HomeMy WebLinkAboutAgenda Report - June 3, 2015 C-04AGENDA ITEM C"40 CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Awarding Contract for 2015-2017 Sidewalk and Miscellaneous Concrete Repair Program to Popuch Concrete Contracting, Inc., of Lodi ($179,900) and Authorizing Public Works Director to Execute Up to Two One -Year Extensions MEETING DATE: June 3, 2015 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for 2015-2017 Sidewalk and Miscellaneous Concrete Repair Program to Popuch Concrete Contracting, Inc., of Lodi, in the amount of $179,900 and authorizing Public Works Director to execute up to two one-year extensions. BACKGROUND INFORMATION: This project will provide the City with a unit -price bid for removing and/or constructing miscellaneous concrete curb, gutter, sidewalk, and other items in various locations throughout the City. This is a two-year contract and will be used to implement the sidewalk installation and repair program as needed during Fiscal Years 2015/16 and 2016/17. Provisions in the specifications will allow the City to extend the contract at the same pricing if it is mutually agreed upon by City staff and the contractor. Staff recommends authorizing the Public Works Director to execute up to two one-year extensions to the contract when it is in the best interest of the City to do so. Specifications for this project were approved on April 1, 2015. The City received the following three bids for this project on May 13, 2015. Bidder Location Bid Engineer's Estimate $ 198,500.00 Popuch Concrete Contracting, Inc. Lodi $ 179,900.00 Arrow Construction Sacramento $ 206,699.00 Richard A Soracco Jr Sutter Creek $ 257,500.20 FISCAL IMPACT: This contract is a key component in the Streets and Drainage Division's ability to perform necessary maintenance. It also minimizes the risk of liability associated with damaged and/or non-compliant concrete improvements. FUNDING AVAILABLE: Pending budget approval, this project will be funded by Measure K (30399000) and Transportation Development Act (TDA) Bike/Ped (33199000). Jordan Ayers Deputy City Mana er/Internal ervices Director F. indelin Public Works Director Prepared by Sean Nathan, Associate Civil Engineer FWS/SN/kjc cc: Associate Civil Engineer Nathan Deputy Public Works Director— Utilities City Engineer/Deputy Public Works Director APPROVED: , City Manager KA MPROJECMSTREETSt2015_17 Sidewalk and Concrete Repair\CAward.doc 5/21/2015 2015-2017 SIDEWALK AND MISCELLANEOUS CONTRACT CONCRETE REPAIR PROGRAM CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and POPUCH CONCRETE CONTRACTING INC., herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the Contractr doc 4.1 05/14/15 general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary to construct, ramps, or other miscellaneous concrete This is a 2 -year unit price bid that will b price between $500 and $20,000. All it related work, all as specified in the sp Miscellaneous Concrete Work" remove, and/or replace curb, gutter, sidewalk, ems at various locations throughout the City. divided into work orders typically ranging in provements will include other incidental and !cifications for the "2015-2017 Sidewalk and See Section 6-07 "Description of Bid Items" for additional information. CONTRACT ITEMS Item Description Est Qty Unit Unit Price Total 1 Saw Cut Concrete 900 LF $ 4.00 $ 3,600.00 2 Remove Sidewalk, Asphalt 8,000 SF $ 4.00 $ 32,000.00 Concrete, Ram 3 Remove Commercial 1,200 SF $ 6.00 $ 7,200.00 Sidewalk 4 Remove Square -Type Curb 350 LF $ 10.00 $ 3,500.00 and Gutter 5 Remove Vertical -Type Curb 50 LF $ 10.00 $ 500.00 and Gutter 6 Remove Driveway -Type Curb 50 LF $ 12.00 $ 600.00 and Gutter 7 Remove Commercial -Type 30 LF $ 15.00 $ 450.00 Curb and Gutter 8 Root Surgery Under Sidewalk 50 EA $ 250.00 $ 12,500.00 or in Planter Area 9 Root Surgery Under Curb and 10 EA $ 300.00 $ 3,000.00 Gutter 10 Install Sidewalk or Residential 500 SF $ 10.00 $ 5,000.00 Driveway 0 - 75 SF 11 Install Sidewalk or Residential 1,400 SF $ 6.00 7T $ 8,400.00 Driveway76 - 300 SF Contractr.doc 4.2 05/14/15 Item