HomeMy WebLinkAboutMinutes - May 15, 2001 SSCITY OF LODI
INFORMAL INFORMATIONAL MEETING
"SHIRTSLEEVE" SESSION
CARNEGIE FORUM, 305 WEST PINE STREET
TUESDAY, MAY 15, 2001
An Informal Informational Meeting ("Shirtsleeve" Session) of the Lodi City Council was held Tuesday,
May 15, 2001 commencing at 7:03 a.m.
A. ROLL CALL
Present: Council Members — Hitchcock (arrived at 7:04 a.m.), Howard, Land, Pennino and
Mayor Nakanishi
Absent: Council Members — None
Also Present: City Manager Flynn, City Attorney Hays, and City Clerk Blackston
B. CITY COUNCIL CALENDAR UPDATE
City Clerk Blackston reviewed the weekly calendar (filed).
C. TOPIC(S)
C-1 "Review of Significant Expenditure Requests"
City Manager Flynn asked that a special meeting be held on May 29, 2001, 5:30 p.m., at
the Merlot facility to consider the significant expenditure request of the Downtown Lodi
Business Partnership.
Deputy City Manager Keeter reported on the following significant expenditure requests
and recommendations as outlined in the 2001-03 City Manager Recommended
Significant Expenditures and Staffing Changes report (filed):
Public Works
• Request: $71,000 for a new position to augment development services and traffic
engineering staff. Assignments would include encroachment permits and plan check
review.
Recommendation: Fund full-time position in year two.
• Request: To hire an Engineer Technician, which was eliminated in the early 1990s
due to budget constraints. The position is needed to complete the two -person survey
crew and would report to a Senior Engineering Technician. These duties are
currently being conducted by part-time interns and technicians pulled away from other
projects.
Recommendation: Fund through the General Fund in year one.
• Request: $5,000 for document preservation to convert and index map and
construction documents in digital format and to assist in making the electronic files
accessible on the Internet.
Recommendation: Department to absorb cost within its operating budget.
General Services
• Request: $27,000 for purchase of six new Liquid Crystal Display projectors.
Recommendation: Moved to Capital Improvement budget.
Continued May 15, 2001
• Request: $13,000 for Local Agency Formation Commission (LAFCO) membership
and dues. AB2838 mandates that cities and counties share the cost of LAFCO
operations. It will be funded 1/3 by the county, 1/3 by special districts, and 1/3 by
cities who will share the cost based on their population.
Public Works — Solid Waste Administration
• Request: Hire a consultant to provide solid waste consulting services. The City's
current contract with Central Valley Waste Services (CVWS) will expire on June 30,
2003. The City has the option to extend the contract if it notifies the contractor within
18 months prior to the expiration.
Recommendation: Fund $20,000, which would include $10,000 for a consultant to
prepare and negotiate a contract and $10,000 to conduct an audit; look at ways of
generating revenue from the waste streams in addition to what CVWS is currently
doing.
Information Systems
• Request: $5,500 for a network management software program, which is a diagnostic
tool used to analyze load patterns and provide early warning of problems with the
network.
Recommendation: Absorb cost within the IS operating budget.
City Clerk
• Request: $33,184 to hire a full-time permanent Administrative Clerk. New policies,
procedures, and standards have been instituted that have increased the workload.
Recommendation: Fund in year two.
Council Member Hitchcock stated that she would support funding the position out of year
one of the budget if funds were available.
Human Resources
Request: Organization study and request to hire a full-time permanent Benefits
Coordinator. The new position is necessitated by many additional programs,
including a new medical program through the Public Employees Retirement System
(PERS), new requirements related to retirees, and general increased workload.
Coordination of responsibilities between the Finance and Human Resources
Departments related to the JDEdwards software system is currently being
considered.
Recommendation: Conduct organization study of the Human Resources and Finance
Departments. Benefits Coordinator position would be considered pending results of
the organization study.
City Manager Flynn reported that the City has invested approximately $2 million over the
past three to four years in new software and equipment. The investment should have
brought efficiency; however, many of the jobs are still being done as they were before,
which necessitates the organization study. The software and equipment has allowed for
new services to be provided.
Mayor Pro Tempore Pennino suggested that Administration be included in the
organization study.
Council Member Howard inquired whether $10,000 would be sufficient to cover an
organization study of three departments.
2
Continued May 15, 2001
City Manager Flynn replied that the amount of $10,000 was merely a placeholder.
Proposals for the service will be sought and staff will return to Council for approval once
the amount is confirmed.
Council Member Hitchcock supported the organization study; however, she estimated it
would cost much more than $10,000.
Request: $16,000 increase in recruitment and advertising fund.
Recommendation: Increase recruitment and advertising fund by $10,000.
Mayor Pro Tempore Pennino asked what impact the Internet site has on recruitment and
questioned the City's current requirement for a signature on preliminary employment
applications.
Human Resources Director Narloch did not have statistics on the number of recruitment
responses received from the Internet.
City Manager Flynn responded that he would look into the necessity of requiring
signatures on preliminary employment applications. He indicated that if there were no
legal requirement, it would be discontinued.
• Request: $10,000 for fingerprinting services. The Department of Justice has recently
expanded requirements related to background investigations for positions that involve
working with children.
Recommendation: Approval.
• Request: $25,000 request submitted jointly by Human Resources and Public Works
to hire a Safety Consultant to update the Public Works safety manual as well as the
injury and illness prevention manual.
Recommendation: Approval in year one.
• Request: $25,000 request submitted jointly by Human Resources and Electric Utility
for consulting services to update the injury and prevention program.
Recommendation: Approval in year one.
General discussion ensued regarding discretionary and non -discretionary spending.
Council Member Howard asked how quickly the City is reimbursed from the State.
Finance Director McAthie reported that staff submits for reimbursement from the State for
voluntary and mandated expenses. To expedite reimbursement, the City has requested
that payments be wired rather than waiting for a check to be processed. When
reimbursements are challenged by the State, it takes from six months to a year to receive
payment.
Council Member Hitchcock questioned the necessity of hiring consultants to update the
injury and prevention programs, and pointed out that a great deal of money is spent by the
City toward consulting services.
Ms. Keeter reported that Electric Utility's long-term plan is to have an employee assigned
to safety issues.
Mayor Pro Tempore Pennino suggested that Electric Utility's update be coordinated
through Northern California Power Agency.
Council Member Land believed this was already being done and would confirm it with the
Electric Utility Director.
3
Continued May 15, 2001
• Request: $9,000 for body mechanics training requested by Risk Management.
Recommendation: Fund $4,500 in year one and $4,500 in year two; and utilize
expertise from Lodi Memorial Hospital for back injury prevention programs and
education.
Council Member Howard reported that Lodi Memorial Hospital conducts a three-hour
"Safe Day" program on the second Tuesday of every month, which is attended by all of its
employees each year on their anniversary date.
Finance Department
• Request: Convert two part-time Account Clerks to full-time permanent status.
Recommendation: Fund in year two (these employees are currently under a two-year
contract signed in September 2000, which provides them with benefits).
• Request: $56,380 to hire one full-time Accountant I. Position needed due to GASB34
accounting standards and responsibilities, redevelopment agency requirements, and
the preparation of quarterly and annual reports to demonstrate compliance with grant
requirements.
Recommendation: Fund in year two. City Manager Flynn noted that it may be
contingent upon the organization study results.
• Request: Convert two part-time Customer Service Representatives to full-time
permanent status.
Recommendation: Fund in year two (these employees are currently under a two-year
contract signed in September 2000, which provides them with benefits).
• Request: Conversion of the equivalent of 2.7 part-time meter readers to 1 full-time
position.
Recommendation: Approval. City Manager Flynn noted that staff will be looking into
an automated process for reading meters.
Facilities Services — Fleet and Facilities Division of Public Works
• Request: Convert contracted Construction Project Manager to a full-time permanent
position.
Recommendation: Approval.
Mayor Pro Tempore Pennino expressed concern about a permanent position due to the
irregularity of workload in construction.
Public Works Director Prima forecasted a heavy workload continuing due to the many
renovations and new projects on the horizon. In addition, he wanted to apply techniques
in construction management to other projects, which will be ongoing.
In response to Council Member Land, City Manager Flynn stated that a recruitment
process would be conducted to fill the position.
Council Member Howard questioned the need for a $22,000 new vehicle for this position.
Ms. Keeter replied that vehicle requests would be reviewed with Council next week under
Capital requests. The purchase of used vehicles would be considered.
• Request: $63,000 to hire a Facilities Supervisor necessitated by the increased
workload from new City facilities and renovations.
Recommendation: Approve in year one.
4
Continued May 15, 2001
• Request: Hire Facilities Maintenance Worker.
Recommendation: Deny.
Mayor Pro Tempore Pennino requested a copy of the organization chart with the inclusion
of the proposed Facilities Supervisor.
• Request: $41,270 to hire Fleet Services Worker due to increase in workload. The
Fleet Services Division currently oversees the maintenance of 410 vehicles and 55
pieces of equipment with 11.5 employees who work 2 shifts at the Municipal Service
Center. Thirty-one percent of the labor is spent on 5% of the fleet (i.e. transit and
Dial -A -Ride vehicles).
Recommendation: Approve in year one; funded through the transit allocation
process.
Police Department
Referring to page 3 of the Significant Expenditure Request report, Council Member Land
asked whether it would be possible to fund $10,000 in year one, and $15,000 in year two
toward Chaplain counseling services.
City Manager Flynn replied that he would discuss the matter with the Police Chief.
Library
• Request: Increase Library hours from Monday through Saturday, to open for services
on Sunday for four hours.
Recommendation: Library utilities will be paid from the City's General Fund, which
amounts to approximately $85,000 per year. This represents sufficient savings to the
Library to fund the increase in hours and part-time Reference Librarian.
D. COMMENTS BY THE PUBLIC ON NON -AGENDA ITEMS
None.
E. ADJOURNMENT
No action was taken by the City Council. The meeting was adjourned at 8:30 a.m.
ATTEST:
Susan J. Blackston
City Clerk
5
Mayor's & Council Member's Weekly Calendar
WEEK OF MAY 15, 2001
Tuesday, May 15, 2001
7:00 a.m. Shirtsleeve Session
1. Review of significant expenditure requests
10:30 - 12 Noon Car dealership simulation presented by Tokay High School's
Marketing/Entrepreneur classes (in partnership with Sanborn Chevrolet),
in front of Tokay High School.
11:00 - 2:30 p.m. Nakanishi and Land. Association of Lodi City Employees "Spring
Appreciation Lunch", Civic Center Plaza (between City Hall and Carnegie
Forum).
6:00 p.m. Special Parks and Recreation Commission meeting, Parks and Recreation
office. -
7:00 p.m. Nakanishi. Peace Officer's Memorial Service, Temple Baptist Church.
Wednesday, May 16, 2001
10:00 - 4:00 p.m. Chamber of Commerce Lodi Job Fair, Lodi Grape Festival Fairgrounds
Chardonnay Hall.
7:00 p.m. City Council meeting.
One Closed Session (NOTE: 6:00
7 Presentations
22 Consent Calendar items
2 Public Hearings
4 Regular Calendar items
One Ordinance
Thursday, May 17, 2001
2:30 p.m. City of Stockton's launching of United Way of San Joaquin County's Youth
Initiative, "United 4 Youth", Stockton Skateboard Park, EI Dorado Street
and Benjamin Holt Drive.
Friday, May 18, 2001
Reminder Nakanishi. US Conference of Mayor's "Weapons of Mass Destruction"
Mayoral Training Meeting, Reno, NV.
Saturday, May 19, 2001
Sunday, May 20, 2001
Monday, May 21, 2001
Disclaimer: This calendar contains only information that was provided to the City Clerk's office
counc i l\misc`.mca Indr.doc
2001-2003 Financial Plan and Budget Instructions
MAJOR BUDGET PREPARATION MILESTONES
PUBLIC
STAFF MEETINGS
Budget Calendar Release 11/28/00
Departments Review of Fiscal Policies 12/11/00
Issue Budget Instructions 1/8/01
Submit Budget Requests to Finance Department 2/19/01
City Council Review of Fiscal Policies/Goals 2/20/01
City Manager Revenue Review 2/26/01
City Council Update Status on Departmental Accomplishments 2/27/01
City Council Project Setting Brainstorming session with public comment 3/5/01
City Council Update Status on Departmental Accomplishments continued 3/6/01
City Manager Budget Request Review with Departments 3/6-15/01
City Council Update Status on Departmental Accomplishments continued 3/20/01
City Council Update Status on Current Projects 3/27/01
City Council Review of Revenue Assumptions 4/10/01
City Council Review of Significant Expenditure and Stang Requests 5/1,8,15,/01
City Manager & Staff Review of Capital Improvement Projects 5/3,7,14/01
Z�
City Council Review of DLBP request 5/
#0
City Council Review of CIP Projects 5/29/01
Town Hall Meeting regarding 2001-03 Financial Plan & Budget 5/30/01
City Council Review of Fund Balance 6/19/01
Adopt Financial Plan & Budget 6/20/01
05/14/01
S- r S a
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Library
REQUEST TITLE: Library Utility Expenditures to be included in City Wide Non -Departmental Account
REQUEST SUMMARY
Absorb the Library utility expenditures in the City Wide Non -Departmental Account for payment, including basic telephone
charges, electricity, gas, water, sewer and refuse.
PRIMARY OBJECTIVE
The payment of all General Fund utility expenditures in one non -departmental account would enable easier analysis for
possible efficiencies and usage. Consolidation of accounts allows for one citywide contact with agencies and service
providers. The transfer of responsibility for payment of utility expenditures will allow for the enhancement of library services.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
All General Fund utility expenditures (except for the Library) are currently budgeted in a non -departmental citywide account.
This arrangement enables the Facilities Manager to easily perform an analysis of usage and possible efficiencies. The
Library as a city facility is requesting that utilities normally budgeted under the Library account be included in the non -
departmental account for consistency — the only departments not included in the non -departmental account would be the
Enterprise funds.
COST SUMMARY 2001-02 2002-03
Additional Costs
Staffing
Utilities 85,700 85,700
Supplies, Materials, Services
Minor Equipment
Total
Savings
Net Cost 85,700 85,700
�'c:
�. ��
-*- �}rte.
_v'" L Y L1�
`.��s� ��� .s�r✓�.
`1`�
i4
'
r
a
r�,�
�';
z
;4
�'c:
200743 FiNANCLkL PLAN & BUDGET
SUMMARY OF SIGNIFICANT EXPENDITURES AND STAFFING C94.4GE3
04/30/01
Police Protection
Police Administration
1
Hire Part time officer
0.5
20,000
0.5
10,000
Support Services
Hit. School Resource Officer
1
1
100% fratded-LUSD COPS grant (551,000)
Police Operations
1
Hire PT Chaplain
20,000
20,000
Animal Control
4
Upgrade O)9ca to Supa"ot
6,500
6,500
Fire Salary
Fire Support Services
5
Fire Safety Educational Program funding
8,000
7,000
Emergency Services
6
Hue Firefighters (5) & Bat Chief(])
3
216,170
3
216,170
3
1S3,790
3
183.790
net orsavingn
Tots l Public S. maty
4.3
270,670
4.5
226,170
3
183,790
3
217~90
Public Utilities
Waterlwastewater Utility Scrvicn
8
Contract services -1years
56,760
56,760
split funding W,%"WtDBCP/Street
Electric Utility Smien
.
Electric Semcca
9
Professional services
90,000
90,000
Electrical Engineering & Operations
10
Orate fuminue replacement
10,000
10,000
one time only expenditure
II
Hue Electrical Engineer
1
83,100
pending re•organittiton study
12
Hue temporary AutoCad Technician
0.25
15,000
0.25
t 5,000
Electric Construction & Maintcnance
13
Add Administrative Clerk
1
2-,,210
(12,000)
pending re -o pnization study
I S
Hue Line aew &vehicles
3
533,365
3
533,365
17
Contract Personnel&tool+
377,135
377,135
19
Hue GtoundpenodApprentice lineman
1
55,615
1
55,615
Substations & System
20
PTOC $ervices for painting
20,000
20,000
Total Public Utilltisa
5.25
1,212.570
3:5
17102,260
1
43,615
1.00
55,615
Transportation
Streets and Flood Control
21
Convert to FT Administrative Clerk
02
18,900
0.2
18,900
net of savings from pa (coca contract)
__
Hue tempatary secretarial assistance
10,100
23
Stomnvater NPDES Permit
50,000
50,000
100% funded by wastewater
24
Additional frmding for sheat -ping
8'_,000
82,000
100% ftmded by wastewater
25
Street Trench damage assessment study
35,000
35,000
of sd by ttvenue
31
landscape paint contract service
29.025
29,025
52,375
52}75
sit mo coat in 1st )T, full yr funding'_nd yr
Total Transportation
0.10
225,025
-
161,0'3
52,375
0.20
106,215
Leisure,
Cultural & Social Servicer
Parks and Recreation
Parks and Recreation Administration
32
Convert to FIT Administrative Clark
02
17,875
0.2
17,875
net of savings from pit (was Contract)
33
Hue Wr IntaWCAD operator
0.5
10,810
0.5
10,810
Prop 32 finding
Aquatics
34
Hire PIT Lifeguard
0.5
3,900
35
Him P!T Swim Instructors
of5w by revenue . 5 i stnreton for 2 wits
Sports Facaitia
36
Convert to FIT Him Laborers (2)
0.2
21--95
0.2
22,775
04
44,070
net of savings Em pct (was contract)
17
Hiro Cabaret
1
39--55
not recommended -pending Ime agree
Parka Division
38
Amasian Legion expenses
56,100
not recommended - pending lease agree
Lodi Lake Park
39
Hire P/T Laborer - irrigation installer
0.5
12,6.10
0.5
1 _&so
Park Mstmem mor
40
Him PR Laborer
0.5
11,505
41
Convert to FST Laborers (2)
0.2
19,125
02
:7,685
0.4
42,810
net of savings from pct (was contact)
Farks Program
Cuiwal Services
Library
42
purchase Digital copier
9,800
9,800
private sector bust
43
Funding for extended hours of operstion
0.5
61,630
0.2
30,000
45
Hue PIT Referemwe Librarian
0.5
20,665
0.5
20,665
Community Center
Pcrfommmg Arts Center
4'
Hue Stage Tach Sianagcr
1
35.000
1
35,000
coat odut by revenuea
4' a Lodi Aro Commission grant
25,000
25,000
Swirtmmimtg Pool
a8
Replace Pool lift
9,300
one time only evpendihmrn
Total Ldsun, Cultural & Social Sar
5.6
353,900
1.5
8%440
0
46.460
Z._
166--30
2001333 FINANCIAL PLAY & BUDGET
SUMMARY OF SIGITFTCAM EYPENDrTURES AND STAFFING CM104GFS
8430/01
F2 S DING SOURCES:
Community Improvement
General Fund
141
1:01,932 7.3
6651422 4.6
312.550 8 638,645
51
Additional finds for Repair/Dcmolition
31,370 1
50,000
50,000
1.0
91,295
_
cast of set by revenues
52
Contact Code Enforcement Officer
9,800
57,200
57 _00
1.0
- I
-
OOSeI by revenues
Pkirming
60,810
50.000
0.5 10,810
Impact Fees
40,000
40,000
53
Consultant services
32,366
40,000
-
40,000
164.366
164.366
impact fees
DBCP
Community Promotion
5,616
5,676
Electric Fund
52
1,180810 325
1,010,500 1
43.615 1 55,615
54
LCYB additional funding
2,819}25 123
70,000
356,165 9 e0 705,070
70,000
56
DLBP additional funding
60,000
one tune expenditure
Engineering
59
Him Civil Engineer
1
49,000
(20,900)
1
39,000
rxtofsavings
60
Him Engineering Technician
1
68,220
1
68,220
61
Contract for Document Preservation
5.000
Community & Econ Der
2.0
399,4_0
i
283 420
('_0,900)
1
49,000
General Government
General Administration
Non - Departmental
62
Purchase LCD projectors (6)
trove to apital
63
LAFCO m<mbenhip&dun
13,000
13.000
Public Works Administration
64
Funding lot Solid Waste contact
20,000
20,000
one time mependiture
Administrative Servim
Information Systems
65
Purchase Network Management Sod-
5,500
one time expenditure
City Cletk
66
Administrative Clerk Confidential
0.5
25,980
0.5
25,980
net olsavings from pt
Hunan Resources
68 a
Organization Study
10,000
10,000
one time expenditure
59
Hua Benefits Coordinator
0.25
12,685
net orsavi np Rom prt R outside admin
,-
Fund Recmitmcnt Advertising
16,810
10,000
75
Fingerprinting
10,000
10,000
Risk Managerment
76
S-r-ty Rag -(PW)
25,000
25,000
100 Ibnxkd by wastevnta&-la
7
Man. & Injury prevention Pmganx (El..)
