HomeMy WebLinkAboutAgenda Report - October 16, 2013 C-05AGENDA ITEM CO 5 CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Awarding Contract for Kofu Park Parking Lot Improvements, 1145 South Ham Lane to A. M. Stephens Construction Company, Inc., of Lodi ($146,231.65) MEETING DATE: October 16, 2013 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for Kofu Park Parking Lot Improvements, 1145 South Ham Lane to A. M. Stephens Construction Company, Inc., of Lodi, in the amount of $146,231.65. BACKGROUND INFORMATION: This project consists of reconstructing the southern parking lot at Kofu Park. The work includes replacing approximately 34,000 square feet of parking lot pavement, constructing a drive approach, installing two handicap -accessible parking stalls, replacing 700 square feet of paving adjacent to the MSC gate card reader, and other incidental and related work. Due to the age of the pavement and the number of vehicles using the parking lot, cracks have allowed water to seep into the pavement subgrade, causing the pavement to settle unevenly and form numerous large potholes. The pavement adjacent to the MSC gate card reader is severely rutted due to the stopping and starting of numerous heavy City vehicles. Plans and specifications for this project were approved on September 4, 2013. The City received the following eight bids for this project on September 25, 2013. Bidder Engineer's Estimate A. M. Stephens Construction MCI Engineering Robert Burns Construction Breneman, Inc. George Reed, Inc. Martin General Engineering Abide Builders, Inc. B & B Asphalt, Inc. FISCAL IMPACT: Location Bid $ 182,356.50 Lodi $ 146,231.65 Stockton $ 162,572.00 Stockton $ 168,025.10 Walnut Creek $ 171,788.75 Modesto $ 186,154.00 Rancho Cordova $ 194,420.75 Vacaville $ 197,516.25 Sacramento $ 201,907.75 The project will decrease maintenance costs. APPROVED: Bartlam, City Manager KAMPROJECTSWISC\Kofu Parking Lot\CAward.doc 10/2/2013 Adopt Resolution Awarding Contract for Kofu Park Parking Lot Improvements, 1145 South Ham Lane to A. M. Stephens Construction Company, Inc., of Lodi ($146,231.65) October 16, 2013 Page 2 FUNDING AVAILABLE: Funding for this project is appropriated and comes from a combination of operating funds identified in the 2013/14 Budget. The estimated total project cost (including contract administration, engineering, permitting, surveying, inspection and contingency) is $190,000. The total cost is separated as follows: General Fund 1211051 $ 38,000 Electric Utility 161051 $ 38,000 Wastewater 171051 $ 57,000 Water 181051 $ 57,000 Jordan Ayers / Deputy City Manager/Internal Services Director Siw F. Wally Sandelin Public Works Director Prepared by Sean Nathan, Associate Civil Engineer FWS/SN/pmf cc: Deputy Public Works Director — Utilities City Engineer/Deputy Public Works Director Associate Civil Engineer Nathan K:\WP\PROJECTS\MISC\Kofu Parking Lot\CAward.doc 10/2/2013 KOFU PARK PARKING LOT IMPROWENTS 1145 South Ham Lane CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and A. M. STEPHENS CONSTRUCTION COMPANY, INC., herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. Contract.doc 1 10/01/13 ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary to reconstruct the southern Kofu Park parking lot (approximately 34,825 square feet) with asphalt concrete; construct a drive approach and two handicap -accessible parking stalls; replace 700 square feet of paving at the MSC gate card reader; and other incidental and related work, all as shown on the plans and specifications for the project. CONTRACT ITEMS Item Description Unit Qty Price Total 1 Traffic Control LS 1 $1,000.00 $1,000.00 2 Clearing and Grubbing LS 1 $8,000.00 $8,000.00 3 Storm Water Pollution Control LS 1 $3,500.00 $3,500.00 4 Compact Original Ground SF 34,825 $0.25 $8,706.25 5 Concrete Sidewalk SF 42 $7.50 $315.00 6 Concrete Curb LF 77 $25.00 $1,925.00 7 Square -Tye Concrete Curb and Gutter LF 8 $41.00 $328.00 8 Concrete Parking Stall (ADA) SF 494 $6.70 $3,309.80 9 Commercial -Type Gutter and Driveway SF 369 $10.80 $3,985.20 10 Install Truncated Dome Panel SF 12 $45.00 $540.00 11 Replace Drop Inlet Catch Basin EA 2 $1,500.00 $3,000.00 12 Adjust Manhole Frame and Cover to Grade EA 3 $500.00 $1,500.00 13 Striping LS 1 $475.00 $475.00 14 Signage LS 1 $1,800.00 $1,800.00 15 Pavement Excavation CY 646 $14.50 $9,367.00 16 Asphalt Concrete TON 1,023 $94.80 $96,980.40 17 1 Landscape Area Modifications SF 200 $7.50 1 1,500.00 TOTAL: $146,231.65 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or r.nntmM ring 2 10/01/13 materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 21 Calendar Days. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: By; Title (CORPORATE SEAL) CITY OF LODI By: Konradt Bartlam City Manager Date: Attest City Clerk Approved As To Form D. Stephen Schwabayer City Attorney ContracLdoc 3 10/01/13 RESOLUTION NO. 2013-177 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING AND AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT FOR KOFU PARK PARKING LOT IMPROVEMENTS, 1145 SOUTH HAM LANE ------------------------------------------------------------------------ ------------------------------------------------------------------------ WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on September 25, 2013, at 11:00 a.m., for the Kofu Park Parking Lot Improvements, 1145 South Ham Lane, described in the plans and specifications therefore approved by the City Council on September 4, 2013; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid A. M. Stephens Construction $ 146,231.65 MCI Engineering $ 162,572.00 Robert Burns Construction $ 168,025.10 Breneman, Inc. __ $ 171,788.75 George Reed, Inc. $ 186,154.00 Martin General Engineering $ 194,420.75 Abide Builders, Inc. $ 197,516.25 B & B Asphalt, Inc. $ 201,907.75 WHEREAS, staff recommends awarding the contract for the Kofu Park Parking Lot Improvements, 1145 South Ham Lane, to the low bidder, A. M. Stephens Construction Company, Inc., of Lodi, California, in the amount of $146,231.65. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the Kofu Park Parking Lot Improvements, 1145 South Ham Lane, to the low bidder, A. M. Stephens Construction Company, Inc., of Lodi, California, in the amount of $146,231.65; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the contract. Dated: October 16, 2013 ------------------------------------------------------------------------ ------------------------------------------------------------------------ I hereby certify that Resolution No. 2013-177 was passed and adopted by the City Council of the City of Lodi in a regular meeting held October 16, 2013, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Johnson, and Mounce NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Katzakian and Mayor Nakanishi ABSTAIN: COUNCIL MEMBERS —None F-OLSON City Clerk 2013-177