• CITY OF LODI COUNCIL COMMUNICATION
AGENDA TITLE: Purchase of Padmount Transformers ($148,979.46)
MEETING DATE: October 15, 1997
PREPARED BY: Electric Utility Director
RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the
bid for the purchase of 10 padmount transformers to the bidders
whose proposals and equipment met City of Lodi specifications,
and whose transformers are expected to yield the lowest overall life -cycle costs,
GE Supply Co., Sacramento
Western States Electric, Portland, OR
1 ea 225KVA 30 $ 6,612.62
1 ea 300KVA 30 $ 7,015.60
$13,628.22
8 ea 1500KVA 30 $135,351.24
BACKGROUND INFORMATION: On September 3, 1997, the City Council approved specifications
and authorized advertisement for bids for five three-phase
padmount transformers.
On September 30, 1997, bids were opened and total life -cycle costs were evaluated. Life -cycle costs
are the combined total of purchase price plus cost of operation based on estimated power loss during
the projected life of the transformer. Proposals are also evaluated on the basis of compliance with
equipment and bid specifications. Failure to comply with both may lead to disqualification of the bid. A
summary of the bid evaluation is attached.
On October 1, 1997, it was learned that Pacific Coast Producers, 32 East Tokay Street, is in the
process of rebuilding a major portion of their plant. Under current plans, this project would require
relocation of the existing 4kV electrical system servicing the plant. However, several factors suggest
the better option for both the City and PCP would be to replace the old 4kV system with a more reliable
12kV system: (1) The 4kV system, due to its age, would require significant maintenance and
reconditioning to maintain reliability; (2) conversion to the 12kV system would relieve the City of the
liability associated with the single 12-4kV transformer presently located at the plant and back-up unit in
place at the Municipal Service Center, (3) service reliability to PCP would be greatly enhanced since the
load would be distributed to five individual padmount transformers instead of one 12-4kV unit; and (4)
having a 12kV system would significantly reduce the service restoration time in the event of a
transformer failure, providing a further benefit to PCP.
In order to implement this system upgrade within the available time frame (completion required by
March, 1998) the City must increase its award quantity on this bid by five 1500KVA padmount
transformers, from three units to eight, at an incremental cost of $84,594.53.
APPROVED:
H. Dixon Flynn -- City Manager
PAD CC2D.DOC 10/03/97
Purchase of Padmount Transformers
October 15, 1997
Page 2
It is therefore recommended that the City Council authorize increasing the award for the 1500KVA
transformers from three units to eight (award to Western States Electric), and to award the purchase of
one each 225KVA and 300KVA units to GE Supply Company of Sacramento, as set forth in the
"Recommended Action" of this Council Communication.
The one 225KVA, one 300KVA, and three original 1500KVA units will be utilized to serve new
commercial and industrial loads at Kettleman Lane and Beckman Road, Kettleman Lane and Sylvan
Way, and on Neuharth Drive, respectively.
FUNDING: Electric Utility Department 1997-98 Fiscal Year Plan,
Line Extensions, Page E-22
—A //� /, lk
Alan N. Vallow, Electric Utility Director
Funding Approved by
Vicky McAthie, finance Director
Prepared by Joel Harris, Purchasing Officer
cc: Director, Engineering and Operations
APPROVED:
H. Dixon Flynn - City Manager
PAD CC2D.DOC 10/03/97
TRANSFORMER BID EVALUATION
October 2, 1997
225 KVA, 20BY1120 Volt, Padmount Number of units:
Vendor
Unit
Extended
Price
14,137.00
Price
Price
w/tax
GE Supply
6,137.00
6,137.00
6,612.62
Howard Industries
5,053.00
5,053.00
5,444.61
Western States Elec.
5,468.00
5,468.00
5,891.77
Wesco
4,846.00
4,846.00
5,221.57
Cooper
7,716.00
7,716.00
8,313.99
Geo. E. Honn
No Bid
Kuhlman
No Bid
300 KVA, 208Y/120 Volt, Padmount
Number of units:
Vendor
Unit
Extended
Price
Life cycle
Price
Price
w/tax
GE Supply
6,511.00
6,511.00
7,015.60
Western States Elec.
