HomeMy WebLinkAboutAgenda Report - December 21, 1988 (87)4i Or �fl 4 •) (1 QCITY OF LODIDEPARTMENTP —i— 0— - ? TO: City Council CCOLUNCILOMMUNICATION FROK : City Manager MEETING DATE: December 21, 1988 AGENDA TITLE: Adopt Resolution Revising the Storm Drain Fees RECOMMENDED ACTION: That the City Council adopt the resolution revising the Storm Drain Fees. BACKGROUND WFAI IM- In November the City Council adopted an Ordinance concerning storm drainage fees in order to comply with AB1600. The actual ruv fees are to be adopted in this implementing Resolution. The recommended fees are $4,830 per gross commercial/industrial acre; $3,620 per gross residential acre; and $1,210 per acre of residential to commercial/industrial conversion if the prcperty had previously paid a Master Drainage Fee. Present fees total $5,170 oer gross acre. City staff has prepared a repert "Storm Drainage Fee Study, November 1988" (copy attached) which includes the background material supporting the proposed fees. This report was sent to 18 members of the development community (engineers, developers, and builders) and the newspapers, as well as to the City Council. The attached cover letter was also provided. It describes the now concepts included in the proposed fee structure, so the. discussion is not; repeated �n,this_memo.Pr An infornational meeting was held on Friday, December 2 which one local engineer attended. Staff has received no other response to the study. One issue that was raised at the meeting was that of reimbursements, Under the terms of Section 4 o f the Ordinance, the City will reimburse developers for the oversizing necessary for Master Plan Storm Drains at the time of development. Reimbursements for other minor oversizing is not covered by the Ordinance and Resolution. Staff intended to rely on the.State Subdivision Act which provides for reimbur'semnenf'a"greementscovering the affected property. This means that the developer must wait for the affected property to develop in order to collect the reimbursement. This issue was formerly ,covered by the City's In -Tract Fee and Credit system which does not comply with AB1600 and is being dropped. Council Communications December 21, 1988 Page " adjacent property at the time of its development. In these cases the first developer is installing a facility needed by the first development anyway. Where facilities are oversized to provide capacity for land beyond the first development, i t i s proposed the City pay the reimbursement t o the f r s t developer and collect from the second development when it develops. (i.e. s e t up a revolving fund), Details of this concept will, be worked out and presented to the Council early in 1989 unless Councilrovides other direction. This does not need to be resolved at this tine. Although the revised storm drain fee structure has generated no controversy, staff recommends the public be given an _opportunity to speak on the issue at the December 21 council meeting. Asstmung no new unanswerable concerns are raised, it is recommended the new Storm Drainage Fee Resolution be adopted. aO c Works Director JLR/ CITY COUNCIL JAME5 W. PINKERTON. Jr., Mayor JOHN R. (Randy) SNIDER Mayor Pro Tempore DAVID M. HINCHMAN EVELYN M. OLSON FRED M.REID Interested Parties CITY OF LODI CITY HALL. 22t WEST FINE STREET CALL BOX 3006 LODI, CALIFORNIA 9524-1-1910 (209) 334-5634 TELECOPIER:(2C9) 333-6795 November 21, 1988 SUBJECT: Storm Drain Fees - AB1600 THOMAS A PETERSON City Manager ALICE M. REIMCHE City Clerk BOB McNATT City Attorney The attached study presents the Ordinance, Resolution, and the supporting information necessary to implement Assembly Bill 1600. This Bill set forth a number of new requirements for fees charged as a condition of approval of developments. The only fees the City presently charges in this fashion are the two drainage fees - "faster Storm Drainage Fee and In -tract Drainage Fee. The Master Storm Drain Fee, begun in 1972, is used to pay for major facilities - basins, pump stations and trunk lines. The present fee is . adjusted semi-annually according to the Engineering Tbm Record Construction Cost Index. It is presently .$40070 per gross acre -and woule go up January 1, 1989 to approximately -$4,160 ;As.presently structured; this fee would be invalidated fly A61600. The _new -ordinance, and - resolution replaces this fee with one'staff,feels meets the`AB160O requirements. calculations as to what the developement itself would have installed had there been no Master Line necessary. 