HomeMy WebLinkAboutMinutes - April 15, 1992CITY COUNCIL, CITY OF LODI
CARNEGIE FORUM, 305 WEST PINE STREET
WEDNESDAY, APRIL 15, 1992
7:30 P.M.
ROLL CALL Present: Council Members - Hinchman, Pennino,
Sieglock, Snider, and Pinkerton (Mayor)
Absent: Council Members - None
Also Present: City Manager Peterson, Finance Director
Flynn, Community Development Director
Schroeder, Public Works Director Ronsko,
City Attorney McNatt, and City Clerk Reimche
INVOCATION The- invocation was given by Pastor Vernon Janzen, Vinewood
Community Church.
PLEDGE OF The Pledge of Allegiance was led by Mayor Pinkerton.
ALLEGIANCE
PRESENTATIONS Dorean Rice, Chairperson of the Lodi District Chamber of
Commerce Street Faire, addressed the City Council regarding
the event which is being held on May 3, 1992. Special
buttons for the event were presented to Council Members and
staff.
CONSENT CALENDAR In accordance with report and recommendation of the City
Manager, Council, on motion of Mayor Pro Tempore Pennino,
Hinchman second, approved the following items hereinafter
set forth. Agenda item #E-12 entitled, "Comprehensive
financial report for 1990-91 (City audit)" was removed from
the agenda.
CLAIMS CC -21(a) Claims were approved in the amount of $1,625,833.65.
MINUTES The Minutes of March 18, 1992 (Regular Meeting) were
approved as written.
PUBLIC HEARING SET REGARDING 1992 WEED ABATEMENT PROGRAM
RESOLUTION NO. 92-59
CC -24(b) The City Council was advised that throughout the spring and
CC -300 summer months, the Lodi Fire Department has an ongoing
program of contacting property owners to remove weeds on
property they own within the City. Follow-up contacts are
made in an effort to have the weeds removed at the earliest
possible date.
11
Continued April 15, 1992
The City Council received a list of approximately 300
parcels within the City that are not in compliance with
weed abatement requirements.
The City Council adopted Resolution No. 92-59 setting a
public hearing for May 20, 1992 regarding the 1992 Weed
Abatement Program.
AWARD CONTRACT FOR LODI LAKE PARK CONCESSION
RESOLUTION NO. 92-60
CC -12(a) The City Council adopted Resolution No. 92-60 awarding
CC -300 the contract for the Lodi Lake Park concession to Bone
Cuisine A La Carte of Lodi for the period• of May 1, 1992
through September 30, 1995.
The City Council was apprised that on February 19, 1992,
the City Council authorized the solicitation of proposals
for the operation of portable food concessions at Lodi Lake
Park for the period of May 1, 1992 through September 30,
1995. Proposals were received from vendors prior to the
March 10, 1992 deadline.
Bone Cuisine A La Carte, Lodi - Percentage to City - 16%
Gloria's Catering, Lodi - Percentage to City - 10%
Proposals were evaluated on the basis of experience in
concession operation, reputation, and percentage of gross
receipts returned to the City. Both bidders operate
similar food cart concessions and have been operating
locally at different locations. The difference in the
proposals is a matter of the percentage return to the
City. Therefore, it is the recommendation to award the
contract to the bidder offering the highest percentage to
the City.
CONTRACT AWARD FOR DEMOLITION OF ELEVATED
WATER STORAGE TANK, 114 NORTH MAIN STREET
RESOLUTION NO. 92-61
CC -12(a) The City Council adopted Resolution No. 92-61 awarding the
CC -300 contract for the Demolition of Elevated Water Storage Tank,
114 North Main Street, Lodi to Ruff Stuff Construction in
the amount of $28,000.
This project consists of the removal of a 100,000 -gallon
steel, elevated water tank and adjacent buildings. The
work shall include the removal of all above -ground support
steel, the tank, piping, valves, conduit, wiring and
appurtenances. Removal of tank concrete foundation is
excluded from the work.
2
Continued April 15, 1992
Plans and specifications for this project
were approved on
January 15, 1992. The City received the
following seven i
bids for this project:
$108,800.00
H. Max Lee, Inc.
Bidder
Location
Bid
Engineer's Estimate
$102,300.00
$50,000
Ruff Stuff Construction
Stockton
$28,000
*Wayne L. Grist, Inc.
Newcastle
$38,350
Clauss Construction
La Mesa
$38,975
American Demolition
Santa Ana
$39,730
Evans Brothers
Livermore
$489600
Ferma Corporation
Mountain View
$49,400
Joe Heim, Inc.
Dublin
$659000
*Wayne L. Grist, Inc., does
not have the C-21 License required
in the specifications.
CONTRACT AWARD FOR LODI LAKE PICNIC FACILITIES
RESOLUTION NO. 92-62
y
CC -12(c) The City Council adopted Resolution No. 92-62 awarding the
CC -300 contract for Lodi Lake Picnic Facilities to H. Max Lee,
Inc., in the amount of $97,500.00.
This project consists of installing two picnic shelters on
the north side of Lodi Lake. Approximately 600 linear feet
of water, wastewater and electrical services and a
decomposed granite path must also be installed from the
existing restroom to the existing shelter in the youth
group picnic area.
Plans and specifications for this project were approved on
March 18, 1992. The City received the following seven bids
for this project:
Bidder
Location
Bid
Engineer's Estimate
$108,800.00
H. Max Lee, Inc.
Lodi
97,500.00
BRCO Constructors
Loomis
$102,300.00
McDonald -Glenn Co.
Manteca
$106,090.01
Grover Landscaping
Modesto
$110,072.00
Diede Construction
Woodbridge
$114,680.03
Wimmer Construction
Rancho Cordova
$116,390.00
Anaconda Engineering
Stockton
$139,900.00
3
Continued April 15, 1992
CONTRACT AWARD FOR FIREWORKS DISPLAY,
FOURTH OF JULY, AT LODI LAKE PARK
RESOLUTION NO. 92-63
CC -12(a) The City Council adopted
CC -300 expenditure of funds to
of July 1992 celebration
Internationale Fireworks
amount of $8,000.
