AGENDA TITLE: Accept Improvements Under Contract for Lodi Public Library Phase 3 Remodel
Project
MEETING DATE: May 7, 2014
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Accept improvements under contract for Lodi Public Library Phase 3
Remodel Project.
BACKGROUND INFORMATION: The contract was awarded to Diede Construction, Inc., of Woodbridge,
in the amount of $284,190, on January 15, 2014. The contract has
been completed in substantial conformance with the plans and
specifications approved by City Council on November 6, 2013.
The Phase 3 project completed carpet, lighting, communications, space conditioning and furniture
upgrades within the remodel area. Rooms to accommodate tutoring, a computer lab, meetings,
caf6-style seating and a teen sitting area were also provided. A drawing of the project floor plan is
attached for reference as Exhibit A.
The contract completion date was April 27, 2014, and the actual completion date was April 17, 2014. The
final cost of the project was $301,849. There difference between the original contract amount and final
contract was due to three change orders totaling $17,659. The changes included adding additional floor
and wall electrical outlets, painting in additional areas and code -required fire alarm system improvements.
Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of
Completion with the County Recorder's office. The notice serves to inform vendors and subcontractors
that the project is complete and to initiate the 30 -day period to file a stop notice requiring the City to
withhold payments from the prime contractor in the event of a payment dispute.
FISCAL IMPACT: There will be a decrease in facility maintenance costs.
FUNDING AVAILABLE: This project was funded through a donation from the Library Foundation
(211 fund).
UJITIU
Cv,,� F. Wally Sandelin
Public Works Director
Prepared by Gary Wiman, Construction Project Manager
FWS/GW/pmf
Attachment
cc: Library Services Director
K:\WP\PROJECTS\MISC\LIBRARY\Renovation Phase 3\CAccept.doc
4/25/2014
0 0 0 0
lff"�" E R
L E91
qp III a a , a a
9 9 9 STACK
AREA
-T. ME
IQ.
F==
-----------
CWE
DE) (EQ7 IL
all
SERVICE
(E)CARPET IN. PET IF KI) r)
A COPY
CENTER
CALIFM03R IA F—Ily FM
MEETING ROOM ROO -------- --------------
71
Ly
11 IM3 III
RITCHIE NIFN &
STACK
A
STORI— IRH HAL AREA
IS ' EFE]
LL
LOBBY ffm. I I'll',T)IFFM kGULT
=-.MEN
p
.......... A 14k, 'e -P
LJ L L -i L -i L -i L -i L -i L -i L -i
9=.. JNF i�
FRIENDS j A
OOKSTONIH
------------------------ -----
0 REMODEL FLOOR PLAN NOTES
II 14B' LOW — W/ TRANSLUCENT TOP - SEE DETAIL A/ A10.1
REMODEL FLOOR PLAN PART I -HLI IN AREA IF -11 - SEE INT1111 111411111 IC"I11L1
SCALE 118-1--0-
WALL LEGEND (CN)N CAR IT TYR—OUT SEE INTERIOR FINISHES SCHEDULE AND
A ..
(N CAR=1 I. CARPET 1ATTERN PLAN AND INTEFOR
(E) MILE FRAMING TO REMAIN FRISIES SC ECULE
ENG—RA IS COMPUTER STATION BY OMER. SEE ELECTRICAL PLANS
(E) AALL FRAMING TO BE REMOWD FOR FOREP REQUIREMENTS
(N) FRAMED Ca SEE IECIAIICAL PLANS FOR SCOPE OF
:, �1 N T 1111
GENERAL NOTES 'AINT ALL aAU-S IN MEETNG ROOMS - SEE INTERIOR FINISHES
SCHEDULE
t PROTECT AND PRESERVE CARPET IN AREAS WERE IT IS TO REMAIN
CS FURNITURE TO BE PROIDED AND ISTAULED 81 OTHERS - TYE,
2, PATCH AND TEXTERE ALL WAU-S IN AREAS OF MRK PRIOR TO PAINTING 2.10 IETAU- (1) — BASE TO MATCH (E) - —
3, (E) BRICK TO REMAIN WITHOUT FINISH; PROTECT DURING CONSTRUCTION 2.11 (E) CEIUNG ACCESS PANEL ABOVE TO REMAIN
2.12 (E) FIRE EXTNWISIER
ANG OR (E) BOOKS— TO FLOOR USING �'O aEDGE 80- 0 24-
2,13 OI� W/ 3 X" EMBED
2.11 EQUIPMENT TO BE PROMDED AND INSTALLED BY OMER
2.15 P—DOM CRILING MOUNTED PROJECTION SCREEN BY OMER
H 0 0 0 0 H
WALL SCHEDULE
NO. SIZEITYPE INSULATION INTERIOR �ERIOIR F.R.
U.L.
I
I M�ISITII RHRG— %",S,D6
HER a
10GA MI 1-19FG RATT
'TUD, a J.'
GO, INFILL
NO NaU—ON V GYP, BD'
V 61TUDI 0 —DES
11F.
INI. MTH
"IN� "'Y"D"T"
SID F—HEI—OF111.
STU IS
D�
SAS12
A a- GNA`!Z
!
I --
'i�� .AADE. NATION
rrm,
WMB
ARCHITECTS
5757 Pacific A—ue
Sui[a 226
Stc.ldc,, CA 952 7
21:�19110T
20 W.5711 F
I-II W-11
Ti. fth.i.
TO. B—
DI am
M.I.I Va..
P,i..ip.1 A,.hft-
Lodi Public Library
Phase III Renovafion
NOTATION PLAIN
PUB ISH HISTORY
2A' —I N -S'.