AGENDA ITEM C 4
CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for
Henry Glaves Park Pump Station Improvements Project
MEETING DATE: February 4, 2015
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for
bids for Henry Glaves Park Pump Station Improvements Project.
BACKGROUND INFORMATION: This project consists of furnishing and installing a submersible storm
drain pump, electrical control panel, and other incidental and related
work, all as shown on the plans and specifications for the project.
The existing storm drain pump station at Henry Glaves Park was originally installed in 1965. The pump
station was designed to handle the on-site irrigation water drainage and other miscellaneous storm water
drainage to keep the low-lying play field dry. The existing pump and control equipment have exhibited
wear and tear from normal usage. The existing control panel is severely corroded and it is separating
from the foundation. The pump control component inside the panel is aged and is not safe to be
operated. The new pump and control equipment to be installed with this project will be up-to-date
equipment and allow remote monitoring through the City's SCADA system.
The specifications are on file in the Public Works Department. The planned bid opening date is
February 25, 2015. The project estimate is $88,000.
FISCAL IMPACT: This project will reduce the maintenance cost to the pump station.
FUNDING AVAILABLE: Funding will be identified at project award.
Jbia 1,4-, ), 1 -4 4_1_Ja_1__
F. Wally SfAdelin
Public Works Director
Prepared by Lyman Chang, Senior Civil Engineer
FWS/LC/smh
cc: Deputy Public Works Director
Utility Superintendent
Senior Civil Engineer
APPROVED:
Stephen Schwabauer, Citf Manager
K:\WP\PROJECTS\STORMDRN\Henry Glave PSA.doc
1/16/2015