Resolution No. 92-63 approving the
purchase fireworks for the Fourth
and fireworks show from Zambelli
Manufacturing Co., Inc. in the
The City Council was advised that for the past three years,
the City has used Zambelli Internationale Fireworks
Manufacturing Co., Inc., in presenting the City's Fourth of
July celebration and fireworks show. Bids were received
from Zambelli and Pyro Spectaculars, Inc. In reviewing the
proposals Zambelli offers many more of the larger shells.
The large shells go higher and explode much wider than the
smaller shells. Pyro Spectaculars is able to compete in
the number of shells only by including 50-2 1/2" shells
which would be a low bursting shell but could only be seen
by viewers that are actually at the lake. For this reason
staff recommended that the contract be awarded to Zambelli
Internationale Fireworks Manufacturing Co., Inc.
CONTRACT AWARD FOR DISPOSAL OF
PCB CONTAMINATED WASTE
RESOLUTION NO. 92-64
CC -12(a) The City Council adopted Resolution No. 92-64 awarding
CC -300 the contract for disposal of PCB contaminated waste to the
low bidder U. S. Pollution Control, Inc. (USPCI) of
Houston, Texas, in the amount of $23,041.
On March 18, 1992 the City Council approved specifications
and authorized advertisement for bids. Bids were opened on
April 2, 1992 with the following results.
Supplier Total Price
U. S. Pollution Control, Inc. (USPCI) $23,041.00
General Electric Co. 33,540.00
Falcon Energy Associates 53,425.00
The Electric Utility Department, in its multi-year program
to eliminate PCB contaminated oil -filled equipment, has
collected forty-eight transformers, twenty-seven 55 -gal.
drums of liquid and three 55 -gal. drums of solid material
contaminated with PCBs. This material must be disposed of
in accordance with Federal and State guidelines by
registered hazardous waste disposal firms.
�C
0
Continued April 15, 1992
REVISED TDA CLAIMS FOR 1990-91 APPROVED
RESOLUTION NO. 92-65
CC -7(f) The City Council adopted Resolution No. 92-65 approving the
CC -300 revised Transportation Development Act (TDA) Claim for
Transit Services for Fiscal Year 1990-91.
This revised claim was requested by the San Joaquin County
Council of Governments. The revision will provide Lodi
with the authorization to transfer funds from the Taxi
service to the Dial -A -Ride service.
AMENDMENT TO THE CITY OF LODI PARKING LOT FEES
RESOLUTION NO. 92-66
CC -6 The City Council adopted Resolution No. 92-66 entitled, "A
CC -48(f) Resolution of the Lodi City Council Setting Permit Parking
CC -150 Fees for Public Parking in City -owned Parking Lots",
CC -300 thereby allowing a discount for the purchase of semi-annual
and annual parking passes in City -owned parking lots.
The Mayor and City staff met with the downtown business
association in January and February 1992 to discuss parking
fines and the City's cost of providing parking enforcement
services. One suggestion made during these meetings was to
allow for the sale of semi-annual and annual parking lot
passes at a discounted rate. At the February 19, 1992
Council meeting, the City Council agreed in principal with
this concept and requested staff to return with a
recommended fee schedule.
The recommended resolution provides for the quarterly,
semi-annual and annual purchase of parking lot permits at a
discounted rate. The discount rate used to compute
semi-annual and annual payments is 7%. This rate was
selected as the average rate of return on funds invested
with the Local Agency Investment Fund (LAIF) over the last
two years.
PARKING FINES COLLECTION CONTRACT
RESOLUTION NO. 92-67
CC -90 The City Council adopted Resolution No. 92-67 authorizing
CC -150 the City Manager and City Clerk to enter into an agreement
CC -300 with West Computil Corporation on behalf of the City to
receive, maintain and collect parking tickets issued by the
City. The contract with West Computil Corporation will be
for a period of one year at a cost of $1.10 per ticket.
In November 1991, the Lodi Municipal Court requested the
Finance Department to assist the Court in determining what
5
Continued April 15, 1992
actions could
the efficiency
was based on
City:
be taken by the City and the Court to improve
in processing parking tickets. This request
the following concerns of the Court and the
Effective July 1, 1992, the Department of
Motor Vehicles (DMV) will no longer accept
"manual" DMV holds for unpaid parking
tickets. DMV holds are issued to insure
collection of parking tickets by preventing
owners of vehicles with outstanding parking
tickets from registering. their vehicle. The
Court does not have the equipment to issue
computer generated DMV holds.
The time required by the Court to process,
maintain, and collect parking tickets
distracts from other more pressing
responsibilities and demands.
Normally the responsibility for collecting
parking tickets belongs to the agency
issuing the ticket. In Lodi, the City has
been fortunate to have the cooperation and
support of the Court in the collection of
parking tickets. As such, the Court has
assumed full responsibility for collecting,
maintaining and processing parking tickets.
The cost in personnel time at the Court,
Finance Department and the Police Department
in processing, maintaining and collecting
parking tickets is relatively expensive in
relation to costs charged by collection
agencies. The Court estimates that they
employ the equivalent of one full-time
person to process, maintain and collect
parking tickets. The Police and Finance
Departments estimate they employ the
equivalent of 1/2 person to process parking
tickets. The time equates to $3.75 per
ticket processed (assumes the average cost
per employee is $25,000 and the number of
tickets processed is 10,000). This cost
compared to $1.10 per ticket quoted by West
Computil Corporation demonstrates the
greater efficiency of private enterprise to
provide similar services.
Based on these concerns, staff contacted other local cities
to discuss their procedures to collect, maintain and
process parking tickets. (Stockton, Galt and Manteca).
Staff learned that these cities are currently using the
Continued April 15, 1992
services of West Computil to collect, maintain and process
parking tickets.
Collection Agency Services
° Receive, maintain and collect parking
tickets.
Provide a toll free 800 telephone number for
customer inquiries.
° Conduct "in-house" hearings for disputed
parking tickets.
Schedule Court dates for violators as
requested.
° Provide courtesy notifications to violators
that they have not paid their parking
tickets.
w Issue "computer generated" DMV holds.
Provide the City and the Court with daily
and monthly reports as to collection status,
number of tickets issued and collected,
number of tickets issued and collected by
officer, etc.
Deposit monies received on a daily basis.
The cost for these services is $1.10 per ticket processed.
Considering the Court and City cost of $3.75 per ticket
processed, staff concluded that the services of a
collection agency is not only more efficient but they
provide a higher quality of service based on the fact that
they process the volume to purchase more efficient
equipment and personnel specialized in processing parking
tickets.
