HomeMy WebLinkAboutMinutes - May 11, 1999 SS226
CITY OF LODI
INFORMAL INFORMATIONAL MEETING
"SHIRTSLEEVE" SESSION
CARNEGIE FORUM
305 W. PINE STREET
TUESDAY, MAY 11, 9999
An Informal Informational Meeting ("Shirtsleeve" Session) of the Lodi City Council was held Tuesday, May
11, 1999 commencing at 7:00 a.m.
ROLL CALL
Present: Council Members — Hitchcock, Mann (left at 8:15 a.m.). Nakanishi, Pennino and
Land (Mayor)
Absent: Council Members — None
Also Present: Deputy City Manager Keeter, Economic Development Coordinator Goehring,
Administrative Assistant to the City Manager Haynes, Administrative Assistant to the
City Manager Hamilton, Information Systems Manager Helmle, Public Works Director
Prima, Community Development Director Bartlam, Finance Director McAthie, Police
Chief Hansen, Fire Chief Kenley, Electric Utility Director Vallow, Community Center
Director Lange, Parks and Recreation Director Williamson, Human Resources Director
Narloch, Library Services Director Martinez, City Attorney Hays and City Clerk
Reimche
Also present in the audience was a representative from the Lodi News Sentinel and The Record.
TOPIC(S)
Discussion Regarding Budget
ADJOURNMENT
No action was taken by the City Council. The meeting was adjourned at approximately 8:17 a.m.
ATTEST:
46�0h.
Alice M. Reimche
City Clerk
.999-01 FINANCIAL PIAN AND SUMMARY draft
OPERATING BUDGET BY MISSION
Police Protection
7,415,559
7,700,846
7,909,365
7,936,805
Fire Safety
3,302,920
3,435,887
3,694,990
3,836,970
Other Safety Services
12,265
32,155
37,380
38,540
Total Public Safety
10,730,744
11,168,888
11,641,735
11,812,315
Public Utilities
Water Utility Services
4,149,465
3,143,030
3,193,825
3,301,895
Wastenvater Utility Services
2,740,734
2,770,105
3,302,060
3,323,470
Electric Utility Services
9,124,707
9,229,870
10,885,080
11,260,925
Total Public Utilities
16,014,906
15,143,005
17,380,965
17,886,290
Transportation
Streets and Flood Control
1,741,165
1,746,421
1,675,385
1,695,335
Transit
1,100,634
1,074,830
1,443,340
1,503,350
Total Transportation
2,841,799
2,821,251
3,118,725
3,198,685
Leisure, Cultural & Social Services
Parks and Recreation
635,049
715,790
754,870
786,355
Recreation Division
334,442
324,820
.377,115
406,270
Parks Division
1,186,139
1,161,485
1,295,595
1,322,455
Cultural Services
1,716,220
1,824,525
2,244,100
2,232,265
Total Leisure, Cultural & Social Services
3,871,850
4,026,620
4,671,680
4,747,345
Community & Economic Development
Planning
373,669
451,115
387,215
475,700
Construction Development
1,547,549
1,505,580
1,615,135
1,674,735
Economic Development
392,978
300,335
389,700
395,280
Total Community & Economic Development
2,314,196
2,257,030
2,392,050
2,545,715
General Government
Legislation and Policy
101,931
80,280
92,015
94,090
General Administration
716,935
593,725
632,515
679,275
Legal Services
278,419
277,080
282,085
279,195
City Clerk Services
222,865
241,050
231,420
267,915
Administrative Services
2,294,700
2,656,050
2,950,825
2,917,275
Organizational Support Services
1,479,446
1,544,250
1,723,330
1,745,820
Non -Departmental Services
4,801,350
5,054,455
4,872,660
4,947,175
Total General Government
9,895,646
10,446,890
10,784,850
10,930,745
TOTAL OPERATING BUDGET`45,669;191
;:;,51,121;095
;
:: ';45:$63.684
_ ':;:.49,990,005:
1999-01 FTNANCLIL PLAN AND SUWMARY
SUMSS XY OF SIGNIFICANT EXTE.ti'DITURFS AM) STAFFING CHANGES
1999 00 2000.01
FiE' Requiested FIE Crry Maga '.; FIE Ragrxated FIE C1ty IYtaoagar .,
.Cost' - ltaeoa�mdod . 'Cost- ....-.Reamtrvesded.; .Casamerri
- :.. -
Pubbe Sarety
Police Protection s
Police Administration •k'_
Federal Block Ceram match funds 1 10,000t r absorb in anent budget
Police Operations-
>lbpatebateam building 2 - 9,750 Y z x one time Coat absorb in arrant budget
Animal Control
Purchase Cat ages + S'= 8.380 one time cost new regulations
Fire Safety ; ti- _
Fere Support Saviees
Purchase Portable weather station i;000 one time cwt
Fme$enry Services '< _
Puaehase Foam dispensing omit -'S is 12,000 - 12,000 one time cost- use catty orae funds
FFe+e FixSgMa.6 ] 41,500 I _Y 41,30p t 41,500 !- 41,Sfp'_
Purchase External defibrillator i' =:7 4,500
4,300' one time costs
Total Pablic Safety ] 81,630 1 - - ?; 49x880; 1 51,000
Public Utilities -
WatetlWastewater Utility Services
Engineering staff support 9"1= 3 204,350 2 F27 880; (6000) ; * divide costs 50/50 to eachtnility
Electric Utility Services
7.
Policy. legislative & Regulatory z _"
K= Administrative Cleat 11 - • i0 1 30,520 hold til re -organization
Cornu lting services 125.000 _I?5000, unbundled rates, benchmarking
Electrical Engineering & Operations
Mm Administrative Clark]] 121" 1 36,400 14,345 `� � �
+ - : ( ) (4 3<$1 reduction dime to one time Cwt
Fore temporary Auto CAD operator 20,840 _ t- �:(2,840) S. r _ ,
Replacement of PCs (5) '.IS,''? 15,000c -w 1500° `divide over two
Replacement of copy machine x:16 * 9,000 Y 9t110p 7 one time costsy�
Imcrese hording of-crtime t:i7-"•.�' 12,000
Meterreading materials fimds11,000
Business Planing & Marketing ;, r
uhmg =`•.i9 50,000
Com services aM_, '- ppp' ysr will encrmberthis FY
Electric Construction & Maimateroe � '
Tree trimming contract increase > 3Q 130.770 - :7 3.930 '" 'I':s•"�:• inceasad
y
Mm Groumdsperson "y+22 2 101,540 2 Y ~cost
,wy 1,070 - ti reduce equal m 2 contract em
Cmtraapeaa>me1 A 377,135
Fund Apprmtioe program 2 55.740 - _ .3Sa?dp second yr to allow time for same
Srsbssatims &Systems .,-.'
PwE actmo s for transformer mains P�f
10.000 .w = ; f> -_ *a" absorb in acre t budget
f: 3 it �c rl er. ,!:
Prof services fw painting 2T, 20,000 ,::'rz: �. ''r�;rt3Q,80Q';. approve far sec od year
' Total Public Ihilirlas 7.00 1,209,295 5.00 -i',Zr -•' 4S7y53P, (8,185) '''•"•>•.38,895ti
':.art-;•,.-
Traaspostatioa
Streets and Flood Control ? far Pr� t7��
Faire Downtown Cleanup laborer ;:29,z 0.25 2,620 0.25620` 40 hrttoww/no benefits
Fire Clem -up truck labra 30; 1 32,475~zc.'m y:;',"•,�-.,?.;",.F%
Tetal Transportation 1.25 35,095 0.25
Leisare. Coltaral A Social Se mfm
Parks and Reaeatran
Paris and ReasLon Administration `r=.'..'�- _h' '-x'•:'
CamauxY eomgaa workstations 8,000-r--�,pQp ''t== mora time Costs
teAdministrative Asst ,y
1 54,000 1
li
P2,W Activities Coordinator '33, I 41,165 0.5 1--
Pursbne office chain 4,400 one limo cosh absorb in current budges
Upgrade activity brochure %''35 9.905
HM Part time CAD e>peratgr36 g 10,495 (3,855) " absorb w197 PT hours budgeted
Reaatiaa Division - t
F'
Agmttw
PuaebaaE Pool slide 3} 5,500 y 5300, i one time acts pending osa of CDBO finds
Puaclwe Inflatable water feanae 38 _ 3,500 .2 _ one time costs absorb in budget
Youth Sports
Increase hands for vouth activities 3914,455 i4 455. net increase offset by revenues
Purchase Portable scoreboards,40 c 4,000 one time eoaU
Spons Faaliriea
u
Prchase Fence material 4,900 _'..4,900.! ons time costs
Additional 1r laborer homes - 42 26,035
27,380 one year of costs
P -Ins Division
Iadi lake Park r
Special evens funding:; 43' ` offset? + offset by donations
maxieom installation
Hire PIf laborer .irrigation installer 41: 11,405
Eir
1999-01 FLNANCIAL PLAN AND SUA U;1RY
SUMMARY OF SIG.NIFICAA'r EXPENDITURES AND STAFFING CHAICGES
Mrs lAborer4 .. 1 31,390
Flue P/T laborer '° 46� 13,415 °4 31$` • Persson &()lave
Equipment I crease part time ham t {7 13.050 . 'fix : .` - absorb w/97 PT hang budgeted
maintenance
Eine Parttime assistant # 3,650After
_ Program'
Increase part time fending 8,710
o
bawd operation to before school �p50 offset
f&et revenues
4
Community Center ' .;,',.",y^ •, r'';"`- c
CammrmityCamerAdminishation
Box office staffing3 '� .
S .1. offset .as y� Ofset by revenues
MM Fast time intern SSS 5,905
Increase part tame Adm Clerk hours .53'x? 16.200 a't." �.w�is f �,� req •e,
Senior Information Gamier
Mrs Plet P ;suborn
Si 6910
or ta
e for PT staff w/ HSS Admin
Swinunins r ?ter
iiae Aquatics Supa[v1sGr$$' =.. 1 _ 8,000 1
Flachim Street Square Maintenance
Refinish wood !loot - Kint hall 12,000 SG - A-,xr s� t$000 we time costs defer for one year
Replace wood Columns 37 5,250 replace as necessary &absorb
Remove alderi'S8 1 5,000 yik f ,jyflQpr w -� one time cats
Inetemejaaitorialsupplies funding 59r> 11,020 at _iT020. ;y«
Replace rental tables :60� 11,990
Increase fiord for sublet services _.61 m 13,180 - �S8A,-..,s.-. i;3 20 each year
fi
hire Park Maunenence Worker .�rK 1 34,145 y
X'!5
Mrs Building Maintenance Worker Zi 1 32,975 1 s- S' 4,085 +
<, �,.-, 40.000 of new space
Fund Bi weekly in hone newsletter :66'w - 5,720 jr.=,''+ a+rb?;v,r
social service
Llbfary
biaeese part time staffing pool _ 15,150
Un Part time librarian Reference
x
Mrs Pert time Lbrarian Childrom + �3 19,100 Me
Total Iwisate, Cultural A Social Ser 4.0 401,430 2S 1.2 2 116,500 2
Cessasnafty & Economic Development
community Improvement
On Frill time Administrative Clark 11 0.5 20,210 OS offset by part time savings
Purchase ogee system finniMa 7,500 >. ^
am time Cent
onomic Development
Ec
Strategic & Marketing Plane 32,500
Ceesasnefty & Eeea Dery OS 60,210 i' 0.5
General Gvv.mwmt
General Administration - 75
Public Works Admmistratiw
I3re full time Administrative Clot VII'•'MC-! OS 15,450 �"` . ' - `s :.
�.:. � '+` .. OS offiat by part time savings
Hue Vohamaer Coordinator yqf, 1 46,150 4io (2,150) .;t�! 4afer for further development
Funding for Solid Waste Contract az' 2,000 "_k -, 4Oat 25,000
Administrative Service
Mae- Resources
Mn Administrative Clerk II OS 10,315 0.5 oEGet
asultin6 Service by pelt time savings
Ce
CUYv''ide training Program w Sy`A 10M.OM850 �r �-;,a� -•• � y-` one time cwb
FIR Risk Management •Sr''" -
tclllamaProgison
25.000time emu
Property Valuation g 1,875 „Rs: f=�;7 % s °?-a� _-
vase time cab
lafesmetionSystems '.-
G�
Web page development services 91 E 5,000-
CamultingServioas _92- 15,000
r �s
Pumbase Laptops(I as yr).,x.93 3,000
FHne Parttime fntem 91- ' 8,320 ° 0 -0. -defer to 2nd year
Purchase Help dmk software :!S 6,000d00' 4 800
WAN Internet Service Provider funding 9,600 ( )
City Clerk
Ms®cipal Code Book codification 5000
A-- rqq 3s<p0- one time costs
Cost oieleetion-increase 96 '' 7,795 a wZc795;
Cemtmuing Ed for Public Officials -9Y 4,340 CMC .tarn
Finaaee Revemse Division .:a - ": •'G-' 7w- •F;s':.
fare full time Aocount Clerks (2) r 100. 1 17,605 1 S 600 -
Organizational Support Senior �� vyrar ' :^ ( ) '� offset by part time savings
Fm -Field Services
101- 6 '^^'Y-�'�' ti:'`:�;
Purchase cellular phones
1, 30 �.• i-:630. 185 •.
-+i r'�i�..� offset by savings
1999-01 FLNANC1AL PLL\ A..'M SU),LNIARY
SUMMARY OF SIGNIFICANT EXPLNMITCREB AND STAFFT.IG CAA.^1GES
Fled Services
='�< <=
r'=:�.�•;
4
Fore Parts Clark
' 83 ' OS
14,845 0.5
673,405
Floe Flea Services Works
242,795 2.50
Transportation Frmd
1 38,230
Total General Government
3.5
230,060 1.5 �;��' 132;355
1.5 75=5
TOTAL OPERATING BUDGET
='173Sr^=i:v-:3-017,728.•?=::10
5=-:•:-:•:-::.893.475x4;'i-,45.-;�.;;.1e:_.2i4AN
FUMING SOURCES:
4
General Fund
9.0
673,405
5.25 4.5
242,795 2.50
Transportation Frmd
1.3
35,095
` 2 6240
Library Fund
54,050-
CDBO
13,000
Geoa al Liability AM
32.875
-
Water Fund
1.5
102,175
(3,000)
Wastewater Fund
1.5
102,175
1 max, :-',s95Q
(31000)
MectrieFund
4.0
1,004,945
3.0
(2,185)
173
2,017,720
10.25.-,t, 4S
234,600 2S(
offset by part time savings
1999-01
FINANCIAL PLAN AND BUDGET
City Manager
Significant Expenditure & Staffing Recommendations
CITY OFp�LODI
CALIFORNIA
PUBLIC SAFETY
Lodi Fire Department bought its first motorized fire truck in 1913
May 1961— new patrol car
1999-2001 SIGNIFICANT EXPENDITURE REQUEST
ACTNITY:
REQUEST TITLE:
PROJECT DESCRIPTION:
POLICE DEPARTMENT
MATCHING FUNDS
For the past three years the Lodi Police Department has been the recipient of Federal
Block Grant Funds. Part of the requirements by the Federal government is that the
city match a certain percent of the Federal funding. The Police Department has taken
funds from its operating budget to cover these matching expenses for the City. We
would like to address this situation by requesting that funds be released from the
General Fund to cover the Federally mandated matching funds.
EXISTING SITUATION:
The Police Department has had to transfer funds from our operating budget to cover
the mandated matching funds the City has promised to pay as part of our grant
submittal. We have transferred $11,561 for Federal Block Grant matching funds for
96 -LB -VX -1055, $11,836 for Federal Block Grant matching funds 97 -LB -VX -3209 and
$9,372 for Federal Block Grant 98 -LB -VX -3209. This totals a $32,769 reduction in our
operating budget for a 3 -year period. We would like this situation addressed as a
Significant Expendure Request to cover the upcoming matching requirements.
PROJECT COSTS:
1999-2000 $10,000 (APPROXIMATELY -EXACT FIGURES DEPENDS ON
GRANT REQUIREMENTS)
2000-2001 $10,000 SAME AS ABOVE
- 1 -
1999-2401 SIGNIFICANT EXPENDITURE REQUEST
ACTMTY: Police Department Training & Conference Account
REQUEST TITLE: Dispatcher Team Building
PROJECT DESCRIPTION:
The Lodi Police Department has sixteen (16) Dispatcher / Jailers who staff the 911 dispatch center for
Police and Fire. A formalized team building is necessary to enhance the effectiveness of the dispatch unit.
PROJECT OBJECTIVE:
Enhance police / fire dispatchers ability to better understand bow to provide missions critical services. By
building a stronger and more cohesive team within the dispatch unit we expect to identify deficiencies in
our service delivery and adopt strategic plans to provide the highest service possible.
EXISTING SITUATION:
The Lodi Police Department has sixteen (16) Dispatcher /Jailers within the Operations Division. A
Police Lieutenant is the Dispatch Manager. There are four (4) Lead -Dispatchers who act primarily as
dispatcher trainers with some limited collateral duties. The Dispatch Lieutenant reports to the Operations
Division Captain.
The Dispatch / Jail area of the Police Department is often a very confined and difficult working
environment. The working space is not sufficient for the number of staff assigned and the jail
environment is stressful. Dispatch / Jailers perform mission critical functions and are the lifeline from the
community to public safety services. As a result of these and other factors, it is important that we have
professional assistance to help staff re -focus on mission goals and team concepts.
PROJECT COSTS:
Professional Dispatch Consultaot (3 days) S4,500.
19 attending (11 hotel rooms) 11z 90 z 3= S2,970.
Perdiem 19z 40 z 3= S2,280.
TOTAL S9,750.
* Associated overtime costs would be incurred to backfill dispatch and would be absorbed in our
overtime budget.
ALTERNATIVES:
An in-house team building could be conducted NOthout a professional consultant at a reduced cost.
1999-2000 SIGNIFICANT EXPENDITURE REQUEST
Police Depannient
Animal Shelter Cat Caues
REQUESTSUMMARY
Purchase two "banks" (nine caries per bank) of cat cages for the Animal Shelter.
PRIMARY OBJECTIVE
Provide adequate space to house cats at the shelter
Increase the number of canes in the limited space of the shelter's "cat room".
SUMMARY OF FACTORS'DRIVING THE REQUEST
The shelter currently has a total of twenty cat cages in its cat room. These cages are
filled to capacity on a daily basis. ;animal Services Officers are often forced to double up
the animals in the cages and are; at times, forced to euthanize cats before the law allows.
On July I" new legislation will increase the number of days the shelter will be required to
keep stray animals from three to five. It will be impossible for the shelter to comply Nwith
this legislation without additional cages. Adding to the problem is the limited space in
the cat room. There are currently four different styles of cages in the cat room and their
ON varying sizes and construction make it impossible -to simply stack or fit more cages in the
room. The two banks of cages requested will match and stack on a bank of cages
purchased two years ago. Some of the older cages will be moved from the cat room into
the euthanasia room to be used as temporary holding and overflow cages. Adding these
cages will increase the number of cat cages at the shelter front twenty to approximately
thirty-three.
ALTERNATIVES
1. Continue to double up cats in the cages. This alternative makes it extremely difficult
handle the cats, difficult to clean cages, it lends to the spread of decease, and would
likely lead to complaints from the public.
2. Euthanize animals as space is needed. This practice would place the shelter in
violation of state law.
COST SUMMARY
TWO Nine -unit 24" x 24" stainless steel kennels with resting shelves and 57,066
platform base with casters
Tax 5565
Estimated Shipping 5750
Total $8,381
P
1999-00 Financial Plan and Budget
SIGN'IFIC.4,\T EXPENDITURE REQUEST .4 -ND ST.417F1\G CHANGE
ACTI\7TY: Support Services
REQUEST TITLE: Purchase of Portable Weather Station
REQUEST SUKMARY
This request is to purchase a portable weather station for hazardous materials emergency calls and general citywide use.
