUi M46RY draft
CHANGES IN FUND BALANCE - VEHICLE LNL4ItNTENANCE FUND
1999-2000:: `2000-01
2001702 '
2002-03:..
Revised
Recommended
Proposed
Actual Budeet
Budget
Budget
Revenues
Tax Revenues
Licenses and Permits
Fines and Forfeitures
Investment/Property Revenues
Revenue from Others
Service Charges
Other Revenue
Total Revenue
Expenditures
Operating Programs
Public Safety
Public Utilities
Transportation
Leisure, Cultural and Social Services
Community and Economic Development
General Government
Total Operating Programs
Bulk Power Purchase
Other Purchases
Capital Projects
Debt Service
Total Expenditures
Revenues/Expenditures (Over/Uuder)
Other Sources (Uses)
Operating Transfers In
Operating Transfers Out
Other Sources (Uses)
Cost of Aledical caraldental, vision
Total Other Sources (Uses)
Fund Balance Beginning orthe Year
Fund Balance End orthe Year
Reserved for Debt Service
Designated Reserve
Unreserved
Total Fund Balance
4,333
4,333
525,849
300,000
525,849
300,000
(521,516)
(300,000)
512,539
372,000
(99,410)
413,129
372,000
17
461,055 352,668
352,668 421,668
352,668 424,668
405,000
405,000
(405,000)
405,000
405,000
424,668
424,668
424,668
2001-03 FINANCIAL PLAN AND SUNMIARY
CHANGES IN FUND BALANCE - TRUST AND AGENCY FUND
1999-2000 2000-01 J
2001-02 1
2002-03
Revised
Recommended
. Proposed
Actual Budget
Budget
Budget
Revenues
1 Tax Revenues
2 Licenses and Permits
3 Fines and Forfeitures
4 Investment/Property Revenues
5 Revenue from Others
6 Service Charges
7 Other Revenue
8 Total Revenue
Expenditures
Operating Programs
9 Public Safety
10 Public Utilities
I1 Transportation
12 Leisure, Cultural and Social Services
13 Community and Economic Development
14 General Government
15 Total Operating Programs
16 Bulk Power Purchase
17 Other Purchases
18 Capital Projects
19 Debt Service
20 Total Expenditures
21 Revenues/Expenditures (Over/Under)
Other Sources (Uses)
22 Operating Transfers In
23 Operating Transfers Out
24 Other Sources (Uses)
25 Cost of Ivfedical care/dental, vision
26 Total Other Sources (Uses)
27 Fund Balance Beginning of the Year
Fund Balance End ofthe Year
28 Reserved for Debt Service
29 Designated Reserve
30 Unreserved
31 Total Fund Balance
202,138
25,736
227,874
50,000
50,000
218,503
268,503
(40,629)
33,571
(13,977)
(13,977)
33,571
1,031,046
1,023,983
1,023,938
1,010,011
1,023,988
1,010,011
Is
201,727
18,585
220,312
220,312
1,197,023
1,417,335
1,417,335
2001-03 FINANCLAL PLAN cot BUDGET 06/12/01
CAPITAL BUDGET DETAIL BY ACTIVITY
Public Utilities
Water Utility Services
Water
Water System Capital Expansion
Water System Capital Maint
Wastewater Utility Services
Purchase Pipe Inspector System
Wastewater - White Slough Facility Upgrade
Wastewater - Collection System (CM)
White Slough Capital Maintenance
Electric Utility Services
Upgrade server
Electric Utility
Electric New Building
Electrical Engineering & Operations
Personal computers replacement
Engineering Analysis & Design software
Electric Construction & Maintenance
Line Extensions
Distribution System Improv
Substation Construction
Street Light Improvement
Overhead Wire Puller
Flatbed trailer
Forklift
High Current Test Set
Battery Testing equipment
Tapchanger Oil Filter Pumps
Substation Block Wall
Total Public Utilities
Transportation
Streets and Flood Control
Streets Division
Tree Planting/Landscape - Hutchins St
Various Street Maintenance Projects
Downtown Street Improvements
Major Street Expansion Projects
Total Transportation
400,000
2001-02.
