Loading...
HomeMy WebLinkAboutAgenda Report - November 6, 2013 C-07AGENDA ITEM Cool CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for City Hall Annex First Floor Phase 2 Interior Remodel Project MEETING DATE: November 6, 2013 PREPARED BY: Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for City Hall Annex First Floor Phase 2 Interior Remodel Project. BACKGROUND INFORMATION: The project is the next phase in remodeling the first floor of the former Police Station for use by the Recreation and Fire Administration divisions. The Phase 1 demolition and abatement project was successfully completed in August 2013. City Council awarded the professional services agreement for design of the City Hall Annex Remodel to WMB Architects, of Stockton, on August 15, 2012. Design work could not be completed until the Phase 1 work was completed. The Phase 2 project will include offices, public lobbies, public counters, ADA access, ADA staff bathroom facilities, lighting, communications, space conditioning and associated staff support areas. There are currently 27 staff members in the two divisions. The area is approximately 6,000 square feet. The project also includes several items to improve services to the entire building, as well as the Civic Center complex. These are a new emergency generator, installation of new main electrical switchgear, relocating the data server and telephone rooms from the basement to the first floor, relocating the radio room to the first floor, and installation of a new chiller unit to serve the City Hall Annex, as well as Carnegie Forum and City Hall. A drawing of the project floor plan is attached for reference as Exhibit A. The planned bid opening date is January 9, 2014. The project estimate is $2,800,000. FISCAL IMPACT: Locating Fire Administration in the Civic Center complex will be more convenient to the public for the building permit process. The office space currently used by the Recreation Division will be utilized by the Parks staff, which will make the Parks Annex once again available for rental. FUNDING AVAILABLE: Funding will be identified at project award. F. Wally S delin Public Works Director Prepared by Gary Wiman, Construction Project Manager FWS/GRW/pmf Attachment cc: Fire Chief Parks, Recreation and Cultural Services Director APPROVED:-� J o radt Bartlam, City K:\WP\PROJECTS\MIISC\City Hall Annex 1st Floor Remodel 2012\CPSA City Hall Annex Phase 2.doc 10/29/2013 FLOOR PLAN - 1ST FLOOR SCALE: 118" = 1'-0" FLOOR PLAN LEGEND: o EXISTING FRAMED WALL ® EXISTING CONCRETE BLOCK WALL � NEW FRAMED WALL- REFER TO WALL SCHEDULE FREE STANDING STORAGE SHELVING - REFER TO 2.4 SPECIFICATIONS -FIELD VERIFY DIMENSIONS OF SPACES PRIOR TO ORDERING SHELVES 2.5 NON-COMMERCIAL DISHWASHER -REFER TO SPECIFICATIONS 2.6 NON-COMMERCIAL REFRIGERATOR -REFER TO SPECIFICATIONS 2.7 NEW MECHANICAL