PRLt1ARY OBJECTIVE
To provide a safe working environment for emergency scene personnel and to determine the correct hind direction and speed in order to
establish the proper plume projection and travel should an emergency evacuation be necessary.
SUMMARY OF FACTORS DRIFT G THE REQUEST FOR CHANGE
This We of equipment is not readily available in the area for emergency use. The shipment of hazardous material is prevalent along the
Highway 99 corridor and the railroad that travels through the city. Should an evacuation be necessary as a result an unscheduled
discharge of hazardous materials, accurate information is crucial to a successful outcome.
ALTEIU ATIVES
1. Do not purchase the equipment.
COST SLNLNL4RY 1999-2000
2000-2001
Additional Cost
Stafime
Su r)lies. Material and Services
�
Minor Equipment
SS 000.00
Total
S5,000.00
Savines
Net Cost
S5.000.00
!A=
1999-01 financial Plan and Budget
SIG.XIFIC.A-NT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTINITY: Emergency Sen -ices
REQUEST TITLE: Install Foam Unit to Engine 1
REQUEST SUNMARY
This request is to install a foam -dispensing unit to Engine 1.
PRDI.ARY OBJECTIVE
To maintain standardization of emergency equipment, response capabilities and service levels throughout the city.
SLI:NZILkRY OF FACTORS DRIVZNG THE REQLTEST FOR CHANGE
Engine 1 vas purchased in 1994 and tivas designed without a foam -dispensing unit. In 1997, two fire engines were purchased with
foam dispensing units for use on ordinary combustible and flammable liquid fires. The benefits realized from a rapid and pre-
measured foam application system supports the installation of this equipment on Engine 1. The installation of this equipment would
maintain an equal service level to all areas of the city and provide a standardized response capability among apparatus.
ALTERNATIVES
1. Do not install the foam application unit
COST SLINMARY
1999-2000 2000-2001
Additional Cost
Staffing
Supplies, Material and Services
Minor Equipment
S 12,000.00
Total
512.000.00
Savings
Net Cost
512.000.00
— 5 —
1999-01 Financial Plan and Bucher
SIGNIFIC.-L..NT EXPENDITURE REQL'EST AND STAFFING CHANCE
ACTIVITY: Emercencw Setxices
REQUEST TITLE: Add One FiietiLhier Position to Emer,_encv Services Activity
REQUEST SL?tLNIARY
The request is to add one additional firefighter's position to the emergency services activity of the fire department. One position vas
authorized in budget year 1995-1999, and tris request is to add a second authorized position to the budget in 1999-2000 and a third
position in budget year 2000-2001.
PRD, OBJECTIVE
To provide staffing for three personnel on the truck company, resulting in a constant on -duty staffing of thirteen (13) personnel per shift,
including the duty chief.
K -IN ARY OF FACTORS DR VD;G THE REQUEST FOR CHANGE
As a result of the department's self-assessment and standards of cower document, it was determined that the minimum number of
personnel required at the scene of a low risk structure fire was thirteen (13), including the duty chief. At present, the minimum staffing of
the department allows the on -duty staffing to drop to twelve (12) to cover vacations, sick leave and other department related leave
requirements. The impact of having only 12 personnel on -scene 21 a low risk structure fire is that certain fueground tasks will not be able
to be performed due to insufficient resources to perform the tasks safely. An additional position per shift would allow the department to
increase its constant staffing to thirteen (13) and still cover vacations, sick leave and other department related leave requirements. Since
75% of the city's buildings fall in the low fire risk category, and clearly at least 90% of the department's actual structure calls fall in this
same low risk category of building types, the addirion of one firefighter per shift would sufficiently cover 75% of the city's fire risk and
90% of our actual calls.
ALTERNATIVES
1. Continue with the practice that is currently urilized.
2. Increase the overtime budget to allow for coverage of vacations, sick leave and other department related leave requirements with
present staff -%vMle maintaining a minimum staffing of thirteen.
COST St sMARY
1999-2000
2000-2001
Additional Cost
Staffing
40,000.00
j 40,000.00
Supplies. 1lateri2l and Services
1.500.00
1.500.00
N4inor Equipment
Total
541.500.00
S41.500.00
Savings
Net Cost
541.500.00
S41.500.00
— 6 —
1999-01 Financial Plan and Buddct
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTINTTY: Emergency Services
REQUEST TITLE: Purchase Automatic External Defibrillator
REQUEST SLr.NLNiARY
This request is to purchase a fourth defibrillator.
PRLILARY OBJECTIVE
To maintain availability of mission critical equipment, to provide essential equipment at site-specific stationary and auxiliary
functions and to maintain the operational readiness of resen-e apparatus.
SUMNLARY OF FACTORS DRIVING THE REQUEST FOR CMAYGE
The availability of this equipment to emergency personnel has been instrumental in saving the lives of seven citizens. At the present time
each front-line engine is equipped with a defibrillator. However, the resen'e fire engine is not. The purchase of this equipment would
maintain availability of mission critical equipment, provide essential equipment at site-specific stationary and auxiliary functions such
as the Street Faire and Ooh Aah Festival. At other times, this purchase would maintain standardization of emergency equipment,
response capabilities, service levels and operational readiness of the reserve fire engine.
ALTERNATIVES
1. Do not purchase the equipment.
COST SUNDIARY 1 1999-2000
2000-2001
Additional Cost
Staffing
Supplies, ?Material and Services
Minor Equipment 1
54,500.00
Total 1
S4.500.00
Savings 1
Net Cost
S4.500.00
— 7 —
PUBLIC UTILITIES
Construction workers in 1905 hoist a utility pole near the corner of Sacramento and
Lockeford
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFV G CHANGE
ACTIVITY: Public Utilities — WatevWastewater
REQUEST TITLE: Engineering Staff
REQUEST SUN5 ARY
This request is to provide dedicated engineering staff to place greater emphasis on supporting the City's Water and Wastewater
Utility; in particular the ongoing replacement of old mains. Related to this would be a reorganization of the present Engineering
Section, which would be handled separately. This request and related reorganization will emphasize use of outside consulting
services for large and "one-time" projects, recognizing that senior staff will be needed to manage and coordinate consultant's
work with other City Departments and outside agencies and, that regular City staff will handle on-going programs.
PRMARY OBJECTIVE
The primary objective of the request is to make the City's Engineering function more responsive to the City goals of replacing
aging infrastructure and supporting economic development. This requires both highly experienced and skilled staff and the
ability to respond to urgent and cyclic demands of development projects. These objectives will be accomplished by:
Assigning three positions to the Water and Wastewater Utilities, creating a project team to focus on replacement of old
pipelines both as separate projects and in conjunction with street rehabilitation projects and do related mapping;
Maintaining a core staff in engineering to do capital planning and coordination in conjunction with current development and
long-range planning to implement the General Plan;
Contracting with an outside firm to assist in development plan checking and processing (already underway).
SU1L1iARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The present organization and staffing levels have not permitted Engineering to move forward with the important goal of
replacing old infrastructure. Also, while Engineering has responded well to the demands of "fast track" development projects
and other economic development efforts, it has been at the expense of other, primarily residential, development activity and our
utility & street projects and administrative duties. In addition, recruiting and retaining experienced staff is beginning to become
a problem. Civil engineers are in high demand in California while college enrollments are declining. With recent and projected
retirements, the City will need the utmost flexibility in hiring staff and consultants.
ALTERNATIVES
Continue with present practices.
Retain an outside consulting/management fum to evaluate the City's engineering function and make recommendations.
COST SUIDIARY
1999-2000
2000-01
The costs below are based on the assumption that current staff
would be transferred to Water/Wastewater and new employees
would be hired in Engineering.
Staff transfer to Water/Wastewater (50150 each)
Senior Engineer (E step)
S76,470
$76,470
PW Inspector (E step)
S61,260
$61,260
Senior Eng. Technician (E step)
S60,620
$60,620
Misc equipment (PC's)
56,000
-
Total:
5204,350
$198,350
WaterWWEngineering
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Policy, Legislative and Regulatory
REQUEST TITLE: Administrative Clerk Il — Full -Time
REQUEST SUMMARY
Establish a full-time Administrative Clerk 11 position to assist the Department's one existing full-time clerical
person. Since March 1997, the Department has been employing a temporary part-time Administrative Clerk 11
over 1900 hours per year without benefit of full-time employment.
PRIMARY OBJECTIVE
• Provide sufficient clerical support to the 44 full-time and nine part-time Electric Utility Department staff.
■ Provide customer response and telephone services.
■ Provide clerical back-up in absence of the one full-time Administrative Clerk II or Department Secretary.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
Industry restructuring, the competitive electric market and increased regulator's requirements have expanded
the demands on the time of the professional staff and the one full-time Administrative Clerk II. The
Department is being pressed to provide a competitive level of service to. its customers and implement public
benefit programs and value-added services. An additional Administrative Clerk 11 is needed to allow
professional staff the time and administrative support to implement these programs.
The duties of this position will allow for the clerical support necessary for the public benefit programs and
value added services. It will also provide the much needed clerical back-up in the absence of the current
clerical staff.
ALTERNATIVES
■ Continue with temporary employee performing these duties without benefits.
• Without this position clerical and reception duties are performed by significantly higher paid employees.
COST SUMMARY
Additional Costs
1999-2000 2000-2001
Staffing 522,200.00 $22,865.00
Overhead 8,320 8,410
Total S 30,520 $ 31,275
IMPLEMENTATION
On approval of this request, the hiring of a full-time Administrative Clerk II will be scheduled.
in —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Policy, Legislative and Regulatory
REQUEST TITLE: Consulting Services
REQUEST SUMMARY
Hire various consulting firms to provide services in the areas of unbundling of rates, restructuring, commodity
risk management policy development and competitive benchmarking.
PRIMARY OBJECTIVE
Provide services to supplement Department activities so that the City can be ready for the competitive electric
market and to maintain a competitive stance in the future.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
This request is required with the proposed opening of the electric commodity to market competition so that the
City will have the tools necessary to survive in the competitive arena.
ALTERNATIVES
These are specialized services that could not -be accomplished with existing staff.
COSTSUMMARY
Additional Costs
Staffing
Utilities
-Supplies, Materials, Services
Minor Equipment
Savings
Total
1999-2000 2000-2001:
125,000
$ 125,000
IMPLEMENTATION
Upon approval, implement during 1999/2000 and 2000/2001 fiscal years.
125,000
$ 125,000
0
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Engineering and Operations
REQUEST TITLE: Administrative C erk if
REQUEST SUMMARY
Add Administrative Clerk 11 pcsiticn in Engineering and Operations Division
PRIMARY OBJECTIVE
Provide the necessary clerical support to Division's staff and relieve existing estimating and engineering staff
of clerical duties
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
At present many clerical tasks are being performed by engineering and estimating staff resulting in a
significant impact on the availability of this highly trained and specialized staff. Although the Division has
temporary clerical staff, the demands for clerical supportfar outweighs the capacity of the temporary staff.
The increased level of outside contracting on several construction projects has significantly increased the
volume of clerical duties. Outside contracting requires considerably more clerical duties to prepare and
administer the contracts when compared to the same construction work being performed by in house staff.
The Division Manager currently percrms the clerical aspects of the tasks listed below. These tasks will be
transferred to the clerical position in turn relieving the Manager to perform more duties of the manager
position, duties that at present are not being performed.
Examples of these tasks are:
AaN Preparing and administering construction contracts; transformer inventory; vehicle acquisition and disposition;
responding to questionnaires; acquisition and disposition of major equipment, processing invoices and billings
as well as numerous day to day clerical tasks.
ALTERNATIVES
Add part time and/or temporary help. Not recommended. It has been demonstrated that even with the
current level of clerical help higher classification staff is still performing large amounts of clerical tasks. Full
time staffing, in the Division, of this classification will bring continuity and availability to the Division's clerical
staff. This will produce a highly experienced, knowledgeable, and effective addition capable of offering
significant assistance to the Division's technical staff which in turn increases the overall efficiency and
effectiveness of the Division.
COST SUMMARY
Additional Costs
1999-2000
2000-2001
Staffing
530,520
531,275
Utilities
180
180
Supplies, Materials, Services
600
600
Minor Equipment
5,100
-
Savings (see belcw)
Total
S36,400
$32,055
— 12 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
.administrative Clerk II (continued).
Savings: Not quantified — Significant as a result of the ability to transfer duties from higher to lower
compensated staff and gaining the availability of technical staff to perform needed duties not presently being
addressed.
IMPLEMENTATION
Upon approval the recruitment process will be initiated
Signi[ Exp Req Adrnin Clerk 1199-0 L doc
— 13 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Engineering and Operations
REQUEST TITLE: AutoCAD Operator, temporary
REQUEST SUMMARY
Add additional temporary AutoCAD stafrg to assistthe Division during this period of high activity level in areas of design,
planning and system development. This position is currently working in the Division utilizing funds from the vacant
Electrical Engineer position. It is estimated that the employee will work approximately 1800 hours per year.
PRIMARY OBJECTIVE
Continue to relieve existing staff of tasks that can be effectively performed by temporary staff. This will increase the
availability of highly trained staff to respond ':o customer requests and reduce the present backlog of projects waiting to
be designed.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The additional temporary mapping staff will be assisting in the development, design and drawing of various Capital
Improvement Projects and electrical system projects. These projects inc!ude: Downtown 12kV system rebuild, Turner
Road duct system, McLane Substation cet-a-ways, wiring schematic drawings for all substation equipment, converting
Electric Engineering Standards (EES) and Electric Construction Standards (ECS) from hand drawings to AutoCAD.
Converting these standards to the AutoCAD formatwill allow `he engineering staff to easily accomplish updates, chances.
revisions and take-cffs from the original computer files. The temporary staff member will also do routine AutoCAD dra;Ing
and assist in more complex :asks such as data input in ADE and GIS programs. An additional AutoCAD rode must be
purchased to meet software licensing acieements.
Other duties and responsibilities will inc!ude, but net limited to the following:
1. Electric system mapping.
2. Streetlight system mapping
3. General AutoCAD drawing.
4. Special drawing projects.
ALTERNATIVES
1. Do nothing.
2. Out source - not recommended, the most efficient way to accomplish this task is to have the employee work
along side and be continually monitored by existing staff. Not practical.
3. Add full time AutoCAD maccer to the current staff. Not recommended at this time.
4. Have current staff --erform the -t+crk. This alternative would further increase the backlog.
COST SUMMARY
Additional Costs 1999-2000 2000-2001
Staffing 18,000 18,000
Utilities
Supplies, Materials. Sertices 2,240 0
Minor Equipment
Savinc_s
Total 520,240 $18,000
IMPLEMENTATION
On approval of this request, the recruitment process will be initiated and additional software will be purchased.
— 14 —
SCgR Eao .ec AvoCA:: ex
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Engineering and Operations
REQUEST TITLE: Personal Computers, replacement
REQUEST SUMMARY
Replace five (5) personal computers.
PRIMARY OBJECTIVE
Replace computers that do not meet standards required by the software programs used within the
Department. In addition some of these units are non -Y2K compliant.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Department has five (5) personal computers on which the latest version of software will not operate
properly due to the speed and capacity of these machines. It has also been determined that some of these
older units will not pass Y2K testing. To eliminate lock -ups and excessive waste of operator time it is
recommended that the machines be replaced.
ALTERNATIVES
Do not replace. This alternative will not solve the existing problems with these machines and will continue to
waste time.
COST SUMMARY
Additional Costs
1999-2000 2000-2001
Staffing
Utilities
Supplies, Materials, Services 15,000
Minor Equipment
Savings Not quantified
Total $15,000
IMPLEMENTATION
Upon approval the procurement process will be initiated.
Signif Exp Req Personal Comp — 15 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Engineering and Operations
REQUEST TITLE: Copy Machine replacement
REQUEST SUMMARY
Replace Xerox 5314 copier presently being used by the Engineering Division.
PRIMARY OBJECTIVE
Provide Engineering and Operations Division with a copy machine that will accommodate a number of different sizes
and types of paper. The current copy machine will only copy one paper size.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The existing copier is not capable of accommodating the needs of the Engineering Division. Electric Engineering Work
Orders are drawn on a variety of paper sizes, the copier needs to be capably of reproducing these different sizes of paper
for Work Order processing. In recent years, the quality of the copies produced has dramatically decreased. Another copy
machine is available, however, this machine is used by clerical staff, other divisions and for mass copy projects. It is
located remotely from the engineering offices causing inefficient use of engineering staff time due to non-availability and
physical location.
ALTERNATIVES
Do nothing - Continue to work with the present copier. This will result in significant impact on staff time, not
recommended.
COST SUMMARY
Additional Costs 1999-2000 2000-2001
Staffing .
Utilities
Supplies, Materials, Services
Minor Equipment 9,000
Savings
Total $9,000
IMPLEMENTATION
Upon approval, purchase will be coordinated with the Purchasing Officer. Existing copier will be traded in.
— 16 —
Signif Exp Req Copy Mach
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Engineering and Operations
REQUEST TITLE: Additional Overtime, Engineering
REQUEST SUMMARY
Increase the funding level for overtime in Engineering.
PRIMARY OBJECTIVE
To increase funding for overtime in order to respond to demands placed on the Division.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The workload in the Engineering Section has increased dramatically in the past year, as a result, system improvement
projects have not been done. Some of the causes for the heavy work load are: the increased industrial development on
the eastside of Lodi, easement and right-of-way issues for the Eastside 12kV circuit, subdivision developments and other
major system reconstruction. Increased workload from design, planning and document preparation associated with
contracting a number of construction projects has further impacted the Division.
ALTERNATIVES
Do nothing, this altemative is not recommended. The backlog will continue to grow and ultimately impact service
continuity, system reliability and customer service.
COST SUMMARY
Additional Costs
1999-2000 2000-2001
Staffing 12,000 12,500
Utilities
Supplies, Materials, Services
Minor Equipment
Savings
Total 512,000 $12,500
IMPLEMENTATION
Upon approval, the overtime will be used on an as needed basis.
- 17 -
Signif Exp Req Overtime Eng
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Engineering and Operations
REQUEST TITLE: Materials and Supplies, Meter Reading
REQUEST SUMMARY
Fund materials and supplies utilized by the Meter Reading Division of the Finance Department
PRIMARY OBJECTIVE
Provide the necessary materials and supplies fcr the Meter Reading Division to perform the duties of meter
reading, turn on, turn off, sealing, etc.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Meter Reading Division utilizes certain materials and supplies such as seals, locking rings, locks, securty
plates, etc. in the daily work. These materials and supplies traditionally were budgeted in the Finance
Department's budget. However, the 1997-99 Financial Plan and Budget did not include funding for these
items in either the Finance Department's or Electric Utility Department's Budgets. During the 1997-99 period
the materials have been funded via Special Allocations. This request will place sufficient funding in the
Electric Utility Department's Financial Plan and Budget for these necessary materials and supplies.
ALTERNATIVES
Do not fund -- not recommended. This alternative will require staff to prepare Special Allocations during the
Fiscal Period to fund the purchase of these items.
COST SUMMARY
Additional Costs 1999-2000 2000-2001
Staffing
Utilities -
Supplies, Materials, Services 11,000 11,275
Minor Equipment
Savings none
Total $11,000 S11,275
IMPLEMENTATION
Upon approval the material and supplies will be purchased during the Fiscal Period to meet requirements.
The request is based on actual expenditures during the curent Fiscal Period.
Si_anifExp Rcq Finan Dcp.doc
18 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Business Planning and Marketing
REQUEST TITLE: Consulting Services
REQUEST SUMMARY
Hire various consulting firms to provide services in the areas of load research, cost of service and customer
options on an ongoing basis.
PRIMARY OBJECTIVE
Provide studies that develop the data and information required too maintain a defensible set of rates and
appropriate services in the competitive market.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
This request is essential with the proposed'opening of the electric commodity to market competition. These
types of studies are very technical and are also necessary to supplement the rate unbundling requirements.
ALTERNATIVES
Have current personnel perform these studies at the cost of other high priority tasks not being performed.
Hire additional permanent personnel to do these tasks.
