Loading...
HomeMy WebLinkAboutAgenda Report - January 7, 2015 C-03AGENDA ITEM cam 5 ' CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Well 6R Pump Replacement Project MEETING DATE: January 7, 2015 PREPARED BY: Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for Well 6R Pump Replacement Project. BACKGROUND INFORMATION: This project consists of furnishing and installing a deep well turbine pump and other incidental and related work, all as shown on the plans and specifications for the project. The existing deep well turbine pump in Well 6R located at Blakely Park was originally installed in 1985. Pieces of the broken impeller from the pump have been recovered recently in the well plumbing. The well is not in service right now, and the pump will need to be replaced due to its condition and age. The City also installed granular activated carbon (GAC) vessels at the site in 2012, and this well is essential to this part of the City to handle the peak flow and fire flow. The new pump will be designed to discharge about 1,400 gallon per minute (gpm) to the City's water system. The specifications are on file in the Public Works Department. The planned bid opening date is January 28, 2015. The project estimate is $30,000. FISCAL IMPACT: Not applicable. FUNDING AVAILABLE: Funding will be identified at project award. Prepared by Lyman Chang, Senior Civil Engineer FWS/LC/smh cc: Deputy Public Works Director Utility Superintendent Senior Civil Engineer APPROVED: F. Wally ndelin Public Works Director Schwa bauer[City Manager K:\WP\PROJECTS\WATER\Well 6R Hep4cerrVd Project\CPSA.doc 12/18/2014