HomeMy WebLinkAboutAgenda Report - August 20, 2014 C-06AGENDA ITEM C0401D
&1&% CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Awarding Bids for the Purchase of Padmount Transformers from
Howard Industries of Laurel, Mississippi ($33,327.72) and Hees Industries of
Astoria, Oregon ($21,732.84)
MEETING DATE: August 20, 2014
PREPARED BY: Electric Utility Director
RECOMMENDED ACTION: Adopt a resolution awarding bids for the purchase of padmount
transformers from Howard Industries of Laurel, Mississippi
($33,327.72) and Hees Industries of Astoria, Oregon ($21,732.84).
BACKGROUND INFORMATION: On July 16, 2014, the City Council authorized the advertisement of
bids to replenish inventory consumed as a result of the Rosegate
Subdivision development project.
The Electric Utility advertised bids on July 23 and 26, 2014. On August 6, 2014, bids were opened with
two suppliers submitting proposals. Life -cycle costs (total purchase price plus cost of operation based on
estimated power loss during the projected life of the transformer) were evaluated as shown on Exhibit A,
attached, and summarized below.
5 each 37.5kVA, 1 -Phase, 240/120V Howard Industries, Laurel, MI $11,531.25
16 each 50kVA, 1 -Phase, 240/120V Howard Industries, Laurel, MI $37,018.97
5 each 75kVA, 1 -Phase, 240/120V Hees Enterprises, Inc., Astoria, OR $17,065.40
2 each 150kVA, 3 -Phase, 480Y/277V Hees Enterprises, Inc., Astoria, OR $20,937.44
Staff reviewed the proposals and deemed Howard Industries of Laurel, Mississippi and Hees Industries
of Astoria, Oregon the lowest responsive bids and compliant with the approved specifications.
FISCAL IMPACT: Procurement cost is $55,060.56. Total life -cycle cost is $86,553.06.
FUNDING AVAILABLE: Included in FY2014/15 Budget Account No. 160.1496.
Jordan Ayers
Deputy City Manager/Internal Services Director
!�'L / 01
Fob, Vizabeth A. Kirkley
Electric Utility Director
PREPARED BY: Jules L. Marchesseault, Engineering and Operations Manager
EAK/JLM/Ist
APPROVED:
Stephen Schwabauer, City Manager
EXHIBIT A.
PAD MOUNTED TRANSFORMER BID EVALUATION Aug 6, 2014
Transformer Bid Evaluation
Price $
Bid Opening: Aug 6, 2014
Loss
(watts)
Padmount
Tax (factor):
1.08 Primary Windings:
Three -Phase, 12000 Volt, 60Hz, Delta Connected
inches
No Load Loss $/watt:
3.75
Single -Phase, 12000 Gird. Wye/6930 Volt, 60Hz
1,987.50 8,180.00 10,167.50
Load Loss $/watt:
1.25
24
1.800
Howard Industries 1,499.00 23,984.00
25,902.72
115
Bid Item 1: 37.5 kVA, 240/120 Volt, 1 Phase Pad
ABB c/o PACIFIC UTILITIES 1,850.00
Number of units:
5 1 1 1 1 — 1.8
Vendnr I l snit I
Fxtenrled I Price INn I narl I
I nad I Nn I nad I I nad I
rnct of I I ife (:vr.lp I DP1ivPrvl Heinht I Imnedanre
Price $
Price $
w/tax $
Loss
(watts)
Loss
watts
Loss value Loss value Losses $
Cost $
weeks
inches
%
106
409
1,987.50 8,180.00 10,167.50
45,712.46
8-10
24
1.800
Howard Industries 1,499.00 23,984.00
25,902.72
115
448
ABB c/o PACIFIC UTILITIES 1,850.00
9,250.00
9,990.00
79
375
1,481.25 2,343.75
3,825.00
13,815.00
8-10
24
1.740
Howard Industries 1,375.00
6,875.00
7,425.00
94
375
1,762.50 2,343.75
4,106.25
11,531.25
6-8
24
2.000
Hees Enterprises Inc. 1,480.00
7,400.00
7,992.00
88
342
1,650.00 2,137.50
3,787.50
11,779.50
8-10
28
1.700
Bid Item 4: 150 kVA, 480/277 Volt, 3 Phase Pad
Bid Item 2: 50 kVA, 240/120 Volt, 1 Phase Pad