COST SUMMARY
Additional Costs 1999-2006
Staffing
Utilities
Supplies, Materials, Services 50,000
Minor Equipment
Savings
Total $ 50,000
IMPLEMENTATION
Upon approval, implement during 1999/2000 and 2000/2001 fiscal years.
2000-2001
50,000
$ 50,000
- 19 -
0
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Electric Construction and Maintenance
REQUEST TITLE: Tree -Trimming —Plectric Line Clearance
REQUEST SUMMARY
Increase funding for Contract Tree -Trimming.
PRIMARY OBJECTIVE
To maintain trees trimmed from primary conductors for new and more stringent clearance regulations.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Electric Utility Department contracted for tree trimming (line clearance) utilizing two three-person crews
and one two -person crew for the 1997-1998 fiscal year. On January 23, 1997, the California Public Utilities
Commission (CPUC) approved Proposed Tree Trimming Rules submitted by Administrative Law Judge
Malcolm. This decision now requires a minimum of 18 inches clearance between foliage and 12kV utility lines
at all times. The CPUC has given the utility companies two years to comply with the new rule, and all foliage
shall be maintained at a minimum of 18 -inch clearance there after.
The 1997-1998 fiscal year is the first year of utilizing three tree -trimming crews. In prior years, two tree -
trimming crews were utilized year-round, consisting of one three-person crew and one two -person crew.
Funding was approved for a second three-person crew for the 1997-1998 fiscal year. On November 3, 1997,
a new tree -trimming contractor commenced work, which included the second three-person crew for a total of
three crews, two three-person crews and one two -person crew.
An all out effort commenced to trim or remove all trees in contact with 12kV utility lines. This project has not
been completed. Tree foliage and/or branches are still in contact with 12kV lines. With the above normal
_ rainfall during the 1997/98 -winter season, an above normal growth rate of trees occurred. To conform to the
new rules, the line clearance effort of three tree -trimming crews must be maintained. Funding was not
approved for the second three-person crew for the 1998-99 fiscal year.
The contract and contract price shall be in effect through fiscal year 1998-1999, i.e. through June 30, 1999.
This agreement may be renewed at City's option on a year-to-year basis for a maximum of three (3) additional
years. Prices shall be mutually agreed upon prior to such renewal or extensions. The maximum
escalation/de-escalation in contract price beginning with and in effect through a fiscal year period shall be the
percentage increase/decrease in salary obtained by the electric unit represented by IBEW in the preceding
fiscal year.
ALTERNATIVES
Continue to trim trees with one three-person crew and one two -person crew. Two tree -trimming crews will not
keep up with the tree trimming required to comply with the 18" rule.
COST SUMMARY
Additional Costs 1999-2000 2000-2001
Staffing
Utilities
Supplies, Materials, Services 130,770 134,700
Minor Equipment
Savings
Total S 130,770 $134,700
IMPLEMENTATION
Upon approval, implement during 1999/2000 fiscal year.
— 20
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Electric Construction and Maintenance
REQUEST TITLE: Groundman/Groundwoman (1), Line Truck Driver/Equipment Operator (1)
REQUEST SUMMARY
Hire one (1) Groundman/Groundwoman and one (1) Line Truck Driver/Equipment Operator.
PRIMARY OBJECTIVE
To increase the Line Division's staffing level by one (1) Groundman/Groundwoman and one (1) Line Truck
Driver/Equipment Operator in response to increasing maintenance of an aging electric system and the
demands of the constantly changing and expanding City. Also, to implement G.O. 165 inspection intervals.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
On October 22, 1998, and by decision.98-10-059, the Califomia Public Utilities Commission denied rehearing
of D-98-03-036 as sought by the California Municipal Utilities Association, respecting the jurisdiction of the
Commission to impose prescriptive distribution system inspection and maintenance practices (General Order
165) on publicly -owned distribution utilities. G.O. 165 specifies inspection intervals of overhead and
underground electric systems that each electric utility shall implement (see attached sheet for intervals).
Implementing and maintaining G.O. 165 inspection intervals will require additional personnel. A full-time two -
person crew will be needed to implement and accomplish this task.
A two -person crew will consist of a Lineman/Linewoman and Groundman/Groundwoman. The cost savings
will be the percentage between the wages of a Lineman/Linewoman and Groundman/Groundwoman.
Line Truck Driver/Equipment Operator will be utilized for driving a line truck and operating equipment i.e.;
crane, backhoe and compressor, etc. where a Lineman/Linewoman is now utilized. The cost saving will the
percentage between the wages of a Lineman/Linewoman and Truck Driver/Equipment Operator. Both
positions will be ongoing.
Due to the aging of the electric system, it is necessary to add personnel in the Electric
Construction/Maintenance Division of the Electrical Utility Department. The reliability and safety of the electric
system is seriously threatened. The underground system requires extensive replacement and rebuilding.
Pole replacement is invariable, and replacement of butt rotted poses is a critical safety issue. A high
percentage of our overhead primary and secondary conductors need replacing. With this comes extensive
rebuilding of the pole apparatus. The Electric Utility needs to inspect, engineer, and implement the
replacement and rebuilding necessary to ensure that customer service remains reliable, and that the safety of
the citizens of Lodi and the crew is not jeopardized. With the condition of the aging equipment, the electric
system reliability is seriously threatened. In the upcoming competitive market, it is essential that we maintain
and build on a reputation of quality and reliability.
ALTERNATIVES
Continue to operate with existing personnel, and let the system continue to degenerate, and not implement
G.O. 165 inspections which are mandated by the Public Utilities Commission.
— 21 —
e:� e,�
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
COST SUMMARY
Additional Costs 1999-2000 2000-2001
Staffing $ 99,540 $ 102,610
Utilities
Supplies, Materials, Services 2,000
Minor Equipment
Savings
Total S 101,540 $102,610
IMPLEMENTATION
Upon approval, following City policy for hiring, these positions will be filled during the 1999/2000 fiscal year.
— 22 —
Crtw eK
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Construction and Maintenance
REQUEST TITLE: Contract Personnel, Material and Equipment
REQUEST SUMMARY
To hire contract personnel, buy additional material and tools and rent equipment.
PRIMARY OBJECTIVE
To maintain adequate personnel, buy materials and tools and rent equipment that is necessary to provide
continuity of reliable service to the electric customers of the City of Lodi.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Electric Utility Constructicn/Maintenance Division is requesting funds to employ Contract
Linemen/Linewomen and Contract Groundmen/Groundwomen. Contract personnel are used to augmant the
Linecrews during times when there is an excessive work load. The extra personnel will enable the linecrews
to keep abreast with services to new commercial customers, installing sub -structures and electric systems for
new sub -divisions, providing services to new residential customers and maintaining overhead and
underground electric systems.
On October 22, 1998, and by decision 98-10-059, the California Public Utilities Commission denied rehearing
of D-98-03-036 as sought by the California Municipal Utilities Association, respecting the jurisdiction of the
Commission to impose prescriptive distribution system inspection and maintenance practices (General Order
165) on publicly -owned distribution utilities. G.O. 165 specifies inspection intervals of overhead and
underground electric systems that each electric utility shall implement (see attached sheet for intervals).
Implementing and maintaining G.O. 165 inspection intervals will require additional personnel. A full-time two -
person crew will be needed to implement and accomplish this task.
The following list is the major projects planned for construction during the 1999/2001 fiscal years.
• Construction of a new 12kV overhead and underground circuit from Industrial Substation to Century
Boulevard and South Stockton Street.
• Rebuilding the downtown underground electric system.
• Construction of a new 12kV underground circuit from McLane Substation to Lower Sacramento Road.
• Replacement of wood poles that do not pass inspection.
• Replacement of faulty underground equipment found during inspection of the underground electric
system.
The use of contract personnel will be a savings to the City of Lodi Electric Utility during the time when there is
no excessive work load. The contract personnel will be laid off. --
ALTERNATIVES
Not hiring the contract personnel will result in degradation of service to new electric customers.
— 23 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
COST SUMMARY
Additional Costs Account No.
Staffing 160650
160651
Supplies, Materials, Services 160650
160650
160651
160651
Equipment Rental 160650
160651
Total
7300
7700
7300
7700
190-9-2000
S 121,281
80,854
40,000
30, 000
15, 000
45, 000
30,000
15,000
S 377,135
IMPLEMENTATION
Upon approval, implement during/999/2000 and 2000/2001 fiscal years.
2000-2001
S 121,281
80,854
40,000
30, 000
15,000
45,000
30,000
15,000
S 377,135
- 24 -
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Electric Construction and Maintenance
REQUEST TITLE: Groundperson/apprentice Lineman/Linewoman
REQUEST SUMMARY
Establish the position of Groundperson/Apprentice Lineman/Linewoman
PRIMARY OBJECTIVE
To provide the Electric Utility Department with an entry level position for Linemen/Linewomen.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
A this time and over the past few years, there has been a shortage of joumey-level linemen/linewomen in the
State of California and surrounding areas. Local Union 1245 I.B.E.W. (Intemational Brotherhood of Electrical
Workers) has been inadequate in providing the City of Lodi Electric Utility Department with qualified journey -
level linemen/linewomen.
The implementation of an apprenticeship program will help to alleviate this problem. Providing on-the-job
skills and training into a technical career will attract employees from other City Departments and the citizens
of Lodi.
The program will provide five years of training and study to reach journey -level lineman/linewoman status.
The successful applicant will work as a groundman/woman for a minimum of twelve months, evaluated
monthly. If successful, the applicant will start a four-year apprenticeship program of intense study and hands-
on training.
The Memorandum of Understanding between the City of Lodi and Local 1245, Intemational Brotherhood of
Electrical Workers, from February 9, 1998 to December 31, 2002, Article III, Section 4-6 states the City of Lodi
intends to establish an apprenticeship program during the term of this MOU.
ALTERNATIVES
Continue hiring journey -level linemen/linewomen from the limited sources available with no entry-level
position in the Electric Utility Department disregarding the Memorandum of Understanding between the City of
Lodi and Local #1245 I.B.E.W. (not recommended).
COST SUMMARY
Staffing S 35,680
Overhead 11,060
Supplies, Materials, Services 2,000
Minor Equipment
Training 6,000
Total S - S 55,740
IMPLEMENTATION
Upon approval, following City policy for hiring, this position will be filled during the 2000/2001 fiscal year.
— 25 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Electric Substations & Systems
REQUEST TITLE: Contract for Professional Services
REQUEST SUMMARY
Contract For Maintenance Of transformers and Equipment
PRIMARY OBJECTIVE
To Contract for a backlog of transformer maintenance.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
Transformer maintenance has not been performed on a regular bases do to work load, injury or sick leave
taken by technical staff and construction work at the Industrial Substation. Maintenance such as filtering tap
changer oil, inspection of contacts, cleaning of high voltage bushings and installing parts to replace worn parts
found in previous inspections has not been done. It will be necessary to contract out some maintenance items
to catch up on the backlog of work.
ALTERNATIVES
Delay maintenance.
COST SUMMARY
Additional Costs 1999-2000 2000-2001
Staffing
Utilities
Supplies, Materials, Services
SUB CONTRACT 10,000 10,000
Minor Equipment
Total $ 10,000 $ 10,000
IMPLEMENTATION -
Advertise and Award Bid Budget years 1999-2000 & 2000-2001
- 26 -
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Electric Substations and Systems
REQUEST TITLE: Contract for Professional Services (Painting)
REQUEST SUMMARY
Contract for Substation Equipment Painting
PRIMARY OBJECTIVE
Prevent further degradation of exterior surfaces of substation equipment.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The exterior surfaces of the power substation transformers and power circuit breakers are in need of painting.
Damage to the exterior surfaces of the power circuit breakers and transformers have caused rust to form. This
rust will in time cause the transformer cooling radiators and tap changers to leak oil. Due to the expertise
needed in applying the commercial coatings needed for this type of equipment, contracting for this service is
necessary.
ALTERNATIVES
Delay painting to a later budget cycle.( Not Recommended.)
COST SUMMARY
Additional Costs 1999-2000 2000-2001
Staffing
Utilities
Supplies, Materials, Services
Sub Contract 20,000 20,000
Savings
Total $ 20,000 $ 20,000
#t111PLEME NTATION
Bid and contract each budget year 1999-2000 and 2000-2001
- 27 -
TRANSPORTATION
Interurban Electric Line (trolley tracks) — Sacramento Street
Sacramento & Pine about 1894 — in front of Lodi Hotel
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFV;G CHANGE
ACTIVITY: Public Works / Street Division
REQUEST TITLE: Downtown Clean -u:)
REQUEST SU-:lLMARY
Add a Downtown Cleanup Laborer to City staff and the necessary equipment. With increasing emphasis on Downtown
Revitalization, the overall appearance of Downtown alleys and tree wells and the unique designs requiring extensive hand
cleaning, the level of effort required for effective overall maintenance warrants someone being assigned on a full-time basis.
PRL NARY OBJECTIVE
1. Assist in keeping the Downtown area aesthetically pleasing.
2. Enhance property value and reduce crime via constant maintenance.
SU�LI-fARY OF FACTORS DRiVL\G THE REQUEST FOR C114'NGE
Prior to FY 1993-94 budget reductions in the Street Division, Public Works had a Maintenance Worker and truck assigned
to the Downtown area. This person reported Downtown daily for the purpose of keeping the area clean. Last year a
temporary laborer was funded for one year (529,855). Having this position emptying our Downtown trash containers has
resulted in a $13,000 annual reduction in refuse charges to the City. This new Laborer position's primary responsibility will
be the overall appearance of the Downtown area. This would include such items as cleaning the sidewalk areas, emptying
the Downtown trash containers, trimming tree wells, quarterly planting of flowers in City planters, repairing street furniture
such as benches, and monitoring the alleys and parking lots for trash, debris and weeds. This position may also be assigned
cleanup of the future parking structure and exterior area of the Multimodal Station.
A sidewalk sweeper will be requested on a separate Capital Improvement Project request to enhance the efficiency of the
cleanup operation. A pickup truck scheduled for replacement will be utilized as secondary usage in this program.
ALTERNATIVES
1. Attempt to meet Downtown needs by means of contract services.
2. Have the property owners be responsible for keeping store fronts and alleys clean.
3. Use service groups and volunteers to periodically do cleanups.
COST SUMMARY
1999-2000
2000-01
Additional Costs
Staffing
$32,475
35,220
Supplies, Materials, Services
Minor Equipment
Total
Savini2s Eliminate Pan -Time Funding
<29,855>
<29,855>
Net Cost
$2,620
$5,365
aIPLEINIENTATION
If this request is approved, the recommendation would include transitioning the incumbent to regular employee status. This
position would be a separate classification and not be part of the Street Division rotation.
— 29 —
1999-2001 Financial Plan and Budget
SIG\TFICA�T E\PENDITLRE REQUEST AND STAFFING CHANGE
ACTIVITi : Public Works
REQUEST TITLE: Clean -Up Truck Laborer
REQUEST SUINBIARY
This request to add a laborer to "City Staff- is to reintroduce the clean-up truck operation. This service was eliminated during
the 1993 budoetlservice reductions.
PRLMARY OBJECTIVE
The primary objective of this program is to assist the street sweeper in cleaning assigned sweeper routes. This position would
clean areas the sweeper can not reach such as certain returns, catch basins, and handicap ramps that are collecting dirt and
debris. In addition, this position would:
• Spray and trim weeds in the City right-of-way
• Clear low tree limbs from obstructing regulatory, waning and informational signs
• Clear low limbs over sidewalks and along bus routes
• Pick up piles in advance of the sweeper
• Remove all advertisements and posters in the public right-of-way
• Report hazards, damaged signs, and chuck holes
• Clean and clear alleys of weeds, debris, and low limbs
• Maintain and clean tree wells City wide.
• Support San Joaquin County Sheriffs Crew in cleanup programs with heavy equipment.
No new vehicle would need to be purchased for this program. The vehicle to be used in this operation is currently in the fleet.
SUINCMARY OF FACTORS DRIVrgG THE REQDFST FOR CHANGE
Existing staff has attempted to assist the street sweeper and meet this need. These efforts have not been consistently sustained
due to workload demands. The implementation of the Downtown Cleanup Laborer and the Tree Operation Supervisor have
helped. However, these positions have many responsibilities and are not able to consistently maintain these areas of concern.
ALTERNATIVES
• Continue with present practices — get to these areas of concern when possible.
• Attempt to use volunteers. Past experience has demonstrated that without constant involvement from the City, these efforts
lose enthusiasm and are not consistently applied.
COST SUMMARY
1999-2000
2000-01
Additional Costs
Staffing
32,475
35,220
Supplies, ?klaterials, Services
Minor Equipment
Total
32,475
35,220
Savings
Net Cost
32,475
35,220
d
A:tG!.'.c99ZiGE%Fcteenu;'jck.doc 0223199
— 30
-I s,gllwS se umo" .Cllemuoj -- a`IE'I !po'I
Utagrl a!2auie:) ssau;o 3uo)s-13nUO3, O2u!Uas-6061 iudy
S:13IAH3S 'IVI34S V rIV2II1.LrIl1D `a2II1SIarI
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Parks Administration
'tEQUEST TITLE: Connect Parks Division Computers to Server in Recreation Office
REQUEST SUhLMARY
Purchase supplies needed to connect Parks Division staff computer workstations to the Recreation Division server. Contract
installation of cable and connection. Allocate funds into the Wide Area Network capital account.
PRIMARY OBJECTIVE
To connect the Parks Division computers to the server in the Recreation office, which will allow staff access to the city's wide area
network.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Recreation Division server will be connected to the city's wide area network. Parks Division staff are housed in a modular
building in the corporation yard and the mechanic in a building adjacent to the Recreation office. In order for the Parks Division staff
to have access to the city's wide area network, they will need to be connected to the server in the Recreation office.
ALTERNATIVES
1. Purchase and connect a stand-alone computer to the server for use by Parks Division staff and do not connect the Parks Division
to the wide area network.
- OST SUMMARY
1999-2000 2000-01
+additional Costs
Staffing
Supplies, Materials, Services
58,000
Minor Equipment
Total
58,000
Savings
Net Cost
$8,000
IMPLEMENTATION
Project will be scheduled once funded,
— 31 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Parks and Recreation Administration
REQUEST TITLE: Administrative Assistant
REQUEST SUMMARY
To hire an Administrative Assistant for the Parks and Recreation Department.
PRIMARY OBJECTIVE
To administer administrative operations of the Parks and Recreation Department to include the areas of office policies and procedures;
personnel; budget; information systems: contracts; programs: reports; grants; surveys and studies.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
With the elimination of the Recreation Superintendent position in 1993, the administrative needs and duties of the department were
dispersed to the Recreation Supervisors and Department Secretary. As the city and department has grown, so have the administrative
needs of the department. This position is needed to pull those administrative duties together to provide a better organized department
and allow effected staff members to give a better performance on the jobs they were hired to do.
ALTERNATIVES
1. Reinstate the Parks Superintendent position. This alternative would cost approximately 564.500.
2. Do nothing.
COST SUMMARY 1999-2000
2000-01
Additional Costs
Staffing
$54,000
Supplies, Materials, Services
Minor Equipment
Total
$54,000
Savings
Net Cost
554.000
DVIPLEMENTATION
This request is for the 2000-01 fiscal year. Recruitment would commence after July 1, 2000.
- 32 -
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Parks and Recreation Administration
REQUEST TITLE: Program Coordinator (Full -Time)
REQUEST SUMMARY
Hire one full-time program coordinator for the Recreation Division.
PRIMARY OBJECTIVE
To assist four Recreation Supervisor in various programming areas in providing quality recreational activities for the citizens of Lodi.
SUMMARY OF FACTORS DRIVING TIE REQUEST FOR CHANGE
The four Recreation Supervisors in the Recreation Division oversee and manager over 40 programs in addition to facility rentals, special
events and miscellaneous assignments. Because our community is a working community, many programs are scheduled during
evening hours and weekends to allow for optimum participation. The Recreation Supervisors consistently work evening and weekend
hours in addition to their regular workdays to ensure quality programming. This position would be used to in the areas of special
events, sport camps, officials and scorekeepers coordination, and as support to the Recreation Supervisors in their day-to-day
programming.