25,000
25,000
100% funded by Electric
78
Body Mechanics Training
9,000
4,500
9,[100
4,500
Finance Accounting Division
W
Convert to FT Accounting Clerk
02
23,800
0 2
23,800
net of saving from p1t(was contract)
81
Hire Accountant 1
1
56.380
1.0
56,390
Finance Revenue Division
83
Convert to Ftf Qu[otner Service Rep (2)
0.2
02
0.1
net of savings from pt (was contract)
Organizational Support Services
Finance Field Services
84
Convert to F/f Meta Reader
0.:
0.2
net of savings from pit (was contract)
Facilities Services
85
Convert to FrT Const Pmj %WMger
net ornvings from pit (was contact)
86
Hire Facilities Supervisor
I
63.315
1
63,315
(41000)
an. time cost of equipment in 1 at yr
98
Hire Facilities' Stant Worker Intl
1
43,825
Fleet Services
90
Hue Fleet Services W'orka
1
412-,o
1
41•'_'0
Transit funded
Total General Government
4.35
357.740
2.2
222.085 12
50,825
2.1
110,660
TOTAL OPERATING BUDGET
21.9.
2,819,323
-123.
2,079,400 5.6
356,165
9.5
705,070
F2 S DING SOURCES:
General Fund
141
1:01,932 7.3
6651422 4.6
312.550 8 638,645
Transit Fwd
1.0
31,370 1
41,7,70
Library Fund
1.0
91,295
-
Private Sector Trust
9,800
9,800
Reimbursed by Others
1.0
- I
-
OOSeI by revenues
05
60,810
50.000
0.5 10,810
Impact Fees
40,000
40,000
Water Fund
32,366
32,366
-
Wastewater Fund
164.366
164.366
-
DBCP
5,616
5,676
Electric Fund
52
1,180810 325
1,010,500 1
43.615 1 55,615
21.9
2,819}25 123
2,079,400 5.6
356,165 9 e0 705,070
PUBLIC SAFETY
POLICE
FIRE
GRAFFITI
ABATEMENT
2001-2002 Significant Expenditure Request
Activity: Police Department Administration
Request Title: Part time Position Addition
Project Description:
Add a part time police officer position to assist with background investigations,
training, traffic and CVSA examinations.
Project Objective:
Provide additional staffing to administrative services unit to assist with
background investigations, training and administration of CVSA examinations.
Existing Situation:
Currently there is one lieutenant and one corporal assigned to the administrative
services section of the Lodi Police Department. Staff assigned to this unit is
currently responsible for the investigation of citizen complaints, pre-employment
background investigations, training management and other administrative duties
as assigned.
Currently an officer from traffic or investigations is taken from their daily duties
to administer pre employment as well as criminal CVSA examinations. Much of
the time the officer(s) are compensated in overtime which costs the city a
considerable amount of money, the approximate rate is $37.00 per hour.
I would propose adding a part time officer (most likely retired) who would work
no more than twenty hours per week to handle CVSA examinations, assist with
background investigations, act as tow company liaison and calibration of radar
units and alcohol detection devices. State laws mandate calibration of these
units every ten days. Currently an officer is taken from regular patrol duties to
complete this task taking approximately four hours per week.
Project Costs:
Part time position would be compensated at a rate of $19.00 per hour which is
commensurate with part time park officers. Yearly cost would amount to
approximately $20,000.00.
- 1 -
2001-2002 SIGNIFICANT EXPENDITURE REQUEST
ACTIVITY: Police Department Support Services Division
REQUEST TITLE: School Resource Officer (Detective)
PROJECT DESCRIPTION:
Add one additional School Resource Officer to our Support Services Division. This
would bring our total School Resource Officer program up to four.
PROJECT OBJECTIVE:
The Lodi Unified School District is submitting paperwork to the State of California
COPS Office for the cost of an additional School Resource Officer. This request is for a
three-year grant cycle. School Resource Officers provide visible law enforcement
presence at each high school within Lodi City limits. Officers provide positive
interaction between law enforcement and students. The School Resource Officers giving
presentations at school rallies and in individual classrooms, attending school sporting
events and daily presence at the school accomplish this.
Lodi Unified would to expand the program by providing funding for an additional officer
to assist with working the grammar schools and the middle schools.
EXISTING SITUATION:
With three School Resource Officers there is intermittent law enforcement
presence/contact at the grammar school and the middle school level. With the annexation
of Woodbridge Middle School, and the increased student population, it would be
beneficial to have an additional officer assigned to the middle schools. This would "free
up" the other officer to dedicate their time to the grammar school age children.
PROJECT COST:
The additional School Resource Officer's salary and benefits would be reimbursed by
Lodi Unified School District via their State COPS Grant ($64,000). If LUSD does not
receive grant funding, this position would not be pursued. If LUSD does receive funding
it would be for three consecutive years. At the conclusion of this three-year grant cycle,
LUSD and Lodi Police Department would want to make the commitment to split the cost
of this officer.
- 2 -
2001— 2002 SIGNIFICANT EXPENDITURE REQUEST
ACTIVITY: Police Department Operations Division & Support
Services Division
REQUEST TITLE: Part -Time Chaplain/Counseling Services Contract
PROJECT DESCRIPTION:
Add one part-time position to continue the Chaplain's counseling services that have'been
provided to the Police Department and citizens.
PROJECT OFJECTIVE:
The Police Department would like to continue to provide the option of non-
denominational spiritual support and counseling, during crisis situations, to Police
Department employees, City personnel and citizens.
EXISTING SITUATION:
Currently, the Lodi Police Department has the benefit of a primarily volunteer Law
Enforcement Chaplain Program. This program has been in effect for approximately
seven (7) years. During this time, the chaplains have been an invaluable resource during
the numerous crisis situations that have occurred at the Police Department. The chaplains
are not only available to police personnel, but are frequently on -scene to offer guidance
and comfort during emotionally charged situations involving the public. The Law
Enforcement Chaplain Program has functioned entirely on donations and fund-raising.
PROJECT COSTS:
Contract costs of $20,000 would provide for a part-time (based on an estimate of 120 hrs.
month @$13.98), Chaplain. All other program costs would continue to operate via the
donation/fund-raising process through an established private 501(c)3 Foundation.
-3-
2001-2002 Significant Expenditure Reguest
Activity: Police Department Administration -Animal Services
Request Title: Upgrade Animal Services Officer to Supervisor
Project Description:
Upgrade the position of Animal Services Officer classification (occupation #24) to
an Animal Services Officer Supervisor.
Project Objective:
Provide adequate and equitable compensation for this employee commensurate
with the duties and responsibilities of the position.
Existing Situation:
Currently there is one full time Animal Services Officer, two assistants, and part
time assistant, a part time kennel person as well as a number of volunteers
assigned to the shelter. The additional personnel as well as the increased
utilization of volunteers create a need for a supervisory position.
Currently one of the Animal Services Officer acts in a quasi supervisory function
in which her duties include scheduling, decision making, training, evaluation of
personnel, minor counseling, budgeting and planning. Despite the fact that this
position has evolved into additional responsibility the pay has remained the same
with the exception of normal pay increases.
I am proposing one position be upgraded to a supervisory position.
Project Costs:
$6,500.00 per year. This represents a 15% increase, which is consistent with
other positions moving from line level position to first line supervisor.
-4-
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFLNG CHANGE
ACTIVITY: Fire and Life Safety
REQUEST TITLE: Fire Safety Educational Programs
REQUEST SU?,MLkRY
Request funding for increased Fire Safety" Educational programs.
PRM ARY OBJECTIVE `
To provide increased education of Fire Safety.
Snni IARY OF FACTORS DRIVING TM REQUEST FOR CHANGE
The Fire Prevention Bureau has increased our commitment to educational programa and for opportunities to
promote fire safety. Additional funding would be used to become more proactive in educating the public
through participating at functions such as the Grape Festival, Walk -A -'Ikons, 4's of July, Street Fair, and the
neer" Eastside Cultural Fair, in addition to fu ndina for the annual Santa program.
The increased level of funding for Fire Safety" material is critical for the success of these educational programs
for the public. The department has solicited donations from businesses, such as Allstate Insurance and
tvlcDonalds which has been used to provide fire safety materials for annual Fire Prevention Week programs at
all Lodi elementary schools. We «ill continue to solicit donations to offset e.xpendirues for materials, a
computer, and training.
ces
Total
ALTERNATIVES
1, Continue with the current finding level - $10,000.
2, Continued dependence upon dotuttions from businesses
3. Eliminate public education activities
- 5 -
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Emergency Services -Fire
REQUEST TITLE: Fire Administrative Reorganization - Add one (1) Battalion Chief & five (5)
Firefighters to Emergency Services Activity over the two-year budget
REQUEST SUM1i LARY
Add one Battalion Chief & 5 Firefighters. Along with the redistribution of 3 Battalion Chiefs, the Fire
Dept is requesting the addition of one Battalion Chief and five (5) firefighters to the emergency services'
division of the fire department.
Three additional firefighters will be required in the 2002-03 budget to continue the long-term strategy to
ultimately rc-staff Fire Station 41 with an engine and truck company. Total department staff increases from
52 authorized personnel to 53 authorized personnel.
PR 'Yr 1ARY OBJECTIVE
To place Battalion Chiefs back on shin schedules to provide closer contact and overall supervision of
emergency services personnel while continue to meet the administrative areas needed to meet the functional
needs of the fire department.
One firefighter was previously authorized in budget year 2000-2001. This reque.-sc will authorize two
additional firefighter positions to the budget in 2001-02 which will increase previously agreed upon staffing
of the new trucklquint from three to four personnel. This staffing is necessary due to the planned relocation
of Engine #1 from Station #1 to Station #4. The combined responsibilities of engine and truck company
operations warrant four personnel and meet the requirements established in the "Standard of Coverage "
documents that was approved in the last budget cycle (1999-2001).
A 4 -year plan was developed and agreed upon by the City Manager to re staff Fire Station #1 with a Truck
Company and Engine Company, The following two-year budget calls for adding three additional firefighters
in 2003-200.4 and an additional Captain for Administrative duties in the 2004-2005 budget year. This will
allow for Fire Station # 1 to be restaffed beginning in July 2003. A request for a new engine will be submitted
in the 2003-04 budget.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
1993 Battalion Chiefs reassigned from 56 hour work week (24 hour shifts) to 40 hour work week.
Shift supervision insufficient.
- Administrative duties inefficient.
• Reassign BIC's to 56 hour work week.
- Creatc Training Chief position for improved co-ordixidon of department training.
December 2001, Fire Station 4 will open for service.
December 2001, Lodi Fire Department will take possession of new Truck/Quint.
December 2001, Engine 1 personnel reassigned to Fire Station #4. Station 1 personnel will be reduced
from 0 fircfic liters to 47ntck l personnel increase from 3 firefighters to 4 firefighters.
- Minimum per shift coverage increases from 13 frrefighters including battalion chief to 14 firefighters
including battalion chief.
Long term staffing proposal n•itl require hiring 3 firefighters and one administrative Captain the following
two year budget.
ALTERNATIVES
1. Continue present staffing and responsibilities
2. Cover the downtown area with a three person combination trucklengine company
3. Increase truck company to four and move Engine -1 to Station #4
4. Continue present operation and choose not to staff new Westside fire station
- 6 -
5. Increase the overtime budget to allow for coverage of vacafions, sick leave and other department related
leaves requirements with present staff while increasing minimum staffing.
COST SUMMARY
2001-2002
2002-2003
Additional Cost
Staffing —
306,806.54
179,290.65
Supplies, Material and Services
4,500.00
4,500.00
Minor Equipment
Total
311,306.5.4
183,790.65
Savings — overtime
<-95,135.31>
Net Cost
S216,171.23
5183,790.65
-7-
PUBLIC UTILITIES
ELECTRIC
WATER
WASTEWATER
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTMTY: Public Works
REQUEST TITLE: Public Works Contract Field Operations Coordinator for. Municipal Service Center and White
Slough Water Pollution Control Facility
REQUEST SUNUAARY
Add a full-time contract Field Operations Coordinator to City staff for a two-year period, assigned to the Municipal Service
Center.
PRIvi 1ARY OBJECTIVE
The primary objective is to assist the offices of the Water/Wastewater Superintendent and the Street Superintendent and their
respective staffs with deferred and overdue project implementations. This position would be a valuable liaison between
Public Works and other departments (i.e., Finance, Human Resources, and Community Development) on various projects.
SUti% 1ARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
During the past several years, and in the immediate future, several new programs have surfaced. These programs have not
been and cannot be adequately addressed by current staffig levels. Some areas not yet being addressed are:
• Water rates and user analysis,
• Wastewater rates and user fee (SSUs) analysis,
• NPDES permit needs (White Slough, and Storm Systems),
• Storm drain and environment quality issues,
• Research availability of grants and loans (plant expansion, Eastside infrastructure rebuild)
• Monitor and manage the DBCP Settlement Agreement
• Develop and implement public relations activities (citizens' awareness).
Many of these programs and issues are Federal and State mandates. These mandates require policy and program
development and implementation.
This position would serve the Water/Wastewater and Street Divisions. It is proposed that this position would be funded
359 Water, 35% Wastewater, 109 DBCP, and 209 Street. It is anticipated that this position would eventually rotate with
a Public Works position at City Hall in order to provide a working knowledge of all phases of the Public Works operation.
Office Space and a computer would be needed for this position. Clerical support would be provided from MSC staff.
ALTERNATTYES
Continue with present practices leaving many of these issues unresolved or inadequately addressed. Deal with the
consequences of Federal and State penalties, and/or lost opportunities for badly needed grants and low interest loans.
COST SUMMARY
2001-2002 2002-2003
Additional Costs
Staffing
$51,160
Supplies, Materials, Services
$3,000
Minor Equipment
$2,600
Capital Equipment - Vehicle
Total
Savings
Net Cost
$56,760
-S-
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Electric Services
EQUEST TITLE: Professional Services
REQUEST SUMMARY
Provide professional services to perform tasks ranging from administrative support to design and engineering
studies. Projects include Broadband Market Survey and Business Model, Multi -Dimensional Benchmarking,
and Project Development Legal/Technical Assistance.
PRIMARY OBJECTIVES
To provide the Department with professional and clerical services to support various activities and projects
including:
• System design and project review associated with the West Interconnection Project.
• Various studies for fiber optics; city-wide data and SCADA networking.
• Provide technical support, maintenance and education for the Electric Utilities network and server. In
addition, network to development of a network to SCADA secure interface.
• Organizational analysis of functional and operational tasks of the Department.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
Recent local changes in the communication industry (cable broadband and wireless broadband) coupled with
the continued deregulation of the electric providers, and CAISO communication needs have created many
opportunities that require professional assistance. In addition, various projects including the west
,nterconnect will create additional spin-off tasks requiring professional services (i.e. legal, environmental, land
issues, and technical).
ALTERNATIVES
COST SUMMARY
Additional Costs
2001-02 2002-03
Staffing
Utilities
Supplies, Materials, Services
Minor Equipment
Savings
Professional Services S' 9 Gi C p 0
Total 5' y 0' c o o
IMPLEMENTATION
To be scheduled in both the 2001-02 and 2002-03 fiscal years.
Sipif Exp Req Prof Services.doc
-9-
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Engineering and Operations
REQUEST TITLE: Office Furniture (replacement)
REQUEST SUMMARY
Replace existing desks and file cabinets with workstations and test equipment furniture.
PRIMARY OBJECTIVE
Provide a work environment conducive to the tasks being performed in today's computer based meter test
shop and office.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The existing furniture today are ordinary office desk and file cabinets, all of which have seen significant usage
prior to being utilized in the meter test shop and office area. Drawer tracks on several file drawers are
completely worn out resulting in drawers jamming and increasing the likelihood of employee injury. Computers
have been added to the meter testing operation for both the test phase and for data management, etc. These
computers were fitted on to existing traditional but narrow desks leaving an inefficient and vary cumbersome
work area. It is recommended that the furniture be replaced with computer workstations and properly
designed test bbnch furniture to support the weight of the test equipment. The recommended furniture can
be relocated to the new service center when constructed.
ALTERNATIVES
Do nothing — not recommended. This alternative would have staff continue to work with equipment that is worn
out and not suited for its utilization.
COST SUMMARY
Additional Costs 2001-02 2002-03
Staffing
Utilities
Supplies, Materials, Services
Minor Equipment S10,000 $0
Savings
Total S10,000 $0
IMPLEMENTATION
On approval of this request, the equipment will be purchased.
-10-
Signd Exp Req M3613 Furndure cac
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Engineering and Operations
REQUEST TITLE: Electrical Engineer
REQUEST SUMMARY
Add position of Electrical Engineer.
PRIMARY OBJECTIVE
To develop sufficient professional engineering staff to address and promptly respond to the ongoing
engineering issues associated with an electric utility the size of Lodi's.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Electric Utility Department has engineering issues, both long range and day to day, that are not being
properly addresses or not at all considered. The issues range from system planning and design, protection
and coordination, system studies to material and equipment application, specification, evaluation and failure
analysis. In addition such matters as power quality, surge protection and large customer energy evaluations
are not being performed at all. Staff training of a technical nature and staff technical support is at best
extremely limited due to other demands on available personnel.
The Department had two Electrical Engineer positions filled until the summer of 1994 when one was eliminated
due to the City's financial situation. The other position has remained vacant since 1996.
Outside professional services have been utilized to assist on specific and definable projects. However, such
assistance does not address the daily issues and has proved to impact existing staff, been quite costly and
not practical to replace permanent staff. Permanent staff by working on a daily basis with the system gain
invaluable knowledge about the system. Such knowledge is lost if outside professional services are utilized
in lieu of permanent staff.
It is strongly recommended that this request be approved and the position filled. An Electric Utility the size of
Lodi's has sufficient engineering matters on a daily basis to employ two full time Electrical Engineers.
ALTERNATIVES
Do nothing — not recommended. This alternative has hidden costs examples of which are missed opportunities
due to poor planning resulting in costly retrofits. Likewise the system's capabilities are not maximized, resulting
in underutilized facilities, miscoordination causing excessive outage all of which has an associated cost factor
to both the City and its customers.
COST SUMMARY
Additional Costs 2001-02 2002-03
Staffing $76,600
Utilities
Supplies, Materials, Services
Minor Equipment $6,500
Savings
Total $83,100
IMPLEMENTATION
Upon approval, recruitment will be initiated for the position.
5.9ml E,p Rea M51 t Elftncal Enq neer.aoc 11 -
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Engineering and Operations
REQUEST TITLE: Temporary AutoCAD Technician
REQUEST SUMMARY
Funding for temporary AutoCAD Technician in the Engineering Section.
PRIMARY OBJECTIVE
To maintain electrical maps and diagrams, construction specifications and engineering drawings and standards
current. In addition this position will assist existing staff with drafting tasks on various maintenance projects.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Electric Department has a large amount of maps, drawings and diagrams that has been developed over
the years as the system expanded. These records are at present in good condition and must remain such in
order to maintain a safe work environment for maintenance, construction and operating personnel. The
workload on the Department's staff, both present and in the foreseeable future, does not allow such records
to be properly maintained. The Electric Department is also committed to making significant improvements to
the electric system over the next 5 years and as a result will need to augment existing AutoCad staff in order
to prepare the necessary drawings for this additional maintenance workload within an acceptable timeframe.