Number of units:
Number of units:
16
>= 1.8
I vendor I unit I Extended I Price INo Load I Loan I No Load I Load I cost of I Lite cvele I uelivervl Helant Ilmoedance
Price $ Price $
w/tax $
Loss
(watts)
Loss
(watts) Loss value Loss value Losses $
Cost $
weeks
inches
%
ABB c/o PACIFIC UTILITIES 2,057.00 32,912.00
35,544.96
106
409
1,987.50 8,180.00 10,167.50
45,712.46
8-10
24
1.800
Howard Industries 1,499.00 23,984.00
25,902.72
115
448
2,156.25 8,960.00 11,116.25
37,018.97
6-8
24
1.800
Hees Enterprises Inc. 1,694.00 27,104.00
29,272.32
115
374
2,156.25 7,480.00 9,636.25
38,908.57
8-10
28
2.000
659
2,812.50 4,118.75
6,931.25
17,304.65
6-8
24
2.400
Hees Enterprises Inc. 1,901.00
9,505.00
Bid Item 3: 75 kVA, 240/120 Volt, 1 Phase Pad
135
683
2,531.25 4,268.75
Number of units: 5
1
1
1
— 1.8
I \/endnr I unit I Fxtandari I Prire INn I nad I I nad I Nn I nad I I nad I (-n-qt of I I ife Cvr.1e I r)elivemi Heinht Ilmnadanra
Price $
Price $
w/tax $
Loss
(watts)
Loss
(watts) Loss value Loss value Losses $
Cost $
weeks
inches
%
ABB c/o PACIFIC UTILITIES 2,483.00
12,415.00
13,408.20
123
611
2,306.25 3,818.75
6,125.00
19,533.20
8-10
26
2.230
Howard Industries 1,921.00
9,605.00
10,373.40
150
659
2,812.50 4,118.75
6,931.25
17,304.65
6-8
24
2.400
Hees Enterprises Inc. 1,901.00
9,505.00
10,265.40
135
683
2,531.25 4,268.75
6,800.00
17,065.40
8-10
28
2.000
Bid Item 4: 150 kVA, 480/277 Volt, 3 Phase Pad
Number of units:
2
>= 1.8
vendor I unit I txtended I Price INO Load I Load I No Load I Load I cost of I Lite c cle lueliveryl Het nt limpeaance
Loss Loss
Price $ Price $ w/tax $ (watts) (watts) I Loss value I Loss value I Losses $ 1 Cost $ 1 (weeks) I (inches)
X10000000.xls 1
RESOLUTION NO. 2014-148
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE BIDS FOR THE PURCHASE OF
PADMOUNT TRANSFORMERS FROM HOWARD
INDUSTRIES, OF LAUREL, MISSISSIPPI, AND HEES
ENTERPRISES INC., OF ASTORIA, OREGON
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on August 6, 2014, at
11:00 a.m. for the purchase of padmount transformers for the Electric Utility Department,
described in the specifications therefore approved by the City Council on July 16, 2014; and
WHEREAS, said bids have been compared as to life -cycle costs, checked, and
tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached; and
WHEREAS, the bids meeting the City's specification with the lowest estimated life -cycle
costs are shown below:
5 each 37.5 kVA, 1 -Phase 240/120V
Howard Industries, Laurel, MI
$11,531.25
16 each 50 kVA, 1 -Phase, 240/120V
Howard Industries, Laurel, MI
$37,018.97
5 each 75 kVA, 1 -Phase, 240/120V
HEES Enterprises Inc., Astoria, OR
$17,065.40
2 each 150 kVA, 3 -Phase, 480Y/277V
HEES Enterprises Inc., Astoria, OR
$20,937.44
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award
the bids for the purchase of padmount transformers as shown above, in the total amount of
$55,060.56.
Dated: August 20, 2014
I hereby certify that Resolution No. 2014-148 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held August 20, 2014, by the following vote:
AYES: COUNCIL MEMBERS — Hansen, Johnson, Mounce, Nakanishi, and
Mayor Katzakian
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
0'4JdNIFE . ROBISON
City Clerk
2014-148
Transformer Bid Evaluation
Padmount
EXHIBIT A.