ALTERNATIVES
Hire a part-time Program Coordinator for 1,500 hours per year. This would cost approximately $18,270
Do nothing.
COST SUMMARY
1999-2000 2000-01
Additional Costs
Staffing
$41,165
Supplies, Materials, Services
Minor Equipment
Total
$41,165
Savings
Net Cost
$41,I65
IMPLEMENTATION
Recruitment to begin once funded.
- 33 =-
1999-2.001 Financial Plan and Budget
SIGN-MCANT EXPL-N-M-URE REQUEST AND ST-kFY G CHANGE
ACTIVITY: Recreation Administration
REQUEST TITLE: Purchase Office Chairs
REQUEST SLINL�4 ARY
Purchase eight matching chairs for conference room; purchase desk chair for director and two supervisors.
PRIMARY OBJECTTVE
To replace worn, mismatched conference room chairs and to provide staff with appropriate desk chairs.
SUAD4 ARY OF FACTORS DRIP G THE, REQUEST FOR CHANGE
The chairs in the conference room are worn, old, and uncomfortable due to being too low for conference table. Three desk
chairs are needed to replace worn and old chairs for director and two supervisors.
ALTERNATIVES
1. Purchase eight matching chaos first year; three desk chain second year.
COST SUMMARY
1999-2000 200M1
Additional Costs
staffmg
Supplies, Materials, Services
Minor Equipment
54,400
Total
54,400
Savin
Net Cost
54,400
If funded, chain will be purchased during the fiscal year.
— 34 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Recreation Administration
''EQUEST TITLE: Upgrade Activity Brochure
REQUEST SUMMARY
Produce and distribute 8'/z x 10`/2 quarterly brochure (approx. 24 pages). Target mail brochures to people whom have taken a course
in the last 18 months (approx, 10,000) and street distribution (approx. 2,500).
PRIMARY OBJECTIVE
Improve the quality and increase the effectiveness of the quanerly activity guide. Part of the effectiveness of a brochure is based on
the format you use. The most common fore. au for brochures are magazine size.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
• Improve the quality and increase the effectiveness of the quarterly activity guide.
• Use our in-house mailing list; it draws a greater percentage of enrollments than any other marketing effort.
ALTERNATIVES
1. Continue to distribute the current activity guide: 11 % x 14, 20,000 copies, newspaper print, 12 pages, colored front, and insert
into the Lodi News Sentinel.
COST SUMMARY
1999-2000
2000-01
Additional Costs
Staffing
Supplies, Materials, Services
S17,705
517,705
Minor Equipment
Total
$17,705
517,705
Savings
Current budget allocation
S7,800
S7,800
Net Cost
59,905
S9,905
IMTLEAfENTATION
If approved, we would create and distribute a magazine size quarterly brochure,
— 35 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STA.F ING CHANGE
ACTIVITY: Parks and Recreation Administration
REQUEST TITLE: Part-time CAD Operator
REQUEST SUMMARY
Hire pan -time CAD operator to assist in preparation of construction drawings for park improvement projects. By doing in-
house design, we are able to save upwards of S70,000 per year in consulting fees, which allows us to put these swings back
into projects
PRLK.IRY OBJECTIVE
To save consultant fees by accomplishing in-house design of our park projects. To efficiently and economically accomplish
the in-house design of our projects for a complete package of construction drawings and specifications.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
Our department has successfully proven that we can save outside consulting fees by doing construction drawings and
specifications in-house. This position provides the nexssary staffing to accomplish our objectives efficiently.
ALTERNATIVES
1. Use outside consulting services. This alternative would leave fewer ftmds available for construction.
2. No CAD Operator. This alternative would cause us to tura this task over to Public Works staff which in turn would
greatly delay projects.
COST SUMMARY
1999-2000
2000-2001
Additional Cosa
Staffing
S10.495
S6,640
Supplies, Materials, Services
Minor EqWpment
Total
S10,495
S6,640
Savings
Net Cost
S10.495
S6.&W
IMPLEMENTATIONS
If approved additional staff to be hired July 1999.
— 36 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Aquatics
REQUEST TITLE: Pool Slide
REQUEST SUMMARY
Purchase "Marlin" Safety Tube Slide for Blakely Park pool
PRIMARY OBJECTIVE
Add aquatic attraction to Blakely Park pool that is portable and appropriate for pool dimensions. This in tura will increase
revenue.
SUMMARY OF FACTORS DRIVII�G THE REQUEST FOR CHANGE
Attendance at Blakely pool is consistently diminishing and this would help to make rt more attractive to the general public.
ALTERNATIVES
Continue to tun the aquatic facility without the slide feature.
Select other ways to improve the facility and increase revenue.
Purchase another less expensive water feature.
COST SUMMARY
1999-2000 2000-01
Additional Costs
Staffing
Supplies, Materials, Services
Minor Equipment
55,500
Total
55,500
Savings
Net Cost
S5,500
IMPLEMENTATION
Bids will be solicited as soon as this item is budgeted
-- 37 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHARGE
ACTIVITY: Aquatics
REQUEST TITLE: Inflatable Aquatic Play Equipment
REQUEST SUNLMARY
Purchase a Boing Giant Inflatable water feature.
PRIMARY OBJECTIVE
Add aquatic attraction to Blakely pool that is portable and appropriate for pool dimensions. This in turn will hopefully increase
revenue.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
With aquatic participation consistently dropping and in an effort to stay competitive with private sector pools and water paries. We
hope to increase attendance at Blakely pool by making it more attractive to the general public through these features.
ALTERNATIVES
Continue to run the aquatic facility without the inflatable.
Select other ways to incr=se attendance.
Purchase another less expensive water feature.
COST SUMMARY 1999-2000
2000-01
Additional Costs
Staffmg
Supplies, Materials, Services
Minor Equipment
53,500
Total
S3,500
Savings
Net Cost
$3,500
� ui•t�A�lui�►���t�Sa�il
Bids will be solicited as soon as the item is budgeted
— 38 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Youth Sports
REQUEST TITLE: Increase in Part -Time Salaries/Transfer of Late Nite Basketball Program
REQUEST SUN1 1MARY
Increase part-time allocation and transfer the late night basketball program expenditure from Miscellaneous Indoor/Outdoor to
Youth Sports.
PRIMARY OBJECTIVE
To allocate appropriate funds needed for Youth/Teen Sports part-time staffing needs. To identify the Late Nite Basketball
program as a teen sport activity.
SLWMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
In July 1998, part -tithe salaries increased. Beginning in July 1999, the rental of the Grape Festival Pavilion goes up 52,000 and
another $2,000 in July 2000. Increased participation in the Junior Basketball program from 900 in 1997 to 1200+ in 1998 and
1999 required additional officials, pictures, and shirt expenses as well as increased revenue.
ALTERNATIVES
1. Set limits on Youth Sports registrations to decrease expense of officials, pictures, shirts.
2. Do not provide officials, pictures, or shirts in some orall programs or age divisiotu-
COST SUMMARY
1999-2000
2000-01
Additional Costs
Staffing
517,720
S17,720
Supplies, Materials, Services
516,400
S16,400
Minor Equipment
Total
34,120
34,120
Savings
Additional Revenue
$7,000
$7,000
Transfer from Mise. In/Outdoor (Late Nite)
$6,510
$6,510
Transfer from Rec. Admin (Annex Rental)
56,155
56,155
Net Cost
$14,455
514,455
IMPLEMENTATION
Changes to take effect July 1, 1999 if approved.
— 39 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Youth/Teen Sports
REQUEST TITLE: Portable Scoreboards
REQUEST SUMMARY
Purchase portable electronic scoreboards
PRIMARY OBJECTIVE
Purchase two electronic portable scoreboards for youth basketball and football.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The youth basketball program continues to grow at an ever increasing rate. The facilities that we use do not have sufficient scoring
equipment to accommodate our needs. In addition to basketball, the scoreboards would be used in flag football and thus enhance that
program as well.
ALTERNATIVES
1. Purchase less expensive portable ele=onic scoreboards
2. Secure a local sponsor for the equipment-
3.
quipment3. Continue to offer the program without the equipment
COST SUMMARY
1999-2000 2000-01
Additional Costs
Staffm g
Supplies, Materials, Services
Minor Equipment
54,000
Total
54;000
Savings
Net Cost
54,000
DgPLEMENTATION
Bids will be solicited when the item is budgeted.
.M
1999-2001 Financial Plan and Buded
SIGNMCANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Spore Facilities Maintenance
REQUEST TITLE: Fence Material for Vinewood Ball Diamond
REQUEST SUMMARY
This needed repair has been deferred x%,eral years because of budget constrai=.
PRIMARY OBJECTIVE
To replace ball diamond backstop fencing that has surpassed its usefulness and safety requirements.
SUMMARY OF FACTORS DRrYTNG THE REQUEST FOR CHANGE
This diamond is heavily used by organized recreation programs. Replacement is overdue due to mmT ssing its useful life. Its
functional and safety characteristics have diminished to the point of concern- This item was budgeted for in the 1997-99
Budget. It wujs deleted when therewere budget cuts.
6r..M. ALTERNATIVES
Continue using this facility that is substandard knowing it is a potential safety hoard
COST SUMMARY
1999-2000 2000-2001
Additional Costs
Stain
Supplies, Materials, Services
Minor went
S4,900
Total
54,900
Savings
Net Cost
S4,900
LNIPLEMENTATION
Bids have been received for this improN-ement and are ready to be processed if this item is budgeted
-- 41 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AIND STAFFU G CHANGE
ACTIVITY: Sports Facilities Maintenance
REQUEST TITLE: Additional Part -Time hours
REQUEST SLDZ1ARY
Two (2) additional part-time weekday laborers (1500 hours each) and 600 hours of additional part-time weekend labor. The
weekday employees are needed to maintain Armory and Stadium softball diamonds and to assist a Maintenance Worker III. The
weekend hours are needed to support weekend tournaments and games. Weekend laborers also ensure clean picnic facilities for
rented facilities as well as heavily used parks.
PRIMARY OBJECTIVE
Weekdav labor
Currently a Maintenance Worker III is assigned to a park for six to seven months. A new employee would free up Maintenance
Worker III to do much needed work that has been deferred from previous years (maintain fences, bleachers, pesticide
application, building maintenance, etc). The second employee would assist the Maintenance Worker III with above
maintenance. Both would assist with diamond renovation.
Weekend labor
To keep up with the demand for growing recreation programs and tournaments. To decrease overtime by 10%a. To provide
clean picnic areas at reserved picnic sites.
SUT1tt1ARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The need to keep facilities safe, playable, clean and to increase maintenance standards. Increased levels of tournaments require
the staff to maintain the fields.
ALTERNATIVES
Continue with present staffing level and defer maintenance.
Decline tournaments and decrease weekend field use.
COST SUMMARY
1999-2000
2000-2001
Additional Costs
Staffing
S27,135
528,480
Supplies, Materials, Services
Minor Equipment
Total
527,135
528,135
Savings
$1,100
$ 1,100
Nct Cost
526,035
$27,380
IMPLE'N ENTATION
If approved, additional staff to be hired July 1999.
— 42 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Parks Operations Coordinator
REQUEST TITLE: Funding for Special Event and Programs
REQUEST SUMMARY
To fund the costs of the following events/programs: (1) Fishing Derby; (2) Camp Lodi; (3) Earth Day; (4) Christmas in the
Park; (5) Salmon Festival.
•PR1119ARY OBJECTIVE
To market Lodi Lake as a prime destination for tourism and as a valuable natural resource for the City.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
Lodi Lake is a primary destination for tourism, schools, outdoor programs and boating and nature enthusiasts. As the Lake
heads toward year around water, the capabilities for more events and opportunities should grow to accommodate this change.
Through community contributions, sponsor fees and small, if any, user activity fees, these programs will be self-supporting.
User fees typically will be charged for specialty items such as t -shirts, boat or bus tours (Salmon Festival), carriage rides
(Christmas in the Park), etc. Some activities will be 100% recovered through sponsor fees, i.e. Fishing Derby.
WNI M\'/DCy
No events. This alternative would eliminate programs that have proven to be very successful and self supporting.
COST SUMMARY
1999-2000
2000-2001
Additional Costs
Staffmt:
Supplies, Materials, Services
59,100
$11,000
Minor Equipment
Total
59,100
$11,000
Savings (revenue as stated above)
59,100
$11,000
Net Cost
-0-
-0-
IMPLEMENTATION
If approved, effective July 1999.
— 43 —
0
IM -2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAYF G CHANGE
ACTIVTIY: Lodi Lake Park
REQUEST TITLE: Part time Irrigation Installer
REQUEST SUINLMARY
One 1500 hour additional part time laborer to help install irrigation and Ma.Xicom water system on the south section of the
pari- Also install irrigation on beach area
PRIMARY OB.TECTTVE
To assist in the installation of automatic and Maxieom irrigation system in the beach and south sections of the park Would
also be available to insla11 Mxdcom clocks in other patio.
SUINV4ARY OF FACTORS DRIVViG THE REQUEST FOR CHANGE
A major objective to upgrade the deficiencies at Lodi Lake is to install automated irrigation in the park In order to
accomplish this maintenance saving objective is to do the work with park crews through out the year.
ALTERNATIVES
1. Continue to experience excessive maintenance hours to irrigate the park by hand
2. Contract out this work at a much higber aist.
COST SUMMARY
1999-2000
2000-2001
Additional Costs
St21hn
$11,405
S11,975
Supplies, Materials, Service
Minor Equipment
Total
S11.405
S11.975
Sa"ings
Net Cost
511.405
$11.975
LN--PLEMENTATI0 N S
if approved, additioaal staff to be hired July 1999.
— 44 —
R
1999-2001 Financial Plan and Budget
SIGI\TFiCANT EXPENDITURE REQUEST AND STAF NG CHANGE
ACTIYPIY: Parks Maintenance
REQUEST TITLE: Full Time Labor for Peterson, Glaves and Kamakian Parks
REQUEST S[.1N9AiARY
Hire one full time employee for maintenance of Peterson Park, Henry Glaves Park and Katzakian Park. With the completion of
Peterson Park and the addition of Katzakian Park, this will place significant impact on our ability to maintain these parts.
PRIMARY OBJECTIVE
To maintain Peterson Park (addition of lb acres for 22 total acres) and Katzaltian Park which is currently under construction.
Impact is significant to bring these parks on line, not only with the facilities, but also the mowing and edging.
SUMMARY OF FACTORS DRTVlNG THE REQUEST FOR CHANGE
We currently do not have additional hours specifically budgeted for Peterson Park. We are using our soccer, softball and
baseball practice facilities at Peterson Park. We are asking for a full time person to allow for maintenance. Additionally,
Henry Glaves Park and Katzaldan Park (when completed) are in close proximity to Peterson Park and needs attention especially
in the area of bathroom maintenance, edging, trimming and playground maintenance.
ALTERNATIVES
Not do the maintenance.
COST SUMMARY
1999-1000 2000-2001
Additional Costs
staffmg
531,390
SuWlies, Materials, Services
Minor Equipment
Total
531,390
Savines
Net Cost
531,390
IMPLE E TATTONS
If approved, additional staff to be hired July 2000.
— 45 —
1999-2001 Flaancial Plan and Budget
SIGNIFICANT EXPEiVDMTRE REQUEST ANT STAFFLNG CHANGE
ACTIVITY: Parks Maintenance
REQUEST TITLE: Part -Time Laborer for Peterson, Glaves and Katzakian Parks
IXy 1I.1ihT� :t�'1
Hire one part-time employee 1500 hours for maintenance of Peterson Park, Henry Glaves Park and Katzakian Park. With the
completion of Peterson Park and the addition of Kamakian Park(under construction), this will place significant impact on our
ability to maintain these parks.
PRIMARY OBJECTIVE
To maintain Peterson Park with the addition of 16 acres and Katzakian Park which is currently under construction. Impact is
significant to bung these parks on line, not only with the facilities, but also the mowing and edging.
SIP,�VAARY OF FACTORS DRTVL\G THE REQUEST FOR CHANGE
We currently do not have additional hours specifically budgeted for Peterson Park. We are using our soccer facilities and
softball and baseball practice activities for Peterson Park, we are asking for 1500 hours of part-time hours to allow for minirnal
maintenance. Additionally, Henry Glaves Park and Katzakian Park(when completed) our in close proximity to Peterson Park
and needs attention especially in the area of bathroom maintenaace, edging, trimming and playground maintenance.
ALT E RNATTVES
Not do the maintenance.
COST SUNOAARY
1999-2000
2000-01
Additional Costs
stafflaz
513,415
513,730
Su lies, Materials, Services
Minor EqWpment
Total
S13,415
$13,730
Savings
Net Cost
$13,415
S13,730
DO PLEMENTATIONS
If approved, additional staff to be hired July 1999.
AG
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Parks Maintenance
REQUEST TITLE: Increase Part-time Hours
REQUEST SUMMARY
Request to increase current level of part-time laborers from 1500 hours to 1552 hours (1 99 912 000) and 1552 hours (2000/01).
PRMkRY OBJECTIVE
Add additional hours to existing part-time staff due to increased demand and to address maintenance needs in the parks
stistem.
SUWMARY OF FACTORS DRIVLiG THE REQUEST FOR CHANGE
The Parks and Recreation Department has identified that proper maintenance levels is the number one priority in department
staff needs. This request allows for rearrangement of staff to be more efficient and productive and to use our staff resources in
the best possible manner.
ALTERNATIVES
1. Keep maintenance at current levels and continue to defer general maintenance.
2. Continue to defer repairs to irrigation until funding is available.
COST SUMMARY
1999-2000
2000-2001
Additional Costs
Staffing
S13,051
$13,730
Su lies, Materials, Services
Minor Equipment
Total
S13,051
S13,730
Savings
Net Cosi
S13,050
$13.730
LNIPLEMENTATIONS
If approved, increased hours to take effect July 1999.
— 47 —
1992001 Financial Plan and Budget
SIGNIFICANT EXTEND1TURE REQUEST AND STA-FTVtG CHANGE
ACITVM: Equipment Maintenantt
REQUEST TITLE: Pan Time Assistance
REQUEST SUWMARY
Hire part time assistance for department mechanic (340 hours).
PRIMARY OBJECTTVE
To help mechanic at end of day with senuing of equipment.
To more efficiently maintain workload of playgrounds and help mechanic when another person is needed.
To facilitate an assistant at Iower wage for duties not requiring a mechanic, i.e. pans pickup, oil and lube, and playground
equipment safety checks.
SLNMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
To meet a growing need to keep our playgrounds safe.
To meet the need of having the equipment ready to use first thing in the morning.
ALTERNATIVES
1. Continue to overload mechanic and not fulfilling needs.
2. Continue using skilled mechanic to perform unskilled duties.
COST SUMMARY
1999-2000
2004-2001
Additional Costs
S
53,650
53,850
Supplies, Materials, Services
Minor Equipment
Total
S3,650
S3,850
Savings
Net Cost
53,650
53,850
IMPLEKENTATTONS
If approved, staff to be hired July 1999.
— 48 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: After School Playgrounds
REQUEST TITLE: Increase Part -Time Expenditures
REQUEST SUMMARY
Five (5) Recreation Leader positions to Recreation Specialist.
PRRII LARY OBJECTIVE
To provide a quality After School Program by hiring qualified staff requiring early childhood education units and experience.
SUNUgIARY OF FACTORS DRWDL G TKE REQUEST FOR CHANGE
Traditionally, the After School Program has used a relatively inexperienced work force in the program. Staff has found it difficult
to find qualified and experienced employees at the recreation leader pay rate. This, in turn, has lead to high staff turnover. As
parent and child requests increase (programmed activities, homework assistance, behavior intervention, etc.) and attendance
increases, it is important that working staff have the skills and knowledge to handle the day -in and day -out demands of providing a
quality program. By hiring Recreation Specialists, with a minimum of 12 early childhood education units and at least 6 months
experience in conjunction with recreation leaders as supporting staff, we will operate a quality program. Key staff members will
have the education background and knowledge of working with children.