695,000
2002-03
x
350,000
Requested =:
City Manager
Requested
'City Manager
�s
Elec
Cost
Recomnicaded
Cost
- Recotttmended
Cormnents
Public Safety
Dec
Police Department
Elec
23,000
23,000
Public Safety Building
1,500,000
1.500,000
1,500,000
1,500,000
designated set aside
Information Systems
Personal Computer replacement plan
60,000
60,000
other funding ie grants
Animal Shelter
Animal Shelter Expansion
220,000
220,000
2,250,000
2,250,000
financing
Interim Animal Shelter Improvements
67,325
67,325
GF Capital
3/4 Ton CNG truck
40,000
40.000
other funding ie grants
Fire Department
Emergency Services
Tools & Equipment for Quint
70,000
70,000
other funding ie grants
Rescue trailer & equipment
34,000
34,000
other funding ie grants
1 1/2 Ton Truck to pull command center
49,000
49.000
other funding ie grants
Total Public Safety
2,006,325
1,946,325
3,844,000
3,784,000
Public Utilities
Water Utility Services
Water
Water System Capital Expansion
Water System Capital Maint
Wastewater Utility Services
Purchase Pipe Inspector System
Wastewater - White Slough Facility Upgrade
Wastewater - Collection System (CM)
White Slough Capital Maintenance
Electric Utility Services
Upgrade server
Electric Utility
Electric New Building
Electrical Engineering & Operations
Personal computers replacement
Engineering Analysis & Design software
Electric Construction & Maintenance
Line Extensions
Distribution System Improv
Substation Construction
Street Light Improvement
Overhead Wire Puller
Flatbed trailer
Forklift
High Current Test Set
Battery Testing equipment
Tapchanger Oil Filter Pumps
Substation Block Wall
Total Public Utilities
Transportation
Streets and Flood Control
Streets Division
Tree Planting/Landscape - Hutchins St
Various Street Maintenance Projects
Downtown Street Improvements
Major Street Expansion Projects
Total Transportation
400,000
400,000
695,000
695,000
350,000
350,000
235,000
235,000
227,000
227,000
2,000,000
2,000,000
21,000
21,000
50,000
50,000
1,094,800
1,795,200
1,886,250
1,484,000
40,000
15,000
90,000
30,000
10,000
1,094,800
1,795200
1,886,250
1,484,000
40,000
15,000
90,000
30,000
10,000
100,000 100,000
10,523250 10,523250
132,000
182,000
2,619,000
2,619,000
160,000
160,000
1,630,000
1,630,000
4,591,000
4,591,000
70,000 70,000 Water
475,000 475,000 Water
16,000 16,000 Wastewater
Wastewater
295,000 295,000 Wastewater
165,000 165,000 Wastewater
20,000 20,000 Elec
5,000,000 5,000,000 Elec
14,000 14,000 Elec
50,000 50,000 Elec
1,036-300
1,036,300
Elcc
1,527 200
1,527,200
Elec
419,950
419,950
Elec
1,487,000
1,487,000
Elec
8,791,500
3,791,500
Elec:
Elec
Dec
Elec
Elec
23,000
23,000
Elec
Elec
10,598,450 10,598,450
streets/ elec grant
4,780.000
4,780,000
Measure K/ TDA/State & Fed TI
281.500
281,500
Street Fd/EU/CDBG
3,730.000
3.730,000
Measure K/ TDA/State & Fed TI
8,791,500
3,791,500
2001-03 FINANCIAL PLAN & BUDGET
06/12/01
CAPITAL BUDGET DETAIL BY ACTIVITY
2001-02
2002-03
Requested,
City Manager
Requested
City Manager - _
Cost
Recommended
Cost
Recommended
Cointnents
Leisure, Cultural & Social Services
Parks & Recreation Capital
150,000
150,000
150,000
150,000
GF capital
Salas Park backstop (50,000)