The addition of a temporary AutoCad technician (25% full time equivalent) will provide the necessary relief.
ALTERNATIVES
Do nothing — not recommended. This option would let existing records deteriorate and would cause significant
delays for the Department in fulfilling its goal of improving the system and would impact the safety of the work
environment, especially for field people.
COST SUMMARY
Additional Costs
2001.02 2002-03
Staffing $15,000
Utilities
Supplies, Materials, Services
Minor Equipment
Savings
Total $15,000
IMPLEMENTATION
Upon approval, the current temporary AutoCAD Technician will continue to assist Engineering Staff.
- iz -
S.g,f E.2 Req 110612 AuwCaa Teo ecc
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
4CTIVITY: Electric Construction and Maintenance
REQUEST TITLE: Administrative Cleric
REQUEST SUMMARY
Add the position of Administrative Clerk to work in the Electric Construction and Maintenance Division. This request also
includes necessary office furnishings and a personal computer workstation.
PRIMARY OBJECTIVE
To increase staffing level to perform the more technical clerical type duties specific to the Electric Construction and
Maintenance Division.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Electric Utility Department is always striving for efficiency in all areas. At this time, this division functions without
fully dedicated clerical support, utilizing the time of the departments full time Administrative Clerk on a limited, time -
permitting basis. A large portion of the clerical duties and record keeping is currently being done by the Electric Utility
Superintendent, the Construction/Maintenance Supervisor, the Technical Service Manager and the Apparatus Mechanic.
The Administrative Clerk now performs all duties assigned from all divisions; the Construction/Maintenance Division is
allocated approximately 20% of the clerk's time. The existing filing system and record keeping methods are in serious
need of reorganization, updating and consolidation. The Mai ntenancellnspection records required by General Order
#165 needs to have a program developed and computerized, as well as yearly reports that are required by the Public
Utilities Commission. This position will enable the record 'keeping and clerical work of the Electric
Construction/Maintenance Division to be brought up to an adequate level of standards and will allow compliance with
regulations, legislation, and General Orders.
Duties will include but are not limited to the following:
Provide customer support services by receiving calls from customers for scheduling of inspections. Work
with the Superintendent and Construction/Maintenance Supervisor to schedule daily Service Orders;
develop and maintain updated customized databases for safety, training, tool and equipment inventories,
General Order #95 (free Trimming), General Order #128, General Order #165 (mandated interval
inspections of overhead and underground electrical system). Prepare yearly reports required by the
Public Utilities Commission; class A drivers license and drivers physicals; inspection records for all field
equipment which require periodic inspections. Maintain purchase orders records; verify shipments of
materials and equipment received prior to releasing invoices for payments. Obtain price quotes; ship
parts for repairs and returns; assign budget account numbers to invoices after verifying prices; draft
and/or type letters, memorandums, and electrical reports as instructed. Type and assemble material and
equipment specification documents required to obtain bids for material or services; recap payroll hours
worked and maintain sick leave, overtime and vacation records for division employees. Type and
assemble preliminary budget documents for the division; organize and post safety meetings, take and
post meeting minutes.
This position will significantly reduce the time the Electric Superintendent (20%), Construction/Maintenance Supervisor
(20%), Technical Service Manager (25%), Apparatus Mechanic (25%) spend on record keeping and clerical work, which
will result in more time spent on technical duties relating to utility services and training.
- 13 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ALTERNATIVES
Continue with the Electric Superintendent, Construction/Maintenance Supervisor, Apparatus Mechanic and Technical
Services Manager doing the record keeping and clerical work (not recommended).
COST SUMMARY
Additional Costs
2001-2002
Administrative Clerk
$
21,196
Overhead
$
5,088
Computer Workstation & Furniture
$
12,000
Total
$
38,284
Savings
$11,075
Net Cost
$27,209
FINANCE 2001-2003
IMPLEMENTATION
Upon approval, implement during 2001/2002 fiscal year.
- 14 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
.OTIVITY: Electric Construction and Maintenance
REQUEST TITLE: Line Crew One (1) Electric Foreman/Forewoman and Two (2) Electric Lineman/Linewoman
REQUEST SUMMARY
To fill the position of one (1) Electric Foreman/Forewoman and two (2) Electric Line me n/Linewo men to work in
the Construction/Maintenance Division. This request also includes the necessary line/digger truck, one ton
flatbed truck and tools and equipment necessary for the new Linecrew to perform their job assignments.
PRIMARY OBJECTIVE
To increase the Line section's staffing level by one (1) Electric Foreman/Forewoman and two (2) Electric
Line men/Linewomen in response to increasing maintenance of an aging electric system and the demands of
the constantly changing and expanding City. Also, to fully implement G.O. 165 inspection intervals and
repairs to the electric system as required.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
Over the past five (5) years the Construction/Maintenance Division has employed continuously two (2) to
seven (7) contract Lineman and/or Groundmen.
In October, 1998 the California Public Utilities Commission imposed prescriptive distribution system
ispection and maintenance practices (General Order 165) on publicly -owned distribution utilities. G.O. 165
,pecifies inspection intervals of overhead and underground electric systems that each Electric Utility shall
implement (see attached sheet for intervals). Implementing and maintaining G.O. 165 inspection intervals will
require additional personnel. Due to previous, present and future workloads, the Con structionlMaintenance
Division has not been able to implement G.O. 165 inspections to the standards required by the California
Public Utilities Commission.
Due to the aging of the electric system, it is necessary to add personnel in the Electric
Construction/Maintenance Division of the Electric Utility Department. The reliability and safety of the electric
system is seriously threatened. The underground system requires extensive replacement and rebuilding.
Pole replacement is invariable, and replacement of butt rotted poles is a critical safety issue. A high
percentage of our overhead primary and secondary conductors need replacing. With this comes extensive
rebuilding of the pole apparatus. The Electric Utility needs to inspect, engineer, and implement the
replacement and rebuilding necessary to ensure that customer service remains reliable, and that the safety of
the citizens of Lodi and the crew is not jeopardized. With the condition of the aging equipment, the electric
system reliability is seriously threatened. In the upcoming competitive market, it is essential that we maintain
and build on a reputation of quality and reliability.
ALTERNATIVES
Continue to operate with existing personnel, and let the system continue to degenerate, and not implement
G.O. 165 inspections which are mandated by the Public Utilities Commission.
- 15 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
OST SUMMARY
Additional Costs
2001-2002
One (1) Foreman/Forewoman
$
65,354
Two (2) Linemen/Linewomen
$
118,810
Overhead
$
44,200
Digger/Linetruck
$
210,000
One Ton Flatbed Truck
$
60,000
Tools and Equipment
$
35,000
Total
$
533,364
FINANCE 2001-2003
IMPLEMENTATION
Upon approval, implement during 200112002 fiscal year.
- 16 -
2001-2003 Financial Pian and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
'TIVITY: Construction and Maintenance
REQUEST TITLE: Contract Personnel, Material and Equipment
REQUEST SUMMARY
To hire contract personnel, buy additional material and tools and rent equipment
PRIMARY OBJECTIVE
To maintain adequate personnel, buy materials and tools and rent equipment that is necessary to provide
continuity of reliable service to the electric customers of the City of Lodi.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Electric Utility ConstructionlMaintenance Division is requesting funds to employ Contract
Line menlLinewomen and Contract GroundmenlGroundwomen. Contract personnel are used to augmant the
Linecrews during times when there is an excessive work load. The extra personnel will enable the linecrews
to keep abreast with services to new commercial customers, installing sub -structures and electric systems for
new sub -divisions, providing services to new residential customers and maintaining overhead and
underground electric systems.
In October, 1998 the California Public Utilities Commission imposed prescriptive distribution system
inspection and maintenance practices (General Order 166) on publicly -owned distribution utilities. G.O. 166
specifies inspection intervals of overhead and underground electric systems that each electric utility shall
implement (see attached sheet for intervals). Implementing and maintaining G.O. 165 inspection intervals will
require additional personnel. A full-time two -person craw will be needed to implement and accomplish this
;k.
ne following list is the major projects planned for construction during the 200112003 fiscal years.
• Construction of a new 60kV overhead and underground circuit from White Slough to Lower Sacramento
Road.
• Rebuilding the downtown underground electric system.
Replacement of wood poles that do not pass inspection.
• Replacement of faulty underground equipment found during inspection of the underground electric
system.
The use of contract personnel will be a saving to the City of Lodi Electric Utility during the time when there is
no excessive workload. The contract personnel will be laid off.
ALTERNATIVES
Not hiring the contract personnel will result in degradation of service to new electric customers.
WFM
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
—OST SUMMARY
Additional Costs
Account No.
2001-2002 2002-2003
Staffing
160650
$ 121,281
160651
80,854 '
Supplies, Materials, Services
160650
7300
40,000
160650
7700
30,000
160651
7300
15,000 -
160651
7700
45,000
Equipment Rental
160650
30,000
160651
15,000
Total
$ 377,135
FINANCE 2001-2003
.IMPLEMENTATION
' loon approval, implement during 2001/2002 and 2002/2003 fiscal years.
-is-
2001 - 2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
';TIVITY: Electric Construction and Maintenance
REQUEST TITLE: Ground person/Apprentice Lineman/Linewoman
REQUEST SUMMARY
Establish the position of Groundperson/Apprentice Lineman/Linewoman
PRIMARY OBJECTIVE
To increase staffing level to provide the Electric Utility Department with an entry level position for
Linemen/Linewomen.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
At this time and over the past few years, there has been a shortage of journey -level linemen/linewomen ii
State of California and surrounding areas. Local Union 1245 I.B.E.W. (International Brotherhood of Electrical
Workers) has been inadequate in providing the City of Lodi Electric Utility Department with qualified journey
level linemen/linewomen.
The implementation of an apprenticeship program will help to alleviate this problem. Providing on-the-job
skills and training into a technical career will attract employees from other City Departments and the citizens
of Lodi.
The program will provide five years of training and study to reach journey -level lineman/linewoman status.
The successful applicant will work as a groundman/woman for a minimum of twelve months, evaluated
-.monthly. If successful, the applicant will start a four-year apprenticeship program of intense study and hands-
on training.
'ie Memorandum of Understanding between City of Lodi and Local 1245 International Brotherhood of
clectrical Workers, from February 9, 1996 to December 31, 2002, Article III, Section 4-6 states the City of Lodi
intends to establish an apprenticeship program during the term of this MOU.
ALTERNATIVES
Continue hiring journey -level linemen/linewomen from
position in the Electric Utility Department. Also will
between the City of Lodi and Local #1245 1.B.E.W.
COST SUMMARY
the limited sources available with no entry-level
be disregarding the Memorandum of Understanding
Additional Costs 2000102
2002/03
Staffing
$ 38,890
Overhead
$ 11,724
Supplies, Materials,Services
$ 2,000
Training
S 3,000
Total
I I 1
1 $ 55,614
FINANCE 2001-2003
IMPLEMENTATION
Upon approval implement during 2002/2003 fiscal year.
- 19 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Electric Substations and Systems
REQUEST TITLE: Contract for Professional Services (Painting)
REQUEST SUMMARY
Contract for Substation Equipment Painting
PRIMARY OBJECTIVE
Prevent further degradation of exterior surfaces of substation equipment.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR
The exterior surfaces of the power substation transformers and power circuit breakers are in need of painting.
Damage to the exterior surfaces of the power circuit breakers and transformers have caused rust to form. This rust will
in time cause the transformer cooling radiators and tap changers to leak oil. Due to the expertise needed in applying the
commercial coatings needed for this type of equipment, contracting for this service is necessary.
ALTERNATIVES
.._Delay painting to a later budget cycle. (Not recommended.)
QST SUMMARY
Additional Costs 2001-2002 12002-2003
Sub Contract $20.000.00 1
Total $ 20,000.00
FINANCE 2001-2003
IMPLEMENTATION
Bid and contract each budget year 2001-2002 and 2002-2003.
- 20 -
TRANSPORTATION
STREETS
STORMDRAINS
TRANSIT
2001- 2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Public Works / Street Division and Water/Wastewater Division
REQUEST TITLE: Municipal Service Center Administration .
REQUEST SUMMARY
Add a full-time permanent Administrative Clerk to City staff.
PRWARY OBJECTM
1. Maintain competent employees.
2. Bring this employment practice in compliance with City policy.
SU1IDLkRY OF FACTORS DRIMG THE REQUEST FOR CHANGE
For more than 15 years, there has been a part-time clerical position at the Municipal Service Center. This position serves the
WaterAVastewater and Street Divisions. This position started out as half-time. After approximately seven years, it grew into
a three-quarter time position. For the last four years, this position has consistently operated at full time. In addition to this,
overtime has increased and the need to contract with temporary agencies has become much more common. These contract
employees have averaged three to four-month assignments each year, over the past several years. The new CalPERS
insurance program will increase the cost of this temporary position.
ALTEPINATIVES
1. Continue as we are.
2. Send some of the workload to other clerical throughout the City.
COST SUMMARY
2001-02 2002-03
Additional Costs
Staffing
$33,400
Supplies, Materials, Services
Minor Equipment
Total
Savings Reduce Part -Time Funding
<14,500>
Net Cost
518,900
ElIPLEMENTATIOY
if this request were approved, the uomial hiring process would be exercised.
- 21 -
2001- 2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Public Works / Street Division and Water/Wastewater Division
REQUEST TITLE: Municipal Service Center Administration Temporary Services
REQUEST SUMMARY
This request is to provide funding to hire, when needed, short-term secretarial assistance from a temporary agency.
PRINLARY OBJECTIVE
1. To maintain production demands during peak periods.
2. To fill in for permanent staff %vhen needed.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
Over the last four years, there has been reoccurring need for this type of service at the Municipal Service Center. Therefore, this
request is being based on past practice.
ALTERNATIVES
1. Don't fund in advance for this type of need and address it at year-end with a special allocation.
COST SUMMARY 2001-02 2002-03
Additional Costs
Staffing S10,100
Supplies. Materials, Services
Minor Equipment
Total
Savings Reduce Part -Time Fundine
Net Cost 510,100
I`IPLE�IENTATION
IF this request is approved, the implementation would occur when needed.
- 22 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
..
ACTIVITY: Public Works — Flood Control
REQUEST TITLE: Stormwater Pollution Prevention Plan and NPDES Permit
REQUEST SUMINIARY
This request is to retain a consultant to assist in preparing Federal and State mandated stormwater pollution prevention plan
and acquire the needed National Pollutant Discharge Elimination System (NPDES) Phase 11 permit.
PRLnARY OBJECTIVE
All cities with a population over 100,000 fall in the Phase I plan and are already required to have obtained a stormwater
discharge permit. Cities with a population under 100,000 fall into the Phase H plan and are required to obtain a stormwater
discharge permit by March 10, 2003. A major requirement of obtaining a permit is to identify and put into place Best
Management Practices (BbiPs) to eliminate pollutants from entering our waterways.
It is anticipated that the Central Valley Regional Water Quality Control and others will be bringing heavy fines to those
agencies not in compliance by the deadline. This is an unfunded mandate. Areas to be addressed are Mokelumne River
discharges, Woodbridge Irrigation Canal discharges, commercial and industrial facilities discharges, street cleaning practices,
and construction activities.
. SUNINL LARY OF FACTORS DRMNG THE REQUEST FOR CHANGE
• Phase II of the NPDES deadline is March 10, 2003.
• Environmentally the correct action to support.
• Protect the City from potentially significant fines/lawsuits (citizen).
ALTER`IATr«S
Staff can find no acceptable alternatives.
COST SUNUAARY 2001-02 2002-03
Additional Costs
Staffing
Supplies, Materials. Services $50,000
Minor Equipment
Total
Savings
Net Cost S501000
- 23 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFMG CHANGE
ACTIVITY- Public Works
REQUEST TITLE: Street Sweeping Increase
REQUEST SUMMARY
This request is to increase street sweeping from once a month to once every two weeks.
PRIMARY OBJECTIVE
In 1993, the City drastically reduced its street sweeping activities from once every 12 working days to once a month. Since then,
the City has grown and, more importantly, awareness of the direct relationship of sweeping and storm «ester pollution has grown as
well. Our storm system drains directly into the Mokehunne River or the Woodbridge Irrigation District Canal. The most cost-
effective way to remove pollutants, dirt and debris from entering our storm system is to get it picked up before it has a chance to get
into our waterways. During the next couple of years, the City will have to obtain a storm water permit under the NPDES Phase II
regulations and increased street sweeping is a typical "Best Management Practice".
SULNIMARY OF FACTORS DRIVING THE REQUEST FOR CH.kNGE
• Reduction in pollutants, dirt and debris entering the storm system.
• Environmentally responsible.
ALTER:-NNATIVES
Continue with present practices.
COST SUMNL4RY 2001-02 2002-03
Additional Costs -
Staffrng
Supplies, ivlaterials, Services 532,000 1
Minor E ui ment
Total
Savings
Net Cost $32,000
IMPLEMENTATION
If funding is approved, staff w'outd present to Council options with regard to providing service in-house, the use of contract services
or a combination of both.
- 24-
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Public Works
REQUEST TITLE: Street Trench Damage Assessment Study
REQUEST SU -M -MARY
This request is to hire a consultant to provide a Trench Damage Assessment Study.
It is common knowledge that cutting trenches into roadways has a negative effect on the life of that roadway. This effect varies
from location to location. Damage has been measured up to six feet on each side of a trench. This accelerates the need for
maintenance and influences future asphalt overlay design during rehabilitation.
PRIMARY OBJECTIVE
It is anticipated that the City will adopt a trench fee ordinance as a result of this study.
S[Ji`ti<IARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
• Increased trenching due to communications cable of various types and replacement of water, sewer, and electric facilities.
ALTERNATIVES
Continue with present practices.
COST SLT-I`iIARY 2001-02 2002-03
Additional Costs
Staffing
Supplies, Materials, Services S35,000 0
Minor Equipment
Total
Savings
Net Cost 53-5,000 0
- 25 -
January 25, 2001 Job No: 01027
City of Lodi
1331 South Ham Lane
Lodi, CA 95242-3995
Attn: Mr. George Bradley
Street Superintendent
Subject: Proposal to Provide a Trench Damage Assessment Study
Dear Mr. Bradley:
It is our pleasure to provide this proposal for your consideration.
BACKGROUND
The City of Sacramento had a Trench Damage Assessment Study performed in
1996197, in which it was determined that in their city there is significant pavement
damage adjacent to retrofitted utility trenches due to the relaxation of soils during
trenching. The testing program was a comparative deflection analysis performed by
CHEC Consultants. Damage was measured up to 6 feet on each side of a trench. For
trenches running longitudinal with the roadway, remediation would require an additional
1-1/2 Inch of AC overlay during rehabilitation. For patches and trenches running
transverse to the roadway, remediation would require full -depth AC repairs extending
3-1/2 feet beyond the trench limits in preparation for an AC overlay. The City elected to
pass an ordinance charging $3.50 per lineal foot as a maximum fee which was a
compromise position between full recovery of costs and the political need to be fair.
Since the Sacramento study, CHEC has tested over 200 trench analyses in
approximately 16 cities. The average damage measured from all studies was an
additional overlay requirement of 1.6 inches with a zone of influence of 10.4 feet.
Variables that may influence the extent of damage that could occur during trenching
include traffic, age of pavement and subgrade soil type. Pavement design tends to
eliminate the effects of traffic and subg rade soils except that in very rigid soil types,
there may be less impact due to trenching.
-26-
Civil Consulting
Pavement Management
��i���t���j •�
Asphalt Technology
COWSt LTANT
lL !�:
Construction Services
Asset Management
January 25, 2001 Job No: 01027
City of Lodi
1331 South Ham Lane
Lodi, CA 95242-3995
Attn: Mr. George Bradley
Street Superintendent
Subject: Proposal to Provide a Trench Damage Assessment Study
Dear Mr. Bradley:
It is our pleasure to provide this proposal for your consideration.
