Loading...
HomeMy WebLinkAboutMinutes - January 4, 2000 SS2,60 CITY OF LODI INFORMAL INFORMATIONAL MEETING "SHIRTSLEEVE" SESSION CARNEGIE FORUM 305 WEST PINE STREET TUESDAY, JANUARY 4, 2000 An Informal informational Meeting ("Shirtsleeve" Session) of the Lodi City Council was held Tuesday, January 4, 2000 commencing at 7:00 a.m. ROLL CALL Present: Council Members — Hitchcock, Land, Nakanishi, Pennino and Mann (Mayor) Absent: Council Members — None Also Present: City Manager Flynn, Deputy City Manager Keeter, Public Works Director Prima, City Attorney Hays and City Clerk Reimche Also in attendance was a representative from the Lodi News Sentinel and The Record. TOPIC(S) 1. Wastewater Treatment Plant Master Pian ADJOURNMENT No action was taken by the City Council. The meeting was adjourned at approximately 8:25 a.m. ATTEST: Ll y: /fi. 1. •2)/ Alice M. Reimche City Clerk 7999 & Projected Industrial Wastewater Flows 4 t Flow, mi 11 n g lions per month 1,•••414t::44414t::4444.41 444 441 LM 160 140 120 100 80 60 40 20 {fir •4ttt, w REVISED - • 1997 Flow - 1998 Flow 1999 Flow - Projected Flow 1997 Total Volume: 231 million gallons 1998 Total Volume: 370 million gallons 1999 Volume Jan. -Sept.: 401 million gallons Future Projected Total Volume: 421 million gallons Jan Feb Mar Apr May Jun Jul Month Aug Nov Dec vr bil 11• a., t. 101.1.14 • ,*.• • ;•%,‘ VII:b•;;;.4 I •••.:1,4: f 711.1!t' 1 41rNetatriltis, • rktir LI;i. t . I •111.24 .41.r-A•f• 1.•....!•11. 7.011.1.1,1011, -4 •;.11 Tee. 4N. kg t-4" 141411%trlyt1 01. Woe •4•J .1r4:11 qtktf1 ,aJtfealiitut .1; 4. ; Iternatives for Satisfying Municipal ischarge Requirements Alternative Discharge Requirements t Vated DO BOD Temp Bact. Zinc NH3 Hg • N P • =e-4 4 Bishop Cut Outfall Pipeline,4 •,1"' Bishop Cut Outfall Wetlands Nitrification Tertiary Filtration . , Enhanced Clarification Biological N Removal . • Biological P Removeht Metal Salts Addition'. ** * ** * • .Other Treatment Wetlands Additional Irrigated Land Winter Percolation (Zero Discharge) Winter Well Injectiory,;, • • * * * * * * * * ** * ** * Additional Storage. Source Control 2 ** * ** ** * * * w Helps mee ' '1 Meets an Rel!ab y meets anticipated,and future.requirervents,4,..a.. .a equire en s nd pieciblay frieets fiiture requiremen!s -pie! c an icipa e and future, ,eq rements 1.0 CD 0 0 0 LO 1.0 11.0 " `V' V" 0 0 0 0 •1 tri • '-►nir'f,; • I 1 w 0 _ `n D- m o co cn C7 0 Q Q. c Q rn 0. Cr CD o sll CD c 3 0 - CD N -� Cho �1 NCD -1 O coS O co 3 CD CI) 0) o_ CCD C- 0) 1 — Could Be $100,00/year or more sauid aleipawW CD 0 0- 3 5 0) 0 0 0)' 0 0 cn -o 0 v -0 a) 0 c) r, - CD 0 c 0 X� co 0 Z:4)1 C) -o 0 r+ r+ ) 0 3 -oCD0 0 N 0 c 5- 5. 5. -o CD CD. Q '- 0 -�h 0 c Z CD 0 Q) 0 0) 0 0 U) c CD (i) Permit Comments by Others Vet,: : ;•. 1: !': 6 74i -i. -)V.5;,. , _ _ • _. EPA - concerns over mercury State Dept. of Health Services - misc. details; wants to review and approve any construction plans DeltaKeeper - mass limits; antidegradation policy/backsliding; short term coliform limits; additional monitoring; local limits; THM's; trucked