Purchasing Considerations
Based on this information, staff contacted West Computil
and requested a presentation for City staff and Court
personnel as to the services they provide cities. The
purpose of this presentation was to give the Court and City
staff an opportunity to evaluate these services and to
determine if contracting for these services would be
advantageous. At the same time, Finance Department
contacted two other parking collection agencies to obtain
price quotes for parking ticket collection. The prices
quoted by all three agencies for similar services were:
7
Continued April 15, 1992
G
Company Unit Price
West Computil $1.10 per ticket
Enforcement Tech $1.29 per ticket
Data Management Systems $1.50 per ticket
Three meetings were held between the Court, Finance and
Police Department personnel in January and February to
evaluate the advantages and disadvantages of contracting
for parking ticket collection. It was concluded that
contracting with a firm such as West Computil will improve
the quality of service to violators, speed-up the
collection process, reduce the number of uncollected
tickets, and improve information for use by the Court and
City staff as to collection procedures.
Recommendation
It was recommended that the City Manager and City Clerk be
authorized to enter into a contract with West Computil for
a one-year trial to receive, maintain, and collect parking
tickets issued by the City at a cost not to exceed $1.10
per ticket. The total estimated cost to the City to be
$11,000.
ITEM REMOVED FROM THE AGENDA
Agenda item #E-12 entitled, "Comprehensive financial report
for 1990-91 (City audit)" was removed from the agenda.
****************************************
COMMENTS BY CITY
COUNCIL MEMBERS The following comments were received under the "Comments by
City Council Members" segment.of the agenda:
RECENT HIGH SCHOOL CLEANUP PROJECT
APPLAUDED
Mayor Pro Tempore Pennino congratulated students and
parents of Tokay High School and Lodi High School on their
recent school cleanup project.
NEW CITY TELEPHONE SYSTEM
Council Member Snider reminded the City Manager of his
promise that when the new City telephone system was
installed that the public during regular business hours
would always have access to a "human contact".
n
_��
Continued April 15, 1992
CONCERN EXPRESSED REGARDING POOR
PUBLICITY REGARDING CITY'S ANNUAL
SPRING CLEANUP PROGRAM
Council Member Hinchman expressed his disappointment on the
lack of publicity for the City's Annual Spring Cleanup
Program. The City Manager advised the City Council that
because of the lack of publicity a second like event will
be conducted at a future date.
PUBLIC HEARINGS REGARDING THE
REVISED DRAFT SAN JOAQUIN COUNTY GENERAL
PLAN 2010 AND THE REVISED DEVELOPMENT TITLE
Mayor Pinkerton and Community Development Director
Schroeder addressed the City Council regarding the San
Joaquin County Planning Commission's scheduled public
hearings on the comprehensive planning program and the
scheduled public hearings before the San Joaquin County
Board of Supervisors regarding the revised Draft San
Joaquin County General Plan 2010 and the Revised
Development Title.
COMMENTS BY THE
PUBLIC ON NON
AGENDA ITEMS The following comments were received under the "Comments by
the public on non -agenda items" segment of the agenda:
COMMUNITY URGED TO ATTEND LODI DISTRICT
CHAMBER OF COMMERCE STREET FAIRE
VARIOUS CONCERNS REGARDING PARKING EXPRESSED
Evelyn M. Olson, 1306 Burgundy Court, Lodi President of the
Lodi District Chamber of Commerce, addressed the City
Council on the following matters:
1. Urged the citizens of this community to
attend the Lodi District Chamber of Commerce
Street Faire being held in Lodi May 3, 1992.
2. Acknowledged the recent installation of
several traffic signals in the community.
3. Complained about the "used car lot" where
cars being offered for sale park on the
south side of Kettleman Lane between Ham
Lane and Hutchins Street.
4.
Complained about
on Cherokee Lane
Poplar Street.
9
the parking of large trucks
between Kettleman Lane and
Continued April 15, 1992
COUNCIL URGED TO RETAIN BASKETBALL
COURTS AT HUTCHINS STREET SQUARE
v
CC -16
Mr. Bob Phillips, 15 South Rose Street, Lodi addressed the
City Council stating that he felt that the removal of the
basketball courts at Hutchins Street Square would be a real
loss to this community.
PUBLIC HEARINGS
There were no public hearings scheduled for this meeting.
PLANNING COMMISSION
The Planning Commission had not met since the City
Council received the last report.
COMMUNICATIONS
(CITY CLERK)
CLAIMS CC -4(c)
On recommendation of the City Attorney and the City's
Contract Administrator, Insurance Consulting Associates,
Inc., the City Council, on motion of Council Member
Sieglock, Hinchman second, denied the following claims and
referred them back to the City's Contract Administrator:
a) Linda Gentry, date of loss 3/12/92; and
b) Linda Marie George, date of loss 2/23/92.
ABC LICENSE
APPLICATIONS
CC -7(f)
The City Clerk presented the following applications for
Alcoholic Beverage Licenses from the State of California:
a) Thomas Lewis Stockwell, Jr., Food and Fun
Concessions for the Softball Complex, 401
North Stockton Street, Lodi On Sale Beer,
Original License; and
b) Thomas Lewis Stockwell, Jr., Food and Fun
Concessions for Armory Park, 333 North
Washington Street, Lodi On Sale Beer,
Original License.
Mr. John Griffin, 783 Palm Avenue, Lodi addressed the City
Council indicating that he didn't want beer sales at the
softball complex.
Mr. Ron Williamson, Director of the Lodi Parks and
Recreation Commission, addressed the City Council regarding
the matter indicating that beer had been sold at the
complex for at least the last 15 years; however, it was not
sold during youth activities at the site. Mr. Williamson
responded to questions regarding the matter as were posed
by members of the City Council.
10
Continued April 15, 1992
RESIGNATION FROM LODI ARTS COMMISSION
CC -2(k) Following receipt of the resignation of Kathleen Manwaring
from the Lodi Arts Commission, on motion of Mayor
Pinkerton, Hinchman second, the City Council directed the
City Clerk to post for the vacancy.
REGULAR CALENDAR
VIDEO - "BIG FEARS - LITTLE RISKS" PRESENTED
CC -183(f) The Video "Big Fears - Little Risks" was presented at
approximately 8:00 p.m. The video presents the story of
the lack of medical evidence to support the banning of
trace elements of certain chemicals in drinking water, such
as the regulation imposed by the State of California on the
City of Lodi's water system with regard to the presence of
dibromochloropropane (DBCP). The video was narrated by
Walter Cronkite.