BACKGROUND
The City of Sacramento had a Trench Damage Assessment Study performed in
1996197, in which it was determined that in their city there is significant pavement
damage adjacent to retrofitted utility trenches due to the relaxation of soils during
trenching. The testing program was a comparative deflection analysis performed by
CHEC Consultants. Damage was measured up to 6 feet on each side of a trench. For
trenches running longitudinal with the roadway, remediation would require an additional
1-1/2 Inch of AC overlay during rehabilitation. For patches and trenches running
transverse to the roadway, remediation would require full -depth AC repairs extending
3-1/2 feet beyond the trench limits in preparation for an AC overlay. The City elected to
pass an ordinance charging $3.50 per lineal foot as a maximum fee which was a
compromise position between full recovery of costs and the political need to be fair.
Since the Sacramento study, CHEC has tested over 200 trench analyses in
approximately 16 cities. The average damage measured from all studies was an
additional overlay requirement of 1.6 inches with a zone of influence of 10.4 feet.
Variables that may influence the extent of damage that could occur during trenching
include traffic, age of pavement and subgrade soil type. Pavement design tends to
eliminate the effects of traffic and subg rade soils except that in very rigid soil types,
there may be less impact due to trenching.
-26-
City of Lodi
January 25, 2001
Page 2
SCOPE OF L.ODI STUDY
It is our recommendation that this study involve no less than 15 sites. Test sites should
vary in age, traffic levels and soil areas. We will need five or six transverse trench sites
to verify the zone of influence. The remaining trenches will be used to determine
increased overlay requirement.
This proposal includes a limited amount of soil auguring and sampling along with coring
which is required for the analysis of the deflection data.
The proposed study is not intended to be a stand alone, statistically viable separate
study but is intended to have enough test sites to verify when and where trench
damage as it occurs is similar to Sacramento's and many of the other studies that have
been performed in the past few years.
The testing and analysis program outlined for this study involves the following major
tasks:
TASK A: Attend a series of meetings, we anticipate two, to determine certain
parameters in regard to the subject study; e.g., study zones, traffic
classifications, materials usage, soil types, City standard repairs.
TASK 8: After review of all the information and the preliminary meetings, we will
perform a final selection of sections for further evaluation. All sections will be
located to a set reference point for future relocation. Ali sections will be
deflection tested with a DYNAFLECT using State of California Test Method
356. We will core the tested areas to determine existing AC, PCC, base
thicknesses and type. We will augur base and subgrade samples from
selected core sites for'soil testing.
TASK C: We will perform an analysis on all information obtained. This analysis will be
used to make comparisons from which conclusions -can be drawn.
L-;�,
City of Lodi
January 25, 2001
Page 3
TASK D: We will provide a full report of the findings. Our final report will include all
supporting data, assumptions and references.
SERVICES PROVIDED BY THE CITY
The City can save considerable consulting fees by providing the following services for
this study:
1. The City will preselect at least 15 known longitudinal trench sites where the location
of the trench is visible, conforming to variations in traffic and different areas of the
City. Additionally, the City should select at least 10 transverse trench cut areas.
CHEC Consultants will choose the final 15 trenches for testing from the City's list.
2. The City is to provide a Traffic Index for each segment and required permits.
Our proposal does not include the above tasks.
COST OF SERVICES
Table 1 provides a cost estimate breakdown of services for each task identified. We
have estimated that the total fees for the testing, analysis and report as discussed
should not exceed $32,765. The unknown extra is the number of meetings that may be
needed to explain issues to the Council, management, utility companies or others
involved.
We are prepared to start this project within one week of your approval of this proposal.
The entire study may take about 2-1/2 months to complete.
Very truly yours,
CHEC CONSULTANTS, INC.
Ron E. Vicari 11
Manager
Staff Engineer
(-,•�'
` 28 -
TABLE 1
ESTIMATED COST BREAKDOWN
TRENCH DAMAGE ASSESSMENT STUDY
CITY OF LODI
JOB NO: 01027
Task A: Initial Project Setup and Meetings
18 hours Associate Engineer @ $105/hr. $ 1,890
9 hours Consulting Engineer @ $150/hr. 1,350
Mobilization 600
Subtotal $ 3,840
Task B: Field Testing, Coring, Sampling and Defect Identification
(Based on 8 to 10 test locations)
15 hours Associate Engineer @ $105/hr.
$ 1,575
36 hours Deflection Testing @ $225/hr.
8,100
33 hours Technician Aid @ $70/hr.
2,310
15 hours Coring/Auguring @ $150/hr.
2,250
Mobilization
1,200
9 days Per Diem @ $95/day
855
Patch Mix, Photos, Etc. (Miscellaneous Allowance)
375
Traffic Control
4.200
Subtotal $20,865
Task C: Data Analvsis and Cost Calculations
12 hours Staff Engineer @ $95/hr.
$ 1,140
9 hours Data Analysis @ $1001hr.
900
6 hours Associate Engineer @ $105/hr.
630
12 hours Drafting @ $75/hr.
900
6 hours Consulting Engineer @ $150/hr.
900
Laboratory Testing (Allowance)
800
Subtotal $ 5,270
TABLE 1(Continued)
Task D: Final Report
18 hours Staff Engineer @ $95/hr.
6 hours Associate Engineer @ $105/hr.
3 hours Consulting Engineer @ $150/hr.
$ 1,710
630
450.
Subtotal $ 2,790
PROJECT TOTAL $32,765
-30-
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST
ACTIVITY: Public Works
REQUEST TITLE: Contract Landscape Maintenance Increases
REQUEST SUMtifARY
This request is to provide funding for new landscaped areas approved by council that will to be added to the City Landscape
Maintenance contract during the next 2 -year budget cycle.
PRDIARY OBJECTIVE
The primary objective is to cover the added costs of maintaining additional new landscaped areas due to new subdivision
landscaped walkways and street median landscape improvements. These new sites will add a significant increase of area and
maintenance. These areas are not currently included in the 2001 — 2003 budget proposals. The exact start date is not yet known.
SUNEVIARY OF FACTORS DRD&NG THE REQUEST FOR CHANGE
• Lower Sacramento Road median
• South Hutchins Street and Kettleman Lane median
• New subdivision frontage, including Parisis Ranch, Periegos Ranch, Century Meadows, and Lodi West 7
ALTERNATIVES
None
COST SUMMARY
2001-02
2002-03
Additional Costs
Lower Sacramento Median
$25,000* 1
$25,000**
South Hutchins Street and Kettleman Lane
median
50 7—
521,000**
New subdivision frontage, including Parisis
Ranch, Periegos Ranch, Century Meadows, and
Lodi West 7, based on 6 months maintenance
$4,025*
56,375**
Total
$29,025
S52,375
Net Cost
$29,025
$52,375
*6 months, fiscal year 2001- 2002
**additional funding to meet full fiscal year 2002-2003 maintenance
LVIPLEi4IHNTATION
If funding is approved, funds would only be used as new landscaped areas are added.
C:\windows\TEMP1S IGEXPlandscapemaintincreases.doe 04130101
LEISURE, CULTURAL & SOCIAL SERVICES
PARKS
RECREATION
LIBRARY
COMMUNITY
CENTER
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDMIRE REQUEST AND STAFFING CHANGE
ACTIV=: Recreation Administration
REQUEST TITLE: Full Time Administrative Clerk
REQUEST SUMMARY
Hire a full time Administrative Clerk for front office operations in the Recreation Division.
PRENIARY OBJECTIVE
To provide quality customer service and clerical support for the Recreation Division.
SUNLY IARY OF FACTORS DRIVli IG THE REQUEST FOR CHANGE
For many years, the Recreation Division front office clerical staff has consisted of one full time Sr. Administrative Clerk
supplemented by two 1500 -hour part time clerk positions. The front office staff provides customer service to thousands of
citizens each year as well as provides clerical support to three recreation supervisors and numerous program coordinators.
In the summer of 2000, one long-term clerk was put on an employment contract. This request is to male the contract employee
full time.
ALTEIIINN IVES
1. Continue this employee on a contract basis
COST SUMMARY
2001-02 2002-03
Additional Costs
Staffing
$35,855
Supplies, Materials, Services
Minor Equipment
Total
$35.855
Savings
-$17,982
Net Cost
$17,873
- 32 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENMURE REQUEST AND STAFFING CHAINGE
ACTTVTTY: Parks and Recreation Administration
REQUEST TITLE: Part-time InternlCAD Operator
REQUEST SUiMIARY
Hire part-time CAD operator to assist in preparation of construction drawings for park improvement projects. By doing in-
house design, we are able to save upwards of $100,000 per year in consulting fees, which allows us to put these savings back
into projects.
PMIARY OBJECTIVE
To save consultant fees by accomplishing in-house design of our park projects. To efficiently and economically accomplish the
in-house design of our projects for a complete package of construction drawings and specifications.
SUNMIARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
Our department has successfully proven that we can save outside consulting fees by doing construction drawings and
specifications in-house. This position provides the necessary staffing to accomplish our objectives efficiently. In addition, the
city will be receiving approximately 5500,000 for park projects in per capita funds from Proposition 12. This position will assist
in the design portion of those projects.
ALTERNN ATSrES
1. Use outside consuliuta services. This alternative would leave fewer funds available for construction.
2. No CAD Operator. This alternative would cause us to turn this task over to Public Works staff, which in turn would
greatly delay projects.
COST SUMMARY
1999-2000 2000-2001
Additional Costs
Staffing
Supplies, Materials, Services
S10,810
Minor Equipment
Total
S10,810
Savings
Net Cost
S10,810
- 33 -
2001-03 F'mancial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE.
ACTIVITY: Aquatics
REQUEST TITLE: Lifeguard
REQUEST SUMMARY
Hire (1) part-time lifeguard to guard the beach extension created by the Lodi Lake Trail project.
PRLNL4RY OBJECTIVE
To provide a safe atmosphere, with adequate supervision, for the community and staff at the Lodi Lake beach.
SUNLNIA.RY OF FACTORS DRIVING THE REQUEST FOR C13ANGE
In November/December the city started phase one of Lodi Lake Trail Project. This has therefore created a larger swim area,
which will require the presence of an additional lifeguard.
ALTERNATIVES
1. Staff the beach with current levels.
COST SUNWARY
2001-02 ` 2002-03
Additional Costs
Staffing,
$3,900
Su lies, Materials, Services
Minor Equipment
Total
53,900
Savings
Net Cost
$3,900 -
- 34-
2401-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFDiG CHANGE
ACTIVITY: Aquatics
REQUEST TITLE: Swim Instructors
REQUEST S[h�LARY
Hire (5) part time swim instructors for one additional swim lesson session (2 weeks/ Aug 20 -Au? 31).
PREVIARY OBJECTIVE
Provide additional (300) opportunities for children to learn how to swim.
SUN IARY OF FACTORS DRIVIiNG THE REQUEST FOR CILANGE
Citizen requests for late summer swim lesson opportunities.
ALTERNATIVES
Provide no sixth session of swim lessons
COST SUMMARY
2001-02 2002-03
Additional Costs
Staffirtg
53350
Supplies, Materials, Services
Minor Equipment
Total
$3350
Savings
Revenue
53600
Net Cost
<5250>
- 35 -
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDTTURE REQUEST AND STAFFNG CHANGE
ACITVM: Sports Facilities
REQUEST TME: Two Full Time Laborers for General Sports Facilities Maintenance
REQUEST SUMMARY
Hire two full time laborers. This request is to bring the level of maintenance staff to an appropriate level for the number of
facilities maintained.
PRLIIARY OBJECTIVE
To provide maintenance of sports facilities in support of recreational programming.
SUNLNi IARY OF FACTORS DRiVLNG THE REQUEST FOR CHANGE
Over the past sic to eight years, the Parks Division has increasingly relied on part time staff for maintenance needs. In August
2000, two long-term part time staff persons were put on contract. This request to make these two employees permanent full
time, one in 2001-02 and one in 2002-03.
ALTERINATIVES
1. Continue using part time staff.
COST SUMMARY
2001-02
2002-03
Additional Costs
Staffing
536.255
536,895
Supplies. Materials, Services
Minor Equipment
Total
$36,255
$36,985
Savings
-$14,960
-S14,210
Net Cost
521,295
522,775
- 36 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Sports Facilities
REQUEST TITLE: Full Time Laborer for National Guard Armory and American Legion Buildings
REQUEST SUINLN .RY
Hire one full time employee for maintenance of National Guard Armory and American Legion buildings if the city acquires.
them.
PRIi LARY OBJECTIVE
To maintain Armory and Legion Buildings for Recreation Sport Activities and Rentals. Impact is significant to bring these
buildings on line, not only with the facilities, but also the mowing and edging. With the addition of these two buildings for Sport
Activities and Rentals, this will place significant impact on our ability to maintain our other parks.
SUNalARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
We currently do not have additional hours specifically budgeted for Armory and Legion Buildings. We currently do not have
enough space for sport activities and rentals. We are asking for a full time laborer to allow for maintenance. Additionally,
these facilities need attention especially in the area of hardwood floor maintenance, restroom maintenance, edging and trimming.
ALTERNATIVES
1. To defer maintenance until a current employee has finished his duties.
2. To contract out maintenance.
3. Staff with part tine.
COST SUMMARY
2001-2002 2002-2003
Additional Costs
Staffing
539,255
Supplies, Materials, Services
Minor E ui ment
Total
$39,255
Savings
Net Cost
339,255
LNIPLEEMENTATIONS
If approved, additional staff to be hired July 2001 or when facilities are acquired.
-37-
2401-03 Financial Plan and Budget
\ SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Parks and Recreation
REQUEST TITLE: Operating Expenses for American Legion Building
REQUEST SUMMARY
Operating expenses for use of the American Legion building by the Parks and Recreation Department to include program
staff, utilities, janitorial supplies, miscellaneous supplies, repairs to building, lease payments, insurance, and taxes.
PRIMARY OBJECTIVE
To provide the community with much needed indoor space for recreational programs and community uses.
SUiN1.4RY OF FACTORS DRArING THE REQUEST FOR CHANGE
The department is in the process of securing use of the American Legion building for indoor recreational programs and
community uses. Once secured, the city will be responsible for ongoing operational costs of the facility. It is anticipated
that through program fees and community use fees, the costs associated with this request will be recovered.
ALTERNATIVES
1. Discontinue pursuing use of the facility and maintain current level of programming.
COST SUMMARY
2001-02 2002-03
Additional Costs
Staffing
$10,000
Supplies, Materials, Services
$46,100
Minor Equipment
Total
$56,100
Savings
Net Cost
- 38 -
2001-2803 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Lodi Lake Park
REQUEST TITLE: Parttime Irrigation Installer
REQUEST SUMMARY
One 1500 hour additional part time laborer to help finish installing irrigation and Maxicom water system on the south section of
the park.
PRLNIARY OBJECTIVE
To assist in the installation of automatic and Maxicom irritation system on the south sections of the park. Would also be
available to install Maxicom clocks in other parks.
SUNLMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
A major objective to upgrade the deficiencies at Lodi Lake is to install automated irrigation in the park. In order to accomplish
this maintenance saving objective is to do the work with park crews through out the year.
ALTERNATIVES
1. Continue to experience excessive maintenance hours to irrigate the park by hand.
2. Contract out this work at a much higher cost.
COST SUMMARY 2001-2002 2002-2003
Additional Costs
Staffing 512,640
Supplies. Materials, Services
Minor Equipment
Total 512,640
Savings
Net Cost 512,640
LNIPLENIENTATTONS
If approved, additional staff to be hired July 2001.
-39 -
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDTT[JRE REQUEST AND STAFFING CHANGE
ACTIVITY: Park Maintenance
REQUEST TITLE: Part Time Laborer for Lodi Lake Park
REQUEST SUINMi ARY
Hire one part-time employee 1500 hours for maintenance of Lodi Lake Park. With the completion of the new Beach area
landscaping (under construction), this will place significant impact on our ability to maintain the rest of the park. With the
addition of this person we will have a better control on maintenance of the Wilderness Area, West Bank and the•rest of Lodi
Lake Park.
�W&OWN<�q f M _tt 31
To maintain Lodi Lake Park Beach area which is currendy under construction and help with the maintenance of the Wilderness
Area and West Bank.
SUNalARY OF FACTORS DRTVPIG THE REQUEST FOR CHANGE -
We currently do not have additional hours specifically budgeted for Lodi Lake Park, With the completion of the new Beach
area, we will have additional maintenance with all the new landscaping. We are asking for 1500 hours of part-time hours to
allow for maintenance. Additionally, Wilderness Area and West Bank (13 Acres west of Lodi Lake) need attention especially in
the area of edging, trimming and spraying.
ALTERNATIVES
Attempt to complete maintenance to the best of our ability.
COST SUMMARY 2001-02 2002-03
Additional Costs
Staffirig S11,505
Supplies, Materials, Services
Minor E ui meut _
Total S11,505
Savings i
Net Cost $11,505
LNIPLEh1ENTATIONS
If approved, additional staff to be hired July 2001 -40-
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVPTY: Park Maintenance
REQUEST TITLE: Two Full Time Laborers for General Park Maintenance
REQUEST SUINZIARY
Hire two full time laborers. This request is to bring the level of maintenance staff to an appropriate level for the number of
parks and facilities maintained.
PRIvi IARY OBJECTIVE
To provide maintenance of general parks.
SLJ-NLN1ARY OF FACTORS DRIVLNG THE REQUEST FOR CHANGE
Over the past six to eight years, the Parks Division has increasingly relied on part time staff for maintenance needs. In August
2000, two tong -term part time staff persons were put on contract. This request to male these two employees permanent full
time, one in 2001-02 and one in 2002-03.
ALTERNATIVES
1. Continue using part time staff.
COST SUMMARY
2001-02
2002-03
Additional Costs
Staffing
536,255
536,895
Supplies, Materials, Services
Minor Equipment
Total
$36,255
536,985
Savings
-$17,130
-$13,300
Net Cost
$19,125
523,685
-41-
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVM: Library
REQUEST TITLE: Purchase a digital copier
REQUEST SUMMARY:
Purchase a digital copier with printer networking capabilities for library staff use
PRLNi IARY OBJECTIVE:
1) Streamline copying tasks by providing a copier with the following features
a) collating,
b) duplexing (two-sided copying), .
c) multiple paper trays, etc.
2) Provide the capacity to create quality copies
3) Reduce the repair bills for copying
4) Provide the opportunity to store document masters digitally and generate copies as needed
SUivtli IARY OF FACTORS DRIVING THE REQUEST FOR CHANGE:
The copier currently available for staff used is a refurbished Minolta. No additional features such as duplexing, collating, stapling,
automatic document feed, etc. are available on the machine. The machine overheats during minor copying jobs on colored paper.
Considerable staff time is used in larger copying projects or the project is taken to city hall. The copier model under consideration
for purchase provides the necessary features and the option to add new features in the future. The maintenance agreement
includes toner, parts and labor for up to 90,000 copies.
ALTERNATIVES:
Continue to use the existing copier; lease a digital copier for S21Imonthy plus a per copy charge of .012, 36 month service
agreement applies.
COST SUMMARY
2001-02 2002-03
Additional Costs
Staffing
Supplies, Materials, Services
11500
Minor Equipment
8,500
Total
10,000
Savings
200
Net Cost
9,800 _
-42-
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Library
REQUEST TITLE: Open the Library for Service on Sundays for 4 Hours
REQUEST SUMMARY:
Extend the library's hours of service to include 1-5 PM on Sunday. Provide full library services including
1) Professional reference services,
2) Circulation services and
3) Internet access
PRII IARY OBJECTIVE:
1) Enhance the public's access to information and the library's resources
2) Provide library services when other libraries are unavailable to students and information seekers
3) Hire one half-time reference librarian to share in providing professional information services on Sundays
SUIN iARY OF FACTORS DRIVING THE REQUEST FOR CHANGE:
Currently the library is open 60 hours per week. Area school libraries, academic libraries, and county public libraries
are closed on Sunday. Patterns of daily life are changing, more residents are experiencing lengthy commutes to the
Bay Area resulting in a need for more weekend hours. In 1995 fourteen (14%) percent of the library users polled in a
survey requested more weekend hours, many asking specifically for Sunday hours. Members of the public frequently
ask library staff and board membdrs about opening the library on Sunday.
