HomeMy WebLinkAboutAgenda Report - October 15, 1997 (84)0 0 • CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Purchase of Padmount Transformers ($148,979.46) MEETING DATE: October 15, 1997 PREPARED BY: Electric Utility Director RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the bid for the purchase of 10 padmount transformers to the bidders whose proposals and equipment met City of Lodi specifications, and whose transformers are expected to yield the lowest overall life -cycle costs, GE Supply Co., Sacramento Western States Electric, Portland, OR 1 ea 225KVA 30 $ 6,612.62 1 ea 300KVA 30 $ 7,015.60 $13,628.22 8 ea 1500KVA 30 $135,351.24 BACKGROUND INFORMATION: On September 3, 1997, the City Council approved specifications and authorized advertisement for bids for five three-phase padmount transformers. On September 30, 1997, bids were opened and total life -cycle costs were evaluated. Life -cycle costs are the combined total of purchase price plus cost of operation based on estimated power loss during the projected life of the transformer. Proposals are also evaluated on the basis of compliance with equipment and bid specifications. Failure to comply with both may lead to disqualification of the bid. A summary of the bid evaluation is attached. On October 1, 1997, it was learned that Pacific Coast Producers, 32 East Tokay Street, is in the process of rebuilding a major portion of their plant. Under current plans, this project would require relocation of the existing 4kV electrical system servicing the plant. However, several factors suggest the better option for both the City and PCP would be to replace the old 4kV system with a more reliable 12kV system: (1) The 4kV system, due to its age, would require significant maintenance and reconditioning to maintain reliability; (2) conversion to the 12kV system would relieve the City of the liability associated with the single 12-4kV transformer presently located at the plant and back-up unit in place at the Municipal Service Center, (3) service reliability to PCP would be greatly enhanced since the load would be distributed to five individual padmount transformers instead of one 12-4kV unit; and (4) having a 12kV system would significantly reduce the service restoration time in the event of a transformer failure, providing a further benefit to PCP. In order to implement this system upgrade within the available time frame (completion required by March, 1998) the City must increase its award quantity on this bid by five 1500KVA padmount transformers, from three units to eight, at an incremental cost of $84,594.53. APPROVED: H. Dixon Flynn -- City Manager PAD CC2D.DOC 10/03/97 Purchase of Padmount Transformers October 15, 1997 Page 2 It is therefore recommended that the City Council authorize increasing the award for the 1500KVA transformers from three units to eight (award to Western States Electric), and to award the purchase of one each 225KVA and 300KVA units to GE Supply Company of Sacramento, as set forth in the "Recommended Action" of this Council Communication. The one 225KVA, one 300KVA, and three original 1500KVA units will be utilized to serve new commercial and industrial loads at Kettleman Lane and Beckman Road, Kettleman Lane and Sylvan Way, and on Neuharth Drive, respectively. FUNDING: Electric Utility Department 1997-98 Fiscal Year Plan, Line Extensions, Page E-22 —A //� /, lk Alan N. Vallow, Electric Utility Director Funding Approved by Vicky McAthie, finance Director Prepared by Joel Harris, Purchasing Officer cc: Director, Engineering and Operations APPROVED: H. Dixon Flynn - City Manager PAD CC2D.DOC 10/03/97 TRANSFORMER BID EVALUATION October 2, 1997 225 KVA, 20BY1120 Volt, Padmount Number of units: Vendor Unit Extended Price 14,137.00 Price Price w/tax GE Supply 6,137.00 6,137.00 6,612.62 Howard Industries 5,053.00 5,053.00 5,444.61 Western States Elec. 5,468.00 5,468.00 5,891.77 Wesco 4,846.00 4,846.00 5,221.57 Cooper 7,716.00 7,716.00 8,313.99 Geo. E. Honn No Bid Kuhlman No Bid 300 KVA, 208Y/120 Volt, Padmount Number of units: Vendor Unit Extended Price Life cycle Price Price w/tax GE Supply 6,511.00 6,511.00 7,015.60 Western States Elec. 5,985.00 5,985.00 6,448.84 Howard Industries 6,003.00 6,003.00 6,468.23 Cooper 5,303.00 5,303.00 5,713.98 Wesco 5,496.00 5,496.00 5,921.94 Geo. E. Honn No Bid 51 325 Kuhlman No Bid 2,912.00 4,862.00 1500 KVA, 480Y/277 Volt, Padmount Number of units: Vendor Unit Extended Price 2,256.00 Price Price w/tax Western States Elec. 15,702.00 47,106.00 50,756.72 GE Supply 17,615.00 52,845.00 56,940.49 Wesco 14,137.00 42,411.00 45,697.85 Howard Industries 16,740.00 50,220.00 54,112.05 Cooper 15,518.00 46,554.00 50,161.94 Geo. E. Honn No Bid Kuhlman No Bid Load TRNSEVL5. WK4 Bid Opening: September 30, 1997 Tax (factor) 1.0775 No load loss $/watt 6.00 Load loss $!watt 2.00 1 No load Load loss No load Load loss Cost of Life cycle Delivery Height Weight loss (watts) (watts) loss value value Losses Cost weeks 188 1085 1,128.00 2,170.00 3,298.00 9,910.62 11 61 348 1518 2,088.00 3,036.00 5,124.00 10,568.61 21-23 51 325 1456 1,950.00 2,912.00 4,862.00 10,753.77 17 61.5 376 1978 2,256.00 3,956.00 6,212.00 11,433.57 12 42.5 382 1648 2,292.00 3,296.00 5,588.00 13,901.99 10-12 59 1 No load Load loss No load Load loss Cost of Life cycle Delivery Height Weight loss (watts) (watts) loss value value Losses Cost weeks 188 1892 1,128.00 3,784.00 4,912.00 11,927.60 11 61 403 1909 2,418.00 3,818.00 6,236.00 12,684.84 17 61.5 402 2058 2,412.00 4,116.00 6,528.00 12,996.23 21-23 57 532 2065 3,192.00 4,130.00 7,322.00 13,035.98 10-12 59 459 2435 2,754.00 4,870.00 7,624.00 13,545.94 12 42.5 3 No load Load loss No load Load loss Cost of Life cycle Delivery Height Weight loss (watts) (watts) loss value value Losses Cost weeks 1316 7118 23,688.00 42,708.00 66,396.00 117,152.72 17 72 554 8623 9,972.00 51,738.00 61,710.00 118,650.49 11 70 1694 7933 30,492.00 47,598.00 78,090.00 123,787.85 12 58.5 1437 7782 25,866.00 46,692.00 72,558.00 126,670.05 21-23 81 1621 8544 29,178.00 51,264.00 80,442.00 130,603.94 12 81 RESOLUTION NO. 97-168 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BID FOR THE PURCHASE OF TEN PADMOUNT TRANSFORMERS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on September 30, 1997 at 11:00 a.m. for the purchase of ten padmount transformers for the Electric Utility Department, described in the specifications therefore approved by the City Council on September 3, 1997; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached hereto; and WHEREAS, on October 1, 1997 it was learned that Pacific Coast Producers would - be rebuilding a major portion of their plant, and because of several factors which suggest the better option for both the City and PCP would to be to replace the old 4kV system with a more reliable 12kV system; and WHEREAS, in order to implement this system upgrade within the available time frame (completion by March, 1998), the City must increase its award quantity on this bid by five 1500KVA padmount transformers, from three to eight, at an incremental cost of $84,594.53; and WHEREAS, the City Manager recommends that award of the bid for the purchase of