Loading...
HomeMy WebLinkAboutAgenda Report - August 20, 2014 C-03AGENDA ITEM C-03 &Q% CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Approve Specifications and Authorize Advertisement for Bids for Replacement Battery Bank at Industrial Substation MEETING DATE: August 20, 2014 PREPARED BY: Electric Utility Director RECOMMENDED ACTION: Approve specifications and authorize advertisement for bids for replacement battery bank at Industrial Substation. BACKGROUND INFORMATION: The Electric Utility (EU) maintains four distribution substations that transform sub -transmission voltage from 60kV to 12kV, for the purpose of providing service to its 26,000 customers. Industrial Substation was commissioned in January 1991 and utilizes a 125 volt direct current battery bank for the primary and back-up controls for operating the substation, which includes all supervisory functions. The original battery bank is 23 years old and has outlived its life expectancy of 15 years and is now showing signs of decay that jeopardize the reliability of the substation. The proposed specifications indicate two distinct bids to be provided; the first for materials only; the second for contract labor and materials to replace the battery bank. The specifications are on file at the Electric Utility, located at 1331 South Ham Lane. The planned bid opening date is Tuesday, September 2, 2014. FISCAL IMPACT: The total cost of the battery bank is estimated to not exceed $35,000. FUNDING AVAILABLE: Included in FY2014/2015 Account No. 161082. r' . i & ext, 0A AS� &'V� o t^ Elizabeth A. Kirkl Electric Utility Director PREPARED BY: Charles J. Berry, Electric Utility Superintendent EAK/CJB/Ist APPROVED: , -& Stephen SchwabAuer, City Manager AGENDA ITEM C3 &1a CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Approve Specifications and Authorize Advertisement for Bids for Replacement Battery Bank at Industrial Substation MEETING DATE: August 20, 2014 PREPARED BY: Electric Utility Director RECOMMENDED ACTION: Approve specifications and authorize advertisement for bids for replacement battery bank at Industrial Substation. BACKGROUND INFORMATION: The Electric Utility (EU) maintains four distribution substations that transform sub -transmission voltage from 60kV to 12kV, for the purpose of providing service to its 26,000 customers. Industrial Substation was commissioned in January 1991 and utilizes a 125 volt direct current battery bank for the primary and back-up controls for operating the substation, which includes all supervisory functions. The original battery bank is 23 years old and has outlived its life expectancy of 15 years and is now showing signs of decay that jeopardize the reliability of the substation. The specifications are on file at the Electric Utility, located at 1331 South Ham Lane. The planned bid opening date is Tuesday, September 2, 2014. FISCAL IMPACT: The total cost of the battery bank is estimated to not exceed $525,000. FUNDING AVAILABLE: Included in FY2014/2015 Account No. 161082. �J mabeth A. Kirkley Electric Utility Director PREPARED BY: Charles J. Berry, Electric Utility Superintendent EAK/CJB/Ist APPROVED: S_ tephbn Schwabauer, City