ALTERNATIVES:
Provide access to information only through a telephone reference service on Sunday.
Open the library with limited services; for example, as a reading room with no materials checkout available and no
assistance in finding information.
COST SLRANIARY
2001-2002 2002-2003
Additional Costs
Staffing
49,628
Supplies, Materials, Services
12,000
Mucor Equipment
Total
61,628
Savinas
Net Cost
61,628
-43 -
ueueagrl azuaaaft GWU-Ped
a6uogJ 6u!))elS pup asuadxd lucoipu&S
6 nags S suwnloa PPY :01 uwnloJ
luo lauuosa aw!l•lar
ao1 alnpagas alai alms as uo palsalpul alsa Aq S uwnloJ ul lunowr aq7 ! AIn1V :6 ownloJ
1uo ljuuo&jA;;wij-pvd
aoJ alnpagas alsa alsJs 4c uo palr4!pui alts Aq S uwnloJ uc lunocur aq7 1 !IIn1V :R uwnloJ
Xluo !4uuo� aw!1-►as
ao1 alnpagas alsa alsas 4v uo Palra!Pul aji q S uwnloZ) ul lunows ag1 f !Nn1V :L uwnloJ
(9R/I/[4411, paa!y) )as31Palq o! 1341gnc sl as o! wa 4411! Sr10' Aq S uwnloJ u! lunowr aql ll !IInlV :9 uwnloJ
P pus C suwnloD ul slunosus a41 XfdiljnjV :S uwnloJ
salsa asa wal/awil-lar aq1 woal 41ra Aivivs ajwlidoiddy a41 acll :p uwnloJ
(uno4 OOI :al wsr3) paain as 4w!l 441 XjIluapi :C uwnloJ
=0113nalsul )!j!3ads,
W999'ot
S RC'9C S 6r'RO
S 91.591 S
Or'999'61 S atialV rwal(Jo lUo•I,
rr'9991or
S 81'9C S WHO
S 91'591 S
Or'999'61 S 16'RI Or01 44u3a4Nt! I ql I awi,l,•lis,1
ro-zanz
rr'999'OL
S RC'9C S (r'RO
S 91'59Z S
Or'999'61 S Irlo.L
W9991OZ
S RC'9C S 6r'RO
S 91'59Z S
Or'999'61 S 16'91 Or01 33u4aaNt( 1 q!'1 aw!,L•1ar,1
ZO-looz
Ot
6 8 L
9
r C Z 1
[S3f1d3�i
aausansul Il.maaS
24ur4n5ul
Ivan au 4181' PMIIl(1 as ani 4111.E 4or
'1V.LO.L
ju;wAojdwaun !rhos 8u3d 4asalP4lV
I910J. !anoll aw!.Lls-3
SZ1 ZZI 1Zl
SII
1080IZ
?f3flIV71N.I.N(107JV
s4a!AaaSuollYLUaolul
;A.I.IAII-)V
ki sag1-1
:.I.N3IV.L21Vd3Q
Is3na3a 3W11-1-dVd/,lav8odw3.Z
L3DGntl QNY Nv-ld IYIJNYNI3 CO-looZ
ueueagrl azuaaaft GWU-Ped
a6uogJ 6u!))elS pup asuadxd lucoipu&S
2001-2003 Financial Plan and Budget
SIGN-MCANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Library
REQUEST TTTLE: Part-time Reference librarian
REQUEST SUMMARY:
Hire one part -tune professional librarian to provide information services during peak times -
(weekday aftemoons, and weekends)
PRLM-ARY OBJECTIVE:
1) Increase customers' access to information by providing a professional librarian to assist in finding information throughout the
library's various collections.
2) To increase the customer's satisfaction with library services
3) Position the library with additional staffing to accommodate extending the library's hours of service
4) Provide the opportunity for professional staff to extend library services through outreach to the community.
SU}LlL4RY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The library has increased its collection and varied its information formats in recent years. The reference staff has increased its
involvement in outreach activities with community groups. The introduction of the Internet as a reference tool has increased the
stafrs ability to answer more complicated reference queries. Although the introduction of the Internet in homes has deceased the
nranbers of customers questions, the level of complexity and the amount of staff time required to provide an accurate answer has
increased. In addition, the introduction of Internet stations for the public access has greatly impacted the reference desk activities.
During peak- times especially after school, the volume of reference help required by the public increases. On weekends no
reference service is available when the full time reference librarian is at lunch.
ALTERNATIVES Continue current staffing levels with no reference desk coverage during lunches and vacations. Unable to
increase library service hours or coaununity outreach activities.
COST SLIMMARY 2001-2002 2002-2003
Additional Costs
Staffing 20,667
Supplies, Materials, Services
Mina Equipment
Total 20,667
Savings
Net Cost 20,667
-45-
Z
Significant Expense and Staffing Change
Port -limo Reference Librarian
2001-03 FINANCIAL PLAN AND DUUGET
TEMPORARY/PART-TIME REQUEST
DEPARTMENT:
Library I
ACTIVITY:
Information Services ACCOUNT NUMBER:
210801
its
121 122 125
Fit Time flourly Total
Medicare PERS social Unemployment
TOTAL
Job Title Purpose Utilized Rite Request
Insurance
Security Insurance
REQUEST
1 2 3 4
6
7 8 9
10
2001-02
Part -Time Lih I Refertnce 1040 1821 S 19,666.40
S 285.16 S
678.41) S 3638 S
20,666.44
TOW S 19,666.40
S 285.16 S
678.49 S 36-38 S
20,666.44
2002-03
I'tri-TIMe 1,11) 1 Rerermce 1040 18.91 S 19,666.40
S 283.16 S
678.49 S 36.38
10,666.44
_S
Total of Items Above S 19,666.40
S 285.16 S
678.49 S 36.38 S
20,666.44
SpecificInstructions:
Column 3: Identify the time required (Example: 100 hours)
I Column 4: Use thea ro riate salary rate from the part-Ilm/lemporary, rates
Column 5: hlulfiply the amounts in Columns 3 and 4
Column 6: Multiply the amount in Column 5 hy.ow if the employee is subject to Medicare (hired
after 3/1186)
Column 7: Multiply the amount In Column 5 rate Indicated on separate rite schedule for part-time personnel only
Column 8: Multiply flit amount In Column 5 by rate Indicated on separale role schedule for
part-time personnel only
Column 9: Multiply the amount In Column 5 by rate Indicated on se orale rate schedule for
art -time person el only
Column 10: Add columns 5 thro 9
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Hutchins Street Square — Performing Arts Center
REQUEST TITLE: Hire Full Time Stage Tech Manager for the Hutchins Street Square Theatre
REQUEST SUMMARY Hire a full time Stage Tech Manager to handle the operation and
management of the Theatre and conference rooms at Hutchins Street Square.
PRIMARY OBJECTIVE '
1. Expand the use and operation of the theatre and conference rooms
2. Provide greater customer service
3. Increase efficiency
4. Provide level of protection for facility and high tech equipment
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The theatre was opened in 1999 as the final construction of the Square was completed. The department
made a commitment to the City to learn the system and piece -meal the operation until the next full budget
cycle in an attempt to manage efficiently.
The proposed plan to add a full-time stage manager matches the proposal of the Arts Commission and the
Hutchins Street Square Foundation over the past few years to supplement staff with a full-time stage tech
manager. Our current use of the theatre and conference rooms is managed by a variety of part-time, out
of town/on-call techs. The addition of a full-time manager would expand the potential use of the
facilities, increasing the opportunities of community use.
The addition of an aquatics coordinator at the Square's swimming pool realized a 20% increase of
revenues over the first twelve months of operation.
ALTERNATIVES
Continue using part-time staff on a need basis.
COST SUMMARY
2001-02
2002-03
Additional Costs
Staffing
Supplies, Materials, Services
S
S
55,000
5,000
Minor Equipment
S
5,000
Total
S
65,000
Savings
S
30,000
Net Cost
S
35,000
-47-
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Community Center'
REQUEST TITLE: Replace Existing Poollift,
REQUEST SUMMARY: Replace existing poollift with unit meeting current ADA standards and
increased capacity.
PRIMARY OBJECTIVE: Provide safe, easy to use and reliable lift service to handicapped
clients using the H.S.S. pool.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANCE: The current poollift has
reached the end of its working lifespan. Calcium deposits and corrosion damage the lifts seals
reducing capacity and cause binding in the lift's action. This lift is undersized for large clients,
does not offer padded surfaces, and does not contain people from falling out of the lift. Falls
have occurred twice. The current poollift does not have child safe edges. The new poollift will
have double the capacity (700 lbs.), padded arm rests, a trapeze overhead for the wheelchair
bound and does not reside in the pool- saving space, increasing lifespan of the apparatus.
ALTERNATIVES: Continue to utilize the existing lift. Consequences: Limited range of clients
able to access the pool. Possible liability due to falls.
COST SUMMARY
2001-02 2002-03
Additional Costs
Staffing
Supplies, Materials, Services
59,300.00 nfa
Minor Equipment
Total
S9,300.00
Savings
Net Cost
S9,300.00
-48-
ecenuenr
INDEPENDENT
LIFT
Homepage
Contact
Information
The Plant
CURRENT
MODEL
4180-S
lifting Capacity
Product Features
-incdl?/arranty
A FAMILY-OWNED AND MANAGED BUSINESS-
Pricing/Warranty
INDEPENDENT LIFT PRICING
DESCRIPTION
PRICE
Model 41 BD -5 lift
$8,500.00
Includes all shower accessories
Step-up pump
Price does not include crating,
$$500.00
shipping or tax where applicable
CONDITIONS OF SALE: In addition to prices listed
above, sales tax and shipping and crating charges
will be added to each purchase.
TERMS OF SALE: All sales and prices set forth are
strictly cash at point of sale. Prices are USD FOB
Bay City, Michigan.
RETURNED GOODS: No returns accepted without
prior auhorization, Merchandise must be returned
within 15 days of shipment. A restocking charge of
15%, plus freight, will be charged to customer.
TRANSPORTATION CLAIMS: if any merchandise is
damaged or lost in transit, the buyer must file a
claim with the common carrier under the carrier's
regulations.
METHODS OF PAYMENT: 50% deposit prior to
shipment and balance by certified check, money
order or cash at delivery, or prepayment by check.
PLEASE: Do not send cash by mail.
WARRANTY: 12 months on all parts & labor at the
factory, or by an authorized representative. This
warranty shall not extend to goods subjected to
misuse, neglect, accident or improper installation
or maintenance, nor goods which have been
altered or repaired by anyone other than seller or
its authorized representative. All claims for
allegedly defective goods must be made within ten
(10) days after buyer learns of such alleged defect.
Homepage I Contact Information I The Plan • 41 -5 I Lifting
a a it I product Features I pricingMarranty
-49-
sti I*ws
eST,4()o -
�tlDEPEh�hT
INDEPENDENT
LIFT
Homepage
Contact
Information
The Plant
CURRENT
MODEL
418D•5
Lifting Capacity
Product Features
ricing/Warranty
A FAMILY-OWNED AND MANAGED BUSINESS:
Homepage
MODEL 41 BD -4
(shown above)
Welcome to Morris Independent Lift®!
Features include waterpower, with hands-on control
at all times. You can ,, : p or s L : crsc at any time.
Controls in Braille, no backvrard travel, floating
safety armrest, and overhead trapeze bar for solid
grasping. No part of the lift touches the inner wall of the
pool. The lift is capable of 700 pounds of lift, 44" of
overall travel, and it's constructed of 316 stainless
steel!
Please visit again!
As we have opportunities to show more of the
Independent Lift with additional presentations on this
site, we will be updating continuously to include more
helpful content. Thank you for visiting!
000417
Homepage I Conla-1 Inforri.7::on , Tn.! Port i 41BO-5 I Lifting
Capauty I Product Pmmg ,Varranty
-50-
COMMUNITY & ECONOMIC DEVELOPMENT
BUILDING
PLANNING
CODE
ENFORCEMENT
ENGINEERING
ECONOMIC
DEVELOPMENT
2001-03 Financial Pian and Budget
SIGNIFICANT EXPENDITURE REOUEST AND STAFFING CHANGE
ACTIVITY: Community Improvement
REQUEST TITLE: Repair and Demolition Fund
REQUEST SUMMARY
Provide additional funding for the Repair and Demolition Fund to allow abatement activities to continue.
PRIMARY OBJECTIVE
1. To ensure that there is sufficient funding to allow for the abatement of public nuisance conditions by demolition,
vacant building securing and property cleanups.
SUMMARY OF FACTORS DRIVING THE REQUEST
The Community Improvement Division has recently streamlined the abatement process for the securing of vacant
buildings and the clean up of properties so that they may be done in a more timely manner. This process will cause an
increase in the number these routine abatements that will be done each year. In addition to these routine abatements, it
is also projected that there will be an increase in the number of demolitions of abandoned, dilapidated structures in
order to eliminate the nuisance and blight conditions. These demolition abatements will also provide an impetus for
redevelopment and reconstruction of new housing units.
ALTERNATIVES
Return to Council to request Special Allocations to cover abatement costs. This alternative would cause a
delay and defeat the purpose of streamlining the abatement process.
Seek funding through other sources such as CDBG and the Redevelopment Agency. Using CDBG funds
for demolitions would add an additional level of environmental review which would slow the abatement
process. Currently, the Redevelopment Agency does not have the necessary funding for these abatement
actions.
COST SUMMARY
Additional Costs
2001-02
2002-03
Staffing
0
0
Supplies, Materials and Services
550,000
Minor Equipment
0
0
Total
550,000
Savings
None
None
Net Costs
550,000
INIPLEiv1ENTATION
With approval of this funding. abatement activities would be carried out without delay.
- 51 -
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Code Enforcement
REQUEST TITLE: Contract Code Enforcement Services
REQUEST SUMMARY
Hire one additional Code Enforcement Officer, as needed over two years to support the existing code enforcement staff
in responding to complaints of substandard housing and dangerous building conditions, property maintenance and
zoning violations, inoperable and abandoned vehicle and other nuisance conditions, specifically on the Eastside .
PRINL&RY OBJECTIVE
1. Ensure that reports of substandard housing and dangerous building conditions are investigated promptly and that
the required abatement action is followed, thereby eliminating serious health and safety hazards in the Eastside
neighborhoods which is where the majority of those conditions exist.
2. Ensure that nuisance and blight conditions are abated in a timely manner.
SUMMARY OF FACTORS DRIVING THE REQUEST
The volume of code enforcement complaints being handled by the Community Improvement Division had become
increasingly harder to manage %vith the existing personnel. In response to that, an additional code enforcement officer
position has been authorized and contract services have been used in the interim until that position is filled. The use of
the contract services has proven to be very effective and has allowed us to move forward with the implementation of
proactive enforcement projects in various areas of the city, but mainly in the eastside residential neighborhoods where
the bulk of the substandard housing cases are concentrated.
ALTERNATIVES
1. Add an additional code enforcement officer to the existing staffing. This alternative would work but may prove
to be unnecessary later on once the current funded positions are filled and are up to speed with the workload.
2. Cut back on any proactive enforcement projects. Reducing proactive enforcement activities would make
available the resources to handle the complaint driven caseload.
COST SUMMARY
Additional Costs
Staffing
Supplies, Materials and Services
Minor Equipment
Total
Savings
Net Costs
2001-02 2002-03
0
557,200
0
S57?00
None
557,200
Contract costs are calculated at S55.00 per hour for a term of G months a year for full-time or 12 -months for part-time.
Based on that hourly rate and those terms, it would cost relatively the same cost to hire a permanent position and
provide benefits.
I \IPLEh1ENTATION
With approval of these services, a contract code enforcement officer would be hired as soon as possible.
- 52 -
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Current/Advanced Planning
REQUEST TITLE: Housing Element Update
REQUEST SUMMARY:
This request involves a comprehensive update to the Housing Element of the General Plan.
PRIli IARY OBJECTIVE:
The City of Lodi is required by State law to update the Housing Element of the General Plan by 2003.
This request will allow us to hire a consultant that is qualified to prepare the new element.
SLQ'vE IARY OF FACTORS DRIVING THE REQUEST FOR CHANGE:
The Housing Element was last revised in 1991. State law requires Cities to update the element on a
specific schedule. Lodi's next schedule revision is due in 2003. However, the City's element does not
meet current state guidelines on a number of areas.
ALTERNATIVES:
Do nothing.
COST SUMMARY 2001-02 2002-03
Additional Costs
Staffing
Utilities and Communications
Supplies, Materials and $40,000
Services
Minor Equipment
Total
Savings
Net Cost 540,000
- 53-
2001- 03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Community Promotions
REQUEST TITLE: Additional Funding for the Lodi Visitors' and Conference Bureau
REQUEST SUMMARY Allocate an additional 570,000 to the $60,000 base for fiscal year 2001/2002, totaling S 130,000.
PRIMARY OBJECTIVE
To fund the following projects in the specified amounts:
1. Advertising
38,000
2. LCVD Website
13,000
3.Destination Marketing
16,500
4. Community Relations
2,500
70,000
SUM`IARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The goal of the Lodi Visitors' and Conference Bureau is to promote Lodi as a destination for tourists seeking the wine country
experience. Projects to be accomplished with the additional funding include advertising in publications such as Sunset, VIA, and
CA Visitors' Guide, a consolidation of the Community Concierge (kiosk) and the Bureau's %veb site; various Destination Marketing
programs such as Familiarization Tours, a Festivals/Events Marketing Symposium, and the Wine Trail Map; Community Relations
such as FAM tours and Lodi 101 Employee Education workshops.
ALTERNATIVES
Continue with the base funding of 560,000 annually, limiting the ability of the Bureau to market the tourist trade in the City of Lodi.
COST SUMMARY 2001-02
Additional Costs
Special Pavments S70,000
Total
savings 0
Net Cost 570,000
- 54-
March 5, 2001
C O N F E R E N C E s
V I S I TORS B U R E A U
Janet Hamilton
City of Lodi
221 West Pine Street
Lodi, CA 95240
Dear Ms. Hamilton,
Per your request, we are providing a brief summary regarding the Lodi Conference &
Visitor Bureau's (LCVB) budget request for Fiscal Year 2001/02. The LCVB is
requesting an additional 370,000 to the 360,000 base, totaling $130,000 for FY
2001/02. These funds will allow the LCVB to continue successful projects and to create
a compelling marketing program.
Advertising
Ads in Sunset, VIA and CA Visitors Guide
LCVB Website/Kiosk
The Community Concierge (kiosk) & the LCVB website will
be consolidated into one site.
Destination ,Marketing
• Familiarization Tours (FAM Tours) will help to familiarize media
representatives, travel planners and out-of-town hospitality service
providers with Lodi.
• Festivals/Events Marketing Symposium will provide festival & event
planners with information, materials and skill building opportunities for
developing a competitive edge in marketing their events.
• Wine Trail Trail/Map will continue to expand as new wineries
come to our area.
Community Relations
• FAM Tours will help to familiarize local business representatives
and community leaders with Lodi and how it benefits from tourism.
• Lodi 101 Employee Education workshops will be designed for
frontline employees who play critical roles in providing information
and resources to travelers and visitors.
TOTAL
$38,000
13,000
15,500
2,500
$70,000
Thank you for considering our request. For your information, the Winegrape
Commission's financial match is running far in excess of the originally agreed upon
50%. Please let me know if 1 can provide additional information for you.
Sincerely,
Sharon Dais
Lodi Conference & Visitors Bureau
2545 West Turner Road • Lodi, California 95242 • Toll -Free - 55- 09.365.1195 • Fax: 209.367.0737 • www.visillodi.com
2001- 03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTMTY: Community Promotions
REQUEST TITLE: Funding for the Downtown Lodi Business Partnership
REQUEST SUMMARY Allocate $60,000 in order to fund 40% of the total operating expenses for the Downtown Lodi Business
Partnership,
PRIMARY OBJECTIVE
To extend funding agreement with the DLBP in order to support efforts to draw and retain business in the Downtown Lodi business
area.
SUMINIARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The breakdown of projected operational costs for the Partnership includes $63,000 for administrative expenses and $75,000 for
advertising and marketing. It is anticipated that business assessments and fund raising events will supplement the funding from the
City of Lodi in order to continue the program at its present level.