FIRM OF DUFOUR AND ASSOCIATES OF
SACRAMENTO RETAINED TO ASSIST IN OBTAINING
FROM THE DEPARTMENT OF HEALTH SERVICES AN
EXTENSION/WAIVER OF TIME LIMITS FOR
INSTALLATION OF DIBROMOCHLOROPROPANE
(DBCP) FILTERS
CC -90 The City Council was advised that the City of Lodi is
CC -183(f) presently going forward with litigation against the various
manufacturers of DBCP. In the meantime, we are still
obligated pursuant to our operating permit from and orders
of the State Department of Health Services to continue with
installation of the granular activated carbon filters on
some of the City's water wells found to contain DBCP. The
costs and other considerations associated with these
installations has been discussed at length recently.
While the litigation goes forward, it may be in our best
interests to also explore the possibility of relief by way
of the administrative process. On April 6, 1992, City
Manager Tom Peterson, Public Works Director Jack Ronsko and
the City Attorney met with Jim Dufour to discuss that
possibility. Mr. Dufour is of the opinion that it may be
possible, using the State administrative process, to obtain
from the State Department of Health Services a waiver or
extension of time in which the DBCP filters must be
installed. That period could be from 12 to 36 months and
might offer several advantages.
First, the DBCP levels in some City wells may drop in 36
months and might bring them into compliance without the
necessity of a filter. The time could also allow the City
to explore amending the regulations or orders. The state
of available technology continues to improve and during the
11
Continued April 15, 1992
a 7 ;7
V
extension, we might find a better and more economical
solution. Also, if we don't have to put the filters on
immediately, there would be no interest accruing on the
loan received from the State.
If no extension is received, the City will be obligated to
continue installing the filters. One-half of our
non-compliance wells must be brought into compliance by
October 1, 1992, and the deadline for complete remediation
is April 1, 1993.
Mr. Dufour's firm specializes in matters of this nature and
his experience covers over 20 years. Hourly rates are $170
and it is his estimate that it would cost between $5 and
$10 thousand to handle this matter all the way through a
decision by the Office of Administrative Law.
On motion of Council Member Snider, Hinchman second, the
City Council approved retaining the firm of Dufour and
Associates of Sacramento at a cost not to exceed $10,000 to
assist in obtaining from the Department of Health Services
an extension/waiver of time limits for installation of
dibromochloropropane (DBCP) filters.
REPORT GIVEN REGARDING 1992 WATER
CONSERVATION PROGRAM
CC -183(d) Fran Forkas, Water/Wastewater Superintendent presented a
report to the Lodi City Council regarding 1992 Water
Conservation Program which included the following
information.
The City Council, at its last regular Council meeting of
April 1, 1992, asked for a recap of the City's water
conservation program.
The original water conservation ordinance was adopted by
the City Council in 1977 and was not changed until last
year. At that time, the following major changes were made
to the ordinance:
1. Established no watering between 10 a.m. and
6 p.m. from May 1 through September 30.
2. Eliminated Monday as a landscape watering
day. The watering days are as follows:
° Premises having odd numbered street
addresses on Wednesday, Friday and Sunday;
° Premises having even numbered street
addresses on Tuesday, Thursday, and
Saturday.
12
7,Y'
.Continued April 15, 1992
3. Made provisions for watering new lawns and
plantings aside the allowed watering times
and days.
4. Increased fines for wasting water.
5. Provided control of overwatering during
winter months.
Starting Monday, April 13, 1992, the City will be using
three part-time Water Conservation Officers to patrol for
water wasting and to answer water complaint calls. These
part-time personnel will be rotated to provide patrol at
all different hours.
In addition to water conservation patrol and responding to
complaints, our 1992 program will include:
1. Active participation in Water Awareness
Month during the month of May.
e 2. Providing an information booth at the Lodi
Grape and Wine Festival during the month of
September.
3. Participating in the annual County
Conservation Fair in October with an
information booth.
4. Providing an information booth at the City's
Crime Prevention Fair in May.
5. Promoting water conservation in a joint
effort with the Lodi News Sentinel to
produce a semiweekly article called "Water
Wise".
6. Continuation of our classroom education
program.
7. We will again enlist the help of all Public
Works and other City personnel to alert the
Water Conservation Office of water waste
occurrences.
Mr. Forkas then responded to questions regarding the
subject as were posed by the City Council.
Addressing the City Council regarding water conservation
was Mr. Carlos Rodriquez of Stockton, California.
13
Continued April 15, 1992
COMPLETION OF CONSTRUCTION OF AUBURN DAM
CC -6 City Manager Peterson introduced the subject advising that
staff was informed last week that the County of San Joaquin
was contributing $50,000 toward efforts of legislative
advocacy of the completion of Auburn Dam. It was suggested
that the City of Lodi join in this effort with a token
contribution of $1,000. Staff has since learned that the
$50,000 amount is being pledged by the San Joaquin
Partnership at the request of the County. Since the City
of Lodi is a contributor to the San Joaquin Partnership, as
is the county, it was recommended that no additional City
funding be pledged.
Following a brief discussion, Council Member Sieglock
requested that the City Clerk note for the record that he
has always been a strong supporter of this project and that
he very much supports what the San Joaquin Partnership is
doing in this regard to lobby for this project. The Auburn
Dam is now at a critical stage. The Army Corps of
Engineers released a feasibility study a few weeks ago to
authorize the go-ahead for a dry dam at Auburn which would
cost $700,000,000. Council Member Sieglock indicated that
he feels it is ridiculous to spend that kind of money and
that he believes the right thing to do is build a
multi-purpose project which would provide water and power,
enhance the fishery, provide flood control and enhance the
flows in the lower American River. There would be a direct
benefit to this region.
On motion of Council Member Sieglock, Hinchman second, the
Lodi City Council adopted Resolution No. 92-70 supporting
the construction of a multi-purpose Auburn Dam.
RECESS Mayor Pinkerton declared a five-minute recess and the City
Council reconvened at approximately 9:30 p.m.
