HomeMy WebLinkAboutMinutes - January 4, 2000 SS2,60
CITY OF LODI
INFORMAL INFORMATIONAL MEETING
"SHIRTSLEEVE" SESSION
CARNEGIE FORUM
305 WEST PINE STREET
TUESDAY, JANUARY 4, 2000
An Informal informational Meeting ("Shirtsleeve" Session) of the Lodi City Council was held Tuesday,
January 4, 2000 commencing at 7:00 a.m.
ROLL CALL
Present: Council Members — Hitchcock, Land, Nakanishi, Pennino and Mann (Mayor)
Absent: Council Members — None
Also Present: City Manager Flynn, Deputy City Manager Keeter, Public Works Director Prima, City
Attorney Hays and City Clerk Reimche
Also in attendance was a representative from the Lodi News Sentinel and The Record.
TOPIC(S)
1. Wastewater Treatment Plant Master Pian
ADJOURNMENT
No action was taken by the City Council. The meeting was adjourned at approximately 8:25 a.m.
ATTEST:
Ll y: /fi. 1. •2)/
Alice M. Reimche
City Clerk
7999 & Projected Industrial
Wastewater Flows
4
t
Flow, mi 11 n g lions per month
1,•••414t::44414t::4444.41 444
441
LM
160
140
120
100
80
60
40
20
{fir •4ttt,
w
REVISED
- • 1997 Flow
- 1998 Flow
1999 Flow
- Projected Flow
1997 Total Volume: 231 million gallons
1998 Total Volume: 370 million gallons
1999 Volume Jan. -Sept.: 401 million gallons
Future Projected Total Volume: 421 million gallons
Jan
Feb
Mar
Apr
May
Jun Jul
Month
Aug
Nov
Dec
vr
bil 11• a., t.
101.1.14 • ,*.• • ;•%,‘
VII:b•;;;.4
I •••.:1,4: f
711.1!t'
1
41rNetatriltis,
•
rktir LI;i.
t . I
•111.24
.41.r-A•f•
1.•....!•11.
7.011.1.1,1011, -4 •;.11
Tee.
4N. kg t-4"
141411%trlyt1
01. Woe
•4•J
.1r4:11
qtktf1
,aJtfealiitut
.1;
4.
;
Iternatives for Satisfying Municipal
ischarge Requirements
Alternative
Discharge Requirements
t Vated
DO BOD Temp Bact. Zinc NH3 Hg
•
N
P
• =e-4 4
Bishop Cut Outfall Pipeline,4 •,1"'
Bishop Cut Outfall Wetlands
Nitrification
Tertiary Filtration
. ,
Enhanced Clarification
Biological N Removal . •
Biological P Removeht
Metal Salts Addition'.
** *
** *
•
.Other Treatment Wetlands
Additional Irrigated Land
Winter Percolation (Zero Discharge)
Winter Well Injectiory,;, • •
*
* * *
* * *
*
**
*
** *
Additional Storage.
Source Control 2
**
*
**
** *
* *
w
Helps mee
'
'1 Meets an
Rel!ab y meets
anticipated,and future.requirervents,4,..a..
.a equire en s nd pieciblay frieets fiiture requiremen!s
-pie!
c
an icipa
e
and future, ,eq rements
1.0 CD 0 0 0 LO 1.0 11.0
" `V' V" 0 0 0 0
•1
tri •
'-►nir'f,;
•
I 1 w
0
_ `n D-
m o
co
cn
C7 0
Q
Q.
c Q rn
0. Cr CD
o
sll
CD
c 3
0 -
CD
N -�
Cho �1
NCD -1
O coS
O co
3 CD
CI) 0)
o_
CCD C-
0)
1
— Could Be $100,00/year or more
sauid aleipawW
CD
0
0-
3
5
0)
0
0
0)'
0
0
cn
-o
0
v
-0
a)
0
c)
r, -
CD
0
c
0
X�
co
0
Z:4)1
C)
-o
0
r+
r+
)
0
3
-oCD0
0
N
0
c
5-
5. 5.
-o
CD
CD.
Q
'-
0
-�h
0
c
Z
CD
0
Q)
0
0)
0
0
U)
c
CD
(i)
Permit Comments by
Others
Vet,: : ;•. 1: !': 6 74i -i. -)V.5;,.
, _ _ • _.
EPA - concerns over mercury
State Dept. of Health Services - misc.
details; wants to review and approve
any construction plans
DeltaKeeper - mass limits;
antidegradation policy/backsliding; short
term coliform limits; additional
monitoring; local limits; THM's; trucked