In 1998, waiting listswere eliminated at Reese and Vinewood schools, allowing all children to participate. This has increased the
attendance at these sites and the staff level has gone from two to three at both these sites. This increase requires staff to be able to
handle large numbers of children as well as maintain control.
ALTERNATIVES
1) Increase participation fees to cover additional expenses.
2) Absorb the difference in revenuelcost in the department's 30% recovery goal
3) Continue to hire inexperienced and unqualified staff.
COST SUMMARY
1999-2000
2000-01
Additional Costs
Staffing
S 15,160
$15,160
Supplies, Materials, Services
Minor Equipment
Total
$15,160
S15,160
Savings
Excess revenue
S6,450
56,450
Net Cost
S8,710
58,710
IMPLEN,fENTATION
Recruitment will occur as soon as funding is available.
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: After School Playgrounds
REQUEST TITLE: Before School Programs
REQUEST SUMMARY
Hire five (5) Recreation Specialists to operate before -school programs at 5 elementary school sites from 6:45 a.m. to 8:00 a.m., 49
weeks per year. Include breakfast for all participants. Charge $31.50 per month tuition fee to all participants to recover 100% of
program operating costs.
PRIMARY OBJECTIVE
Provide a safe place, with something to eat, for the children of our community before school begins. To recover 100% of
operating costs from fees charged
SUMMARY OF FACTORS DRrVriG THE REQUEST FOR CHANGE
Parent and school principal request. A minimum of 20 participants must be enrolled at a site for the program to operate.
ALTERNATIVES
1. Provide no breakfast during the program and charge parents only S20 per month, per child.
2. Subsidize the program the cost of breakfast (S14,700 per year) and charge parents S20 per month, per child.
COST SUMMARY
1999-2000
2000-01
Additional Costs
Staffing
M565
522,565
Supplies, Materials, Services
514,700
514,700
Minor Equipment
Total
$37,265
S37,265
Savings
Revenue
537,800
S37,800
Net Cost
Q535>
a535>
IIAPLEMENTATION
If funded, we will open five sites July 1, 1999 provided there are least 20 participants per site enrolled.
— 50 —
1999-2000 Financial Plan and Bud -et
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING C1-La\GE
ACTIVITY: Hutchins Street Square Administration
REQUEST TITLE: Box Office at The Square
REQUEST SUNLNL-kRY
Open and maintain a box office at the Square to sell tickets for theatre performances, ansNver questions
about the facility, act in a marketing capacity and provide tours of the facility.
PRDtkRY OBJECTIVE
Marketing and promotion of not only the facility, but also the cultural events of the community.
SUNDLARY OF FACTORS DRI`T G THE REQUEST FOR CH.-k\GE
The new addition of the theatre and the conference facilities have made it evident that we need to offer
a box ofYice to pruchase tick: s and market the events at the Square to ensure their success. The sale
of the tickets would supplement and -!or cover the cost of the part-time person selling the tickets. Our
"in-house bass" office v.-culd charge 51.00 on the cost of all tickets to cover the cost of providing the
sen -ice.
ALTERNATIVES;
Have all private rental parties sell their own tickets at location outside of the Square.
COST SU\LAARY 1999-2000 2000-01
Additional Costs
Staffing (20 hr./%\:k, S8/hr) S8,320.00 S 3,320.00
Total S8,320.00 S 8,320.00
T_ �IPLE.LE\TATIO\
— 51 —
1999-2000 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Hutchins Street Square administration
REQUEST TITLE: Part -Time Intern
REQUEST SU %LN1ARY
Intern to supplement special event activities.
PRDIARY OBJECTIVE
Support cultural and civic activities at the Square and continue the summer push for activities and
events.
SUNLNIARY OF FACTORS DRIVL\G THE REQUEST FOR CHANGE
Historically we have added a college intern to supplement staff and allo%v programs opportunity for
growth.
ALTERNATIVES:
None.
COST SUND. IARY
Additional Costs
Stang (700 hours @ S8.25/hr)
Total
DIPLEMENTATION
1999-2000
S 5.903.22
S
2000-01
S 5.903.22
S
— 52 —
1999-2000 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFC�G CFLa\GE
ACTIN•TIY: Hutchins Street Square Administration
REQUEST TITLE: Increase in Part -Time Administrative Clerk IT Hours
REQUEST SUNDL-kRY
Increase part-time daily administrative clerk II position to 30 hours per wveek to manage rentals of
facilities at Hutchins Street Square.
PRDL.kRY OBJECTIVE
• Ensure contracts, insurance, security and other liabilities are properly administered.
• DeN-elop a continued marketing plan to keep the spaces contracted and maintain cash flow.
SU*NnL.kRY OF FACTORS DRI`'M THE REQUEST FOR CH--k\GE
With construction of the Performing Arts and Conference Center completed in May 1998, we have
added four meeting facilities, with a total of six facilities. Rental of these facilities provides space
for the community and is an opportunity to realise substantial revenue for the City of Lodi.
N' : TIVE
ALTER A S
COST SU\LNL&RY 1999-2000 2000-01
Additional Costs
Administrative Clerk II (330 hrlweek) S 16,201.86 S 16,201.85
MPLE1OE\TATION
We are currently accommodating 25 groups per week on average at the Square's facilities. By .
increasing our part-time position, this will allow us the staff needed to continue to provide space
needed for the community.
— 53 —
1999-2001 Financial Plan and Budeet
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
--------------------------------------------------------------
ACTIVITY: SENIOR INFOKNIATION CENTER
REQUEST TITLE: Hire a Part-time intern
REQUEST SUl' 4ARY
Hire apart -time intern to assist Senior Services Coordinator with all aspects of Senior Services
and Programs.
PRIMARY OBJECTIVE
1. Assist in secretarial duties at Senior Information Center
2. Develop and coordinate new senior programs in partnerships with Lodi Memorial Hospital,
and Lodi Unified
3. As paid staff on-site allow Senior Services Coordinator to continue to participate in networking
organizations and public relations in the community
4. Recruit and train new volunteers
SLZvf�IARY OF FACTOR DRIVNG THE REQUEST FOR CHANGE
Since 1990, all programs and services offered to Local Seniors have been developed and
coordinated by the Senior Services Coordinator. The Dept. of Aging has provided two part-time
receptionist (who, due to funding deficits, are laid off quite often). These employees are
minimally skilled and cannot absorb any of the Directors duties. The Senior Center assist an
average of 650 seniors monthly with a staff of many volunteers. It has reached a point that more
experienced and skilled help is needed to tend to the day to day operations and allow for growth
in both scope and quality of services offered.
ALTERNATIVES
. Continue with current staff and not develop any more new programs or partnerships
COST SUhnSARY 1999-2000 2000-01
Additional Costs
Staffing 56,912. S7,500
Savings 0
Net Costs S6,912 57,500
L�iPLEI fEINTATION
NVith approval, a part-time Intern will be hired, relieving Senior Services Coordinator from day to
day secretarial duties. Intern -A-ill also plan and implement new programs and services.
— 54 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFDZG CHAINGE
ACTIVITY: Hutchins Street Square Swimming Pool
REQUEST TITLE: Hire a full-time Aquatics Supervisor
REQUEST SUMMARY
Hire a full time Aquatics Supervisor to run all aspects of swimming programs at Hutchins Street
Square.
PRIMARY OBJECTIVE
1. Meet increasing demands on staffing a year-round pool
2. Expand and improve aquatic programs at H.S.S.
3. Reduce demands on maintenance staff
4. Increase revenue
5. Provide high quality progrnns %pith high customer satisfaction
SUMMARY OF FACTOR DMVD G THE REQUEST FOR CHANGE
Since it's opening in 1990 the pool has been staffed by part-time lifeguards, hired and supervised
by the Senior Services Coordinator. The turn -over rate is high due to changes in schooling and
full-time employment elsewhere. Continuity is difficult to maintain and revenue is lost due to
inconsistency of staffing. A current part-time Recreation Specialist rill be retiring in 1999, A
Aquatics Coordinator will absorb his duties as well as some pool maintenance.
ALTERNATIVES
1. Continue with current staffing which will not allow the programs to increase and grow
and continue pattern of poor customer senice due to inconsistency and high turn over rate.
2. Discontinue swimming programs at Hutchins Street Square
COST SUTIN gARY 1999-2000 2000-01
Staging costs $35,000+
$35,000—
Savings (eliminate Rec Spec.) 8,992.
(eliminate Headlifeguard) 518,482.
$8,000+
DvTLENENI TATION
With approval, a full-time Aquatics Supervisor will be hired, Recreation Specialist and
Headlifeguard position will be eliminated and part-time lifeguard hours can be kept to a minimum
— 55 —
1999-2000 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Hutchins Street Square .Maintenance
REQUEST TITLE: Refinish Wood Floor in Kirst Hall
REQUEST SUNBLARY
Contractor to come in, sand Kirst Hall floor down to bare v---ood, refinish and re -stripe floor.
PRM-kRY OBJECTIVE
?Maintain and protect hardwood floor.
SUNDL-kRY OF FACTORS DR.IVLNG THE REQUEST FOR CHxk\GE
Daily use of this hall has wom the wood floor bare in spots, Nvith the finish yellowing and
flakins in other areas. This is due to normal wear and tear. This floor -%vas refinished last in
November of 1994.
ALTERNATWES:
If allowed to continue the floor Nvill be damaeed resulting in very costly replacement.
COST SUiL1IARY 1999-2000 2000-01
Additional Costs
Supplies, Materials, Services S 12,000.00 S 0
Total S 12,000.00 S 0
LNTPLE'MENTATION
— 56 —
1999-2000 Financial Plan and Budget
SIG\IFICANT EXPENDITURE REOfESTAND STAFFING CHANGE
ACTIVITY: Hutchins Street Square Maintenance
REQUEST TITLE: Replace RottingWood Columns in Patios and Entrances
REQUEST SUNL A RY
Begin as needed replacement of rotted %vood ornamental columns in patio and building
entrances. Estimated cost for materials (per column) 4350.00. Estimated number of
replacements at this time - 15 columns.
PRLIL.kRY OBJECTIVE
Chane over to cement reinforced foam core columns that do not rot.
SUNDL-�RY OF FACTORS DRIVD�G THE REQUEST FOR CHANGE
Existing columns are rotting around their bases. Those located under rooflines will last
indefinitely. However, tho_e columns exposed to the iveather and irrigation will have to be
changed. Request is for materials. Labor to be supplied by Hutchins Street Square
maintenance staff.
ALTERNATIVES:
At some point, the failing columns will have to be replaced.
COST SUI EL LARY 1999-2000 2000-01
Additional Costs
Supplies S 5,250.00 S 0
Total S 5,250.00 S 0
BIPLEIIENTATION
- 57 -
1999-2000 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Hutchins Street Square Maintenance
REQUEST TITLE: Remove Diseased Alders at Hutchins Street Square
REQUEST SU %DIARY
Hire a contractor to remove 42 mature diseased alders on the west and north sides of the
Square. This is a one-time cost.
PRLIL-kRY OBJECTIVE
To upgrade to a more disease -resistant, more colorful and longer -lived species of trees.
SU\LNLARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
These alders suffer from a vascular fungus and secondary infestation of Flathead Borer.
Streamside trees, these alders will not recover. New plantings of big leaf maple, red oak and
live oak have already been installed next to the alders. This will lesson the impact of the
removed alders.
ALTEILNATIN-ES:
Allow the trees to die off one by one with possible transfer of the fungus to healthy trees,
visual blight and safety hazards from dead falls.
COST SUNLNLA.RY
Additional Costs
Supplies, Materials, Sen -ices
Total
L11PLEMENTATION
1999-2000 2000-01
S 5,000.000 S 0
S 5,000.00 S 0
— 56 —
1999-2000 Financial Plan and Budget
SIGNIFICANT E\PENDITi:RE RiQUEST AND STAFFING CHANGE
ACTIVITY: Hutchins Street Square Maintenance
REQUEST TITLE: Janitorial Supplies
REQUEST SUNENL4RY
Increase budget for janitorial supplies.
PRMARY OWECTIVE
Maintain high level of building finish.
SU)EMARY OF FACTORS DRIVTNG THE REQUEST FOR CHANGE
Large increase in building size, high level of building finish and increased use volunteers
(Vacuum Buddies) has increased the use of janitorial supplies. As of 11/98, 73% of budget
has been used within 42°/0 of year.
ALTERNATIVES:
None.
COST SUN -DIARY
Additional Costs
Supplies, Materials, Services
Total
L'1IPLEMENTATION
1999-2000
S 11,020.00
S 11,020.00
2000-01
S 11,350.00
S 11,350.00
- 59 -
1999-2000 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIN7TY: Hutchins Street Square Maintenance
-REQUEST TITLE: Replace Rental Tables
REQUEST SUMMARY
Replace tables used at Hutchins Street Square for events, rentals and city functions with new
lightweight tables. Requests consist of 40 sixty inch round tables and 15 3'x8' tables. Staff
expects that new tables would have a similar service life.
PRD1ARY OBJECTItE
Maintain safe, reliable equipment.
SU LVIARY OF FACTORS DRI TNG THE REQUEST FOR CELA..NGE
These tables have been in zlmost constant use for the past 10 years and are reaching the end
of their service life. Thev are beginning to pull scre%vs, delaminating and no longer set up
flat. ✓
ALTER\ATNES:
Continue with current tables: remove damaged and unsafe tables % pith a decrease in
inventory.
COST SUMMARY 1999-2000 2000-01
Additional Costs
Supplies,'`-Saterials, Services S 11,990 S 0
Total S 11,990 S 0
DIPLEMENTATION
MEN -M
1999-2000 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Hutchins Street Square Maintenance
REQUEST TITLE: Increase in Sublet Services
REQUEST SUIL'�L-►RY
Increase funding level for sublet sen. -ices (33%) for contract/demand sublet services.
PRDL4RY OBTECTIVE
Ensures adequate funding for the repair of building systems and maintenance contracts.
SU 1nIARY OF FACTORS DRIVL\G THE REQUEST FOR CHAN-GE
Large increase of building size and use. Senior Center, Adult Day Care, Swimming Pool
and Kirst Hall are now in their tenth year of almost constant use. The finishes, building
systems and furnishings are coming into a repair and replacement phase. Sublets include:
HVAC control analysis, peat control, on -demand garbage collection, janitorial services, fire
equipment maintenance and elevator maintenance.
ALTERNATIVES:
Continue at current levels with problems reflected in appearance and performance of
facilities.
COST SUNENNI .RY 1999-2000 2000-01
Additional Costs
Supplies, Materials, Sen -ices .$13, 180' S 13.576
Total $13,180 S 13,576
L\7PLE'1IIENTA,TION
NOTE: The alternative to this would be to convert
this to a full-time position.
- 61 -
SUBLET SERVICES
Hutchins Street Square
Contractor
Cosu'Inter►•al
Yearly Cost
Remarks
Alamo Alarm
S
380.00/grdy.
S
720.00
charges for weekly reports
Cal Waste
S
96.00
on demand
S
n/a
additional dumpster calls
Clark Pest Control.
S
275.00/mo.
S
3,300.00
possible drop
Korean Bldg.
S 2,593.34/mo.
S 31,120.00
contract
Paramount Pest Control
S
l 75.00/mo.
S
2,100.00
pigeon control; possible drop,
if staff trained
Sentinel Fire Equipment
S
75.00/6mo.
S
150.00
Crete Hall kitchen hood
Stockton Fire Equipment
S
155.00/yr.
S
155.00
recharge fire extinLruishers
UniFirst
S
55.91/�i-kIy
S
4,467.32
possible drop if decided to
purchase rags, mop heads and
rugs, if labor supported
US Elevator
S
411.00/mo.
I S
4,932.00
2 units currently/Theatre to be
added; est. S205
Waste 1`4anasement
S
217.75/mo.
S
2,604.00
portable toilets
Notes: We can eliminate numbers 1,2, 5 and 7 for a total of 540,988.00 if we add both recommended
labor positions which would allow for a shift worker to clean, take better advantage of the community
service workers and license our Senior Building Maintenance Worker position to handle the
spraying/pest control operation as needed.
F9 -
1999-2000 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUESTA\D STAFFING CHANGE
ACTIVITY: Hutchins Street Square Maintenance
REQUEST TITLE: Hire a Full -Time Park Maintenance Worker
REQUEST SUNLNIARY
Hire a full-time parks maintenance worker to maintain Hutchins Street Square grounds and supervise
community service workers and volunteers.
PRDIARY OBJECTIVE
• Maintain a high level of Grounds care.
• ?Maintain constant supervision of community service ivorkers and to facilitate the best use
of volunteer service at the Square (Lodi Garden Club, etc.).
• Provide an additional trained staff member for laree events and rentals.
• Provide a cheaper source of trained overtime staff for overtime.
SU'\LIL-kRY OF FACTORS DRIVING THE REQUEST FOR CH_a.N-GE
Hutchins Street Square is now a fully landscaped 10 -acre site xith a playground, outdoor
amphitheatre and stage, large patios and extensive plantings. This position would only bring staffing
to par with other city parks.
ALTERNATWES:
Continue at current staffling levels with direct loss of facility care due to manpower/oversight
capability.
COST WILMARY 1999-2000 2000-01.
Additional Costs
Staffing $34,145 $34,145
Total $34,145 $34,145
D IPLEMENTATION
—63 —
1999-2000 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Hutchins Street Square _Maintenance
REQUEST TITLE: Aire a Full -Time Building :Maintenance NN'orker
REQUEST SU.NEAZ-kRY
Hire a full-time building maintenance worker to maintain building finishes, give constant
supervision to building maintenance workers, service staff request throughout the complex
and supply Hutchins Street Square Nvith trained, knowledgeable staff for special events,
rentals and overtime situations.
PRLNIARY OBJECTIVE
• Maintain Performing Ans building high level of finish.
• Receive better performance and results from community service workers and maximum
benefit from volunteers.
• Supply knowledgeable, trained staff for rentals and large special events.
• This position \rill supply a cheaper source of overtime and allow senior staff to focus on
technical maintenance.
SUINENIARY OF FACTORS DRIVLNG THE REQUEST FOR CHANGE
�-_� A 40,000 square foot increase in building size and increased foot traffic from rentals and
`7 special events is over extending current staffing and will result in deterioration of the
building and its facilities.
ALTERNATWES:
Maintain current stafng levels with crisis management of needed maintenance.
COST SL`1.NIARY 1999-2000 2000-01
Additional Costs
Staffing S 32,97 5 S 37;06.56
Total S 32,975 S 37,056.56
MPLE'1IEN TA TION
— 64 —
Hutchins Street Square Stats (approximate)
Exterior Features
Pool 70,000 gallons
Kitchens/Kitchenettes 5
Showers 17
ToiletsX-rinals 73
Two Workers Care For
71,115 square feet of buildings
70,000 gallon pool (open Monday -Friday 6:30 a.m. - 5:00 p.m.,
Saturday 6:30 a.m. - 2:00 p.m.)
9.2 acres of ;rounds (including mowing)
1,087 hours of overtime (rentals and special events)
6,000 hours of community service work supervised
Acres
10.8
1.
63
.2
.57
.18
5.1
2.9 (approx.)
.01
.01
.Is
— 65 --
Sq. Ft.
Facility size
469,800
Parking Lots:
Oak Street
43,200
Walnut Street
27,540
Firelanes (2)
8,100
Playground
24,750
Patios (2)
7,762
Turf
221,805
Misc. Landscaping & Walk%vays
Side Yards (2)
3,838
Basement
3.360
Old Auto Shop
5,118
- Buildings
Cottage Room
1,265
Pisano Room
1,265
Crete Hall
3,936
'North Hall
6,400
Performing Arts Theatre:
Stage
2,240
Seating
6,592
Accessory
1,856
Backstage (first)
2,880
Backstage (second)
1,642
Conference Center
14,990
Lobby/Rotunda
5,116
Fine Arts First Floor
5,070
Fine Arts Second Floor
3,690
Senior Complex
27,039
Total Overall
71,115 sq. ft.