POLICY ON OWNERSHIP AND MAINTENANCE
OF NEW RIGHT-OF-WAY FENCES AND
LANDSCAPING AT REVERSE FRONTAGE LOTS
CC -6 Mr. Rich Prima, Assistant City Engineer advised the City
CC -46 Council that the design of new residential subdivisions
adjacent to arterial streets often includes the use of
reverse frontage lots. "Reverse frontage" means the' lot
faces the interior of the subdivision with the rear of the
lot on the arterial. A fence is usually constructed at the
right-of-way line on the arterial street. Some specific
plans require this design (Lower Sacramento Road and South
Hutchins Street). Some past developments have proposed
such fences that have been accepted by the City for
ownership and maintenance. Others, mainly those which
include landscaping, are under private ownership and
maintenance.
14
-,2,�-o
Continued April 15, 1992
Many of the new developments proposed under the growth
management plans include reverse frontage lots. These have
a number of advantages to the developer and future
homeowner. For example, the City's Design Standards
require lots on arterials be designed such that exiting
vehicles do not back out onto the arterial. To do so
requires a larger, more expensive lot. The fence also, if
designed to do so, provides some sound reduction, and, of
course, privacy from busy street traffic.
The General Plan, in the Urban Design and Cultural
Resources element, indicates the City will develop ". . . a
street tree program, with an emphasis on enhancing major
arterial streets . . .". The right-of-way provided in the
proposed development plans does not include room for trees,
nor do they propose landscaping. Although the Planning
Commission would certainly have an interest in the
provision and design of fences and/or landscaping, the
decision on ownership and maintenance should rest with the
City Council due to the potential cost and impact on the
City budget. In order to expedite the new developments,
staff is requesting that the Council provide the
Commission, staff and the development community with a
policy guidance.
Costs
The City presently is responsible for roughly 3.2 miles of
reverse frontage fence with no landscaping except for the
trees in tree wells on South Hutchins Street. The designs
are based on grape stakes with block pilasters and
returns. They are fairly simple to maintain and remarkably
graffiti free, probably due to the difficulty of painting
on the grape stakes. We probably average five repairs per
year at a total cost of roughly $4,000. Most of the
repairs are due to vehicle damage and are often reimbursed
from the driver's auto insurance. None of the fences have
reached an age where total replacement of the wood has been
necessary. Our track record with the South Hutchins Street
trees has been less satisfactory. Vandalism has been so
frequent we have stopped replacing the trees. Maintaining
the irrigation systems is also a significant effort.
The cost of landscaping maintenance depends on the type and
age of the planting. Cost of trees alone (in tree wells)
would be much less than turf or shrubbery, assuming root
damage is minimized with careful tree selection and
installation. Presumably, landscaping along fences would
be similar to that in medians. Present total contract
costs for median maintenance are nearly $11,000 per year.
This includes the median on Hutchins Street north of Harney
Lane, Lower Sacramento Road between Turner Road and Allen
Drive, and Ham Lane between Kettleman Lane and Harney
Lane. It also includes various islands and other small
15
Continued April 15, 1992
a 1-�-
medians. An approximate average cost per mile for strip
landscaping is $5,730 for contracted maintenance. This
does not include water, power, supervision and
administration and City repairs to sprinklers and trees.
For estimating purposes, the total cost is assumed to be
$8,000 per mile. (For landscaping on both sides of the
street, the cost would be double.) There are roughly two
miles of proposed right-of-way fence and a potential for an
additional five miles if these were extended with future
development.
Replacement costs for fences and landscaping are difficult
to estimate. Certainly, over the long run, replacement of
wood portions will be needed. Shrubbery and irrigations
systems will eventually need replacement. On an annual
basis per mile, these replacement costs have been estimated
at $8,000/year for fences and $2,000/year for landscaping.
Our present annual cost (including replacement) of
approximately $30,000 per year could increase to as much as
$165,000 per year if all new right-of-way fences are
landscaped similar to medians. The costs of median
landscaping is also shown for comparison.
Alternatives
There are a myriad of ownership and maintenance
alternatives for right-of-way fences and landscaping. The
applicability and practicality of each is influenced by the
presence of landscaping. The following briefly describes
the main alternatives. In all cases except as noted, it is
assumed the developer would pay for and construct the
initial fence and/or landscaping as part of the subdivision
improvements.
1) City ownership and maintenance - This is
fairly straightforward and the alternative
favored by developers. Maintenance
standards would be set by the City,
although, there would undoubtedly be
pressure from adjacent residents to keep a
high standard. Costs could be borne under a
number of options:
a) City cost - Costs for existing median
maintenance are borne by the City's
General Fund. While these could be
borne by Gas Tax funds, this would
reduce funding for typical street
maintenance. In either case, the
general taxpayer is paying for the
maintenance.
b) Property assessment - Adjacent property
owners, or others benefiting owners
16
,;/,
Continued April 15, 1992
from the fence and landscaping, could
be assessed under various State laws.
The most practical would be the
Landscaping and Lighting Act of 1972.
This requires a fair amount of ongoing
administrative work and has the subject
of scrutiny by the State legislature.
The legislature is concerned over
perceived abuses and may change the Act
to require annual mailings to each
property owner and prohibit the Council
from overriding majority protests. If
this were to happen, the costs would
fall under Option a).
c) Lump sum prepayment - The developer
could be required to pay a lump sum
toward future maintenance and/or
replacement. The amount would depend
on assumptions for interest, the number
of years and estimated costs. Payment
could be deferred until lots are sold
or developed to ease the developer's
cash flow. Note that the lump sum
figure increases only marginally as the
term increases beyond fifty years.
2) Private ownership and maintenance - This
alternative would require the developers to
either place deed requirements on each
reverse frontage lot, or establish a
homeowners' association to collect homeowner
fees and maintain the improvements. The
developers generally do not favor forming an
association unless it is key to the project
such as in Parkview Terrace which has
"common" facilities. Standards of
maintenance would be determined by the
property owners unless there were some type
of agreement with the City providing for
maintenance requirements.
In either case, City staff has been concerned about ongoing
maintenance. Of the 2.4 miles of private fences, the
maintenance has generally been good. However, these are
fairly new and a notable exception is the wood fence on Ham
Lane. In that case, the property owners are requesting the
City to pay approximately 85% of the cost of a new masonry
fence.
The following draft policy statement is recommended for
Council consideration. This is a general policy
statement. Many details will need to be worked out once
17
Continued April 15, 1992
staff and the development community have some general
direction.