Small projects (20,000)
Shade structure (25,000)
Maxicom irrigation Kofu (20,000)
Maxicom irrigation Salas (25,000)
Maxicom irrigation Beckman (20,000)
Slurry Seal for Nature Trail (10,000)
Lodi Lake Parking lot (100,000)
Lodi Lake Pedestrian Trail Phase II
500,000
500,000
undetermined
Aquatic Center
225,000
225,000
2,775,000
2,775,000
Financing
DeSendetti Park Development
310,000
310,000
5,900,000
5,900,000
Financing
Indoor Sports Center
500,000
500,000
5,250,000
5,250,000
Financing
Replace duplicator
10,000
10,000
Equip Rep
Floor Litt
16,000
GF capital
UL Ton Pickup Truck
26,000
GF capital
Skate park
538,000
538,000
GF capital/ Elec benefits
Lodi Lake Central Area Improvements
1,200,000
1.200,000
Financing
Cultural Services
Community Center
Table & Chairs Replacement for Kirst Hall
43,660
20,000
20,000
GF Equip
Library
Lib Trust
Renovation & ADA compliance
30,000
30,000
30,000
30,000
CDBG
Checkout equipment
13,500
13,500
Lib Trust
Upgrade computer system
270,000
270,000
grants
Workstations
10,000
10,000
100,000
-
Private sector trust for yr l
Total Leisure, Cultural & Social Services
2,372,160
2,306,500
15,675,000
15,595,000
Community & Economic Development
Construction Development
Building and Safety
Microfiche conversion to CD ROM
15,215
15.215
GF capital
Field Inspection Pickup Truck
24,400
24,400
GF capital
Engineering
Purchase 1/2 ton Pickup
30,000
30,000
Water/ Ww
Total Community & Economic Development
69,615
69,615
-
General Government
Non -Department
Replace High Speed copier
37,000
37,000
equip replacement
Civic Center Veterans Monument
City Clerk
Purhase Image Scanner
4,000
part of Inf Systems rept
Information Systems
Telehphone system upgrade
55,000
55,000
LCD projectors (6)
27,000
-
part of Inf Systems rep!
Replace City Hall Server
16,000
-
part of Inf Systems rept
Information Systems Replacement
75,000
75,000
75,000
75,000
GF capital
IDE consultant services - HR module
100,000
100,000
GF capital/Elec & w/cow
Organizational Support Services
Meter Reader Vehicle
22,000
22,000
Elect
Public Works Facilities Services
Vehicle for Const Proj Manager
22,000
22,000
GF capital
HVAC replacement - Library
10,000
10,000
600,000
600,000
electric grant - NCPA
Roof Replacement - Fire Station 43
26,570
26,570
GF capital
2001-03 FINANCIAL PLAN & BUDGET
CAPITAL BUDGET DETAIL BY ACTIVITY`
06/12/01
Current Debt Service:
2001-02
Re
Requested
4
Cost
:y
Ci Mane c
tY B
Recommended
2002-03 ,
sd
Re uete�� Ci M ,
9 tY mag '
Cast Recotttmended .. :. Cotaments -
HVAC replacement - Fire Station 43
39,000
39,000
GF capital/ Public Benefits
Roof Replacement - White Slough
22,000
22,000
WW
Purchase one pickup truck
29,000
29,000
GF capital
Total General Government
48.1,570
437,570
675,000 675,000
TOTAL CAPITAL BUDGET
20,046,920
19,874+60
39,583950 i = :__39,443950
Current Debt Service:
1,500,000
1,500,000
GENERAL FUND - CAPITAL
1,059,185
General Fund
1,275,205
1,275,205
1,267,895
1,267,895
Electric Fund
1,391,435
1,391,435
1,391,435
1,391,435
Water Fund
227,975
227,975
227,975
227,975
Wastewater Fund
812,385
812,385
817,465
817,465
TOTAL CAPITAL BUDGET & DEBT SERVICE
23,753920
123.581.260
43,288,7120 ; =. =.