Description Est Qty Unit Unit Price Total 12 Install Sidewalk or Residential 6,000 SF $ 4.80 $ 28,800.00 Drivewa >300 SF 13 Install Curb Ramp 2,000 SF $ 7.50 $ 15,000.00 14 Install Commercial Driveway 1,300 SF $ 10.00 $ 13,000.00 Install Square -Type Curb and 15 Gutter 7 -inch or less (0 - 20 100 LF $ 40.00 $ 4,000.00 LF 16 Install Square -Type Curb and 300 LF $ 36.00 $ 10,800.00 Gutter 7 -inch or less >20 LF Install Square -Type Curb and 17 Gutter Greater than 7 -inch (0 - 20 LF $ 40.00 $ 800.00 20 LF Install Square -Type Curb and 18 Gutter Greater than 7 -inch 50 LF $ 36.00 $ 1,800.00 >20 LF 19 Install Vertical -Type Curb and 20 LF $ 40.00 $ 800.00 Gutter 0 - 20 LF 20 Install Vertical -Type Curb and 20 LF $ 36.00 $ 720.00 Gutter >20 LF 21 Install Driveway -Type Curb 10 LF $ 45.00 $ 450.00 and Gutter 0 - 20 LF 22 Install Driveway -Type Curb 30 LF $ 36.00 $ 1,080.00 and Gutter >20 LF 23 Install Tree Well 2 EA $ 250.00 $ 500.00 24 Install Truncated Domes (3'x 60 SF $ 40.00 $ 2,400.00 4' typical) 25 Install Furnished Side -Inlet 2 EA $ 650.00 $ 1,300.00 Catch Basin Assembly 26 Install Catch Basin Barrel 1 EA $ 1,000.00 $ 1,000.00 27 Install Furnished Street Name 2 EA $ 200.00 $ 400.00 Si2n Base 28 Miscellaneous Concrete 13,000 SF $ 1.50 $ 19,500.00 Sub rade Compaction 29 Move -In Cost for Jobs Less 2 EA $ 400.00 $ 800.00 Than $200 TOTAL $ 179.900 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal Contractr.doc 4.3 05/14/15 of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The length of the contract will be twenty-four (24) months, starting July 1, 2015 and ending June 30, 2017. The contract may be extended if agreed upon by the Contractor and the City. ARTICLE IX - State of California Senate Bill 854 requires the following: No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Contractr doc 4.4 05/14/15 WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR. CITY OF LODI, a municipal corporation 0 Title 0 STEPHEN SCHWABAUER City Manager Date: Attest: JENNIFER M. FERRAIOLO City Clerk (CORPORATE SEAL) Approved As To Form: JANICE D. MAGDICH_,V City Attorney t Contractr doc 4.5 05/14/15 RESOLUTION NO. 2015-63 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT FOR THE 2015-2017 SIDEWALK AND MISCELLANEOUS CONCRETE REPAIR PROGRAM AND AUTHORIZING THE PUBLIC WORKS DIRECTOR TO EXECUTE UP TO TWO ONE-YEAR EXTENSIONS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on May 13, 2015, at 11:00 a.m., for 2015-2017 Sidewalk and Miscellaneous Concrete Repair Program, described in the specifications therefore approved by the City Council on April 1, 2015; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid Popuch Concrete Contracting, Inc. $179,900.00 Arrow Construction $206,699.00 Richard A. Soracco, Jr. $257,500.20 WHEREAS, staff recommends awarding the contract for the 2015-2017 Sidewalk and Miscellaneous Concrete Repair Program to the lowest bidder, Popuch Concrete Contracting, Inc., of Lodi, in the amount of $179,900; and WHEREAS, staff recommends authorizing the Public Works Director to execute up to two one-year extensions at the same pricing, if mutually agreed upon by City staff and the contractor. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the 2015-2017 Sidewalk and Miscellaneous Concrete Repair Program to the lowest bidder, Popuch Concrete Contracting, Inc., of Lodi, California, in the amount of $179,900; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the contract on behalf of the City of Lodi; and BE IT FURTHER RESOLVED that the Lodi City Council hereby authorizes the Public.Works Director to execute up to two one-year extensions, at a cost not to exceed $$9,950 per year, if mutually agreed upon by City staff and the contractor. Dated: June 3, 2015 I hereby certify that Resolution No. 2015-63 was passed and adopted by the City Council of the City of Lodi in a regular meeting held June 3, 2015, by the following vote: AYES: COUNCIL MEMBERS — Kuehne, Mounce, Nakanishi, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Chandler ABSTAIN: COUNCIL MEMBERS — None J NIFER FERRAIOLO City Clerk 2015-63