ten padmount transformers for the Electric Utility Department, be made to the bidders whose proposals and equipment met City of Lodi specifications, and whose transformers yielded the lowest overall life -cycle costs in each rating category, to wit: GE Supply Company, Sacramento Western States Electric, Portland,OR 1 ea, 225KVA 30 $ 6,612.62 1 ea. 300KVA 30 $ 7.015.60 $13,628.22 8 ea. 1500KVA 30 $135,351.24 NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of the purchase of ten padmount transformers for the Electric Utility Department, be and the same is hereby awarded to the above-described responsible bidders, in the total amount of $148,979.46. Dated: October 15, 1997 -------------------------------------------------------------------- -------------------------------------------------------------------- I hereby certify that Resolution No. 97-168 was passed and adopted by the City Council of the City of Lodi in a regular meeting held October 15, 1997, by the following vote: AYES: COUNCIL MEMBERS — Land, Mann, Sieglock, Warner and Pennino (Mayor) NOES: COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS - None ABSTAIN: COUNCIL MEMBERS - None *&�A- Amc1 ALICE M. REIMCHE City Clerk 97-168 TRANSFORMER BID EVALUATION October 2, 1997 Tax (factor) 1.0775 No load low $Avatt 6.00 Load loss $Aved 2.00 Bid Opening: September 30, 1997 225 KVA, 208YI120 Volt, Padmount Number of units: 1 Vendor Unit Extended Price No load Load loss No load Load loss Cost of Life cycle Delivery Height Weight Price Price w/tax loss (watts) (watts) loss value value Losses Cost weeks GE Supply 6,137.00 6,137.00 6,612.62 188 1085 1,128.00 2,170.00 3,296.00 9,910.62 11 81 Howard Industries 5,053.00 5,053.00 5,441.61 348 1518 2,088.00 3,036.00 5,124.00 10,568.61 21-23 51 Western States Elec. 5,468.00 5,468.00 5,691.77 325 1456 1,950.00 2,912.00 4,862.00 10,753.77 17 61.5 Wesco 4,846.00 4,846.00 5,221.57 376 1978 2,25600 3,956.00 6,212.00 11,433.57 12 42.5 Cooper 7,716.00 7,716.00 8,313.99 382 1648 2.29200 3,296.00 5,588.00 13,901.99 10-12 59 Geo. E. Honn No Bid Kuhlman No Bid 300 KVA, 208Y/1 20 Voit, Padmount Number of units: 1 Vendor Unit Extended Price No load Load loss No load Load loss Cost of Life cycle Delivery Height Weight Price Price w/tax loss (watts) (watts) loss value value Losses Cost weeks GE Supply 6,511.00 6,511.00 7,015.60 188 1892 1,128.00 3,784.00 4,912.00 14,927.60 11 61 Western States Elec. 5,985.00 5,985.00 6,448.84 403 1909 2,418.00 3,818.00 6,236.00 12,684.84 17 61.5 Howard Industries 6,003.00 6,003.00 6,468.23 402 2058 2,412.00 4,116.00 6,528.00 12,996.23 21-23 57 Cooper 5,303.00 5,303.00 5,713.98 532 2065 3,192.00 4,130.00 7,322.00 13,036.98 10-12 59 Wesco 5,496.00 5,496.00 5,921.94 459 2435 2,754.00 4,870.00 7,624.00 13,546.94 12 42.5 Geo. E. Honn No Bid Kuhlman No Bid 1500 KVA, 480YrXn Volt, Padmount Number of units: 3 Vendor Unit Extended Price No load Load loss No load Load loss Cost of Life cycle Delivery Heigh Weight Price Price wttax loss (watts) (watts) loss value value Losses Cost weeks Western States Elee. 15,702.00 47,106.00 50,756.72 1316 7118 23,688.00 42,708.00 66,396.00 •117,152.72 17 72 GE Supply 17,815.00 52,845.00 56,940.49 554 8623 9,972.00 51,738.00 61,710.00 118,850.49 11 70 Wesco 14,137.00 42,411.00 45.697.85 1694 7933 30,492.00 47,598.00 78,090.00 123,787.88 12 58.5 1 Howard Industries 16,740.00 50,220.00 54,112.05 1437 7762 25,866.00 46,692.00 72,568.00 126,670.05 21-23 81 Cooper 15,518.00 46,554.00 50,161.94 1621 8544 29,178.00 51,264.00 80,44200 130,603.94 12 81 Geo. E. Horan No Bid Kuhlman No Bid rnnsM5.wu4'