43,148,720;
FUNDING SOURCES:
GENERAL FUND RESERVE
1,500,000
1,500,000
GENERAL FUND - CAPITAL
1,059,185
225,000
GENERAL FUND -EQUIP REPL
67,000
20,000
LIBRARY- TRUST
23,500
-
FINANCING
1,255,000
17,375,000
CDBG GRANT FUND
216,000
236,000
IMPACT FEE FUNDS -REGIONAL (332)
1,100,000
1,100,000
STATE STREETS (335)
417,500
375,000
MEASURE K GRANT
-
-
MEASURE K-MAINT
664,500
1,193,500
STREET TDA
150,500
-
1MPACT FEE FUNDS - LOCAL STREETS (327)
1,460,000
1,530,000
BICYCLE/PED FUND
FEDERAL STREETS (33 1)
534,000
4,320,000
FTA FUND
-
ELECTRIC FUND
430,775
773,000
ELECTRIC FUND DEBT
ELECTRIC FUND -LONG-TERM
8,360250
9,470,450
WATER FUND
1,759,025
1,250,000
WATER-DBCP
WATER FUND DEBT
WATER Gaff'
-
-
WASTEWATER FUND
I,298,025
1,683,000
UNDETERMINED
500,000
-
OTHER GRANTS
159,000
304,000
TOTAL CAPITAL BUDGET
=i�0264;260
411355950
General Fund Debt Service
1,275,205
1,267,895
Electric Fund Debt Service
1,391,435
1,391,435
Water Fund Debt Service
227,975
227,975
Sewer Fund Debt Service
812,385
817,465
TOTAL CAPITAL BUDGET & DEBT SERVICE
x� =2071,260 t
x$45,060;720 i
2001-2003 Financial Plan and Budget Request
CAPITAL LIVIPROVENIENT BUDGET REOUEST
ACTMTY: Wastewater Treatment
REQUEST TITLE: White Slouch Water Pollution Control Facility Capital Maintenance
Project Description
Major replacements and repairs of facility components and equipment.
Project Objectives
Maintain reliability and efficiency of wastewater treatment facilities.
E.tisting Situation
The City's wastewater treatment facility was originally c011structed in the mid 1960's. Various components, as listed, are in
need of major repair or replacement, independent of future improvements to the facility. Other components have been identified
as needing repair or replacement in a Component -Reliability Study performed by the City's Wastewater Master Plan consultant.
Excerpts from that study are attached which better define the work recommended.
Schedule and Project Costs
Projcct
Fiscal Year 2001.200' 2002-03 2003-04 2004-05 TOW
*Roadway Improvements (CM)
S 30,000
S 30,000
S 60,000
**Variable Frequency Drive Replacements (CM)
S 70,000 S70,000
S 140,000
*Digester Cleaning
S 5,000 S55,000
S55,000
S 55,000
S 170,000
Aeration Basin pH Control Chemical Addition
S 92,000
S 92,000
Chlorine Residual Monitor Replacement
S 55,000
S 55,000
Replacement Comminutors with Screens
S 30,000
5325,000
5325,000
S 680,000
Restore Gate Operability at Headworks
S 5,000
S56,000
S 61,000
Enlarge Capacity of Industrial Influent Pump
S 5,000
S72,000
S 77,000
Temporary Clarifier Chemical Feed System
S 5,000
5290,000
S 295,000
RAS and WAS Pump Modifications
S 30,000
S 30,000
Liquid Hypochlorite/Bisulfite Disinfection
S 15,000
S260,000
S 275,000
Total: 5227,000 $165,000 $873,000 $ 670,000 $1,935,000
* These projects had funds approved in the 1999/01 Capital Improvement Budget but were unable to be completed during that
budget cycle.
** This project had originally been scheduled through the 2003/04 budget cycle. Acceleration is requested to complete this task in
a more timely manner.
Notes: All funding from Wastewater Capital Outlay Funds, 17.2
(CM) means Capital Maintenance Project account automatically appropriated with budget.
Alternatives
For slight reductions, roadway and equipment replacement projects can be deferred.
Project Effect on Operating Budget
Minor reductions in electrical and labor costs.