ALTERNATIVES
Allow the DLBP to function independent of City funding, potentially reducing the effectiveness of the program.
COST SLT',-1?VLkRY 2001-02
Additional Costs
Special Payments 560,000
Totat
Savings 0
Net Cost 560,000
-56-
.'?fr
DOWNTOWN
TO D
March 9, 2001
Memo to Janet -Hamilton
Subject: Downtown Lodi Business Partnership (DLBP)---general funding request in
the amount of 560,000 for budget year July 1, 2001—through June 30, 2002.
The DLBP has had its most successful rear ever in 2000, greatly exceeding its
project goals for events and promotion in all areas. The combination of all events
dreg` over 50,000 people to the Downtown core. With your continues support we
expect even great: accomplishments in the year 2001-2002.
The heart of Lodi, is it's Community Shopping Center, the Downtown business core.
These funds are necessary for our continued revitalization. The DLBP and the City
of Lodi have partnered last several vears'to create this success. Our Downtown area
is showing continued strong economic growth, in terms of new business, profitability
of existing business (see enclosed survey), and the success of all events.
City funding amounts to approximately 40% of the new budget, with businesses
assessments, and funding raising events bringing in 60% of total revenues.
The DLBP's events projects include the Farmers Market, Parade of Lights, a new
A&W Collectables show, Kiddie Parade, plus many others. In addition wecooperatively work with the city on economic development, parking regulation ---
permit, and solutions to the current theater parking situation ---special marketing
for integrating the new theater into the business community, and business retention.
Part of our retention program includes a cooperative advertising programs for all
Downtown businesses, advise on business practices"through our news letters, and
working with business owners to answer their daily concerns about the business
clement in our Downtown area. In addition we provide Kiosk maintenance, and
governmental liaison with city officials.
b _
Our total administrative expenses in the new budget year are projected to be
S63,000 ---these expenses include the managing of the above listed events and
programs, office space rent, accounting, administrative salaries, telephone, and
other normal office expenses.
P.O. Box 1565 Lodi, CA 95241 (209) 369-8052 FAX (209) 369-8053
Office located at 4 W. Pine Street, Lodi (corner of Pine c4 Sacramento St.)
e -moil, d1bp0mi7dspring.com
-57-
DOW 14TOWN
_fIDS
PAG£ 2 OF 2
Our advertising and marketing expenditures to promote the Downtown will be over
575,000. The majority of this amount goes for newspaper, TV, Radio, billboards,
and printed marketing items such as parking and general marketing brochures for
the Downtown area.
The DLBP is ready to continue to meet the challenges presented in the continuing
opportunity of revitalization for our Downtown area. Even though we have come a
long way, there is still a continuing road to travel. Together, we can continue this
success. If you were to visit cities that do not have this cooperative program, you
will, for the most part, see cities that are having "heart problems".
The most successful Downtowns across this great nation, are the one's that have
implemented a public/privet partnership, such as we have done here in Lodi. it is
vital for our continued success, that the leadership of both parts of the partnership
continue to work together. We have proven that the DLBP is the best vehicle to
implement the action plan for our continued growth and success.
A continuing investment in vour Downtown, is an investment in the improving
health of the City of Lodi ---our "heart" will improve and beat stronger.
Respectfully submitted by
Lewis F. Van Buskirk
Executive Director for the
Downtown Lodi Business Partnership
- 58-
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFMG CHANGE
ACTIVITY: Engineering
REQUEST TITLE: Civil Engineer
REQUEST SULNENLARY
Hire one Civil Engineer on a permanent basis to augment the staffing of the Development Services and Traffic Engineering
sections. One-half full-time equivalent is needed in each area to serve an increasing number of private development projects and
to maintain traffic operations services.
PRLNLARY OBJECTIVE
1. Improve customer service in the areas of encroachment permits and plan check review.
2. Enable supervisory staff to assign work tasks to appropriately skilled and trained persons in lieu of part-time interns.
3. Improve the productivity of both Sections through better utilization of staff.
SU`MkRY OF FACTORS DRIVLNG THE REQUEST FOR CHA\GE
The combined workload volume of development projects and traffic operations enhancements has steadily increased as the
community has grown. The demand has been met by conunitted senior technicians, part-time interns, and contract services. An
imbalance exists in the department staffing that jeopardizes the department's ability to serve as a result of re-assignmems,
transfers, and retirements. The key support civil engineer of Development Services has been re -assigned full-time to
engineering design. The key Senior Engineering Technician wilt be re -assigned to engineering design to fill a retirement
vacancy.
ALTERNATIVES
1. Hire one civil engineer as a permanent staff member assigned to Development Services and Traffic Engineering.
2. Contract with consulting firms to meet our customer service demands. Long-term contracts will be necessary because the
workload is not market driven but more turn -key in nature. The cost of these services will be approximately $39,000 per
year.
3. Delay review of development applications and defer traffic operations enhancements.
COST SUNIMARY
2001-02 2002-03
Additional Costs
Staffing
63,000
Supplies, Nlaterials, Services
3,000
Minor Equipment
Total
71,000
Savings
22,000
Net Cost
49,000
-59-
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFLNG CHANGE
ACTIVITY: Engineering
REQUEST TITLE: Engineering Technician
REQUEST SUi &IARY
Hire one Engineering Technician on a permanent basis to complete the staffing
of the surve; crew are
the two -person survey crew. Principal duties
re to perform design surveys/construction staking in support of projects implemented by the Engineering
Division. The Engineering Technician will work under the supervision of a Senior Engineering Technician.
PRLMARY OBJECTIVE
1. Ensure that cost-effective survey services are provided to projects designed by the Engineering Division.
2. Implement quality assurance measures by assigning an individual technician whose principal duties are to support the chief
surveyor and, thereby, assure a greater constancy in the performance and quality of surveying services.
SUKNIARY OF FACTORS DRIV]1�G THE REQUEST FOR CHANGE
Services of a two -person survey crew are needed to support the Engineering Division projects that include: 1) downtown
revitalization; 2) water and wastewater infrastructure rehabilitation; 3) sidewalk and wheelchair ramp replacement; 4) Parks and
Recreation projects; and 5) roadway maintenance projects. Surveys are the final and most important part of the design process
and it requires two trained and experienced persons to comprise an effective and productive crew. For the most part,
Engineering Division projects are under S250,000 in construction cost but the annual value of capital improvements will exceed
52.5 million for each of the next five to ten years. By nature, these projects are collaborative between Engineering, Streets, and
WaterAVastewater and, as a result, require on-call survey services that are difficult to secure from outside contract sources. At
present, the position duties are performed by interns and technicians that are pulled from other assignments.
ALTERNATIVES
1. Hire one engineering technician as a permanent staff member on the two -person survey crew.
2. Retain the services of a firm specializing in survey services at a supplemental cost of 570,000.
3. Continue existing operations.
COST SUMMARY
2001-02 2002-03
Additional Costs
Staffing
6,220
Supplies, Materials, Services
Minor Equipment
3,000 0
Total
63,220
Savings
Net Cost
68,220
60 -
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAF'FV\G CHANGE
ACTIVITY: Engineering
REQUEST TITLE- Document Preservation Services
REQUEST SUti11i WRY
Contract with a firm specialized in the conversion and indexing of map and construction documents to digital format. The
electronic files will reside in MapGuide and wilt be accessible over the Internet.
PR YIARY OBJECTIVE
1. Preserve the integrity and quality of map and construction documents by significantly reducing handling of original
documents.
2. Enhance the functionality of existing ivlapGuide indexing by allowing the general public to preview subdivision maps, parcel
maps, and improvement plans from the Intemet.
SUNCNLARY OF FACTORS DR VM THE REQUEST FOR CHANGE
A majority of the City's "record" copies of mapping and construction plans are of paper or vellum media. Age and handling
have significantly damaged many documents. Access to this information is primarily facilitated by Engineering staff that
research, retrieve and copy these documents for public and private improvement projects. As the City continues to expand, the
number of these documents steadily increases. With the rehabilitation of the City's aged infrastructure systems, handling of the
older documents will result in accelerated deterioration of archival information. Enhancing the public accessibility to these
documents will reduce staff workload in this area.
ALTERL ATTVES
1. Contract with a specialized firm to convert record documents to digital form.
2. Purchase a flat bed scanner and software and have staff perform the conversion. The alternative cost is approximately
S24,000.
3. Preserve original documents by working from prints of originals. Storage space limitations and the redundant effort to
maintain two sets of documents will add to staff workload.
COST SUMMARY
2001-02 2002-03
Additional Costs
Staffing
0 0
Supplies, Materials, Services
5,000
Minor Equipment
0 0
Total
5,000
Savings
Net Cost
5,000
- 61-
GENERAL GOVERNMENT
LEGISLATION
ADMINISTRATION
CITY CLERK
SUPPORT SERVICES
NON -
DEPARTMENTAL
2001-02 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
—TMTY: General Services
xtEQUEST TITLE: Purchase 6 LCD Projectors
REQUEST SUMMARY
Purchase six new LCD (Liquid Crystal Display) Projectors for City use. The new units ,vill cost an average of S4,500 each
and should have a usefW life of from 5 to 6 years.
PRIILA.RY OBJECTIVE
The purchase of the LCD Projectors will assist City Departments in the following areas:
Five LCD Projectors would be placed at the following locations: Carnegie Forum, Hutchins Street Square, the Library, the
Police Department, and the Parks and Recreation Departmcnt. The sixth would be loaned to various departments by -
Information Systems on an as -needed basis. They would be used for both presentations and training.
SUlIhL4RY OF FACTORS DRIVING THE REQUEST FOR CHANGE
Currently, the City of Lodi owns two LCD Projectors. One unit is used in the Finance Dept training room, and the other unit
is managed by the Fire Dept. Boeh units are available to City staff. However, because of the setup time involved and the risk
of being damaged, they are not used as often as they might be. These four units would be placed where they can be used on
demand. We have long had a need to provide training to City staff at the various locations, and these four units would fill
that need. And, finally, presentations are much more effective when they can be enhanced by modern technolog • such as
PowerPoint or live Web Based tools.
ALTERNATIVES
• Continue to operate as we do today.
COST SUMbLARY
2001-02 2002-03
Additional Costs
Six New LCD Projectors S27,000 SO
Total 527,000 SO
Savings
Net Cost
- 62 -
3001- 03 Financial Plan and Budget
SIGN IFICA.NT EXPEttMITURE REQUEST a:\i3 STA.F•FI G CH I:\GE
ACTIVITY: General Support .
REQUEST TITLE: tMembersIdp and Dues
REQUEST SUZNDIARY Funding for the City of Lodi's share of the cities' of San Joaquin County portion of the LAFCO (Local
Agency Formation Commission) annual budget.
Y
SUM -MARY OF FACTORS DRIVING THE REQUEST FOR CH .NGE
As r_quired by ARMS, the State of C=lifornia has mandated gnat cities shat, in the cost of opecations for [^.e Local Agcncy
Formation Commission (L.• .FCO). Operation costs for the apncv gill be shared by t1m: Counyy ofSan Joaquin (1/3), the Special
Discricts (l/3), and t cities (l/3). The c�layor of tnc cities deter+ ncd gnat tl` :: costs «•ould be d'mibuted according to population.
COST S(J-,,INLARY
I 2001-02 I 2002-03
:additional Coss
I I
ScafFcn?
I
Suopli,s, ivtace^als, services
I S13,000 I
-Minor Eouiomeac
I I
Total
I S13.000 i
SavL-12s
I I
I I
I i
I I
tiet Cost
I S13.000 1
- 63 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Public Works
REQUEST TITLE: Solid Waste Administration
REQUEST SUMMARY
To provide funding to address the upcoming renewal of the solid waste removal contract, provide professional guidance
in meeting the City's goals and responsibilities as outlined in the SRRE, and provide matching funds for numerous
grants being offered by the State.
PRIMARY OBJECTIVE
To provide the best solid waste/recycling service at the most reasonable cost to the consumer and yet provide the City
with a revenue source that is based on an appropriate formula.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
Many things have changed in the solid waste industry in the last few years. New programs must be added to continue
to meet the goals of the California Integrated Waste Management Board. There are also other sources of revenue in
the solid waste/recycling field that must be addressed. There are grants available through the State which require
matching funds. Many of these grants are for regional activities and San Joaquin County Public Works will take the
lead in securing funding. The City must have matching funds available to participate. Not only will these grants help in
the City's recycling and reduction of waste efforts, it will show our good faith effort to meet the goals of SB 939.
The contract with our solid waste contractors comes to an end June 30, 2003. We have the option to extend the
contract under the present agreement for an additional period if the contractor is notified 18 months (December 2001)
prior to the ending date. The contractor's operation has not been audited recently and this should be done before the
new franchise agreement is negotiated. An outside auditor would be hired to do this. It is imperative that a consultant
with experience in this growing and sophisticated industry be hired to assist in the preparation of the new franchise
agreement that will be most advantageous to the City and provide quality service to the customer at a reasonable price.
An audit will probably be a minimum of S10,000, and a consultant to help with the new agreement will be at least
S10,000 in the next fiscal year. There are sources of revenue in the solid waste recycling field that have not been
addressed by the City. This is one of the things that would be included in the new agreement.
A waste generation audit is presently being conducted in the business and industrial sectors of the City. When this is
completed, probably in March, 2001, we will have information available which we didn't have in the past. After this is
completed, the City's Source Reduction and Recyling Element must be updated. Presently, there is not enough time
for in-house staff to do this and a consultant would be hired. This would be done in the second year.
ALTERNATIVES
s Extend the existing contract for an additional 7 -year term as provided in the contract without developing a new
rate structure or franchise agreement.
Don't participate with other regional agencies in acquiring grants to target recycling, reuse, and reduction of
waste.
COST SUMMARY
2001-2002
Additional Costs
Staffing
Supplies, Materials, Services $20,000
Minor Equipment
Total $20,000
'Savings
Fines could be levied if goals are not met.
Net Cost $20,000
- 64 -
2001-02 Financial Plan and Budget
SIGNIFICAiti'T EXPENDITURE REQUEST AND STAFFS G Cii.AN GE
ACTIVITY: Information Systems
REQUEST TITLE: HP Openview Network Management Software
REQUEST SUNLNIARY
Provide support for the City's Nide Area Network (WAN) with a network alert and monitoring tool (HP Openview). The system
costs S 3,500.
PRIMARY OBJECTIVE
This nec%vork alert and monitoring tool will assist Information Systems with keeping the City's network operational.and will provide
an early warning when nevvork problems arise
Sni IM RY OF FACTORS DRIVLNG THE REQUEST FOR CEL-k\GE
The Nide Area Network (WAN) is an extremely complicated system of electronics, software and inftastructure required to
work in harmony. City staff has learned new ways to be more efficient and has become very dependent on its operation. The
network management system will allow us to keep the rerwork operational a higher percentage of the time. It can detect
components that have failed and alert us to take corrective actions. It is also capable of analyzing load patterns so %ve can better
balance network traffic. The result is a more smoothly operating network with hither degree of reliability.
ALTER:\ ATI VES
• Continue to operate as we do today, waiting for a call from a user to let us know we have a problem and then relying on an
outside vendor to resolve the problem
COST SUNINIARY
2001-02 2002-03
Additional Costs
HP Opemiery Network- Management S5,500
Total 55,500
Savings
Net Cost
- 65 -
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: City Clerk
REQUEST TITLE: Administrative Clerk (confidential)
REQUEST SUMMARY
Staff increase of one full-time authorized Administrative Clerk (confidential)
PRIMARY OBJECTIVE
Adequate staffing level to maintain current level of services.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
NEW Standards & Procedures: (instituted since July 2000)
• Minute preparation for all noticed City Council meetings. Minutes of Shirtsleeve Sessions were not
prepared prior to July 2000. This has increased the total hours of meetings per month, in which
minutes must be prepared, by a minimum of four hours. Standard minute preparation time is four
times the number of meeting hours (example: comprehensive minute preparation for a one-hour
meeting typically takes a total of four hours); this equates to an additional 16 hours of work each
month. The style of minutes for regular meetings has changed from a staff report "cut and paste"
method, to minutes that are reflective of the actual discussion taking place at meetings.
• Information Tracking: Logs are now maintained for tracking Council meeting minutes, Council
attendance, documents pending recordation, report of pending Council requests, public hearing
notification/procedures, and requests for information.
• Full review of Council agenda and staff reports is now being done prior to submittal to City Manager.
This results in more accurate documents and decreases the burden on City Manager staff.
• Same day response letters are now prepared for all citizen correspondence (including e-mail)
• Support to Mayor — A separate calendar is maintained, as well as a calendar summary, and phone
call reminders for all appointments. Preparation of general correspondence, response letters, and
City employee birthday cards from the Mayor are processed by the City Clerk's Office.
• Boards and Commissions — Preparation of publications soliciting applications, annual list of
appointive terms to expire, communication with liaisons regarding vacancies, applications, and Brown
Act requirements.
• Proofing Lodi Municipal Code supplements received from Book Publishing; interim updating of Code
books for Clerk and City Attorney.
Technology: The Fortis electronic records management imaging system requires a significant amount of
on-going staff time for document preparation, scanning, and indexing. In addition to Council meeting
packets, ordinances, resolutions, minutes, and election documents, which the City Clerk's Office is
responsible for — there has been an increasing interest from other departments to add documents to the
Fortis system (e.g. budget documents, Planning Commission minutes, etc.). Though this is an excellent
idea, it will substantially increase the amount of staff time needed to index and process the documents.
Routine maintenance of the City Clerk's section of the City's Web site will soon be transferred from City
- 66 -
Manager staff to City Clerk's staff; maintenance will include posting agendas and other public notices
weekly, as well as creating and updating general information pages.
Administration Support Services: Deputy City Clerks serve as front counter receptionists for the entire
Administration division. City Clerk staff (2 Deputy City Clerks) devote approximately 2-3% of their time to
services unrelated to the City Clerk's Office (e.g. general secretarial support and fielding calls / counter
inquiries for City Manager and City Attorney staff). In addition, these interruptions result in a substantial
reduction in efficiency. Receptionist duties would more cost effectively be handled by a lower level
position.
BENEFITS OF ONE ADDITIONAL FULL-TIME POSITION IN CITY CLERK'S OFFICE: ,
• Currently when one staff member is absent (illness, vacation, training) there is an immediate 33%
reduction in productivity. A third staff person would allow more flexibility in scheduling, would better
balance staffing when additional assignments are added to the office, and provide time for Deputy
Clerks to take advantage of training and mentoring opportunities.
• Would allow the City Clerk to devote more time to managing the office, rather than performing day-to-
day activities.
• Progress on the following backlog of projects could be made:
1. Creation of a meaningful policy & procedure manual
2. Records inventory
3. Development of an archival & vital records program
4. Creation of City Clerk's web page
5. Lodi Municipal Code in-house codification (potential savings of $6,000 per year)
6. Reorganize and streamline internal election related procedures and instructional documents
7. Movement towards a paperless environment (e.g. Council packets available on the Internet)
8. Conversion to open shelf, end tab filing system
9. Contracts — prepare folders, label, and file 70 executed contracts; log 2,650 contracts dating from
1946 to 1985 into the Access program
10. Fortis — process and image the following documents: Council Communication 1974 to 1995;
resolutions 1906 to 1983; ordinances 1906 to 1997; elections 1975 to 1995
PRELIMINARY JOB DESCRIPTION FOR ADMINISTRATIVE CLERK:
• First-line phone and counter coverage (lunch hour coverage for Administration)
• Twice daily mail runs (including dropping off payroll, picking up checks, getting petty cash, sorting
mail for all of administration, opening and handling City Clerk and Council mail - including copying
invitations for Council's binder and preparing response letters)
• Weekly deliveries to Council Members and miscellaneous errands
• Photocopying (agendas, minutes, packets, miscellaneous)
• Stuffing / addressing envelopes
• Packet copy, assembly and distribution
• Maintenance of the Mayor's and Council Member's meeting binders
• Preparation of weekly and monthly Council Member calendars
• Assistance with routine follow-up (prepare and label folders for original ordinances, copy resolutions,
etc.)
