HomeMy WebLinkAboutAgenda Report - May 7, 2014 C-10AGENDA ITEM C 4D CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Accept Improvements Under Contract for Lodi Public Library Phase 3 Remodel Project MEETING DATE: May 7, 2014 PREPARED BY: Public Works Director RECOMMENDED ACTION: Accept improvements under contract for Lodi Public Library Phase 3 Remodel Project. BACKGROUND INFORMATION: The contract was awarded to Diede Construction, Inc., of Woodbridge, in the amount of $284,190, on January 15, 2014. The contract has been completed in substantial conformance with the plans and specifications approved by City Council on November 6, 2013. The Phase 3 project completed carpet, lighting, communications, space conditioning and furniture upgrades within the remodel area. Rooms to accommodate tutoring, a computer lab, meetings, caf6-style seating and a teen sitting area were also provided. A drawing of the project floor plan is attached for reference as Exhibit A. The contract completion date was April 27, 2014, and the actual completion date was April 17, 2014. The final cost of the project was $301,849. There difference between the original contract amount and final contract was due to three change orders totaling $17,659. The changes included adding additional floor and wall electrical outlets, painting in additional areas and code -required fire alarm system improvements. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to inform vendors and subcontractors that the project is complete and to initiate the 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT: There will be a decrease in facility maintenance costs. FUNDING AVAILABLE: This project was funded through a donation from the Library Foundation (211 fund). UJITIU Cv,,� F. Wally Sandelin Public Works Director Prepared by Gary Wiman, Construction Project Manager FWS/GW/pmf Attachment cc: Library Services Director K:\WP\PROJECTS\MISC\LIBRARY\Renovation Phase 3\CAccept.doc 4/25/2014 0 0 0 0 lff"�" E R L E91 qp III a a , a a 9 9 9 STACK AREA -T. ME IQ. F== ----------- CWE DE) (EQ7 IL all SERVICE (E)CARPET IN. PET IF KI) r) A COPY CENTER CALIFM03R IA F—Ily FM MEETING ROOM ROO -------- -------------- 71 Ly 11 IM3 III RITCHIE NIFN & STACK A STORI— IRH HAL AREA IS ' EFE] LL LOBBY ffm. I I'll',T)IFFM kGULT =-.MEN p .......... A 14k, 'e -P LJ L L -i L -i L -i L -i L -i L -i L -i 9=.. JNF i� FRIENDS j A OOKSTONIH ------------------------ ----- 0 REMODEL FLOOR PLAN NOTES II 14B' LOW — W/ TRANSLUCENT TOP - SEE DETAIL A/ A10.1 REMODEL FLOOR PLAN PART I -HLI IN AREA IF -11 - SEE INT1111 111411111 IC"I11L1 SCALE 118-1--0- WALL LEGEND (CN)N CAR IT TYR—OUT SEE INTERIOR FINISHES SCHEDULE AND A .. (N CAR=1 I. CARPET 1ATTERN PLAN AND INTEFOR (E) MILE FRAMING TO REMAIN FRISIES SC ECULE ENG—RA IS COMPUTER STATION BY OMER. SEE ELECTRICAL PLANS (E) AALL FRAMING TO BE REMOWD FOR FOREP REQUIREMENTS (N) FRAMED Ca SEE IECIAIICAL PLANS FOR SCOPE OF :, �1 N T 1111 GENERAL NOTES 'AINT ALL aAU-S IN MEETNG ROOMS - SEE INTERIOR FINISHES SCHEDULE t PROTECT AND PRESERVE CARPET IN AREAS WERE IT IS TO REMAIN CS FURNITURE TO BE PROIDED AND ISTAULED 81 OTHERS - TYE, 2, PATCH AND TEXTERE ALL WAU-S IN AREAS OF MRK PRIOR TO PAINTING 2.10 IETAU- (1) — BASE TO MATCH (E) - — 3, (E) BRICK TO REMAIN WITHOUT FINISH; PROTECT DURING CONSTRUCTION 2.11 (E) CEIUNG ACCESS PANEL ABOVE TO REMAIN 2.12 (E) FIRE EXTNWISIER ANG OR (E) BOOKS— TO FLOOR USING �'O aEDGE 80- 0 24- 2,13 OI� W/ 3 X" EMBED 2.11 EQUIPMENT TO BE PROMDED AND INSTALLED BY OMER 2.15 P—DOM CRILING MOUNTED PROJECTION SCREEN BY OMER H 0 0 0 0 H WALL SCHEDULE NO. SIZEITYPE INSULATION INTERIOR �ERIOIR F.R. U.L. I I M�ISITII RHRG— %",S,D6 HER a 10GA MI 1-19FG RATT 'TUD, a J.' GO, INFILL NO NaU—ON V GYP, BD' V 61TUDI 0 —DES 11F. INI. MTH "IN� "'Y"D"T" SID F—HEI—OF111. STU IS D� SAS12 A a- GNA`!Z ! I -- 'i�� .AADE. NATION rrm, WMB ARCHITECTS 5757 Pacific A—ue Sui[a 226 Stc.ldc,, CA 952 7 21:�19110T 20 W.5711 F I-II W-11 Ti. fth.i. TO. B— DI am M.I.I Va.. P,i..ip.1 A,.hft- Lodi Public Library Phase III Renovafion NOTATION PLAIN PUB ISH HISTORY 2A' —I N -S'.