11.I.00INTS-IOENT^u01\bVP15U0GE7,CtP WSWPCFCaoN1aint..dee 06112/01
2001-2003 Financial Plan and Budget Request
CAPITAL IMPROVEMENT BUDGET REQUEST
ACTIVITY: Engineering MISSION CATEGORY: Wastewater Utility
REQUEST TITLE: Wastewater Collection System Capital Maintenance _
Project Description
Major replacements and repairs of mains and other system components.
Project Objectives
Maintain reliability and efficiency of wastewater collection facilities.
Existing Situation
The City's wastewater collection system is reaching an age in which the older lines (primarily in the Eastside) need to
be replaced. Many of the lines are concrete pipes, which suffer from chemical corrosion and do not have capacity for
the present demand.
Project Work Completed
Some replacement of older lines has taken place in conjunction with other projects, such as the Downtown
Revitalization. While the Wastewater Utility has a positive fund balance, rates are under review to ensure that
adequate funding will be available for these projects.
Schedule and Proiect Costs
Fiscal Year:
2001-02
2002-03
2003-04
2004-05
Total
Construction:
Miscellaneous System Relocations (CM)
S 15,000
S 15,000
$ 15,000
$ 15,000
$ 60,000
Miscellaneous Main Replacements (CM)
$200,000
$200,000
5500,000
S 500,000
$1,400,000
Sewer Taps (CM)
$ 20,000
S 20,000
S 20,000
S 20,000
S 60,000
Main Trunk Line Corrosion Control Pilot Study
(Chemical addition)
$ 60.000
$ 60.000
Total:
$235,000
S295,000
5535,000
$535,000
S1,600,000
Note: All funding from Wastewater Capital Outlay Funds, 17.1
(CM) means Capital Maintenance Project account automatically appropriated with budget.
Alternatives
1. For slight reductions in expenses, the landscaping and erosion/roadway projects can be deferred.
Project Effect on Operating Budget
Additional engineering staff or consultant time will be needed to accomplish the main replacement program shown and
these costs are included.
CIP_Wastewater Collection System 06/12/01
2001-2003 Financial Plan and Budget Request
CAPITAL IMPROVEMENT BUDGET REQUEST
ACTIVITY: Transportation a
REQUEST TITLE: Downtown Streets Improvements
Project Description
This project consists of repair and enhancements of Downtown streets adjacent to the renovated section of
School Street. The work includes street, sidewalk, and curb and gutter repairs, as appropriate; installation of street
lighting using the same green poles and globes as used on School Street; installation of trees with an irrigation system;
and, placement of the same type benches and trash receptacles as used on School Street.
Project Objectives
The objective of this project is to:
• Rehabilitate the aging streets in the Downtown;
• Provide pedestrian amenities as identified in the Downtown Revitalization Program;
• Continue the incentive for Downtown property owners to renovate their buildings;
Existing Situation
The existing Downtown streets and sidewalks consist of a mixture of design types and ages. While the Downtown
Revitalization catalyst project on School Street included some work on the adjacent blocks of Pine and Oak streets,
there is a need for sidewalk improvements on these blocks, and other adjacent streets were untouched by the project.
In the normal course of street maintenance, these streets would receive various pavement and drainage
improvements; however, these would not normally be done in a manner that would provide the enhancements called
for in the Downtown Revitalization Program. This project, if approved, would set the standard at this higher level.
Project Work Completed
Based on the Downtown Revitalization Program, budget estimates, including the items in the project description, have
been prepared by City staff. This is an ongoing capital improvement program that is entering the third year of
implementation. The transfer of street lighting to the Electric Utility Fund will provide funding for the streetlight portion of
the program. The program would be implemented at blocks adjacent to major public or private projects in the
downtown area as has been the case with the theatre project The next years of the program include improvements to
Walnut, Oak, Locust, and Sacramento Streets.