• Phone calls (reminders for campaign and conflict of interest filing deadlines; agenda and Council
Communication deadlines; follow-up on agenda calls - pastor confirmation and award recipients;
general business, etc.)
• Preparation of Fortis materials - resolutions, ordinances, budgets, election documents, etc.
• Assistance with travel (confirming hotel reservations, typing the travel folders, copying of information
to include in the travel folders, etc.)
• Lodi Municipal Code book supplements (ensuring the books are updated, mailing out of and billing for
the supplements, etc.)
• Mayor's birthday cards to employees (ensuring the cards are prepared, signed and mailed in
appropriate time frame)
- 67-
• Miscellaneous filing - the finalized agendas and minutes, maintaining the State Cost Claiming Manual
documentation and log, etc.
• Maintenance of minute and ordinance books
• Council -hosted receptions - printing invitations on cardstock, mailing invitations, errands, set up and
clean up
• Process deeds for filing and recording
• Ribbon/seaVmatting/framing of proclamations/certificates
• Setup and cleanup of Council meetings and shirtsleeve meetings
• Assist in preparation, setup, cleanup and errands for luncheons and Council -hosted events
• Inventory, ordering and stocking of Forum supplies (food, drink and office supplies)
• Inventory and maintenance of forms (Boards and Commissions applications, claims against the city,
Fair Political Practices Commission filings, etc.)
• Inventory and ordering of office supplies
• Recording and posting of agendas and meeting notices, Boards and Commission vacancies
• Miscellaneous office errands (Costco supplies, Council meeting refreshments, special event items)
• Assistance in compiling and producing annual telephone directory
• Assistance in preparing and maintaining contract files
• Assist with annual destruction of records process (to include purging obsolete computer documents)
• Recording bid openings
• Agendas, minutes and clerical support for Sister City Committee
COST SUMMARY:
Salary 8, benefits for 1 full time Administrative Clerk 33,184.12
Elimination of part time staff (100101) -5,000.00
Elimination of part time staff (100102) -2,205.00
Total Cost: $ 25,979.12
ALTERNATIVES
None. Denial of adequate staffing request will likely result in failure to achieve some or all of the major
objectives for 2001-03. (NOTE: Major objectives listed forthe City Clerk's Office are above and beyond
current day-to-day functions and responsibilities.)
- 68 -
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Human Resources
REQUEST TITLE: Hire Full Time Benefits Coordinator
REQUEST SUMMARY: Hire a full time Benefits Coordinator to process additional
workload that has impacted the Human Resources Department.
5
PRIMARY OBJECTIVES:
1. Address increases in the City of Lodi employee population.
2. Assist with processing new workload generated by:
• . assumption of duties from the Finance Department
• implementation of the JD Edwards software program
• administration of benefit programs
3. Maintain a high level of customer service.
4. Increase the efficient processing of a broad range of requests from employees, City
departments, the general public and other agencies.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE:
Since FY 1994-95 the number of authorized full time positions in the City of Lodi has increased
from 379 to 444 today (a 17% increase). During this period of time, the number of staff devoted
to the Human Resources function has not increased.
During the first half of the 1990's, various components of the Risk Management function were
performed by the City Clerk, City Attorney, Assistant City Manager, Assistant to the City
Manager and Risk Management Technician. In FY 1995-96, the Risk Management functions
were consolidated and (1) one professional position was placed in the Human Resources
Department. In FY 2000-01, a clerical position was added to assist the Sr. Human Resources
Analyst (Risk Manager).
Over the past two years the City purchased a financial software package. When the payroll side
of this system was implemented, HR assumed responsibility for computing and inputting salary
changes to the salary schedule and classification plan and inputting other forms of data including
employee transactions and benefits information. This change had a significant impact on our
workload.
Additional workload has also been placed on Human Resources by the following:
• The recent change of medical plans has required that billing and reconciliation for medical,
dental, vision, chiropractic, life insurance and accidental death and dismemberment insurance
benefits, revert to an in-house operation. This was previously handled by outside
administration.
- 69-
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE (cont.)
• Transfer of responsibility from Finance for implementing all changes to the salary schedule
and classification plan.
• Maintenance of benefits changes on the JD Edwards system.
• Establishment of a program to recognize City employees on a quarterly and annual basis.
• Transfer of responsibility for managing the annual service awards program from the City
Clerk's office in 2000.
• Transfer of functions previously performed by the Lodi City Employee's Association -
enrollment and reconciliation of accounts in health club.
• Setting up sick leave conversion accounts for retirees by translating unused sick leave into
dollars to be used for the purchase of medical care.
• Setting up a mechanism for retirees to receive reimbursement for medical premiums.
• Assisting retirees and surviving spouses with problems and special requests.
• Monitoring and coordinating the fingerprinting of employees and volunteer staff.
• Monitoring hours for temporary staff.
The increased demands placed on the Human Resources Department by the incremental growth
of the City's overall workforce, coupled with the assumption of new responsibilities outlined
herein, has pressed HR to the point where we are unable to perform all the work required of us.
The requested position will assist Human_ Resources in coping with increased workload and will
play a vital and specialized role in the department. This individual will be the staff person
primarily responsible for setting up, inputting and maintaining benefit, employee transaction and
other information in the new JD Edwards system. In addition, a savings of S15,672 (the fee
ABD Services would charge in the first year of its contract) will be realized by returning the
billing and reconciliation function to an in-house operation performed by this position. Another
517,520 will also be saved by not hiring temporary staff.
The Benefits Coordinator will also be responsible for an extensive array of duties including:
• performing complex calculations such as converting accumulated sick leave hours to medical
benefits, COBRA payments, eligibility periods, retirement calculations, and others
preparing reports and statistical summaries regarding affirmative action, position control,
salary history, and various reports for State and Federal agencies
• providing information to employees that requires interpretation and application of policies,
procedures, and regulations
-7o-
ALTERNATIVES:
• Transfer billing and reconciliation, retiree reimbursements, set up and maintenance and data
entry responsibilities to the Finance Department.
• Cease performing employee recognition responsibilities.
• Use temporary employees.
• Eliminate programs.
• Reduce service levels.
COST SUMMARY:
2001-02
Additional Costs
. Staffing 45,878
Total 45,878
Savings 33,192
Net Cost 12,686
IMPLEMENTATION:
With approval of this request, Human Resources staff will:
• Conduct recruitment for the position of Benefits Coordinator
- 71 -
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Human Resources
REQUEST TITLE: Recruitment Advertising
REQUEST SUMMARY: To obtain additional funds for advertising and promotional
materials to fill vacant positions throughout City of Lodi departments.
. ti ..
PRIMARY OBJECTIVES:
1. Advertise for vacant positions so the City of Lodi can obtain quality applicants.
2. Remain competitive with other agencies, both public and private, by using new methods of
advertising (e.g., internet employment websites and higher cost regional newspapers).
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE:
Over the past two years, the City has had to compete with both public and private sector
employers for quality applicants, at a time when unemployment rates have been at a historical
low.
Human Resources is constantly trying new avenues of advertising to reach qualified personnel.
In doing this, we are able to determine which approaches are effective and which are not. This
allows the department to advertise in areas that generate the best return on our advertising dollar
while bringing in quality applicants.
Since FY 94-95 the number of authorized full time positions in the City of Lodi has increased
from 379 to 444 today (a 17% increase). With the passage of time, the increased size of the
City's workforce has placed greater demands on the Human Resources Department to recruit for
positions. More positions mean more vacancies must be filled. Yet during this time the
advertising budget for these vacant positions has grown only marginally. To keep up with active
recntitments and hard to fill positions, the City must take a more aggressive approach in
advertising. This request for S 16,810, when coupled with the department request in FY 2001-02
of S8,190 totals S25,000.
ALTERiNATIVES:
Set a dollar amount for advertising expenditures for each department. Once a department
reaches that amount, require it to start paying out of its own budget.
Advertise with less frequency and fewer promotional materials.
-7z-
COST SUMMARY:
2001-02
Additional Costs:
Supplies, Materials, & Services: S16,810
Total: S16,810
INIPLEivIENTATION:
With approval of this request, Human Resources staff will:
• Continue to actively recruit and aggressively advertise for vacant positions.
- 73 -
1999 — 2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Human Resources
REQUEST TITLE: Professional Services
REQUEST SUMMARY: Retain the services of professional firms to set up/implement/train
staff on the JD Edwards system for Human Resources use, conduct significant management
recruitments, and provide job applicant testing.
PREVIARY OBJECTIVES:
1. To implement the JD Edwards system for Human Resources.
2. To cover projected costs of fingerprinting.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE:
The JD Edwards automated system, while primarily a financial system, contains several elements
that have the potential to be very useful to the Human Resources Department. At the present
time, Human Resources staff have been assigned responsibility for inputting data in the payroll
module. While this is valuable to the Finance Department, it has done little to improve the
efficient operation of the Human Resources Department. In fact, although it has added an
automated component to the functions HR performs, we continue to perform many operations
manually, to the detriment of efficiency and morale.
The JD Edwards system can be used to automate processes in Human Resources that are
currently performed manually. One example is the tracking of employee's salaries. Currently
this is done using a series of cards, which record salary changes for each City employee as they
occur, along with an explanation of why these changes took place. The services of a professional
who specializes in JD Edwards systems can be used to set up the appropriate module for salary
tracking and train HR staff on the proper use of this module.- There are several other HR
functions which can -be executed by JD Edwards such as benefits monitoring, position control
and preparation of compensation schedules. All of these however must be set tip by a competent
professional who can provide training in their use. It is estimated that more than 13 weeks of a
professional's time will be required in FY 2001-02 for a cost approximating 5100,000.
Additional requirements imposed by the Department of Justice for employers to conduct
fingerprinting and child molester background checks are estimated to cost the City of Lodi
510,000 in FY 2001-02. This significant expenditure request for 5110,000, when coupled with
the department request in FY 2001-02 of S21,500 totals S 131,500.
- 74 -
ALTERNATIVES:
1. Send Human Resources staff to training facilities which specialize in JD Edwards
systems (this alternative is more costly).
2. Do not implement HR module in JD Edwards system.
COST SUMMARY:
2001-02 2002-03
Additional Costs
Supplies, Materials & Services S110,000 S
Total $110,000 S
INIPLEiv1ENTATION:
• With Council approval of this request, staff will retain the services of a professional firm for
the purpose of automating processes in Human Resources that are currently performed
manually, and train HR staff in their use.
- 75 -
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Public Works
REQUEST TITLE: Safety Program
REQUEST SUMMARY
To provide funding for a consultant to update the Public Works Department's Safety Manual and the Public Works
Department's portion of the City's IIPP.
PRIMARY OBJECTIVE
To bring the Department into compliance with the State and Federal OSHA regulations and requirements.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Public Works Department's written safety program, which includes the City's Injury and Illness Prevention
Program, is not in compliance with new OSHA regulations. Just recently, the Electric Utility Department hired a
consultant to update their safety manual and their portion of the City's Injury and Illness Prevention Program. The
Public Works Department's mandated, written programs/policies are also out of compliance and must be updated.
Because this is a very specific field of expertise and no one on City staff has the experience needed to bring all the
policies and procedures up to date, it would be economically feasible to hire a consultant..
Although we believe our practices are fully in compliance, the written documentation is out of date. There are also new
requirements for record keeping that are not being followed because there is no one on staff who has been able to
keep up with the changes in the codes. A professional will be able to complete the task in a short period of time,
whereas many months of staff time would be spent if done by an employee not familiar with all the safety codes and
new requirements.
ALTERNATIVES
• Do nothing and continue with the existing, outdated written policies and practices.
• Hire someone who is knowledgeable regarding about safety requirements and regulations, worker's compensation
and risk management to update the City's safety program and work with all departments to ensure compliance with
the many requirements and the record keeping that goes along with it.
COST SUMMARY 2001-02 2002-03
Additional Costs
Staffing
Supplies, Materials, Services $25,000
Iblinor Equipment
Total $25,000
Savings (Cities are now subject to fines
which could be thousands of
dollars if documentation is not
current.)
Net Cost $25,000
- 76 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Electric Construction and Maintenance
REQUEST TITLE: Injuryand Illness Prevention Program (Accident Prevention Rules and Training)
REQUEST SUMMARY
Update Injury and Illness Prevention Program (accident prevention rules and training).
PRIMARY OBJECTIVE
To update the Injury and Illness Prevention Program and accident prevention rules to comply with CAL -OSHA Rules and
Regulations_
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The City of Lodi Injury and Illness Prevention Program (I.I.P.P.) has never been completed. The portion of the I.I.P.P.
that has been previously written is now outdated. The City of Lodi Electric Utility Accident Prevention Rules need to be
updated. At this time, there are no accident prevention rules that govern the Electricians, Electrical Technicians, Metering
Electricians or the office staff. Training programs, intervals of training need to be established.
It is imperative that a safety consultant be hired to complete the above mentioned items to comply with CAL -OSHA Rules
and Regulations.
.LTERNATIVES
Continue to use existing documents and be out of compliance with CAL -OSHA Rules and Regulations.
COST SUMMARY
Additional Costs 2001-2002 2002-2003
Supplies, Materials, Services S 25,000.00
Total $ 25,000.00
FINANCE 2001-2003
IMPLEMENTATION
Upon approval, implement during the 2001/2002 and 2002/2003 fiscal years.
-77-
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Risk Management
REQUEST TITLE: Body Mechanics Training
REQUEST SUMMARY: To obtain additional fiends for Body Mechanics Training.
PRIMARY OBJECTIVES:
1. To increase City employees' awareness of techniques for preventing back and other forms of
injury to the body.
2. To lower unit costs of training sessions provided by the City by reducing travel and business
expenditures associated with training.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE:
Public sector agencies are discovering that wellness programs and physical fitness training alone
are not the answer to growing costs of workers' compensation disability injuries and retirement
losses. City of Lodi employees, particularly those working in the field, are subject to constantly
changing conditions with reoccurring physical, often awkward demands placed on the body.
Body mechanics can be described as the proper way to perform daily activities that are safe,
energy conserving and help prevent the physical strains that may cause injury. Proper body
mechanics are employed to prevent back problems, decrease the stress and strains that everyday
life places on the body, and protect the ligaments and muscles of the back. Back pain will occur
from lack of proper body mechanics. Once back pain occurs, it is more difficult to treat and
increases the chance of reoccurrence. The best way to avoid back pain is to prevent it through
diet, exercise, stress management, not smoking, and by practicing good posture and body
mechanics.
This request is being made to obtain funding for a firm to provide body mechanics training for
City of Lodi employees in FY 2001-02 and 2002-03. Don Norris, Risk Manager for the City. of
Modesto has been consulted on this subject. He indicates that a cost of S 18,000, spread over the
course of a two-year training program for field personnel, should be sufficient to obtain a firm
capable of meeting the City of Lodi's needs.
ALTERiNATIVES:
• Seek lower-cost forms of education in the form of pamphlets/articles distributed to City
employees.
-7s-
COST SUMMARY:
2001-02 2002-03
Additional Costs:
Supplies, Materials, & Services: S9,000 59,000
Total: 59,000 59,000
IMPLEMENTATION:
With approval of this request, Human Resources staff will:
• Obtain proposals in order to retain the services of professional training firms with expertise
in this discipline.
- 79 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Accounting Services
REQUEST TITLE: Convert one (1) Part-time Accounting Clerk to Full-time authorized position
MMI Y.�t1T•'filu1T►Tii:��1
Convert one Part-time Accounting Clerk to handle the increased workload in Payroll and Accounts Payable. Currently, Payroll
is being processed by one Payroll Technician and half time of one Accounting Clerk. Since the JDE system was put in place,
processes have either changed or additional edits are put in place to maintain accuracy and reliable internal control. The work is
doubled and it cannot be handled with the same level of staff. The same is true with the Accounts Payable desks, since the
implementation of the Purchasing and Inventory modules and converting into a voucher system, Accounts Payable processing is
longer than we used to. Overtime is constant and the staffs are burnt-out.
PRLMARY OBJECTIVE
1. To reduce overtime and to promote efficiency, accuracy and reduce staff stress and burn -out.
2. To have additional staff to handle the requirements of GASB 34 to input all capital assets into the system and to do
depreciation.
SUNLMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The conversion of the Financial Systems to JD Edwards is a great benefit to the City in providing more information city-wide.
Departments have more access to information and easier for staff to answer questions more quickly. Although the system is
great, this also means more input to the system than we used to do. In order to put out more information, the staff has to key
them to the system which is taking twice as much time to process. Processing time takes longer and staffs are constantly taking
overtime every week to run Payroll and Accounts Payable.
ALTERNATIVES
1. Do the additional workloads Nvith current staff. This means continued overtime in order for staff to meet deadlines for
Payroll and Accounts Payable.
COST SUMMARY 2001-02 2002-03
Additional Costs
Staffing 23,800*
Supplies, Materials. Services
Minor Equipment
Total
Savings
Net Cost 23,800
*fret of 12, 000 in Overtime and Part-time
s 1:M
2001-03 Financial Plan and Budget '
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Accounting Services
REQUEST TITLE: Hire Accountant I
REQUEST SUNSIARY
Hire one Accountant I to handle the increased workload created by the demands of increased Federal/ State grants . The
additional work due to the additional requirements of the Environmental Abatement Program (PCEITCE-16M COPs), the
Electric Utility Improvement Bonds (43M COPs), the additional work because of the Redevelopment Agency and the additional
requirements of GASB 34. These have a major impact in the workload, responsibility, required expertise and level of effort on
the Accounting Staff. In addition, this new person will assist in the transition to the Phase IV of the JDE implementation of the
JOB Cost, Fixed Asset and Contract Management modules.
PRLl4ARY OBJECTIVE
1. Ensure compliance with all State, Federal, local grants, redevelopment agency and debt service requirements.
2. Ensure that the City has adequate, experienced staffing necessary to develop, implement and mange the above requirements.
3. Ensure the accurate and timely filing of required reports and grant reimbursement requests.
4. Ensure compliance to the GASB 34 requirements.
5. To prevent staff burn-out and to achieve a higher level of efficiency.
SUNDL4RY OF FACTORS DR.IVrgG THE REQUEST FOR CHANGE
GASB 34 is expected to restructure much of the information local governments have reported in the past. Information
traditionally limited to enterprise infrastructure, now includes new financial reporting requirements involving all capital assets —
including infrastructure assets like, roads, bridges, tunnels, drainage systems and lighting systems. It also requires reporting of
depreciation expenses. GASB 34 also requires reformatting of the financial statements of the fiscal year prior to the compliance
period, which for the City of Lodi, the year 2002-03. These will require a lot of effort to deal with the new accounting
standards.
Th'• riw has :±lso hccnrne more actively involved vriih the use of other alternative funding sources and so there is an increase in
federal, state and Iocal grants; increased long-term capital fitiancing to meet various long-range, capital improvements. 'These
alternative funding sources include various grants, CDBG funds, Redevelopment Agency, Special Assessments and Revenue
Bonds. Each of these has numerous levels of requirements covering filing of quarterly and or annual reports, annual or tri-
annual audits. In addition, the Redevelopment Agency requires developing and implementing a system to account for its
transactions separately.
ALTERNATIVES
1. Do the current workloads Nvith current number of Accountants. The current workloads of the current accountants G
Accountant I, one Accountant 11 and one Accounting Manager), are already overwhelming and with the implementation of
GASB 34 and the impending addition of the Redevelopment Agency, we need another Accountant to ease the load of the
already overburdened staff.
2. Contract with outside experts. Under this alternative, the City would contract out with outside experts at least the
Accounting for the Redevelopment Agency and even with that, the involvement of current staff will still be needed for
reconciliation and reporting requirements to the State Controller's office. GASB 34 is here to stay and the impact to current
staff is inevitable. Contracting this out is not an option unless the whole financial statements will be contracted out.