EQUIPMENT - PROVIDE 6" CONCRETE HOUSE KEEPING PAD - REFER TO MECHANICAL DRAWINGS EXTEND WALL FRAMING TO UNDERSIDE OF DECK ABOVE w/ 5/" 2.8 GYP. BD. ON ONE SIDE AND SOUND BATTS -REFER TO DETAIL D/A6.1 2.9 NEW SEMI RECESSED FIRE EXTINGUISHER CABINET AND NEW FIRE EXTINGUISHER 2.10 INSTALL (E) SEMI -RECESSED FIRE EXTINGUISHER CABINET AND NEW FIRE EXTINGUISHER 2.11 NEW LOUVER - REFER TO MECHANICAL DRAWINGS & DETAIL M/A6.1 2.12 NEW FIRE EXTINGUISHER w/ WALL MOUNT 2.13 RACKS PROVIDED BY OWNER, INSTALLED BY CONTRACTOR - VERIFY LAYOUT WITH THE CITY PRIOR INSTALLATION 2.14 FIRE SUPPRESSION SYSTEM - REFER TO SPECIFICATIONS; UTILIZE EXISTING SHOWER AREA FOR TANK STORAGE 2.15 COORDINATE NEW WALL FRAMING w/ EXISTING PIPING - SEAL AROUND PIPE PENETRATIONS 2.16 PATCH & REPAIR HOLES IN EXISTING MASONRY WALL 2.17 ELECTRICAL SERVICE PANELS - REFER TO ELECTRICAL DRAWINGS RATED WALL SHALL BE CONSTRUCTED FULL HEIGHT TO 2.18 UNDERSIDE OF METAL DECK - BLOCK IN AND AROUND EXISTING OPEN WEB JOIST & FLUTED DECK, CUT IN GYP. BD. & TAPE 2.19 EXISTING PLASTER FINISH TERMINATES @ +8'-0" A.F.F. - EXTEND PLASTER FINISH TO +8',8" A.F.F. NOTES: 1. U.O.N., WALLS SHALL TERMINATE 12" ABOVE THE FINISHED CEILING AND BRACED TO FLOOR DECK ABOVE - REFER TO DETAILS A&BIA6.1 2. 518" WATER RESISTANT GYPSUM BOARD REQUIRED AT PLUMBING FIXTURES AND BEHIND TILED WALLS. WMB ARCHITECTS 5757 Pacific Avenue Suite 226 Stockton CA 95207 209.944.9110 T 209.944.5711 F www.wmbarchitects.com Larry Wenell Tim Mattheis Tom Bowe Doug Davis Melanie Vieux Principal Architects CITY HALL ANNEX 1 ST FLOOR PHASE I I SOUND TYPE'X' Lodi, Ca. FLOOR PLAN SSD ARC 2A BATTS GYP. BD. BOTH cls, REN. 8-31-13 �S 9>�DF 1 HR. U465 PERMIT APPL. PUBLISH HISTORY 0 DATE REVISION/ SET SIDES 12-62 A2.1 3 3 %"20 GA. MTL. $/" GYP. BD. ON STUDS @ 16" O.C. EXPOSED SIDE 4 1 %" 20 GA. MTL. %" GYP. BD. ON FURRING @ 16" O.C. EXPOSED SIDE 5 (E) MTL. STUDS SOUND $/" GYP. BD. BATTS BOTH SIDES 6 (E) CONCRETE %Z' GYP. BD. BLOCK WALL (TAGGED SIDE) 7 (E) CONCRETE %" GYP. BD. BLOCK WALL BOTH SIDES 8 (E) CONCRETE 314" T&G BLOCK WALL PLYWOOD 9 4"20 GA. CT MTL. 518" TYPE W 1" TYPE X STUDS @ 16" O.C. GYP. BD. GYP. BD. 1 HR. U465 SHAFT LINER E (E) MTL. STUDS (E) WALL FINISH NOTES: 1. U.O.N., WALLS SHALL TERMINATE 12" ABOVE THE FINISHED CEILING AND BRACED TO FLOOR DECK ABOVE - REFER TO DETAILS A&BIA6.1 2. 518" WATER RESISTANT GYPSUM BOARD REQUIRED AT PLUMBING FIXTURES AND BEHIND TILED WALLS. WMB ARCHITECTS 5757 Pacific Avenue Suite 226 Stockton CA 95207 209.944.9110 T 209.944.5711 F www.wmbarchitects.com Larry Wenell Tim Mattheis Tom Bowe Doug Davis Melanie Vieux Principal Architects CITY HALL ANNEX 1 ST FLOOR PHASE I I INTERIOR REMODEL 210 W. Elm Street Lodi, Ca. FLOOR PLAN SSD ARC 0'A r N0. C006599 cls, REN. 8-31-13 �S 9>�DF 08.15.13 PERMIT APPL. PUBLISH HISTORY 0 DATE REVISION/ SET WMB PROJECT: 12-62 A2.1