Pool 70,000 gallons
Kitchens/Kitchenettes 5
Showers 17
ToiletsX-rinals 73
Two Workers Care For
71,115 square feet of buildings
70,000 gallon pool (open Monday -Friday 6:30 a.m. - 5:00 p.m.,
Saturday 6:30 a.m. - 2:00 p.m.)
9.2 acres of ;rounds (including mowing)
1,087 hours of overtime (rentals and special events)
6,000 hours of community service work supervised
Acres
10.8
1.
63
.2
.57
.18
5.1
2.9 (approx.)
.01
.01
.Is
— 65 --
1999-2000 Financial Plan and Buclact
SIGN'IFICAtiT EXPENDITURE REQI:EST AND STAFFING CHANGE
ACTIVITY: Hutchins Street Square Administration
REQUEST TITLE: In House City Employee.Newsletter
REQUEST SU_*%DL4RY
Initiate and oversee the publication ob bi-»veekly in-house nevvslenerkornmuni cation piece for the
employees of the City of Lodi.
PRDL-kRY OBJECTI\-E
Develop a positive line of cc-tmunication between all employees, managers, boards and commissions
and the City Council. Distribute through p2vroll.
S00%L-►RY OF FACTORS DRIVJNG THE REQUEST FOR CFA\GE
There does not exist a positi\-e line of communication between the various levels of employees in the
City of Lodi. Obviously, a commiree of rerresent2iives from each deparmert in the Cite, nieet]na
one time per week and co;,tributing an hour here and there would be able to produce a solid
publicEtion to establish a re',Etionship and connection amongst the employees.
ALTEPUNATIV ES:
None.
COST SUNDL-kRY
1999-2000
2000-01
Additional Costs
Computer
S 2,046.00
S
0
Scanner
S 272.61
S
0
Monthly Printing Cost (=00 x 12)
S2.400.00
S
2,400.00
Printer
S 1,000.00
S
1,000.00
Total
S5,720
S
5,720
D1PLEMENTATIO\
1999-2001 Financial Plan and Budget
SIG'\MCANT EXPENDITURE REQUEST AND STAFFL\G CILk\GE
ACMTf l': Library
REQUEST TITLE: Increase Part -Time Staffing Pool
REQUEST SUNV VARY Extend pan -time hours for the library aid and library page by 20 hours per week for each
position
PRLMARY OBJECTIVE 1) To restoreThursday evening hours (6-9 Plvi) including reestablishing the evening
storytime for worldng familics.
2) Offer the Spanish bilingual storyhour on a weekly basis.
3) Offer more access to information through extended library hours.
SURLMARY OF FACTORS DRINTiG THE REQUEST FOR CHANGE
In 1993 the library reduced its scnice hours from 60 per week to 57 per week. The reguIarly scheduled Thursday
evening story hour was eliminated in the reduction of hours. The public particularly high school students frequently ask
for the reinstatement of these hours. The Youth Commission on behalf of the community's youth has requested that the
library reopen on Thursday evenings. Since 1995 tate library has offered a monthly Spanish (bilingual) storyhour. In the
past year the audience has increased and returned on a regular basis indicating a need for an increase in frroquency of this
program. Considering the relatively modest expenditure to reopen, the library board has requested that the Thursday
evening hours be reinstated as soon as possible. With increased hours and usage of the library, the need for staffing the
circulation desk increases (library aid) and the volume of materials that need reshelving increases (library page)
ALTEPU ATIVES Maintain the library's existing weekly schedule. \Ion-1N'ed I0 AM -9 Pl`4, Thurs-Sat l0 A.\1-6 P.\4
COST SLIN5 ARY 1999-2000 2000-01
Additional Costs
Staffing S15.150 S15,150
Supplies, Materials, Services
Minor Equipment
Total
Salines I
Net Cost 1 SIS.ISO 515,150
— 67 —
- 68 -
•
• O
A
P Co.
N
\D
,D
N
aD N
'
N
P co
LA
kM
I I
pi
w«
M
N
«
M
.
•0 co
c0
I
h
III I
, c•
N�0:
M
--ia,
I I
I 1
ice'
1
I
i
1 I I
I 1 I
N
i
i
I jj
yl
1 'o:o o!
I
Ini�
i
co Ie
el e;
I
co
I;
N,
a
N
M
M
i�i V. Q.V:
17; PI
Y yl
O
O h
h
�
co
.21
po
let
I y�"
Vl VI V;
1'•i
�
0000
���
r1 V VI V)
1 \ll q N
V V V
jVPC
¢
0'Q'
V z : 0 0
tiVi��'oI'o
�
f
MCIS
cc
O
IC,
L.L
:
'
1�I
N N
r cI0 X islX
W
M
N
eO0
N _I OI nl T
y
�I
N)
% wt I�I.G
p\ u % k"
NDN N N
C7 �
I
a,
_
I
E
�+ c c c
E I E I E E
A W
�
:
VI .
7
I W 1.2 2Ly
e -:
OI
I
OI 0101010!�rl
Q
.1�
�
G
!
.FI F•F F!F:F 7
i
e�ly�Y
co a'!
A a eJ C: e! e cl c! e
UIU:U.0 O U:U
- 68 -
Part -Time Staff
Additional Professional
1999-01 FINANCIAL PLAN AND BUDGET
TEMPORARY/PART-TIME REQUEST FOF
DEPARTMENT: Library
I
ACTIVITY: Information Services ACCOUNT NUMBER: 210801
115 121 122
Est Time Hourly Total Medicare PERS Social
Job Title Purpose Utilized late Request Insurance Security
1 2 3 4 5 6 7 8
125
Unemployment TOTAL
Insurance REQUEST
9 to
1599-2000
Librarian I Children's 10401- $17.85 $18.564.00- $269.18 $192.69
Librarian I Reference 1040 $17.85 $18,564.00 $269.18 $192.69
$24.13 $19.050.01
$24.13 $19.050.01
$37,128.00 $538.36 $325.39 $0.00
$48.27 $38.100.01
Total of Items Above
Specific Instructions:
Column 3: Identify the time required (Example: 100 hours)
Column 4: Use the appropriate salary fate from the part-timeltemporwy rates
Column 5: Multiply the amounts in Columns 3 and 4
Column 6: Multiply the amount in Column 5by.0145 If the employee Is subject to Medicare (hired alter 311186)
Column 7: Multiply the amount in Column 3 by (ate Indicated on separate (ate schedule for part-time personnel only
Column 8: Multiply the amount in Column 3 by (ate indicated an separate (ate schedule for paft-ftepersonnel only
Column 9: Multiply the amount in Column 3by rate Indicated an separate fate schedule fo(paft-time personnel only
Column 10: Add columns 5 thru 9
$38.100.01
Budget with Signiricant Part -lime Expense (Clerical /Prof)
1999-2001 FINANCIAL PLAN t BUDGET
BUDGET WORK SHEET NEW - A . CTM . TY
-I'JJ7 'JU_
-13ri 1jun7
IM -Mu
_1j1:YA1(rMERT
laCUMMKIfFf
zuuu-ui
-YFUJEUrEir
Hul.;
.......
(Total
urrLtv
SUPLIES,
__._1Pfint6g.
I
-----------
Regular."loyees salary
Ove(th-ne
. _. --- ----
Part. fte_"iloyees salafs�.
Admin Leave Pay_.
1-1 �d. fe'a insurance
Dental hisufance
Visicni care
Medicare rnswanc;e
Service cmur�ution PERS
Socialsecu(it payews
--
Ll
Ltd
Gleirr�ractic
Insurance Refund
7101
162-
7103
7110
7 fi2'-
7113
-7114*
7115
$512.728
$461
$500
$1,250
$57,225
$63.960
$123,552
$2,451
$4,038
$4.025
$4,052
$47,626
$50.759
$51,633
$53,182
$7.085
$8.193
$7,590
$7.590
$2.276
$2,395
$2,340
$2,410
$3,710
$4,874
$5,349
55,414
$49,325
$56,380
$43,431
__$4_4,430
7122
-. .-"-Defe(fedcorpmisation
7123
-7-12.5-
7128
7129
2130
7202
7213
-Ji__----
7215
7300
7 - 302
7jd3
$2,052
$1,273
$2,679
$2.679
$8,064
$8,868
$10,304
$10,664
$1,843
$1,994
$1.932
$1.932
$1,463
$764
$829
$843
$1,163
$1.309
$2,564
--$2-.624
$1,083
$964
$884
$884
$2,699
$5,100
$2,600
$2,600
Telephane
Electricity'
Ga . s -- - ---------
Water
Sewer
I-L&TERIALS a SERVICES"'_
$653,207
----
$698,540
$773,689
$788,855
$5,601
$8,000
$7.500
$2.570
$3,500
$8,000
$8.000
$54,734
$2,742
. $499
$1,466
$50.000
$56.000
$56,000
$3,800
$4,000
$4.000
$500
$530
$500
$390
-:46 0
$40
$250
$66,470
$77.900
$67,990
binding, duplicatiorn$1.500
$2.000
$2,000
Photocopying
$2,526
$2,700
$2,700
$2,700
I
IL-3tmdf2
Advenishig
$32
$0
$100
$1001
& Dry Cleaning
budget with Significant Part -lime Expense (Clerical /Prop
Safety Equipmmt
_7305
7307
$150
$300
$400
$400
_
Office Supplies
-�
$3,449
$3,500
$4,000
$4.000
Books b Periodicals
7308
$137,042
$140,000
$150,000
$150,000
_
Memberships & Dues
_7309
$4,587
$4,800
$5,800
$5,800
Data Processing software
7313
$407
$25_0
$1,000
$1,000
--
-
- --
$usiness esrpense__
-----
Ccmference expense -
Professional Services
Repairs to Computer Equip _
Repairs to Machinery Q Equip
-
Repairs to Office Equip--
Repairs to Buildings - _
Sublet Service contracts _
Motor fuel, lube7351
Special dept materials
anttortalsupplies _-,
General Supplies _
Trainhig h education
SYnall tools tt e u _. _. _._.__.-•
Supplies 2>_1•latgs If OC --
7314
?315
$1,535
$1,397
$980
$2,000
$2,000
$2,500
$2.000
$2,500
$1.000
$4,000
$1,500
$7,000
$53,650
$13,500
$2,000
_ $1.000
--- . -
$l,D00--
$1,200
_
_
_
- -
$1,500
$2,000
7323
_?330
7331
- 7332
_7334
7335
$2,500
$2,500
----$1,000-
$4,000
_._._._..___
_.
. .----•-_-... ....
$5_318
--
-
-_. _--
$4,000
$2,000
$6,000
_
$1,452
$1,500
_
$7,386
$46,283
-_
_
$7,000
$53,650
_ $100
$13,500
$48,415
7352
7353__
-7355
7358
-7359
_ ....
7399
--T
$63
$12,101
$1,991
$11,000
$1,500
$2.000
-------•--.___$..
$710
$180
1,345
_...._.
$1,176
_$1,000
$500
$2.000
$500
$4,000
$1,200
-
EQUIPMEET,I.AND
-
Total
tx STRUICTU_RES
Dtat Processinc-Hardware -
7715
- 7719
-----------
$232.000
-
$234,!90
$261.950
$262,450
-- -
$30,000
Other E u' nre'nt
$6,000
- ---
Total
^--$9,661
$30,000
$6,000
$0
SPECIAL PAYME1fTS
Cost of Allocation
$75,000
$75,000
$50,000
$50.000
ACTIVITYTOTAL
- --
$962,858
$1.029.500j
j $1,119,539
$1,129,805
1999-2.001 Financial Flan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFNG CHANGE
ACTWITY: Library
REQUEST TITLE: Part-time Reference Librarian
REQUEST WNLMARY Hire one pan -time professional librarian to staff the reference desk during peak times
(after school, on Saturdays, and during vacations)
PRMARY OWECTWE 1) Increase customers' access to information by providing a professional librarian to assist
in finding information throughout the library's various collections.
2) To in tease the customer's sarisfacdon with library services.
SUNMARY OF FACTORS DRIYLNG THE REQUEST FOR CHANGE
The library has increased its collection and varied itc information formats in recent years. The reference staff has increased
its involvement in outreach activities with community groups. The introduction of the Interact as a reference tool has incre-sed
the staff's ability to ansvtr more complicated reference queries and increased time spent on some quesdons. The introduction
of Internet stations for the public access has greatly impacted the reference desk activities. Although circulation statistics are
down, reference statistics have risen indicating an increase in onsite library use.
ALTERNATIVES Continue current staffing levels with no reference desk coverage during lunches and vacations. Unable to
increase community outreach services.
COST SUMMARY 1999-2000 2030-01
Additional Costs
Staffing 19,500 19,500
Supplies, Materials. Services
Minor Equipment
Total
SavinLs
Net Cost 19,500 19,500
— 72 —
1999-2001 Financial Pian and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFLs;G CHANGE
ACTIVITY: Library
REQUEST TITLE: Pan -Time Children's Librarian
REQUEST SUAMARY Hire one part-time professional children's librarian to assist with children's programming
and provide after school reference and reader's advisory service.
'PRBIARY OBJECTIVE l) Provide additional reference and reader's advisory senice in the children's room after
school.
2) Provide backup for the children's librarian for programming and outreach activities.
3) Provide an opportunity to train a potential replacement in preparation for the children's
librarian's retirement.
SUAB1ARY OF FACTORS DMTgG THE REQUEST FOR CHANGE
The library provides an extensive children's program under the leadership of the present full-time children's librarian—a 28
year veteran. Additional services and activities including* selection of new formats, public Internet access, public storytime
engagements, and a potential computer lab have increased the tasks of the professional children's librarian. To maintain the
level of the program in the future, it is necessary to begin training a new children's librarian now.
ALTERNATIVES Continue without additional patron service.
COST SUMMARY 1999-2000 2000-01
Additional Costs
Staffing 19,100 19,100
Supplies, Materials, Services
Minor tri men(
Total
Savings
Net Co.q 19,100 19,100
— 73 —
COMMUNITY & ECONOMIC DEVELOPMENT
A very rare 1907 photograph of the original wooden arch and the Mission -
style arch that still stands on Pine Street
I uotef Loaf — sometime after its 1915 completion date
1999-2000 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: CONIMUNITY HvIPROVEMENT
REQUEST TITLE: CREATION OF FULL-TINIE ADMINISTRATIVE CLERK II POSITION
- REQUEST SUMMARY
Authorize a full-time Administrative Clerk H position for the Community Improvement Division, in
place of the existing part-time Administrative Clerk II position.
PRIMARY OBJECTIVE
1. To provide adequate clerical support for the Community Improvement Division.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
1. The part-time, temporary clerical staffing within the Community Improvement Division is unable
to keep up with the increasing workload of a full-time division.
2. Lack of adequate clerical support is hindering the ability of the Community Improvement
Division to implement new, or expand current programs which are intended to eliminate blight
and unsafe building conditions, foster community pride and improve the overall appearance and
living conditions throughout the community.
ALTERNATIVES
1. Reduce services provided by the Community Improvement Division until adequate staffing levels
are achieved.
COST SUMMARY
1999-2000 2000-01
Current Requested
Additional Costs
Regular Employee Salary
Community Improvement Administrative CIerk II $ 35,055.93 $ 35,055.93
Total $ 35,055.93 $ 35,055.93
Savings
Part time Employee Salary
Community Improvement Administrative Clerk II $ 14,846.69 $ 14,846.69
Net Cost
IMPLEMENTATION
$20,210 $20,210
The Community Improvement Division would pursue the filling of this position once authorized.
- 75 -
1999-2000 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: COMMUNITY IMPROVEMENT
REQUEST TITLE: PURCHASE OF OFFICE SYSTEM FURNITURE
REQUEST SUAi11TARY
Authorize the purchase of office system furniture to replace the existing freestanding office furniture within the
Community Improvement Manager's office.
PRIMARY OBJECTIVE
1. To provide a more effective use of office space and to provide more file storage space.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
1. The Community Improvement Manager's position was created during the latter stages of the City Hall
renovation, and an office space was created in what was originally intended to be a conference room. At
that time it was too late to make a substantial addition to the order for office system furniture that had
already been placed and scheduled for installation, so the office was furnished from surplus furnishings that
were available.
2. More desk and storage space, as well as a more efficient use of the existing office space is needed to
maximize productivity.
3. Due to an increase in the number of casefiles that have been created within the Community Improvement
Division, additional filing space is needed, and there is no room for additional filing cabinets.
ALTERNATIVES
1. Make do with existing furnishings.
2. Find space elsewhere in department to locate additional file cabinets.
COST SUABIARY
1998-99 1999-2000
Additional Costs
Minor Equipment 0 $ 7,500.00
Total 0 $ 7,500.00
Savings NONE NONE
Net Cost 0 $ 7;500.00
— 76 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTMTY: Economic Development
REQUEST TITLE: Professional/Consulting Services
REQUEST SUMMARY
Hire professional consulting services to facilitate and/or design materials related to the following economic development
activity: (1) economic development strategic plan; (2) community profile marketing brochure.
PRIMARY OBJECTIVE
1. To ensure targeted economic development activity by providing the framework for the City's involvement in the local,
regional and state efforts in the field of economic development.
2. To ensure effective promotion of the City of Lodi through a professional and quality marketing piece.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
Lodi has experienced unprecedented business and industrial growth over the past few years. In order to ensure our
competitive position in the marketplace, we must develop a strategy which outlines our business attraction selection process
and continue to provide appropriately zoned industrial properties. A quality marketing brochure is key to selling our
community and future business attraction success.
ALTERNATIVES
1. Create an economic development strategy in house. Staff limitations, however, would disallow timely completion of this
effort.
2. Due to the absence of an on staff public information director we have no other choice to farming this effort out.
COST SUMMARY
1999-2000 2000-01
Additional Costs
Staffing
Supplies, Materials, Services
32,500
Minor Equipment
Total
32,500
Savings
Net Cost
32,500
— 77 —
GENERAL GOVERNMENT
Original City seal — adopted January 4,1907, just two months after the date of incorporation
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Public Works Administration
REQUEST TITLE: Administrative Clerk ILII
REQUEST SUMMARY
To increase the part-time Administrative Clerk I position in the Public Works Administration office to a full-
time position.
PRIMARY OBJECTIVE
1. Maintain the Public Works standard of serving the public in an efficient and timely manner both at the
public counter and on the telephones.
2. Maintain records and set up fives for the ever-increasing incentive, deferral and development
agreements.
3. Provide our professional and administrative staff with the clerical support that will allow them to spend
their time in the most productive and cost-effective manner.
4. Assist the Building and Equipment Maintenance Superintendent in organization and development of a
filing system.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The activities of the administrative, engineering, transportation, and building maintenance divisions have
increased to such an extent that our clerical staff are often overwhelmed. The number of phone calls and
customers at the counter increases in relation to the number and types of Capital Improvement and
development projects in progress. Some days, one person is kept busy just answering phones, helping
people at the counter and getting messages to field and building maintenance personnel. Routine items
that don't have a high priority do not get done until they become a crisis. Many times this creates
problems for other employees in this office because additional time must be taken by the professional staff
to search for items that have not been filed or processed.
In the last few years, the City has undertaken several large capital projects, and many more are now
underway (the Multimodal Station Remodeling, Public Safety Building and the water and street capital
projects, etc.). These projects cause increased phone calls and front counter contact, and require the
typing of many more letters, memos, agreements, bills, purchase orders, and council communications.
Because of the diversity of the Public Works Department, and the staff time and expense required to train
clerical staff, it is not cost-effective or productive to constantly train and retrain part-time clerical staff. A
permanent, full-time position will help alleviate these problems.
ALTERNATIVES
Ask professional staff to do their own clerical work. Professional staff are currently doing much of
their own clerical work. To ask them to do more than they are currently doing, i.e., making their own
copies, typing envelopes and mailing labels, etc., would have an even greater negative impact on their
workload and morale and the level of customer service provided. In addition, uniformity of document
formats tends to be compro,—nised when non -clerical staff is expected to perform clerical duties.