D R A F T
Policy on Right -of -Way Fences and Landscaoin
1. Where an approved development provides a
fence with landscaping along the street
side, both shall be privately owned and
maintained. The developer shall either
establish a homeowners' association to
maintain the improvements, or place
appropriate requirements in each parcel's
deed. Either method shall include a
provision as provided by the City Attorney
requiring maintenance to City standards and
a provision allowing the City to have work
performed and charge the property owner in
the event of noncompliance.
2. Where an approved development provides only
a fence along the streets side, the fence
shall be owned and maintained per 1., above,
or it will be City owned and maintained and
the developer shall pay a fee to the City.
The fee shall be determined by the City and
guaranteed as part of the development's
improvement agreement, and be paid upon sale
of the lot or issuance of a building permit.
3.
Trees shall be required within approximately
ten feet of all right-of-way fences. They
shall be incorporated within the landscaping
in 1., above, or in 2., above, a landscape
easement shall be provided on the parcel
side of the fence and shall be privately
owned and maintained. The developer shall
either install the trees and a temporary
irrigation system and maintain the trees
until lot development, or pay the City for
the installation. The City will include
these landscaping easements in the City's
tree planting program and install trees at
no additional charge to the property owner.
Addressing
the City Council regarding the matter were:
a)
Mr. Dennis Bennett, 777 South Ham Lane, Lodi;
b)
Mr. Jeff Kirst, 109 River Meadows Drive,
Lodi; and
In
Continued April 15, 1992
c) Mr. Steven Pechin, 323 West Elm Street,
Lodi.
Based on the information given by those addressing the City
Council regarding the matter, the Mayor asked that the
developers and staff meet and bring back to the City
Council at a future meeting their mutual recommendations
regarding the matter.
COMMUNITY DEVELOPMENT BLOCK
GRANT PROGRAM
RESOLUTION NO. 92-68
COMMUNITY DEVELOPMENT BLOCK GRANT
REALLOCATIONS APPROVED
CC -55 Community Development Director Schroeder advised the City
Council that the City's expected Community Development
Block Grant (CDBG) allocation for Fiscal Year 1992-93 is
$422,966.00.
Staff recommends allocations to the following projects:
Administration
Provides for the administration of the CDBG Program as
prescribed by HUD. ($20,750)
Fair Housing
Provides fair housing counseling and referral services to
City residents in order to eliminate discrimination in the
provision of housing and to promote greater choice in
housing opportunities. ($5,000)
Code Enforcement
Provides for a part-time Code Enforcement Officer and
clerical assistant who work to arrest the decline of
certain eligible areas in the City, particularly the East
Side. Enforcement activities include auto and nuisance
abatement, housing inspections, and zoning enforcement.
($21,882)
Dial -A -Ride
This program, which was begun last year will continue to
provide travel vouchers to meet the needs of Lodi's
low/moderate income and senior citizens utilizing the local
Dial -A -Ride service. This service will permit such
individuals the freedom of travel where otherwise they
might be denied that ability. ($5,500)
19
Continued April 15, 1992
Housing Rehabilitation
This existing program provides for low or no interest
amortized and deferred loans and grants for low and
moderate income homeowners on the East Side to fix up their
homes.
In recent years this program has attracted enough
applicants so that all money currently in the account is
spoken for. We expect an increasing number of residents to
take advantage of this program in future years.
($258,871.73)
Hale Park
This project is a continuation of the 1989-90 Hale Park
Improvements Project. The funding is being requested to
provide for a small shortfall due to a higher than
anticipated completion costs. This final amount will allow
for completion of the park renovation scheduled to begin
construction on or about April 21, 1992. ($15,000)
Kofu Park Handicap Walkway
This project will replace a 200 foot concrete walkway
leading from Ham Lane to the restroom/recreation building.
The new walkway will eliminate several steps, will be flat
and level and will add a curb cut in Ham Lane which will
provide for wheelchair accessibility from that side of the
park. ($8,000)
East Side Street Lighting
This project will provide for the installation of new
lights on streets adjacent to several public facilities in
the east side. The target sites are Blakely Park, Van
Buskirk Park, Hale Park, and the Lodi Academy. ($70,562.67)
Senior Service Agency Kitchen
This project will provide for the completion of the new
kitchen. A shortfall was created when some integral
construction items were inadvertently excluded from the
original estimate. The meals prepared at the kitchen will
serve Lodi's senior citizens and will be distributed
through local agencies and organizations. ($17,400)
On motion of Council Member Snider, Hinchman second, the
City Council adopted Resolution No. 92-68 entitled,
"Resolution of the City Council of the City of Lodi,
California approving the Projected Use of Funds for the
Fiscal Year 1992-93 Community Development Block Grant
Program".
20
' �Y
Continued April 15, 1992
Further, the City Council, on motion of Council Member
Snider, Hinchman second, approved the following
reallocations of Community Development Block Grant money
from past years' accounts into current accounts. These
actions are an integral part of the 1992-93 Entitlement
Statement.
Emerson Park Allocation
Would transfer $27,000 from this account into the Hale Park
Improvements account in order to provide sufficient funding
for completion.
Hale Park Parking Lot
It was decided to postpone this project indefinitely. The
$100,000 would be reallocated to the Hale Park Improvements
in order to provide sufficient funds for completion of the
park.
Homeless Shelter
There was a balance of $748.05 remaining in this account
upon completion. The amount would be transferred into the
Housing Rehabilitation Program.
The City Council was apprised that the transfers from the
Hale Park Parking Lot and the Emerson Park accounts are
necessary to close the accounts and transfer their balances
into the Hale Park Improvements account.
Subsequent to approval of funding for Emerson Park, it was
determined that the work required would far exceed the
$27,000. Since the estimates for Hale Park had increased,
it was decided to use the $27,000 to help make up the
shortfall instead of requesting it in the 92-93 entitlement.
It was decided by staff that the Hale Park Parking Lot
would no longer be included as a part of the park project.
It was also decided that the $100,000 should also be used
to help make up the shortfall for the Hale Park
Improvements project for the same reason as above.
After the Homeless Shelter was completed it was discovered
that a balance of $748.05 remained in the account. In
order to close this account, the balance needs to be
transferred out. Due to the small amount, the Housing
Rehabilitation was thought to be the best account to
receive the money.
