Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Agenda Report - November 6, 2013 C-06
AGENDA ITEM •b AhCITY OF LODI ,. COUNCIL COMMUNICATION TM AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Lodi Public Library Phase 3 Remodel Project MEETING DATE: November 6, 2013 PREPARED BY: Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for Lodi Public Library Phase 3 Remodel Project. BACKGROUND INFORMATION: The Lodi Library Board has been developing plans to renovate the Lodi Public Library and has implemented the renovation as a phased project. Phases 1 and 2 were successfully completed in 2009. City Council awarded the professional services agreement for design of the Lodi Public Library Phase 3 Remodel to WMB Architects, of Stockton, on May 1, 2013. The Phase 3 Project will complete carpet, lighting, communications, space conditioning and furniture upgrades within the remodel area. Rooms to accommodate tutoring, a computer lab, meetings, cafe -style seating and a teen sitting area will also be provided. Working with Library and Public Works staff, WMB Architect has completed plans and specifications for the Phase 3 project. A drawing of the project floor plan is attached for reference as Exhibit A. The planned bid opening date is December 5, 2013. The project estimate is $340,000. FISCAL IMPACT: None. FUNDING AVAILABLE: Funding will be identified at project award. F. Wally Sa elin Public Works Director Prepared by Gary Wiman, Construction Project Manager FWS/GRW/pmf Attachment cc: Library Services Manager APPROVED: "Konradt Bartlam, City Manager K:\WP\PROJECTSWIISC\LIBRARY\Renovation Phase 3\CPS&A Library Phase 3.doc 10/9/2013 0 0 0 0 0 0 0 0 as acorlsa /� ti' LEARNING CENTER STAFF C�'� O TEEN O W W W W ��® � a a s STAG A AREA f�1 I �'I, OaP NeRa woRK AREA INTERNET IIJ ID L1 ME y eo ' � F== 0 O COMPUTER o FLEA ING ROOM (EQ7 IL I SERVICE I, ® I Ii I ,E10ARPET1,mGAaPET IF Ia Qa I 16'<Tle• I A COPY I CENTER E E a_ JAN. ® II E DEG. y , mI E CALIFORNIA FAMRr FAmILv MEETING ROOM ROOM S E o 71 m / RITCHIEI MEN E § II rEI-m STAG STOq 't HALL t _ Eby AREA LOBBY �E t ITS itt. t12.t =-.MEN E t S S 14DULT 1 1 ' A 14k, '______ ' NCONF.'t r -n m FOUNDATION FRIEND'SIll E 0 O 0 © BOOKSTORE 0 o D O 0 REMODEL FLOOR PLAN NOTES 2.1 +48 LOW WALL W/ TRANSLUCENT TOP — SEE DETAIL A/ A10.1 ®REMODEL FLOOR PLAN 22 PAINT ALL WALLS IN AREA IF WORK - SEE INTERIGR FINISHES SCHEDDLE SCALE : 1/8" =1'-0" WALL LEGEND 2.3 CARPER PATE RH—OUT - SEE INTERIOR FINISHES SCHEDULE AND I� (E) WALL FRAMING TO REMAIN 2'A FRIISHESPSCHEOULEGHOUT I. CARPET PATTERN PLAN AND INTERIIXt [] (E) WALL FRAMING TO BE REMOVED 25 FOR POWER REQUIREMENTS NG—RA IS STATION BY OWNER. SEE ELECTRICAL PLANS (N) FRAMED WALL Ca SEE MECHANICAL PLANS FOR SCOPE OF WORN GENERAL NOTES 'AINT ALL LE ALLS IN MEETNG ROOMS - SEE INTERIOR FINISHES SCHE1. PROTECT AND PRESERVE CARPET IN AREAS WHERE IT IS i0 REMAIN CS FURNITURE TO BE PROWDED AND INSTALLED Br OTHERS — TYP. 2, PATCH AND TEXTURE ALL WALLS IN AREAS OF WORK PRIOR TO PAINTING 210 INSTALL (1) WALL BASE TO MATCH (E) — TW. 3 (E) BRICK TO REMAIN WITHOUT FINISH; PROTECT DURING CONSTRUCTION 2.11 (E) CEILING ACCESS PANEL ABOVE TO REMAIN 2.12 (E) FIRE EXTNWISHER ANCHOR (E) BOOKSHELVES TO FLOOR USING )'O WEDGE BOLTS 0 24- 2,13 O.C. W/ 3 5" EMBED 2.14 EQUIPMENT TO BE PROVIDED AND INSTALLED BY OWNER 2.15 P—DOM CRILING MOUNTED PROJECTION SCREEN BY OMER 0 0 0 0 0 0 WALL SCHEDULE NO. SIZET'PE INSULATION INTERIOR EXTERIOR F.R. U.L. 'n2Tuos RG.eATT %", a QE 10 e F.G. RATT X•Gr GA aiia slog Ss('2DNO NaU—ON VGY oa0 —DES NMTH INE �GYD x aGReGDee�W .AADE. NATION rrm, WMB ARCHITECTS 5757 Pacific Avenue SuRe 226 Stockton CA 95207 209.9E6.9110 T 220 W..5711 F barchilec[s.wm Larry Wenell Ti. Mafih.i. Tom Bowe Doug Dam Melanie Veu. Principal Archkecis Lodi Public Library Phase III Renova4on NOTATION PLAN USED ARCN Nott 30855 $ FpF cA��Fo 08.08.73 PUBLISH HISTORY Q DATE REYISIo1 WMB PROJECT: 10-103 A2.2