Continue using part-time clerical. Just answering telephones and helping people at the counter
requires a knowledgeable fu:l-time employee who is dedicated and interested in the activities of the
Public Works Department. V. e ask much more of this positten than to simply act as a receptionist
— 79 —
SGNEXCLK
1997-99 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Public Works Administration
REQUEST TITLE: Administrative Clerk Illi
(i.e., preparing payroll and opening and sorting mail, preparing public works project specifications,
typing letters, memos, budget documents, etc., and handling all of the duties of the full-time
Administrative Clerk II in her absence). This employee is an essential part of our Department and
should have the responsibilities and benefits of a full-time employee.
In addition, we need more hours available than presently budgeted. We could hire a second part-time
person to help, but this required additional training and coordination as we only have one work station
available.
COST SUMMARY
1999-00 2000-01
Additional Cost
Salary S20,545 S21,550
Overhead 6.780 7.110
Total requested S27,325 S28,660
Savings $11,835 S13,330
(budgeted for part-time)
Net Cost S15,450 S15,330
IMPLEMENTATION
On approval of the budget and this request, the hiring of a full-time Administrative Clerk will be pursued.
SGNEXCLK 2 - 80 -
1999-2001 Financial Plan and Budget
SIG\IFICA_.\TEXPENDITURE REQUEST AND STAFFING CHANGE
aCTB ITY: Public %%'orks .administration
REQUEST TITLE: Volunteer Program
REQUEST SLNLNLARY
This request is to hire a "Volunteer Coordinator' to assist the Department in making use of non-traditional labor, support and
programs. The request is for a contract part time position (estimated at 80% time, with benefits) for two years to establish the
program and determine its long-term vi -ability. Upon completion of the two-year program, a recommendation will be made to
either:
Abandon the program;
Continue the program as -is; or,
:• Expand the program within the Public Works Department and, possibly, to other Departments (such as Community
Development/Code Enforcement). If the position were to be expanded to full-time, the recommendation would include
transitioning the incumbent to resul:r employee status. (The initial recruitment will be done using the City's comperitive
process.)
PRIi1L-kRY OBJECTI3E
The primary objective of the program is to involve the community in the upkeep of the public right-of-way. The person selected
for the program will need to be someone adept at working with volunteers and other non-traditional sources of time and energy.
Examples of the types of tasks and grouts include:
Organizing the many ",malkers" to cover the entire city, giving them a clipboard, and have them look for and record problems
such as overhaneing trees and shrubs. rip hazards, improper signs, unauthorized encroachments, water toasting and any other
"problem" they see.
Preparing various notices, posting and follow-up.
Training and equipping some of the "walkers" to do tree pruning such as sucker removal.
;$ :• Coordinating work by County Sheriff s inmates.
Coordinating work by CalWorks persons.
Assisting in various public relations and community outreach efforts, such as career days, job fairs and the water quality
annual report.
Acting as Public Works liaison to the Lodi Improvement Committee.
SUi ZiARY OF FACTORS DRIVD;G THE REQUEST FOR CHANGE
Existing staff can take advantage of this "community energy", however, it takes away from their current duties. In addition, the
skills necessary to work with volunteers and public outreach are not typical engineering or maintenance supervisory skills.
Someone experienced in the charitable or non-profit sector would do this work more efficiently.
ALTERNATIVES
Continue with present practices — The Department has utilized the Sheriff's inmates for limited amounts of time. Our
' :adopt-A-Strect" program is languishing for lack of adrninistrative time to work with the volunteers.
Attempt to use the City's other ma t volunteer organization — the Police Partners — to take on additional duties and programs.
COST SUNEMARY
1999-2000
2000-01
Additional Costs
Staffma (ince. all beneflas excen't PERE;
S39.I50
541,000
Supplies, Materials, Services (rra -J}'
adverstising R. office supplies)
S5.000
$3,500
Minor Equipment Personal Co:a.ruter, mist.
S2.500
-
Total
S46,650
S44,500
Savings: Some savings in waver co nser anion program I
and street summer part-time labor
<5500>
<S500>
Net Cost:
S46,150
S44,000
Voiur,teerProeram.doc
— 81 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Public Works
REQUEST TITLE: Solid Waste Acministration
REQUEST SUMMARY
To provide funding to address the upcoming renewal of the solid waste removal contract as well as provide
professional guidance in meeting the City's goals for the Year 2000.
PRIMARY OBJECTIVE
To provide the best solid waste/recycling service at the most reasonable cost to the consumer and yet provide the City
with a revenue source that is based on an appropriate formula.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
(Jany thin -as have changed in the solid waste industry in the last few years. new programs must be added to continue
to meet the goals of the California Inlegrated Waste Management Board. There are also other sources of revenue in
the solid waste/recycling field that have not been addressed by the City. The contract with our solid waste contractors
comes to an end June 30, 2003. We have the option to extend the contract for an additional 7 years if the contractor is
notified 18 months prior to the ending date. The contractor's operation has never been audited and this should be done
before any decision is made regarding continuation of the contract. An outside auditor would be hired to do this. In all
likelihood, the City will go to bid for a new contract rather than operate under a 14 -year old agreement. It is imperative
that a consultant with experience in this growing and sophisticated industry be hired to prepare a request for proposal
493
that will be most advantageous to the City and yet provide reasonable and quality service to the consumer.
L
While not shown here, this may be the appropriate place to show the cost of services provided by the City for the solid
waste operation.
ALTERNATIVES
Extend the existing contract for an additional 7 -year term as provided in the contract without developing a new rate
structure or franchise agreement.
COST SUMMARY
1999-00 2000-01
Additional Costs
Staffing
Supplies, Materials, Services 52,000 S25,000
Minor Equipment
Total S2,000 S25,000
Savings
Net Cost 52,000 $25,000
— 82 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Human Resources
REQUEST TITLE: Administrative Clerk II
REQUEST SUMMARY: Add one position of Administrative Clerk II to authorized staff in
the Human Resources Department in FY 2000/01.
PR.IIIIARY OBJECTIVES:
• Increased effectiveness and efficiency in obtaining and transmitting relevant information to
citizens concerning the filing and processing of liability claims.
• Increased effectiveness and efficiency in obtaining and transmitting relevant information to
employees concerning the processing of General Liability and Workers' Compensation
claims, implementation of the City's Injury and Illness Prevention Program (i.e.
Safety/Training), and the control and transfer of exposures to loss.
• Increased effectiveness and efficiency between the City and third party administrators in the
management of General Liability and Workers' Compensation claims, and between the City
and contractors in the transfer of risk exposures and risk financing.
• To compile and maintain relevant loss information and data bases.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
In September 1995, Human Resources absorbed the risk management functions of General
Liability, Workers' Compensation, and Safety & Training. These functions had previously been
performed since 1991, by an Administrative Assistant To The City Manager, and a Risk
Management Technician. Only one position in Risk Management ( subsequently classified as
Risk Manager) was retained.
In addition, Human Resources absorbed Labor Relations functions consisting of labor
negotiations and grievance investigations. These functions had previously been performed by the
Assistant City Manager, and his support staff. These functions were added to the existing
Human Resource functions of Recruitment & Selection, Classification & Compensation, and
Employee Relations without the clericall'technical support which had been previously provided.
Clerical/technical support is needed in processing the following: General Liability and Workers'
Compensation claims; certificates of insurance; reports of unsafe working and public risk
exposure conditions; and OSHA compliance. The position will also provide clerical/technical
Support in other functional areas of Human Resources.
AV Tech Page I of!
— 83 —
The current level services provided by the Human Resources Department do not adequately meet
the service demands of the City or of our citizens. Exposures to loss are not readily being
identified, and loss control techniques are not readily being developed, implemented or
monitored. Employees and citizens are not receiving information or services completely or in a
timely manner. Programs for loss control and employee development are not being developed or
implemented because the time needed for these activities are consumed with maintaining the
daily activities.
The Human Resources Department has been funded for part-time clerical help for the last 4
fiscal years because the need is present. The need for clericalltechnical support on a full-time
level has not dimished since its creation in 1991, and continues to remain.
ALTERNATIVES
Continue to provide existing levels of service.
Contract out all or part of Risk Management and Human Resources functions.
Increase current part -ti m&!temporary hours from 20 hours/week to 40 hours/week.
COST SUNENIARY 2000-2001
Additional Costs:
Salary and benefits: 529,342
Supplies, Materials, &
Services: 0
Minor Equipment: 0
Total: 529,342*
* Actual net increase would be S10,316 over current.
B1PLEMENTATION: The above objectives will begin to be achieved after training. The
objectives will be measured in the following manners:
• Decrease in time gathering relevant claim information, and reporting such information to the
appropriate personnel and administrators.
• Decrease in administrative cost of the General Liability due to increased in-house
management of property damage claims.
• Increased recovery from losses by second parties.
• Increased activities implementing the City's Injury and Illness Prevention Program.
• Increased reporting of loss information and data to departments, Executive Management and
the Council.
A,1 tech raga 2 of t.
— 84 —
1999 — 2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AN7D STAFFIN�TG CHANGE
ACTIVITY: Human Resources
REQUEST TITLE: Consulting Services
REQUEST SUININMARY: Retain a professional firm to conduct a salary survey for members
of the Maintenance & Operators, General Services, and United Firefighters units.
PR MARY OBJECTIVES:
To thoroughly examine the structure of salaries and deferred compensation currently
provided for City of Lodi employees in the M&O, General Services, and United Firefighters
units.
2. To ensure that appropriate differentials are structured between salary ranges within
classification families.
3. To ensure that appropriate compensation differentials exist between classification families
and classifications which supervise positions in those families.
4. To ensure that the City of Lodi remains competitive with other cities and public sector
organizations in California that make aneffort to attract and retain quality employees.
IN
SUNITMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE:
The last salary survey prepared for the M&0, General Services, and United Firefighters units
was conducted in 1983 — sixteen years ago. The industry standard is to conduct these studies
every three to five years. This survey is long overdue. During the latest set of labor negotiations
with these units, it was agreed this survey would be prepared.
This survey will cover over 160 positions with 90 classifications. As such it will be very labor
intensive and require a significant degree of expertise. Human Resources staff are currently
focusing effort on conducting a large number of personnel recruitments, refining existing and
developing new risk management programs, preparing for labor negotiations, developing
proficiency regarding the use of new payroll/ personnel automated sof \ware and its interface with
the Finance Department, as .vell as other assignments. The preparation of a compensation study
by Human Resources staff would disrupt the timely performance of projects listed above and the
routine flow of inquiries, salary adjustments, benefits chanes, etc. which the department
processes daily.
The appearance of impartiality in the preparation of this survey is very important to members of
the M&O, General Services, and United Firefighters units. Retaining a professional firm with a
track record of proficiency in preparing compensation plans will ensure a valid quality product
for the City.
Comp S,u?y sign. frequev-roc A-ge ! of?.
- 85 -
ALTERNATIVES:
Perform the salary survey using Human Resources Department staff.
COST SUMI7ARY:
1999-2000
Additional Costs:
Salary and benefits: 0
Supplies, Materials, & 20,000
Services:
Minor Equipment: 0
Total: 20,000
IMPLEMENTATION:
With Council approval of this request, staff will prepare a scope of work and request for
proposals in order to retain the services of a professional firm to analyze the salary structure. It
is anticipated the study of the M&0, General Services, and United Firefighters units will be a
three to six month project.
Comp San'), sign iirequest. 4c
Page 2 of 2.
— 86 —
w
1999 — 2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Human Resources
REQUEST TITLE: Citywide Training Program
REQUEST SUMMARY: Creation of a Citywide training program in FY 1999-2000.
PRIMARY OBJECTIVES:
1. To increase the skill and motivation levels of City employees through an increased awareness
of techniques to improve communications, customer service, conflict management and
general competency in the performance of assigned duties.
2. To provide department directors and supervisors with an increased confidence level when
dealing with human resource issues such as employee supervision, discipline, sexual
harassment, violence in the workplace and other employment issues.
3. To lower unit costs of training sessions provided by the City by reducing travel and business
expenditures associated with training.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE:
Continuous, incremental improvement of any organization's human resources is necessary to
maintain a motivated work force that delivers high quality services to the community.
There is currently a lack of consistency in the way City departments provide training. A variety
of high-volume vendors mail numerous brochures to the City offering an assortment of generic
training sessions. Departments often respond in a reactive, ad-hoc manner by sending staff to
these sessions when the inclination arises e.g., when an employment issue highlights some form
of training deficiency. This program strives to introduce a greater degree of planning into the
City's training efforts. Through a process of consultation with departments, an outline of
citywide training needs will be developed and professional firms with the expertise to meet these
needs will be obtained. Training of a uniformly high quality, designed for City of Lodi
employees, will then be made available to all departments.
In part, this program is designed to bring expertise, as much as possible, to the City of Lodi.
Currently, a great deal of training for the City is obtained by sending staff to outside locations
such as Sacramento, Modesto and the Bay Area. The expense and logistical rearrangements
necessary to cover absent staff members often acts as a disincentive for a department to take any
action to provide staff training.
ALTERNATIVES:
• Continue using sessions provided by the consortium and training firms exclusively.
CitylVide Training signifrequest.doc Page 1 of?.
— 87 —
COST SUMMARY:
1999-2000 2000-2001
Additional Costs:
Supplies, Materials, & 10,850 11,176
Services:
Total: 10,850 11,176
IMPLEMENTATION:
With approval of this request, Human Resources staff will:
1. Consult City departments to obtain an understanding of perceived training needs.
2. Using input from departments, and Human Resources expertise, develop an outline of
training to be provided.
3. Obtain proposals in order to retain the services of professional training firms with capability
in the required disciplines.
It is anticipated the citywide training program will be implemented soon after budget adoption
and will be applied over the course of FY 1999-2000 and continue into FY 2000-01.
C hyll'ide Training signifrequesi.doc Page 2 oft.
— 88 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Risk Management
REQUEST TITLE: Injury and Illness Prevention Program Evaluation and Update
REQUEST SUMMARY: Contract with a professional firm to evaluate and update the Injury
and Illness Prevention Program (IIPP) for field operations in the Electric Utility and Public
Works Departments.
PRDIARY OBJECTIVE: To evaluate the City's field operations, and update the IIPP to
conform to CalOSHA regulations.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The City's IIPP was first developed in 1990 in an effort to be in compliance with SB 193 which
revamped the General Industry Safety Orders (GISO). Since that time the IIPP has not been
assessed nor updated to ensure compliance with changes in GISO, which is enforced by the
California Occupational Safety and Health Administration (CalOSHA). The City's greatest
exposure in this regard is found in field operations in the Electric Utility and the Public Works
Department's Streets and Water/Wastewater Divisions.
Due to the complexity of the GISO requirements, and the broad scope of field operations in the
Electric Utility and Public Works Departments, City staff do not have the resources to complete
this project. An experienced and knowledgeable professional in this field is needed to evaluate
safety and work practices for compliance with GISO requirements. This professional will update
the IIPP which defines these practices and the training needed to ensure conformity with them.
ALTERNATIVES
1. Continue operations with the knowledge that the IIPP is out of compliance with
CalOSHA regulations, and the uncertainty that unsafe work practices are being utilized.
2. Use City staff to evaluate and update the IIPP.
COST SUMMARY 1999-00 2000-01
> Additional Costs:
Salary and benefits:
Supplies, Materials, &
Services: S25,000 0
Minor Equipment:
Total: S25,000 0
IMPLEMENTATION: Upon approval, a professional firm will be contracted to perform
the project during the 1999-00 fiscal year.
SER-IIPP Page I off.
cot -R -M
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Other Insurance
REQUEST TITLE: Property Valuation
REQUEST SUMAZARY: To hire a consultant to valuate buildings, their contents and
property in the open during FY 1999/00, and to do follow-up valuations in 2000/01.
PRIMARY OBJECTIVE: To accurately establish the insurance premium for City buildings,
their contents and property in the open.
SUA51ARY OF FACTORS DR.IVII�G THE REQUEST FOR CHANGE
The City has property insurance purchased through California Joint Powers Risk Management
Authority (CJPRMA). Coverage is up to 5300 million per occurrence, with a 525,000
deductible. Each year the City submits a listing of property values to CJPRMA for the purposes
of tracking valuations, reporting changes in the property inventory, and for premium calculation.
The valuation has been, and continues to be conducted by City staff— principally the Risk
Manager and Fleet and Facilities Manager. Neither are professionally trained in property
valuation.
Due to the current appraisal methodology, it is uncertain as to whether the City's properties are
accurately valued. Therefore it is uncertain as to whether the premium being paid is too high or
too low. Should one of the City's properties suffer an accidental loss, there is no reliable criteria
upon which to base the value of the loss, thus there_is no basis in declaring a value for
indemnification of the loss.
The valuations will need to be updated given completion of pending capital projects such as the _
multimodal station, and public safety building remodel.
ALTERNATIVES
Continue to valuate buildings, contents and property in the open with current
methodology by the Risk Manager and Fleet & Faciities Manager.
COST SUMMARY
Additional Costs:
Supplies, Materials, &
Services:
Total:
LNIPLEMENTATION:
for FY 2000/01,
SER -Prop 1701
1999-00
S7,875
57,875
The valuation will be completed prior to the premium assessment
Page I of 1.
— 90 —
1999-00 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQt'EST .kN-D STAFML G CHANGE
• T
ACTIVITY: Information Systems
REQUEST TITLE: Information Systems Web Page Development Services
REQUEST SU�Z1ARY
Provide for professional Web Page Development Services to augment City staff in maintaining the City's Web Page.
PRBIARY OBJECTIVE
The primary objective is to provide for Web Page Development services to assist City staff in developing and maintaining the
City of Lodi's Web Page.
SUMMARY OF FACTORS DRTVL\G THE REQUEST FOR CH.A\'GE
The City will be better served by the use of outside professional Web Page Development services to resolve issues related to
our Web Page. City staff resources could be better utilized in other areas (such as the content of the Web Page).
ALTERNAMES
• Train City staff in all areas Web Page development at the City of Lodi
• Start slowing down the use of Lodi's Web Page to adequately handle the task
COST SUNMARY
1999-00 2000-01
Additional Costs
3 Web Page Development Services S5,000 $5,000
Savings
Net Cost
— 91 —
1999-00 Financial Plan and Budget
SIG\IFICANT E\PE\DITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Information Systems
REQUEST TITLE: Information SN -stents Consulting Services
REQUEST SUh4MARY
Provide for Consulting Services to augment City staff in maintaining the City's information s�ystemt .
PRBJARY OBJECTIVE
With today's diverse technology, it is difficult, if not impossible, to be experts in 211 areas of teclutology used at the Cite of
Lodi. Funding to use outside Consultants would enable Information Systems to solve extremely complicated problems
NAithout the length of time needed for extensive research and solution by trial and error. Consultants simply can resolve
certain problems more quickly and cost effectively.
SUMMARY OF FACTORS DRIVDiG THE REQUEST FOR CHANGE
The City pill be better served by the use of outside Consultants to resolve complicated technology issues, permining staff to
learn from their expertise while getting problems resolved in a timely fashion.
ALTE%NATIVES
• Train Cin staff in all areas of technology used at the City of Lodi
• Start sloping down the proliferation of technology to adequateh handle support
Aah
vp COST SUMMARY
1999-00 2000-01
Additional Costs
Consulting S15,000 S15,000
Savings
Net Cost
- 92 -
1999-00 Financial Plan and Bud�oct
SIGNIFICANT EXPENDITURE REQUESTA.ND STAFFLNG CHANGE
ACTIVITY: Information Systems
REQUEST TITLE: New Portable Microcomputers
REQUEST SUD'L ARY
Purchase two new laptop computers for Staff to use at Carnegie for presentations. for Wide Area Network (WAN) support and
as a desk -top support replacement.
PRIMARY OBJECTIVE
The purchase of two new laptop computers will assist Information Systems in the following areas:
• Allow City staff to setup and prepare for their presentations at Carnegie ahead of time.