Schedule and Project Costs
Project
2001-02 2002-03 2003-04 2004-05 Total
Street Improvements 5 37,000 $108,500
Street Lighting $ 37,000 $ 67,000
Landscaping/Pedestrian Amenities S 86,000 $106,000
Total $160,000 $281,500
$ 54,000
$291,500
$ 491,000
$ 48,500
$ 78,500
$ 231,000
$200,000
$208,000
$ 600,000
$302,500
$578,000
$1,322,000
Recommended Funding Sources: Street Fund, Electric Utility, and Community Development Block Grant, Measure K
Project Effect on Operating Budget
Some increase due to additional electrical and water usage.
CIP Downtown Streets.doc 06/15/01
2001-2003 Financial Plan and Budget Request
CAPITAL IMPROVEMENT BUDGET REQUEST
ACTIVITY: Transportation
REQUEST TITLE: Major Street Expansion Projects
Project Description
These projects are major street widenings and extensions not included in other project descriptions. They are:
Lower Sacramento Road widening from Kettleman Lane to Kristen Court — this will be accomplished in partnership
with the County of San Joaquin that secured the funding reservation from San Joaquin Council of Governments.
City of Lodi will act as the lead agency for design and construction activities. Design of the new roadway will be
similar to the widening project north of Kettleman Lane.
Century Boulevard extension from near Sage Way to Lower Sacramento Road is being done to provide improved
traffic circulation for residents south of Kettleman Lane. Combined with the extension of Mills Avenue to
Harney Lane by residential developers, new access will be provided to the arterials, Lower Sacramento Road and
Harney Lane. A traffic signal will be installed at Century Boulevard and Lower Sacramento Road.
Kettleman Lane will be widened to 4 lanes between Ham Lane and Tienda Drive. Additionally, medians and
landscaping will be installed between Lower Sacramento Road and Cherokee Lane.
Miscellaneous widenings — this consists of City participation through the Development Impact Fee Program in
which the fee program participates in the cost of "oversize" streets being built as part of a development project.
Project Objectives
The objective of this project is to provide street infrastructure that serves the demands of growth in the City.
Existing Situation
Lower Sacramento Road is in need of significant maintenance and widening. The project is included in the
Lower Sacramento Road Special Purpose Plan and is a priority project for the County and City. This project and the
Century Boulevard extension will provide the street frontage improvements at DeBenedetti Park that are required
before that facility can be used. With the Kettleman Lane project, turning restrictions will be implemented at several
intersections between Ham Lane and Lower Sacramento Road resulting in the requirement for new routes to be
provided in the southwest quadrant of the City.
Project Work Completed
Plans for Lower Sacramento Road between Kettleman Lane and Harney Lane are being prepared with construction
expected to begin in Summer 2002. The design will conform to that approved by the San Joaquin County Board of
Supervisors in the Lower Sacramento Road Special Purpose Plan.
Kettleman Lane project environmental review and design are underway. Right of way acquisition will be required for
the project and the necessary technical and appraisal studies are in process. Construction of the project will be led
by City forces and is expected to begin Spring 2002.
Design of the Century Boulevard extension to Lower Sacramento Road is completed. Construction of the extension
will be coordinated with the Lower Sacramento Road project. Half -width improvements will be constructed on the
City side of DeBenedetti Park.
Schedule and Project Costs
Project
2001-02 2002-03 2003-04 2004-05 Total
Lower Sacramento Rd — Kettleman to Kristen $1,100,000 $1,100,000
Kettleman Lane Gap Closure and Medians $2,600,000
Century Boulevard Extension $500,000
Miscellaneous Widenings (Street IMF) $30,000 530,000
Total: $1,630,000 $3,730,000
$2,200,000
$2,600,000
$500,000
$30,000 $30,000 $120,000
$30,000 $30,000 $5,420,000
CI?_Major Street Expansion Projectsl.doc 06/15/01
Funding: Measure K, Gas Tax, Transportation Development Act, State & Federal Transportation Improvement Program except as
noted.
Misc. Widening projects are typically appropriated with the approval of the individual development projects.