3. Recalculation of Fees. The fee calculations and Resolution will be redone every year with appropriate adjustments made for projects constructed, new projects added, acreage fees paid, etc. `In addition to these concepts, a number of policies and interpretations that have been made over the years were incorporated in the Resolution, specifically in Sections 1. Definitions, 2. Fees, and 3. Time of Payment . This letter is being sent to various interested parties shown on the attached mailing list. A meeting to discuss the issue is being set for Friday, December 2, 1988 at 9:44 a.m. a t the Lodi City Council Chambers, 221 W. Pine Street. The matter will be heard by the City Council on December 21, 1988 at 7:30 p.m. I f you have any questions or comments, please contact Ri and Prima at 333-6706. Jack. Ronsko ublic� Works Director M C O U N C I L C O M M U N I C A T I O N TO: THE CITY CCC.I\CL OJ -Z*, ][., MEETING DATE FROM: THE CITY MANAGER'S OFFICE NOVEMBER 2, 1988 SUBJECT: CONSIDER ADS OF STATE -MANDATED ORDINANCE AND RESOLUTION ESTABLISHING STANDARDS AND PROCEDURES FOR IMPOSITION , COLLECTION AND FSPENDIrL RE OF DEVELCFERS FEES (AB1600) PREPARED BY: City Attorney RECOMMENDED ACTION: That Council adopt the attached ordinance and resclution mandated by State statute, addressing collection, retention and utilization of developers' fees. BACKGROUND INFORMATION: As Council is aware, the State Legislature, pursuant to AB1600 and its companion bill SB372, has mandated that local government adopt provisions for the establishment of procedures establishing a "nexus" between development fees imposed and the needs generated by the development upon which such fees are imposed, as well as set up certain segregated accounts for the deposit and retention of funds. The attached resolution and ordinance carry out these mandates.The ordinance.. itself establishes the Master Storm Drainage Fee (the only dev&pment ::fee presently in place in the City), limits the use of fee revenues_ ' and establishes a mechanism for fee adjustments. The resolution provides. necessary definitions, sets the fee itself, and provides for fee reviews ORDINANCE NO. 1440 AN ORDINANCE OF THE LODI CITY COUNCIL ESTABL A STORM ERADAM FEE FOR DEVELOPMENTS WITHIN THE CI1Y OF LODI BE IT ORDAINED BY THE LODI CITY COUNCIL AS FOLLOWS: SECTION .l. PURPOSE. In order to implement the goals and objectives of the City of Lodi 's General Plan, and to mitigate the impacts upon the drainage system of the City caused by future development, certain public drainage improvements or facilities rust be or have been required to be constructed. The Lodi City Council has determined that a development impact fee is necessary and appropriate in order to finance these public drainage improvements and to pay for each development's fair share of the construction costs of such improvements. In establishing the fee described in the following sections, the City Council has found the fee to be consistent with it s General Plan, and pursuant to Government Code §65913.2, has considered the effects of the fee with respect to the City's housing needs as established in the Housing Element of the General Plan. The City Council also finds that the City's storm drain system, which consists of an interconnected network of pumping stations , retention basins and trunk lines has been planned as a unified system and constructed in stages since 1963 using a combination of funding sources including a Master Storm Drain Fee. The City Council finds that it is in the best interest of the entire City that properties that are to be developed pay the cost of additional storm drain facilities in accordance with the Storm Drain Master Plan so said costs will not become a burden on City taxpayers. i.. .. i3 .. _.ba ��.,.a:K.... ,,..,,�... ....fie, .... :.s. ,h. �T.:.. ... ...:......... :.'�" SBCTDN 2. ISLABURIVIENT OF THE STORM DRAINAGE FEE There is hereby established, upon issuance of all building, use or occupancy permits and subdivision maps:for development in the. City. of.Lod' Storm: Drainage Fee. Ths.fee is established topay for public drainage.improvements,,:;fhe: .-::,City-Council shall; in a Council resolution.adopted after.a duly. noticed s public..hearing, set forth the specific amount of:the fee; describe the benefit,: list the specific_ municipally -owned improvements; tobe financed, describe'the estimated .:cost6f-'these facilities;: describe the reasonable rel atibhshlp between, thi s fee :and .the: various types of:. new developments, and set'. forth- the time for payment. As described in the. fee ,reso.lution, th:l.s. development: fee: shall: be paid by each developer as spec ified;::in: ... Go."vernnient;Code:§5307.7:5:;referrjg_ -n to.:time of.coliection: On an: annual. ':: basis,the:...City,:.Council: shall --review.. this fee 'to. determine: whet Fie r. the::fee. amounts'.are',,reasonably.related to the impacts of developments and whether.. ;;.; ...the described pubTi c drainage facilities are still needed: : Y .....:... . i.. .. i3 .. _.ba ��.,.a:K.... ,,..,,�... ....fie, .... :.s. ,h. �T.:.. ... ...:......... :.'