• Assist pith the WAN maintenance and support
• Allow support staff to use a portable as a replacement for a defective desktop PC, which would permit the user to return to
,work immediately and allow support staff to correct the problem at a more suitable location.
SUMMARY OF FACTORS DRIVE G THE REQUEST FOR CHANGE
Currently there is one portable computer available to Cin- staff. It is heavily used for training for the new J.D. Edwards
Financial Accounting System and will continue to be used for the ORCOM Utility Billing / CIS System. Two new portable
computers could be used for three purposes. 1. One could be used at Carnegie for presentations where it could be setup well
before the presentation. This ,would reduce the risk of a failed presentation due to being mored around 2. One would be eery
useful on an intermittent basis for maintaining the Wide :area Network. 3. Currently, when there is a call for desktop
support, staff must many times attempt to respond immediately as the function might bevery critical to the user (such as an
agenda that must be printed for a meeting in the next 15 minutes). Other times, the user simply can not be away from their
position while support staff attempts to correct the problem. A portable computer could be used as a replacement to enable
the user to return to work eery quickly while support staff takes the unit to a more suitable location to correct the problem.
ALTERNATIVES
• Continue to operate as we do today.
COST SUMMARY
1999-00 2000-01
Additional Costs
New Portable Microcomputers S3,000 53,000
Total S3,000 S3,000
Saminas
Net Cost
— 93 —
1999-00 Financial Plan and Budtet
SIGNIFICA.XT EXPENDITURE REQUEST AND STAFFING CHANCE
ACTIVITY: Information Symms
REQUEST TITLE: Information Svstems Paid Intern(s)
REQUEST SUMNLARY
Provide for part-time paid intern(s) to assist Information S} -stents with technical support and training.
PRDIARY OBJECTIVE
The primary objective is to add additional part-time personnel to assist in teclutical support and training.
SUMMARY OF FACTORS DRIVD G THE REQUEST FOR CHANGE
With today's Leer -increasing use of technology, an increased amount of support is required to keep all systems functioning.
The City could work in cooperation Mth local colleges to:
• Have access to trained students capable of helping -. ith technological support in a very cost-effective manner
•
Have more personnel capable of handling problems as they arise
• Increase potential candidates for fill ina future positions at the City
• Assist colleges to train in the use of modern information systems
ALTEFNATIVES
• Increase City, staff
• Start sloziing do,.,,m the proliferation of technology to adequately handle support
COST SUh7siARY
1999-00 2000-01
Additional Costs
Paid Intern(s) S8,320 S8,320
Savings
Net Cost
94 —
� 1
1999-00 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST .kND STAF'FLNG CHANGE
ACTIVITY: Information Systems
REQUEST TITLE: Help Desk Sof vare Application
REQUEST SUMA-kRY
Provide a Help Desk System for Information Systems staff and department level information systems coordinators.
PRIMARY OBJECTIVE
A Help Desk system will assist Information Systems staff and all personnel in the Cin by:
• Providing a central location to search for solutions to all technology related problems.
Keeping track of problems by user, enabling Information Systems to determine when further training might be beneficial
• Allowing Information Systems to add solutions to technology problems as »-e learn them
• Permitting each technician to review work done on previous calls prior to attempting to solve a problem
• Permitting the Cin to share solutions to problems as they are discovered — eliminating the need to re -invent the wheel
SUMMARY OF FACTORS DRIVLNG THE REQUEST FOR CHANGE
Timely solutions to technology problems are becoming more and more important. A Help Desk system would be one of the
most cost-effective methods of getting these problems under control.
ALTERNATIVES
• Increased support staff.
10-1
COST SUMMARY
1999-00 2000-01
Additional Costs
Help Desk Sofm-are S6,000 S1,200
Total 56,000 51,200
Sa%ings
Net Cost
— 95 —
1999-00 Financial Plan and Budget
SIGNIFICA.N'T EATENDI'TURE REQLEST AND STAFFLNG CHANGE —
ACTIVITY: Information Systems
REQUEST TITLE: Wide Area Network Internet SeMce Provider (ISP)
REQUEST SUAMARY
Provide on-going funding for the City's new Wide Area Network (WAN) Internet Service Provider (ISP) and high-speed
connection.
PRIIMARY OBJECTIVE
To provide funding to keep the Wide Area Network connection to the Internet operational.
SUA4MARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
Currently, all City access to the Internet is through individual modem connections to an Internet Service Provider. When the
Wide Area Network (WAN) is operational, access to the Internet will be changed to a high-speed connection and available to
everyone on the WAN.
ALTERNATIVES
• Discontinue access to the Internet via the Wide Area Network.
• Continue adding individual modem lines (compromising network security)
COST SUNBLkRY
1999-00 2000-01
Additional Costs
Internet Service Provider and Connection $9,600 $9,600
Total $9,600 59,600
Savings
Net Cost
— 96 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPEI\DITURE REQtEST A.\ -D STAFFING CEA.NGE
ACM,TTY: City Clerk
REQUEST TITLE: Funds To Update Municipal Code Book (Zoning Ordinance Revisions)
REQUEST SU:1L11ARY
At the January 20, 1999 Council meeting, the City Council approved an agreement for a major revision to the City's zoning
ordinance with the firm of Crawford, Multari and Clark, Associates. The City's zoning ordinance has not been significantly
updated since the 1950's.
PRL�ZARY OBJECTIVE
A major revision such as this will require extensive modifications by the City's codifier, Book Publishing Company. By law,
each time an ordinance is adopted a legal must be published within a prescribed time period in order that the public may be
aware of the changes. It is anticipated that the costs will be in the range of 55,000.
SU`;NWARY OF FACTORS DRIVING THE REQUEST FOR CH.-AINGE
Major revisions to the Municipal Code will require codification amendments by the City's codifier, Book Publishing Company.
Further, it is a requirement of law that legal publications are made within a prescribed time from the adoption of an ordinance.
ALTERNATIVES
None. As regulated by law, the City has no choice or alternative option available if this major revision is undertaken.
COST SUMMARY I 1999-2000 I 2000-01
Additional Costs
Staffing
Supplies, Materials, Services $5,000.00
Minor Equipment
Total
Savings
Net Cost I $5,000.00
bud ?c;.99siacxp.doe
— 97 —
1999-2001 Financial Plan and Budget
SIGMFICANT EXTEN-DITURE REQL-EST .kND ST.4FF13�G CILUNGE
ACTiVTI-I': Elections
REQUEST TITLE: City Clerk
REQUEST SUNL IARY
The conduct of local elections and the processing of State mandated campaign and conflict of interest filings.
PRINIARY OBJECTIVE
1. To conduct General Municipal and Special Elections in the City of Lodi pursuant to State statute and in a professional,
efficient and cost effective manner. We need to keep in mind, however, that inasmuch as we consolidate with the County
of San Joaquin, there are some cost factors of which we have no control.
2. By State statute, the City Clerk serves as the filing officer for campaign statements and conflict of interest filings for elected
officials, appointees and designated employees of the City. It is the goal of this office to ensure that all filings are made in a
timely manner and pursuant to State statutes.
SLTLMARY OF FACTORS DRINTG THE REQUEST FOR CHANGE
The City of Lodi General Municipal Elections are held every November of even -numbered years. Therefore, fewer funds are
required in off -election years, resulting in a larger budget request in the year 2000-01. Additionally, we received unofficial
notification from the San Joaquin County Registrar of Voters' Office that the cost for the 1998 General A'lunicipal Election might
be in the area of 516,000 (an increase of approximately 56,000 from the previous election). Therefore, we have significantly
increased the dollar amount in the professional services account (:00 series) to cover the County's costs for the 2000 General
Municipal Election.
ALTERNATIVES
None. State law mandates local elections and sets forth the duties and responsibilities of the City Clerk in the conduct of such
elections.
COST SUMMARY
1999-2000 2000-01
Additional Costs
Staffm e
1,794
Supplies, Materials, Sen>ices
6,000
Minor Equipment
Total
Savines
Net Cost
7.794
— 98 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPF.NDTTURE REQUEST AND STAFFLN G CHANGE
ACTIVITY: City Clerk
REQUEST TITLE: Funds For Staff Traituns
REQUEST SUMMARY
Funds to sends two Deputy City Clerks for training at the Continuing Education for Public Officials (CEPO) in Santa Barbara.
This is an intense 7 -day conference geared toward team -building, education and management lessons, with credits that can also
be applied to obtaining the Certified Municipal Clerk (CMC) status.
PRIMARY OBJECTIVE
The City Clerk's Office believes in supporting and educating its staff. CEPO is probably the most important and rewarding
training available for municipal clerks. It helps to build and strengthen one's management skills, to reaffirm the importance of
working in unison with fellow team members and to expand the knowledge of the inner workings of the City CIerk's Office.
SUMMARY OF FACTORS DRrVING THE REQUEST FOR CHANGE
Both Deputies have a number of years of experience with working in the City Clerk's Office and have attended numerous City
Clerk -related conferences and training sessions. Both are members of the City Clerk's Association of California (CCAC) and
International Institute of Municipal Clerks (IIIvIC) organizations. CEPO is a natural extension of this education and training,
and is a three-year commitment. This significant expenditure request is for 2 CEPO sessions each, year, which are held in
February and September.
ALTERNATIVES
COST SUMMARY 1999-2000 2000-01
Additional Costs
Staffing
Supplies, Materials, Services S4,340 $4,340
Minor Equipment
Total
Savings
Net Cost $4,340 $4,340
budget199sigexp2.doe — 99 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Finance - Revenue
REQUEST TITLE: Staffing Change
REQUEST SUMMARY: Hire two full time account clerks
PRIMARY OBJECTIVE:
1 To offer excellent customer service in a more efficient manner.
2 To maintain current customers and acquire additional customers during deregulation.
3 Ensure that the City has adequate, full time employees who maintain a greater
efficiency due to daily work exposure.
4 To prevent staff burn -out and to achieve a higher level of efficiency and attention to detail.
5 To give current staff time to actively pursue the business license ordinance and gain
additional revenue.
6 To avoid the risk of part-time staff having the responsibility of handling cash in excess of
515,000.00 on a daily basis.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE:
We continue to have an increase of service orders due to the mobility of customers. Implementation
of a Customer Information and Utility Billing System nake it necessary to hire and train employees
in a full time capacity as was stated in Council Communication dated April 15, 1998 addressing
the purchase of a CIS system
ALTERNATIVES:
Continue to operate using part-time staff.
COST SUMMARY:
1999-2000
2000-01
Additional Costs
Staffing
547,887.68
S52,042.08
Supplies, Materials, Services
Minor Equipment
Total
547,887.68
$52,042.08
Savings (100505.7103)
530,282.64
40,039.08
Net Cost
517,605.
$12,003.
- 100 -
1999-2001 Financial Plan and Buduct
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Fina;tce Field Sen -ices
REQUEST TITLE: Cellular Phones
REQUEST SUMMARY
Purchase eight (8) portable combination radio/cellular phones for a total cost of $1,285.00 for use by the
'Field Services staff. The monthly fee per unit is S22.00.
PRIMARY OBJECTIVES
1. Increase quality of communication.
2. Decrease cost of communication system.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Field Services staff spends the majority of their working day in the field. Their only means of
communication is a portable radio system. The replacement cost per unit is approximately S1,600; three
units have been replaced over the past seven years. The radio system's signal quality is inconsistent; also
the unit is bulky and heavy.
ALTERNATIVE
1. Do nothing - continue with the current system.
COST SUMMARY 1999-2000 2000-2001
Additional Costs
Utility & Communications
S2,115
$2,115
Supplies, Materials & Sen -ices
1:285
0
Total
3.400
2.115
Savings
<1;770>
<1,770>
Net Cost
S1.630
S 345
The savings would be from 1) monthly pager fee, and 2) the monthly radio transmission fee that the
Public Works Department pays for on the current system. There would be additional savings if a buyer
could be located for the used portable radios.
- 101 -
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHARGE
ACTIVITY: Finance Field Services
REQUEST TITLE: Lead deter Reader
REQUEST SUMMARY
Create a new position to assist the current staff of four (4) Meter Readers and one (1) Accounts Collector.
The Lead Meter Reader would fill in for the Meter Reader or the Accounts Collector positions during an
absence. This person would also read the new accounts that are being added monthly, read the large
account and survey meters for the Electric Utility Department, and fill in when the Accounts Collector is
performing energy audits.
PRIMARY OBJECTIVES
Decrease the dependence on part time employees.
2. Provide greater customer service.
3. Increase inner office efficiency.
SnBIARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The part time hours worked is equal to 1.6 full time persons. There tends to be a steady turnover in the
part time staff. The new trainees make more mistakes resulting in customer dissatisfaction. The addition
of a full time person would lend itself to continuity in section practices and accuracy.
The number of electric and water accounts read each month has increased over the past twenty (20) years
from 18.000 to 25,000. The number of Meter Readers has remained constant at four (4). Approximately
six years ago, another read day was added for a total of nineteen (19) days per month. Adding another
day is not feasible since some months only have nineteen work days if there are holidays and/or five
weekends.
ALTERNATIVE
1. Do nothing - continue with the current staff.
COST SUMMARY
Additional Costs
Staffing (Total Compensation)
Total
Savings from Part time
Net Cost
1999-2000 2000-2001
542,000543,200
42,000
43,200
<24,605>
<24,605>
S 17.395
$18,595
— 102 —
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Fleet Services
REQUEST TITLE: Parts Clerk
REQUEST SUMMARY
Add a Parts Clerk position and reduce part-time hours.
PRIMARY OBJECTIVES
1. Provide an optimum -staffing level to serve the City's equipment maintenance needs while servicing and repairing City
vehicles and equipment.
2. Lower administrative costs and improve efficiency of Shop operation.
3. Provide reliable, functional, and safe equipment for employees.
4. Make sure that preventative maintenance, repairs, and maintenance requests are completed in a timely and high-quality
manner.
5. Maintain a balance between services performed by in-house support staff and services provided by vendors, contractors,
and through contracted service arrangements.
6: Ensure that City vehicles present a positive image to the public.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
Locating and obtaining repair parts and managing an inventory of frequently needed parts is an important portion of vehicle
maintenance. Multiple attempts at managing our parts operation, without one staff person dedicated to that effort since the
retirement of the Equipment Parts Coordinator and the elimination of that position, have been less than successful. In recent
years, one Heavy Equipment Mechanic has been assigned the responsibility of managing the parts inventory and ordering. This
is not the most effective use of City moneys, since it uses a higher paid employee to do lower classification work for a significant
part of their workday (approximately 50-800/0 of an 8 -hour work shift). A new position of Parts Clerk is recommended. This
position will be responsible for ordering parts, managing the parts inventory, coordinating deliveries, tracking warranties, doing
data entry for the Shop's computer management system, and generating a variety of reports for supervisors and
management. Hours for part-time clerical (50% of full time) would be dropped.
ALTERNATIVES
1. Do nothing. This is not advised, since we have the responsibility to run our operation in the most cost-efficient and
professional manner we can, which includes evaluating "how we do business" and implementing better ways to accomplish
our mission, when possible. The evening shift currently lacks supervision, and, as stated earlier, multiple attempts at
managing our parts operation, without one staff person dedicated to that effort (since the retirement of the
Equipment Parts Coordinator and the elimination of that position), have been less successful than needed.
2. Utilize additional part-time help and contracts with vendors. This is not advised, since skill levels of part-timers are limited,
training costs and efforts are not fully realized, and vendors cannot respond as quickly or completely yet still require in-house
supervision and management.
COST SUMMARY
1999-2000
2000-01
Additional Costs (Preliminary Estimate)
Staffing: Parts Clerk (new classification @ C step)
$31,625
$33,205
Savings
J
Part-time Adm. Clerk E/II and Summer Laborer
<16,780>
<16,780>
Net Cost
$14,845
$16,425
IMPLEMENTATION
As soon as authorization is received and funds budgeted, the review and adoption of job descriptions, classification titles,
etc. will be scheduled. These are estimated costs only, so exact costs will have to be determined.
attachment
— 103 —
$i^y1 Exp?2 Rs Clk. d,^,c
1999-2001 Financial Plan and Budget
SIGNIFICANT EXPENDITURE REQUEST AND STAFFING CHANGE
ACTIVITY: Fleet Services
REQUEST TITLE: Fleet Services Worker (Equipment Service Worker)
REQUEST SUMMARY
Add one Fleet Service Worker (Equipment Service Worker) in 2000/2001 to the Fleet Services section of
the Fleet and Facilities Division to help service the continually growing vehicle/equipment fleet.
PRIMARY OBJECTIVES
1. Provide an optimum -staffing level to serve the City's equipment maintenance needs while servicing
and repairing City vehicles and equipment.
2. Improve efficiency of Shop operation by doing service -related work and other less technical jobs with
lower classification workers rather than expending unnecessary funds to perform lower level tasks.
3. Provide reliable, functional, and safe equipment for employees.
4. Make sure that preventative maintenance, repairs, and maintenance requests are completed in a
timely and high-quality manner.
5. Maintain a balance between services performed by in-house support staff and services provided by
vendors, contractors, and through contracted service arrangements.
6. Ensure that City vehicles present a positive image to the public.
SUMMARY OF FACTORS DRIVING THE REQUEST FOR CHANGE
The Equipment Maintenance Section currently maintains a fleet of vehicles and equipment totaling
approximately 440 pieces, serving the entire City fleet, except mowing equipment and scooters. Included
in the duties of the Equipment Maintenance Section are repairs to vehicles and equipment of all types and
sizes; managing the parts inventory; troubleshooting and repair of mechanical operation problems in
electric, hydraulic, and mechanical systems; welding/fabricating projects; and copying keys for vehicles.
Other duties include providing preventative maintenance to all equipment; oversight of the equipment
maintenance management system and software; and supervising contract labor and outside vendors. The
current allocated staff consists of 10.5 full-time and .75 full-time equivalent positions.
In the near future, it is likely more equipment and vehicles will be added to the City's fleet, particularly in
the growing Transit operations. Responsibility for the Fire Department's heavy equipment, and standby
generators at all well sites was added in the last budget cycle. Recent discussion has included
consideration of providing contracted services to outside agencies as potential for additional City revenue.
This remains to be decided, but should continue to be discussed and considered. If this plan is adopted, it
will add more pieces of equipment per person for staff to maintain.
The Fleet Service Worker position is the entry-level position in the equipment maintenance series of
classifications. In 2000/2001, a second Service Worker position needs to be added to maintain a fair
balance between the number of vehicles/equipment and the number of staff servicing them. We should
continue to use outside vendors, as we do now, or hire specialized labor whenever it is most cost effective
or requires specialized training, tools, or equipment.
ALTERNATIVES
1. Do nothing. Keeping the same staffing level while adding vehicles and equipment to the fleet is not
advised. The last three times additional personnel for the Equipment Maintenance Shop were approved, the
appropriate equipment -to -maintenance personnel ratio for Lodi was 50-55 compared to an average of our
survey cities of 43. Our current fleet size of 440 vehicles and pieces of equipment divided by 6.5 staff
(Welder -Mechanic figured at 50%) requires each mechanic to service 67.7 vehicles and pieces of equipment.
Adding one Fleet Service Worker will reduce that number to 58.7 vehicles and pieces of equipment per
mechanic (440 divided by 7.5 staff), still significantly above the average.
Si p Exp FAS rvWrkr. doc — 104 —
ALTERNATIVES (continued)
2. Utilize additional part-time help and contracts with vendors. This is not advised since skill levels of
part-timers are limited, training costs and efforts are not fully realized, and vendors cannot respond as quickly
or completely yet still require in-house supervision and management.
COST SUMMARY
1999-2000
2000-01
Additional Costs (Preliminary Estimate)
Staffing:
Fleet Service Worker (Salary @ C step)
-0-
$31,240
Benefits/Overhead
-0-
6,250
Uniform
-0-
240
Tools
-0-
500
Total
-0-
$38,230
IMPLEMENTATION
The hiring process (review of existing job specification, job analysis, etc.) would begin prior to the next
fiscal year. Materials and supplies would be purchased as appropriate.
— 105 —