Project Effect on Operating Budget
Negligible
CIP_Major Street Expansion Projectsl.doc 06/15/01
2001-2003 Financial Plan and Budget Request
CAPITAL IMPROVEMENT BUDGET REQUEST
ACTIVITY: Transportation
REQUEST TITLE: Street Maintenance Projects
Project Description
This project consists of major street maintenance projects and upgrades to traffic control systems not included in the
operating budget. Included in this work is the review of traffic signal timing, performing car and truck counts, and the
purchase of materials required to perform the work. Major street widening, extensions and other significant programs
are included in a separate project description.
Project Objectives
The objective of this project is to:
• Rehabilitate the aging streets in the City;
• Provide safe and efficient traffic control systems.
Existing Situation
Over the past few years, the focus on a few major street projects (mainly Lower Sacramento Road, Stockton Street,
Downtown) has meant that the more typical street overlay and repair projects have been delayed. This "project"
continues to focus efforts on the fundamental maintenance projects that need to be addressed. Some of the listed
projects have been rescheduled from the previous budget.
Project Work Completed
Budget estimates have been prepared for most of the projects listed and increased funding, mainly Federal funds, has
been secured for a number of the projects listed.
Schedule and Proiect Costs
Project Effect on Operating Budget
Negligible
CIP_Street Maintenance Projects.doc 06/15/01
2001-02
2002-03
2003-04
2004-05
Project
Total
Misc. Traffic Control Improvements (CM)
525,000
$25,000
$25,000
$25,000
$100,000
New Traffic Signal Installations
$544,000
$120,000
$120,000
$120,000
5904,000
Upgrades to Existing Traffic Signals
S60=
$60,000
$60,000
$60,000
$240,000
Misc. Street & Sidewalk Improvements (CM)
$100,000
$100,000
$100,000
$100,000
$400,000
Misc. Curb & Gutter Improvements (CM)
$10,000
$10,000
$10,000
$10,000
540,000
Misc. Bicycle Transportation Improvements (CM)
$15,000
$15,000
$15,000
$15,000
$60,000
Handicap Ramp Retrofit Program (CDBG)
S100,000
5100,000
$100,000
$100,000
5400,000
Hutchins St_ Reconstruction - Lodi to Pine
S500,000
5500,000
Stockton St. Reconstruction - Kettleman to Harney
$1,600,000
$1,600,000
Lodi Ave. Track removal, rail improvements
$930,000
$1,500,000
$1,518,000
$2,167,000
$6,115,000
Miscellaneous Overlays
$835,000
$750,000
S750,000
$750,000
$3,085,000
Total:
$2,619,000
$4,780,000
$2,698,000
53,347,000
$13,444,000
Funding: Measure K, Gas Tax, Transportation Development Act, State & Federal
Transportation Improvement Program except as
noted.
Projects listed with (CM) are Capital Maintenance
and are appropriated with the adoption of the budget and usually done under
purchase order without additional Council action.
Project Effect on Operating Budget
Negligible
CIP_Street Maintenance Projects.doc 06/15/01
1999-2001 Financial Plan and Budget Request
CAPITAL IMPROVEMENT BUDGET REQUEST
ACTIVITY: Animal Shelter Services
REQUEST TITLE: Interim Animal Shelter Improvements
Project Description
Improve Animal Shelter Services' ability to house cats and dogs by leasing a portable trailer and by purchasing cat
cages and dog kennels.
Project Objectives
Provide interim arrangements for Animal Shelter Services until such time as a new facility is constructed.
Existing Situation
The current Animal Shelter was constructed in the 1960's and no longer meets the space needs for adequately housing
animals. The Lodi Animal Shelter Task Force recommends that the City acquire new interim space for the office area
via a portable trailer, re -arrange the former office area, and purchase additional housing units for cats and dogs. The
cages and kennels can also be utilized in the proposed new facility.
Project Work Completed
Schedule and Project Costs
Prior Project
Budgets 2001-02 2002-03 2003.03 200.3-05 Total
Phasing
Study
Design
Acquisition 567,321
Construction
Total
Recommended Funding Sources
Capital Outlay Fund 567,321
Electric Utility Fund
Water Fund
Sewer Fund
Total
Alternatives
Continue current practice of overcrowded conditions
Project Effect on Operating Budget
Slight increase in utilities for leased trailer