PAD MOUNTED TRANSFORMER BID EVALUATION Aug 6, 2014
Bid Opening: Aug 6, 2014
Tax (factor): 1,08 Primary Windings: Three-Phase, 12000 Volt, 60Hz, Delta Connected
No Load Loss $/watt: 3.75 Single-Phase, 12000 Grd. Wye/6930 Volt, 60Hz
Load Loss $/watt: 1.25
Bid item 1d 37.6`!E 240Ii20 V
1 Phase Pad
Number of units:
5
>= t8
Vendor
Unit
Extended
Price
INo Load
Load
No Load Load
Cost of
Life Cycle
Delive
Nei ht
h etignCe
Price $
Price $
w/tax $
Loss
(watts)
Loss
watts
Loss value Loss value Losses $
Cost $
weeks
inches
%
B n/o PACIFIC UTILITIES
1,850.00
9,250,00
9,990.00
79
375
1 481.25 2,343.7
3,825.00
13 815.00
8-10
24
1.740
Howard Industries
1,375.00
6,875,00
7,426.00
941
375
1,762.50 2,343.75
4.106.25
11 631.26
6-81
24
2.000
Hees Enter rises Inc.
1,480.00
7,400.0
7,992.00
88
342
1,650,00 2,137,50
3,787.50
11779.50
8-10
28
1.70
Bid Item 2t GO kVA 246112p V6 .1 Phase Pad
Number of units:
1
>= 1.$
Vendor
Unit
Extended
Price
IVa Load
Load
No Load Load
Cost of
Life Cycle
Delive
He' ht
t
Price $
Price $
w/tax $
Loss
watts
Loss
watts
Loss value Loss value Losses $
Cost $
weeks
inches
ABB c/o PACIFIC UTILITIES
2,057.
312 00
35 544.96
105
409
1,987.5 8 180,00 10 167.50
45712.46
8-10
24
1.80
(Howard Industries
1,499.00 23 984.00 25 902.72
115
448
2 156.25 $9$0:00 11,116.25
37 018.97
6-8
24
1.800
FIe6a Ente dae :[ft.
1004.00 _g7104:00 ;M 27232
11.
$74
2 15625 7,480-00
9,636.2 SB 08.67
8-10
28
2:000
aid Item 3; 75 kVA 240/120 Volt, 1 Phaea Pad
Nuiittiei .of unite:
5
Vendor
Unit
Extended
Price
No Load
Load
No Load Load
Cost of
Life C cle
Delive
He' ht
Im edilr400
Price $
Price $
w/tax $
Loss
watts
Loss
watts
Loss value Loss valuel Losses $
Cost $
weeks
inches
°10
ABB c/o PACIFIC UTILITIES
.2,483.0
12,415X
13 406.20
123
611
306.25 3,818.75
6,125.0
19 533.20
8-10
26
2.230
Howard Industries
1,921.0
9,605.00
10 373.40
150
659
2,812.50 4,118,75
6 931.25
17304.65
6-8
24
2.40
Hees Enterprises Inc.
1,90M0
9,505.0
10 265.40
135
683
2,531.25. 4268.75
6,800.0
17 065.40
8-10
29
2.00
Bid Item 4: 150 kVA 480/277 Vol
3 Phaea Pad
Num er of units:
2
>= 1,6
Vendor
Unit
Extended
Price
Wo Load
Load
No Load Load
Cost of
Life Cycle
Deliv
He ht
Price $
Price $
w/tax $
Loss
watts
Loss
watts
Loss value Loss value Losses $
Cost $
weeks
inches
%
,ABB c/o PACIFIC UTILITIES
6,475.0
12 950,0
13, $416.00
332
1358
6 225A0 . 3,390.0
9,615- 23601.00
8-10
56
3.19
Howard Industries
5,613,00
11 226.00
12 124.08
348
1302
6,525.00 3,255.00
9,780-00
21 904.08
6-8
48
2.30
Hees Enter rises Inc.
5309.00
10 618.0
11 457.44
334
1283
6,262-50 3,207,50
9,470,00
20 937.44
10-12
4
3.600
X10000000.xIs