- 81 -
2001-03 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Accounting Services
REQUEST TITLE: Hire Accountant I
COST SUMMARY
2001-02 2002-03
Additional Costs
Staffing
Supplies, Materials, Services
56,382
Minor Equipment
Total
Savings
56,382
Net Cost
56,382
_82_
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTTYTTY:
REQUEST TITLE:
REQUEST SUD NARY
Additional.CSR I staff member each budget year
PR111ARY OBJECTIVE
To better service and implement special incentives, services, programs and centralized telephone pool for current and
potential City of Lodi utility customers.
Allow for a process action team to review department policies and procedures and submit changes or revisions to
management for approval.
Facilitate increased telephone and lobby traffic due to customer concerns regarding the impact of deregulation.
SUiti111ARY OF FACTORS DRIVLNG THE REQUEST FOR CHANGE
By increasing staff we can provide management with the timely information needed to make decisions that will promote
goodwill and deliver exemplary customer service. We also wish to continue to provide customers with a greater array of
payment options and programs. We must also limit or reduce the impact on customer support and service due to increased
levels of interaction caused by deregulation.
ALTEMNATIYES
Reduce current and proposed levels of customer service
Reduce training and growth of employees
COST SUMMARY
2001-2002
2002-2003
Additional Costs
Staffing 7101)
S37700.00
S37700.00
Supplies, Materials, Services 7359)
2000.00
2000.00
Minor Equipment 17359
200.00
200.00
Total
Savines
7103 contract employee)
(37700.00)
(37700.00)
Net Cost
$2200.00
52200.00
- 83 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Finance Field Services
REQUEST TITLE: Meter Reader
REQUEST SUMMARY
Hire one (1) additional Meter Reader. Currently, there are two (2) Meter Readers. The new.position
would assist the current staff in obtaining the monthly readings for billing purposes.
PRIMARY OBJECTIVES
1. Decrease the dependence on part time employees.
2. Provide greater customer service.
3. Increase inner office efficiency.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The part time hours worked is equal to 2.7 Hill time persons. There tends to be a steady turnover in the
part time staff. The new trainees make more mistakes resulting in customer dissatisfaction. The addition
of a fill time person would lend itself to continuity in section practices and accuracy.
1711c uumbcr of electric and -water meter rcadings obtained each montli has increased oVer the past twenty-
one (2 1) years from 18,000 to 26,600. The meter readings are divided over four (4) routes. There are two
(2) full time Meter Readers. The other two meter routes are filled by a Field Services Representative and
part time staff. Approximately seven years ago, in an effort to deal with the growing number of accounts,
another read day was added for a total of nineteen (19) days per month. Adding another day is not
feasible now since some months only have nineteen work days if there are holidays and/or five weekends.
When there is an unexpected injury or illness to staff, the meter routes fall behind. In order to catch the
work up, overtime or additional part time staff is utilized.
ALTERNATIVE
1. Do nothing - continue with the current staff.
COST SUMMARY
Additional Costs
Staffing (Total Compensation)
Vehicle
Radio/Uniform
Total
Savings from Part time
Net Cost
2001-2002
541,841
22,000
300
64,141
<41,841>
522,300
- 84 -
2002-2003
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Facilities Services
15QUEST TITLE: Construction Project Manager
REQUEST SUMMARY
Add one Construction Project Manager to the Facilities Services section of the Fleet and Facilities Division to help service
the continually growing number of Public Works construction and remodel projects.
PRIMARY OBJECTIVES
i. Provide thorough and professional administrative oversight to construction and remodel projects, direction to
contractors and architects, and management of contracted service arrangements related to those projects.
2. Provide an optimum -staffing level to serve the City's facilities construction and remodel needs.
3. Improve efficiency of operation.
a. Provide reliable, functional, and safe facilities for employees.
5. Ensure that City facilities present a positive image to the public.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
For the past 12 years the Fleet and Facilities Manager has had the responsibility for oversight of several significant
building remodel projects including remodeling City Hall, the Carnegie Forum, the City Hall Annex, the Senior Center at
Hutchins Street Square, and most recently the Conference and Performing Arts Center. Part time and full time
Construction Inspectors (contract employees) have been hired to help provide direct and daily supervision for these
projects. The construction inspector hired for the City Hall Remodel Project has been given increasing amounts of
responsibility, and has been a full time Construction Project Manager for projects including the Conference and
Performing Arts Center, the Multimodal Station Project, the Sacramento Street Parking Structure, Fire Station #4, and
the new Police Facility.
'n the near future there will be the responsibility for construction oversight for Fire Station #4, the new Police Facility, and
e Sacramento Street Parking Structure. Also in the planning stages to be constructed soon are the eastside Electric
Utility complex, new Animal Services Facility and Purchasing offices and warehouse. Remodeling and additions to the
existing Municipal Service Center, Fleet Services Shop, a Parking Structure at Church & Elm Streets, remodeling of the
existing Public library, Public Safety Building, and provision of additional leased space (or trailers) in the Civic Center area
(especially during construction of the Police Facility) are likely.
A Construction Project Manager position should be added to the full time staff roster because of the continuing list of
building remodel and new construction projects planned. All phases of small and large building projects, from conceptual
design and budgeting to project completion, will be their responsibility. The Fleet and Facilities Manager will provide
supervision. A classification specification and pay scale need to be established, but for budgeting purposes are
estimated to be equal to what the City is paying now for salaries and benefits. It is recommended that this be a
professional/mid-management level position. The only additional financial impact is the cost of a vehicle.
ALTERNATIVES
Do nothing; keep the position as a contract position. Continue to hope that the existing contract employee will stay.
Take a chance that the investment of training, knowledge and experience given to the employee in the current
contract position won't be lost,
COST SUMMARY
2001-02 2002-03
Additional Costs (Preliminary Estimate)
Staffing: Construction Project Manager (Salary)
$55,725
Benefits/Overhead
21,175
Vehicle
22,000
Subtotal
$98,900 1
Savings. Contract posmon salary & benefits [76,900]
Net Cost $22,000
IMPLEMENTATION
The hiring process (creation of job specification, job analysis, etc.) would begin upon approval. Specifications for the
vehicle would follow as appropriate.
- 85 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Facilities Services
REQUESTTITLE: Facilities Supervisor
REQUEST SUMMARY
Add one Facilities Supervisor to the Facilities Services section of the Fleet and Facilities Division to help manage
service of the continually growing number of buildings to be maintained. ,
PRIMARY OBJECTIVES
1. Provide an optimum -staffing level to serve the City's building maintenance needs while servicing and
repairing City facilities and equipment.
2. Improve efficiency of operation.
3. Provide reliable, functional, and safe facilities for employees.
4. Matte sure that preventative maintenance, repairs, and maintenance requests are completed in a timely and
high-quality manner.
5. Maintain a balance and better utilization of services performed by in-house support staff and services
provided by vendors, contractors, and through contracted service arrangements.
6. Ensure that City facilities present a positive image to the public.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Facilities Services Section currently maintains a total of 15 buildings and associated equipment totaling
approximately 201,820 square feet, serving the entire City except for Park and Recreation and Community
Center facilities. Included in the duties of the Facilities Services Section are maintenance and repairs to
buildings and equipment of all types and sizes; managing building systems; troubleshooting and repair of
mechanical operation problems in electric and mechanical systems; wood,,vorking/evelding/fabricating projects;
and copying keys for buildings. Other duties include providing preventative maintenance to all facility equipment;
oversight and supervising contract labor and outside vendors, and administrating construction projects for
building remodels and renovations/additions.
The current allocated staff consists of 3.5 full-time positions; there are two (2) Facilities Maintenance Workers
and one (1) Senior Facilities Worker that actively take care of building needs and employee requests, and one
(1) Fleet and Facilities Manager that provides administrative oversight (50% allocated to Fleet Services and 50%
to Facilities Services). Currently the employee in the Senior Facilities Maintenance Worker position has had little
time to maintain and update files, building drawings/maps, key system, or materials inventory. There has been
no time to do a Facilities Needs Survey, evaluate nor implement Facilities Management software programs, or
work on planning, short or long-term goals. We are seeing an increase in overtime call -outs due to equipment
failures, and know that, in short, we are just not able to do the job the way we would like to do it.
In the near future, responsibility for the Fire Department's soon-to-be constructed Fire Station #4, the new Police
facility, and the Sacramento Street Parking Structure will increase the total number of square feet maintained to
approximately 395,430 square feet, almost doubling the space maintained now. Also in the planning stages to be
constructed soon are the eastside Electric Utility complex, new Animal Services Facility and Purchasing offices and
Warehouse, which will add another 71,000 sq. ft. to the facilities inventory. Additions to the existing Municipal
Service Center Fleet Services Shop, a Parking Structure at Church & Elm Streets, and additional leased space in
the Civic Center area (especially during construction of the Police Facility) are likely.
The Facilities Supervisor position is a new position in the facilities maintenance series o. classifications. A
Supervisor position needs to be added to provide an improved level of direct supervision to staff in this section of
the division and to provide better daily direction and oversight. The City has been, and continues to be, adding
to the number of facilities and increasing the amount of square footage to maintain, while not increasing the
number of staff to service them. This has the current staff at the point of being reactive rather than proactive.
Management of building systems, implementation of facilities management software, and scheduling of work
becomes difficult, if not almost impossible. We are simply too busy fixing problems, without enough time to plan
and be proactive.
- 86 -
2001-2003 Financial Plan and Budget
Significant Expenditure Request and Staffing Change
Page 2 of 2
Our intent is to use more service contracts, especially for aging building HVAC systems (like those at the Public
Safety Building and Library), but those require supervision and management as well. We will continue to use
outside vendors, as we do now, or hire specialized labor whenever it is most cost effective or requires
specialized training, tools, or equipment that we don't have. We must, however, have a realistic balance .
between the number of facilities/equipment and the number of staff servicing them, and we must provide proper
supervision for the staff we employ.
Finally, the Fleet and Facilities Manager's time needs to be freed up to better oversee and manage City-wide
utilities (looking for ways to conserve, implementing energy efficiency projects, etc.), major building projects (to
help the Public Works Director due to the number of projects currently in process), and seeing ways to provide
better service in both Fleet and Facilities divisions.
ALTERNATIVES
1. Do nothing. Don't add the direct, daily supervision that staff need. Keep the same staffing level while adding
facilities, projects and workload. This is not advised.
COST SUMMARY
2001-02 2002-03
Additional Costs (Preliminary Estimate)
Staffing:
Facilities Supervisor (Salary @ A step)
_
$42,980
Benefits/Overhead
16,335
Furniture and Computer
4,000
Total !
$63,315
IMPLEMENTATION
The hiring process (creation of job specification, job analysis, etc.) would begin upon approval. Materials and
supplies would be purchased as appropriate.
- 87 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Facilities Services
REQUEST TITLE: Facilities Maintenance Worker I/ll
REQUEST SUMMARY
Add one Facilities Maintenance Worker 1/II in 200212003 to the Facilities Services section of the Fleet and
Facilities Division to help service the continually growing number of buildings to be maintained.
PRIMARY OBJECTIVES
1. Provide an optimum -staffing level to serve the City's building maintenance needs while servicing and
repairing City facilities and equipment. '
2. Improve efficiency of operation.
3. Provide reliable, functional, and safe facilities for employees.
4. Make sure that preventative maintenance, repairs, and maintenance requests are completed in a timely and
high-quality manner.
5. Maintain a balance between services performed by in-house support staff and services provided by vendors,
contractors, and through contracted service arrangements.
6. Ensure that City facilities present a positive image to the public.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Facilities Services Section currently maintains a total of 15 buildings and associated equipment totaling
approximately 201,820 square feet, serving the entire City except for Park and Recreation and Community
Center facilities. Included in the duties of the Facilities Services Section are maintenance and repairs to
buildings and equipment of all types and sizes; managing building systems; troubleshooting and repair of
mechanical operation problems in electric and mechanical systems; woodworking/welding/fabricating projects;
and copying keys for buildings. Other duties include providing preventative maintenance to all facility equipment;
oversight and supervising contract labor and outside vendors, and administrating construction projects for
building remodels and renovations/additions.
The current allocated staff consists of 3.5 full-time positions. There are two (2) Facilities Maintenance Workers
and one (1) Senior Facilities Worker that actively take care of building needs and employee requests, and one
(1) Fleet and Facilities Manager that provides administrative oversight (the Fleet and Facilities Manager's time is
allocated 50% to fleet and 50% to facilities).
In the near future, responsibility for the Fire Department's soon-to-be constructed Fire Station #4, the new Police
facility, and the Sacramento Street Parking Structure will increase the total number of square feet maintained to
approximately 395,430 square feet, almost doubling the space maintained now. Also in the planning stages to be
constructed soon are the eastside Electric Utility complex, new Animal Services Facility and Purchasing offices and
Warehouse; which will add another 71,000 sq. ft. to the facilities inventory. Additions and remodeling to the existing
Municipal Service Center, the Fleet Services Shop, adding a Parking Structure at Church & Elm Streets, and
additional teased space in the Civic Center area (especially during construction of the Police Facility) are likely.
The Facilities Maintenance Worker 1/11 position is the entry-level position in the building maintenance series of
classifications. In 2002/2003, a Facilities Maintenance Worker position needs to be added to maintain a fair
balance between the number of facilities/equipment and the number of staff servicing them. We should continue
to use outside vendors, as we do now, or hire specialized labor whenever it is most cost effective or requires
specialized training, tools, or equipment that we don't have.
ALTERNATIVES
Do nothing. Keeping the same staf ing level while adding facilities is not advised. One measure of workload
is the amount of facility that each staff member maintains. Currently that amount is 67,273 square feet per
staff member (201,820 total square footage divided by 3 staff). When new facilities are completed that total
will be revised to 395,430 (not including the planned Electric Utility complex, new Animal Services Facility
and Purchasing offices and Warehouse, which will be another -t1,000 sq. ft.). Maintaining the existing staff
level will push the square foot amount that each staff member maintains to 131,810. Adding one Facilities
Maintenance Worker will reduce that number to 98,858 square feet per staff member, still 32% more than
each presently maintains.
- 88 -
2001-2003 Financial Plan and Budget
Significant Expenditure Request and Staffing Change
Page 2 of 2
ALTERNATIVES (continued):
2. Utilize additional part-time help and contracts with vendors. This is not advised since skill levels of part-
timers are limited, training costs and efforts are not fully realized, and vendors cannot respond as quickly or
completely yet still require in-house supervision and management. Several facilities require a high level of
security clearance as well, which cannot be easily or quickly attained for part-time help.
COST SUMMARY
2001-02
2002-03
Additional Costs (Preliminary Estimate)
Staffing:
Facilities Maintenance Worker 1/11 (Salary @ B step)
- 0 -
$32,990
Benefits/Overhead
- 0 -
12,535
Uniform
.0-
300
Total
- 0 -
$45,825
Salary @ B step
IMPLEMENTATION
The hiring process would begin upon approval. Materials and supplies would be purchased as appropriate.
- 89 -
2001-2003 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Fleet Services
REQUEST TITLE: Fleet Services Worker
REQUEST SUMMARY
Add one Fleet Service Worker in 2000/2001 to the Fleet Services section of the Fleet and Facilities Division to
help service the continually growing vehicle/equipment fleet.
PRIMARY OBJECTIVES
1. Provide an optimum -staffing level to serve the City's equipment maintenance needs while servicing and
repairing City vehicles and equipment.
2. Improve efficiency of Shop operation by doing service -related work and other less technical jobs with lower
classification workers rather than expending unnecessary funds to perform lower level tasks.
3. Provide reliable, functional, and safe equipment for employees.
4. Make sure that preventative maintenance, repairs, and maintenance requests are completed in a timely and
high-quality manner.
5. Maintain a balance between services performed by in-house support staff and services provided by
vendors, contractors, and through contracted service arrangements.
6. Ensure that City vehicles present a positive image to the public.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Fleet Services Section currently maintains a fleet of vehicles and equipment totaling approximately 410
registered and 55 miscellaneous pieces, serving the entire City fleet, except Parks Division mowing equipment
and scooters. Responsibility for the Fire Department's heavy equipment and standby generators at all well sites
are now maintained by this division. Included in the duties of the Fleet Services Section are repairs to vehicles
and equipment of all types and sizes; managing the parts inventory; troubleshooting and repair of mechanical
operation problems in electric, hydraulic, and mechanical systems; welding/fabricating projects; and copying
keys for vehicles. Other duties include providing preventative maintenance to all equipment; oversight of the
equipment maintenance management system and software; and supervising contract labor and outside
vendors. The current allocated staff consists of 11.5 full-time positions, which manage and work two shifts.
Current operations are reviewed for areas where we might contract additional work with outside agencies and
vendors. Recently we have partnered with the San Joaquin Sheriffs Department Jail Industries program for
vehicle painting, and have contracted out Smog Certifications that used to be done in-house.
In the near future, at least 15-20 more vehicles and equipment units will be added to the City's Fire, Police,
Transit, Community Development and Public Works Departments. Recent discussion has included
consideration of providing contracted services to outside agencies as potential for additional City revenue. This
remains to be decided, but should continue to be discussed and considered. If this plan is adopted, however, it
will add more pieces of equipment per person for staff to maintain.
The Fleet Service Worker position is the entry-level position in the equipment maintenance series of
classifications. Currently only one is allocated. This position was requested in the last 2 -year budget and was
denied. In 200112002, a second Service Worker position needs to be added to maintain a fair balance between
the number of vehicles/equipment and the number of staff servicing them. We should continue to use outside
vendors, as %ve do now, or hire specia!ized labor whenever it is most cost effective or requires specialized
training, tools, or equipment that we don't have.
ALTERNATIVES
1. Do nothing. Keeping the same staffing level while adding vehicles and equipment to the fleet is not
advised. The last three times additional personnel for the Equipment Maintenance Shop were approved,
the appropriate equipment -to -mechanic ratio for Lodi was 50-55 compared to an average of our survey
cities of 43. Our current fleet size of 465 vehicles and pieces of equipment divided by 6.5 staff (Welder -
Mechanic figured at 50%) requires each mechanic to service 71.5 vehicles and pieces of equipment.
- 90 -
2001-2003 Financial Plan and Budget
Slgnificant'Expenditure Request and Staffing Change
Page 2 of 2
ALTERNATIVES (continued)
Adding one Fleet Service Worker will reduce that number to 62 vehicles and pieces of equipment per
mechanic (465 divided by 7.5 staff), still significantly above the average. Transit staffing
guidelines/standards from the Federal Transit Administration for vehicle -to -mechanic ratios suggest that
even more mechanics should be hired to serve transit vehicles (3.5 mechanics is the average for a transit
fleet of our size). However, with the addition of this position we believe we can wait until the next two-year
budget cycle before another position is recommended.
2. Utilize additional part-time help and contracts with vendors. This is not advised since skill levels of
part-timers are limited, training costs and efforts are not fully realized, and vendors cannot respond as
quickly or completely yet still require in-house supervision and management. A recent comparison of
internal average labor costs per job versus external cost per job revealed that using City staff saves 32% by
doing work in-house.
COST SUMMARY
2001-02 2002-03
Additional Costs (Preliminary Estimate)
Staffing:
Fleet Service Worker (Salary @ A step)
529,225
Benefits/Overhead
11,005
Uniform
290
Tools
750
Total
541,270
1i'V1PLEMENTATION
Our recommendation, per prior negative experiences, is that this position be considered as part of a
re-classification of the fleet services mechanic series, including job specifications for Fleet Service Worker,
Heavy Equipment Mechanic, Welder -Mechanic, and possibly Lead Equipment Mechanic.
Too often an employee in the Service Worker classification has been stuck there when their abilities,
experience, and training have carried them well into Heavy Equipment Mechanic job status. They have been
resigned to wait until an opening is created through retirement or vacancy. It is our hope that a Fleet
Mechanic 1/II, and possibly Fleet Mechanic III, be adopted to prevent this from occurring in the future. A
reduction in incentives is possible, depending what is required for each position and necessary for
advancement bet%veen levels. We believe that "block budgeting" gives the City greater flexibility in the hiring
process and is fairer to the employees, and should strongly be considered in this case.
The hiring process (review of existing job specification, job analysis, etc.) would begin upon approval. Tools,
materials and supplies would be purchased as appropriate.
- 91 -