21
Continued April 15, 1992 edf�p
REINTRODUCTION OF ORDINANCE NO. 1548
TO COMPLY WITH STATE LAW REQUIRING THE
OPPORTUNITY FOR PUBLIC COMMENT BEFORE
COUNCIL ACTION ON AGENDA ITEMS
ORDINANCE NO. 1548
CC -6 The City Council was advised that Ordinance No. 1548 was
CC -149 originally introduced at the Council meeting of April 1,
1992, in order to comply with new State legislation. Its
purpose was to allow the opportunity for public comment on
any item before Council action on the matter.
Concerns were expressed that under the new agenda format,
persons arriving just a few minutes late would entirely
miss the chance to speak because the new agenda slot for
public comment came so near the beginning of meetings. In
order to address these concerns, the amended Ordinance No.
1548 allows two opportunities for public comment.
The first (Item "E") comes before adoption of the consent
calendar, and allows comment on any topic. The second
(Item "H") would address comments on non -agenda items,
and appears where it did in the old for This should
take care of the concerns expressed.
On motion of Council Member Snider, Hinchman second, the
City Council reintroduced Ordinance No. 1548 entitled, "An
Ordinance of the City Council of the City of Lodi Amending
Section 2.04.100 of the Lodi Municipal Code, Regulating the
Order of Business for City Council Meetings".
MID -YEAR BUDGET REPORT
CC -21(b) Finance Director Dixon Flynn presented for the City
Council's review a mid -year budget report advising that the
purpose of this report is to provide the City Council a
financial update and to recommend revenue and appropriation
adjustments as required for the current fiscal year.
Although monthly financial reports are distributed to the
Council on an ongoing basis, this review provides the City
Manager with an opportunity to identify and present any
fiscal problems to the Council which have been recognized
during the mid -year review and to recommend appropriate
action prior to the end of the fiscal year.
Short Summary
The City's overall financial condition generally conforms
to the 1991-92 budget as approved by Council in June 1991.
The City has experienced significant shortfalls in several
revenue sources which impact the General Fund; however,
these shortfalls have been offset by $1 million of
additional revenues. At the same time, expenditures
22
07 b'J'
Continued April 15, 1992
increased $2,040,817 or 2.7% over current appropriations.
These increases were approved by Council during the course i
of the year as "off -cycle" budget appropriations, i.e.,
compensation increases, capital projects, etc, or represent
adjustments for unfunded balances in prior year fund
balances.
Revenues for Fiscal Year 1992-93 are projected to increase
by 7% due to one-time revenues and moderate growth in tax
revenues. If the State further reduces the City's revenues
or increases mandates, the impact in Fiscal Year 1993-94
could be significant. The current revenue projections for
Fiscal Year 1992-93 will allow the City to maintain current
service levels. However, it should be noted that this is
due in large part to one-time revenues to be received by
the City from PERS refunds which will be used to finance
General Fund operations and from Impact Fees for new
construction and infrastructure.
Fund balances at the beginning of the 1992-93 Fiscal Year
are anticipated to be low and do not provide the City with
any flexibility to finance increased service levels,
emergencies, and/or unanticipated expenditures unless
changes are made to current budget policies which allow
funds to be "fenced" for special interest programs and
capital projects. There is a minimum of $12.6 million in
funds set aside for special programs and capital projects.
FINANCIAL CONDITION SUMMARY
Revenues
A summary of revenues by major category and source was
provided for the period 1989 through 1993. A comparison of
the original 1991-92 revenue estimates, adjusted 1991-92
revenue estimates, and projected revenue estimates for
1992-93 was provided. As reflected in these summaries,
staff projects significant shortfalls in key General Fund
revenue sources, although one-time, unanticipated revenues
during 1991-92 and 1992-93 off -set these losses and allow
the City to maintain current service levels. These
projections are consistent with the trends previously
identified and discussed with the Council.
The revenues for 1992-93 are projected to increase by 7% or
$4.5 million overall based on improved economic conditions
in the housing market and retail sales, a one-time PERS
distribution, and the collection of Impact Fees for new
construction. Property tax is currently expected to
increase 5%. The PERS refund will provide the City with an
additional $950,000 for City services. And the impact fees
approved by Council in 1991 are project to be $5 million.
23 •
Continued April 15, 1992
All revenue projections were developed based on information
obtained from City staff, other agencies and City
consultants. These estimates have been made on a
conservative basis and every effort was made not to
overestimate revenue growth due in part to the low fund
balances in the operating funds and the possibility that
the State may further reduce City revenues and increase
mandates. As additional information becomes available from
the State, these estimates will be revised and incorporated
into the 1992-93 budget.
Taxes
The 1991-92 tax revenues are following state-wide trends
and are currently down 5% or $560,000 •due primarily to
lower sales tax, transit lodging and real property transfer
taxes. Staff estimates that tax revenues will increase by
3% in 1992-93 due to an improved housing market and retail
sales; however, the sales tax increase of $50,000 is very
conservative. This estimate accounts for economic
uncertainty and is based in part on low fund balance in the
General Fund.
Licenses and Permits
Overall revenues have increased over original estimates by
28% or $67,200 due primarily to an increase in bicycle
licenses and parking lot permits. The projected 3%
increase in Fiscal Year 1992-93 is due to the increase in
parking lot permits approved by Council in December 1991.
Fines. Forfeitures and Penalties
Revenues are down from original estimates by 22% or $71,000
due primarily to State legislative action to reduce vehicle
code fines by 50% for trial court funding. However, staff
projects an overall increase of 28% in 1992-93 due to the
fines for delinquent payment of utility bills and the
parking fines approved by Council in December 1991.
Revenue for Use of Money and Property
Investment revenues continue to decline due to lower
interest rates and fund balances. The decrease in revenues
during Fiscal Year 1991-92 is projected to be 6% or
$102,700 less than the original projections. In Fiscal
Year 1992-93, these revenues are projected to decrease 31%
or $536,800. This is a significant reduction in revenue
considering that in 1989-90, the City's investment revenues
were $3.5 million.
24
Continued April 15, 1992
Subventions and Grants
The revised projections reflect an increase in revenues of
$108,600 in 1991-92 due primarily to Measure K funding for
street maintenance, construction and development. However,
the 1992-93 revenue projection is down 2% or $103,000 due
to the loss of Cigarette Tax and a 77% decrease in
Transportation Partnership funding.