5,985.00
5,985.00
6,448.84
Howard Industries
6,003.00
6,003.00
6,468.23
Cooper
5,303.00
5,303.00
5,713.98
Wesco
5,496.00
5,496.00
5,921.94
Geo. E. Honn
No Bid
51
325
Kuhlman
No Bid
2,912.00
4,862.00
1500 KVA, 480Y/277 Volt, Padmount Number of units:
Vendor
Unit
Extended
Price
2,256.00
Price
Price
w/tax
Western States Elec. 15,702.00 47,106.00 50,756.72
GE Supply
17,615.00
52,845.00
56,940.49
Wesco
14,137.00
42,411.00
45,697.85
Howard Industries
16,740.00
50,220.00
54,112.05
Cooper
15,518.00
46,554.00
50,161.94
Geo. E. Honn
No Bid
Kuhlman
No Bid
Load
TRNSEVL5. WK4
Bid Opening: September 30, 1997
Tax (factor)
1.0775
No load
loss $/watt
6.00
Load
loss $!watt
2.00
1
No load
Load loss
No load
Load loss
Cost of
Life cycle
Delivery
Height Weight
loss (watts)
(watts)
loss value
value
Losses
Cost
weeks
188
1085
1,128.00
2,170.00
3,298.00
9,910.62
11
61
348
1518
2,088.00
3,036.00
5,124.00
10,568.61
21-23
51
325
1456
1,950.00
2,912.00
4,862.00
10,753.77
17
61.5
376
1978
2,256.00
3,956.00
6,212.00
11,433.57
12
42.5
382
1648
2,292.00
3,296.00
5,588.00
13,901.99
10-12
59
1
No load
Load loss
No load
Load loss
Cost of
Life cycle
Delivery
Height Weight
loss (watts)
(watts)
loss value
value
Losses
Cost
weeks
188
1892
1,128.00
3,784.00
4,912.00
11,927.60
11
61
403
1909
2,418.00
3,818.00
6,236.00
12,684.84
17
61.5
402
2058
2,412.00
4,116.00
6,528.00
12,996.23
21-23
57
532
2065
3,192.00
4,130.00
7,322.00
13,035.98
10-12
59
459
2435
2,754.00
4,870.00
7,624.00
13,545.94
12
42.5
3
No load
Load loss
No load
Load loss
Cost of
Life cycle
Delivery
Height Weight
loss (watts)
(watts)
loss value
value
Losses
Cost
weeks
1316
7118
23,688.00
42,708.00
66,396.00
117,152.72
17
72
554
8623
9,972.00
51,738.00
61,710.00
118,650.49
11
70
1694
7933
30,492.00
47,598.00
78,090.00
123,787.85
12
58.5
1437
7782
25,866.00
46,692.00
72,558.00
126,670.05
21-23
81
1621
8544
29,178.00
51,264.00
80,442.00
130,603.94
12
81
RESOLUTION NO. 97-168
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE BID FOR THE PURCHASE OF TEN
PADMOUNT TRANSFORMERS
WHEREAS, in answer to notice duly published in accordance with law and the
order of this City Council, sealed bids were received and publicly opened on September
30, 1997 at 11:00 a.m. for the purchase of ten padmount transformers for the Electric
Utility Department, described in the specifications therefore approved by the City Council
on September 3, 1997; and
WHEREAS, said bids have been compared, checked, and tabulated and a report
thereof filed with the City Manager as shown on Exhibit A attached hereto; and
WHEREAS, on October 1, 1997 it was learned that Pacific Coast Producers would
- be rebuilding a major portion of their plant, and because of several factors which suggest
the better option for both the City and PCP would to be to replace the old 4kV system with
a more reliable 12kV system; and
WHEREAS, in order to implement this system upgrade within the available time
frame (completion by March, 1998), the City must increase its award quantity on this bid
by five 1500KVA padmount transformers, from three to eight, at an incremental cost of
$84,594.53; and
WHEREAS, the City Manager recommends that award of the bid for the purchase
of ten padmount transformers for the Electric Utility Department, be made to the bidders
whose proposals and equipment met City of Lodi specifications, and whose transformers
yielded the lowest overall life -cycle costs in each rating category, to wit:
GE Supply Company, Sacramento
Western States Electric, Portland,OR
1 ea, 225KVA 30 $ 6,612.62
1 ea. 300KVA 30 $ 7.015.60
$13,628.22
8 ea. 1500KVA 30 $135,351.24
NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of
the purchase of ten padmount transformers for the Electric Utility Department, be and the
same is hereby awarded to the above-described responsible bidders, in the total amount
of $148,979.46.