Service Charges
An increase of $546,659 in the 1991-92 revenue projections
and $4.8 million in the 1992-93 revenue projections. These
increases are primarily attributed to increased
construction activity in Lodi. While these projections may
appear to be less than conservative, the City Engineer has
based the projections for Impact Fees and Engineering Fees
on the development plans submitted by developers. It
should be noted that Impact Fees cannot be used for capital
projects until received and therefore limit expenditure
growth to the amounts received.
Service Charges - Enterprise Activities
There is a $276,000 increase projected in the 1991-92
revenue estimates and a $90,000 increase projected in the
1992-93 revenue estimates. The increase in the Sewer Fund
is based on rates approved by the City Council in 1991. As
new residential property is sold, these revenues should
increase at a rate consistent with increases in property
tax and impact fees. In May 1992, the City Council will be
presented with recommendations for water and sewer rate
increases which will increase these estimates if approved.
Trust and Agency Revenues
There is no change in the original projections for
1991-92. The Turner Cluff Assessment Bonds were called in
1992-93 and paid off with existing reserves; accordingly,
there were no expenditures made from this Trust Account.
Other Revenues
The increase of $472,000 in 1991-92 reflects a $986,000
PERS refund approved by the State under AB 702. In
1992-93, the City will again receive a distribution of
$950,000 from PERS. This is a final distribution from
PERS. This distribution will be allocated to the General
Fund to fund current operations.
Operating Program Expenditures
Table 3, which was presented for Council's review, includes
an overview of changes to the operating budget since
25
Continued April 15, 1992
adoption of the 1991-92 Budget. Organized by Fund and
Department, the table includes the original budget,
encumbrance carryovers from the prior year and changes to
the budget since adoption. These summaries also reflect
the recommended budget appropriations.
Projected Fund Balances
Based on the revised revenue projections, expenditure
summaries and approved capital outlays, Table 4 and Table 5
presented for Council's review, summarize changes in fund
balance for each fund at June 30, 1992. As provided in the
revenue projections, changes in fund balances have been
expanded to include revised projections for 1991-92.
Accordingly, this allows the Council to review not only the
impact of these revisions on the current fiscal year
funding but also the expenditure limits for 1992-93 based
on projected revenues.
The General Fund, Electric Fund and Water Fund will not
have adequate fund balances necessary to provide additional
service levels, provide for contingencies, or fund
unanticipated expenditures. The projected balance in the
General Fund at June 30, 1992 highlights the need for the
City to reduce operating costs and to develop appropriate
revenue strategies to ensure the financial health of the
City. The following is a summary of concerns regarding the
City's projected financial position for key funds at the
end of 1991-92.
General Fund
The General Fund balance is projected to be $757,955 at
June 30, 1992 of which $1,157 will be available. As
previously discussed with Council, this balance does not
provide the City with the necessary flexibility to fund
greater service levels, provide for contingencies, or pay
unanticipated expenditures. Thankfully, the one-time
$986,000 distribution from PERS will allow the City to
continue the current level of operations through June 30,
1993. After this date, unless additional revenue sources
are developed and costs reduced or current revenues
significantly rebound, the City may have to make
significant reductions in current service levels.
Electric Fund
The Electric Fund will end the 1991-92 Fiscal Year with a
$1.6 million balance which after deductions for approved
requirements leaves a negative fund balance of $1,501,267.
This loss offsets the funds set aside for rate
stabilization by $1.5 million.
26
Continued April 15, 1992
Sewer and Water Fund
The balance in the Water Fund at June 30, 1992 will be
$365,700. At this time, no changes have been made in the
assumptions originally used to prepare the 1991-92 Sewer
Fund budget. Staff will be making recommendations to
increase water and sewer rates in May 1992, which, if
adopted, will offset the current available fund deficit in
the Water Fund.
Capital Project Funds
The fund balance of the Capital Project Fund is projected
to be $4,563,682 at June 30, 1991; however, the available
fund balance is currently projected to be•$34,207. There
are $4,113,720 in capital projects (all funds combined)
approved by Council which have not been started and which
could be reprogrammed.
Mid -Year Budget Requests
Based on current fund balances and projected revenues, the
staff is not requesting additional funds for current year
services beyond the amounts previously requested and
approved. However, additional appropriations are necessary
to fund compensation increases approved by Council,
unanticipated increases in current expenditures, and prior
year expenditures not previously approved.
Following discussion with questions being directed by the
City Council to Finance Director Flynn, the City Council,
on motion of Council Member Hinchman, Pinkerton second,
received for filing the Mid -Year Budget Report with revenue
projections for Fiscal Year 1992-93 and adopted Resolution
No. 92-69 entitled, "A Resolution of the Lodi City Council
Approving Supplemental Appropriations for Fiscal Year 1992
by Fund."
VOTING DELEGATE AND ALTERNATE DETERMINED
FOR ANNUAL AMERICAN PUBLIC POWER
ASSOCIATION MEETING BEING HELD IN WASHINGTON
D. C. JUNE 13 - 17 . 1992
CC -7(1) On motion of Mayor Pro Tempore Pennino, Hinchman second,
the City Council designated Mayor Pinkerton as the voting
delegate and Mayor Pro Tempore Pennino or Council Member
Snider as the voting alternate for the American Public
Power (APPA) Annual Conference being held in Washington D.
C., June 13 - 17, 1992.
27
Continued April 15, 1992
ORDINANCES
ORDINANCE AMENDING THE LODI MUNICIPAL
CODE CHAPTER 15.64 "DEVELOPMENT IMPACT
MITIGATION FEES" ADOPTED -
ORDINANCE NO. 1547 ADOPTED
G�-
CC -46 Ordinance No. 1547 entitled, "An Ordinance of the Lodi City
CC -149 Council Amending Lodi Municipal Code Chapter 15.64
'Development Impact Mitigation Fees"' having been
introduced at a regular meeting of the Lodi City Council
held April 1, 1992 was brought up for passage on motion of
Council Member Snider, Hinchman second. Second reading of
the ordinance was omitted after reading -by title, and the
ordinance was then adopted and ordered to print by
unanimous vote of the City Council.
ADJOURNMENT There being no further business to come before the
City Council, Mayor Pinkerton adjourned the meeting at
approximately 10:40 p.m.
ATTEST:
l�� A
Alice M. Keimche
City Clerk