Dated: October 15, 1997
--------------------------------------------------------------------
--------------------------------------------------------------------
I hereby certify that Resolution No. 97-168 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held October 15, 1997, by the following
vote:
AYES: COUNCIL MEMBERS — Land, Mann, Sieglock, Warner and
Pennino (Mayor)
NOES: COUNCIL MEMBERS - None
ABSENT: COUNCIL MEMBERS - None
ABSTAIN: COUNCIL MEMBERS - None
*&�A- Amc1
ALICE M. REIMCHE
City Clerk
97-168
TRANSFORMER BID EVALUATION
October 2, 1997
Tax (factor) 1.0775
No load low $Avatt 6.00
Load loss $Aved 2.00
Bid Opening: September 30, 1997
225 KVA, 208YI120 Volt, Padmount Number of units:
1
Vendor
Unit
Extended
Price
No load
Load loss
No load
Load loss
Cost of
Life cycle
Delivery
Height
Weight
Price
Price
w/tax
loss (watts)
(watts)
loss value
value
Losses
Cost
weeks
GE Supply
6,137.00
6,137.00
6,612.62
188
1085
1,128.00
2,170.00
3,296.00
9,910.62
11
81
Howard Industries
5,053.00
5,053.00
5,441.61
348
1518
2,088.00
3,036.00
5,124.00
10,568.61
21-23
51
Western States Elec.
5,468.00
5,468.00
5,691.77
325
1456
1,950.00
2,912.00
4,862.00
10,753.77
17
61.5
Wesco
4,846.00
4,846.00
5,221.57
376
1978
2,25600
3,956.00
6,212.00
11,433.57
12
42.5
Cooper
7,716.00
7,716.00
8,313.99
382
1648
2.29200
3,296.00
5,588.00
13,901.99
10-12
59
Geo. E. Honn
No Bid
Kuhlman
No Bid
300 KVA, 208Y/1 20 Voit, Padmount Number of units:
1
Vendor
Unit
Extended
Price
No load
Load loss
No load
Load loss
Cost of
Life cycle
Delivery
Height
Weight
Price
Price
w/tax
loss (watts)
(watts)
loss value
value
Losses
Cost
weeks
GE Supply
6,511.00
6,511.00
7,015.60
188
1892
1,128.00
3,784.00
4,912.00
14,927.60
11
61
Western States Elec.
5,985.00
5,985.00
6,448.84
403
1909
2,418.00
3,818.00
6,236.00
12,684.84
17
61.5
Howard Industries
6,003.00
6,003.00
6,468.23
402
2058
2,412.00
4,116.00
6,528.00
12,996.23
21-23
57
Cooper
5,303.00
5,303.00
5,713.98
532
2065
3,192.00
4,130.00
7,322.00
13,036.98
10-12
59
Wesco
5,496.00
5,496.00
5,921.94
459
2435
2,754.00
4,870.00
7,624.00
13,546.94
12
42.5
Geo. E. Honn
No Bid
Kuhlman
No Bid
1500 KVA, 480YrXn Volt, Padmount Number of units:
3
Vendor
Unit
Extended
Price
No load
Load loss
No load
Load loss
Cost of
Life cycle
Delivery
Heigh
Weight
Price
Price
wttax
loss (watts)
(watts)
loss value
value
Losses
Cost
weeks
Western States Elee.
15,702.00
47,106.00
50,756.72
1316
7118
23,688.00
42,708.00
66,396.00
•117,152.72
17
72
GE Supply
17,815.00
52,845.00
56,940.49
554
8623
9,972.00
51,738.00
61,710.00
118,850.49
11
70
Wesco
14,137.00
42,411.00
45.697.85
1694
7933
30,492.00
47,598.00
78,090.00
123,787.88
12
58.5
1
Howard Industries
16,740.00
50,220.00
54,112.05
1437
7762
25,866.00
46,692.00
72,568.00
126,670.05
21-23
81
Cooper
15,518.00
46,554.00
50,161.94
1621
8544
29,178.00
51,264.00
80,44200
130,603.94
12
81
Geo. E. Horan
No Bid
Kuhlman
No Bid
rnnsM5.wu4'