�" Said Resolution and associated studies shall be available to the general public for a period of at least fourteen days prior to the public hearing . SECTION 3. LIMITED USE OF FEE REVENUES. The revenues raised by payment of these fees shall be placed in a separate and special account, and such revenues, along with any interest earnings on that account, shall be used solely to: (a) Fay for the City's future construction of drainage facilities described in the resolutions enacted pursuant to Section 2 above, or to reimburse the City for those described or listed facilities constructed by the City with funds advanced by the City from other sources, or; (b) Reimburse developers who have been required or permitted by Section 4 hereunder to install such listed facilities which are oversized, with supplemental size, length, or capacity. (c) To pay for and/or reimburse costs of program development and ongoing administration of the fee program for such public facilities. Passed and adopted this 16th day of November, 1988 JAMES W. PINKERTON, JR. Mayor Attest: ALICE M. RENGE City Clerk State of California County of San Joaquin, ss. I, Alice M. Reimche, City Clerk of Ordinance No. 1440 was introduced of the City of todi held November adopted and ordered to print at a November 16, 1988 by the following the City of Lodi, do hereby certify th.H at a regular meeting of the City Council 2- 1988 and was thereafter passed, regular meeting of said Council held vote: Council Members - Hinchman, Olson, Reid, Pinkerton (Mayor) Council Xfthbm None Council Members - None Snider and RESOLUTION NO. 88-165 A RESOLUIION OF THE LODI CITY COUNCIL., ESTABLISHING A STORM DRAKACE FEE FOR ALL DEVFLORVEN S WITHN THE =OF LODI VVHQXASy the Lodi City Council has adopted Ordinance No. 1440, creating and establishing the authority for imposing and charging a Storm Drainage Fee in the City of Lodi; and VEREAS, studies have been made and data gathered on the impact of contemplated future development on existing publ is drainage facilities in the City of Lodi, along with an an analysis of the need for new public drainage facilities and improvements required by new developinent was conducted, and said ordinance and study set forth the relationship between new development, the needed facilities, and the estimated cost(s) of those improvements. This study, entitled Master Storm Drain System was prepared by the City of Lodi Public Works Department, Engineering Division and is dated November 1988; and WHEREAS, such information was available for public inspection and review fourteen days prior to the public hearing; and NHEREAS, the City Council finds as follows: 1. The purpose of this fee is to finance Master Drainage f a c i l i t i e s and to reduce the impacts of flooding and related problems caused by new development, within the City of Lodi; 5. The facts and evidence presented establish that there is a reasonable relationship between the need for the described public facilities and the impacts of the types of development described in paragraph 3 above, for which the corresponding fee is charged, and, also there is a reasonable relationship between the fee's use and the type of development for which the fee is charged, as these reasonable relationships or nexus are in more detail described in the studies and data referenced above; 6. It is appropriate to establish the fee on a city-wide basis in order to construct facilities in a timely and cost effective manner and reduce the need for replacement of existing facilities in order to accommodate new development; 7. The cost estimates set forth in Exhibit 1 are reasonable costs estimates for constructing these facilities, and the fees expected to be generated by new development will not exceed the total of such costs; 8. The City has appropriated funds and established a Capital Improvement Program which includes a portion of the projects shown in Exhibit 1; NOW, THEREFORE, IT IS RESOLVED by the Lodi City Council that: (a) For new residential development, the Storm Drainage Fee shall be $3620.00 per gross acre, and (b) For each my commercial or industrial development, the Storm Drainage Fee shall be $4830.00 per gross acre, and (c) For each conversion of residential development to commerci_, or industrial development, where a Storm Drainage Fee was previously paid, the Storm Drainage Fee shall be 91210.00 per gross acre. The fee shall not apply to City projects, other projects exempted by 'law, nor to reconstruction of, or additions to single family dwellings. 3. T I iM E OF PAYMENT. In accordance with Government Code § 53077.5(b), such Storm Drainage fees shall be paid prior to the Final Subdivision Map filing; or, in cases of Parcel Maps or other developments, prior to the issuance of a building or other permit, by all non -exempted new development in this area. The Public Works Director shall determine the type of development, area to be charged, and the corresponding fee in accordance with this Resolution. 4. USE OF FEE. My fee shall be solely used to pay (1) for the described public facilities to be constructed by the City; (2) for reimbursing the City for the developer's fair share of those capital improvements already .. constructed by. the City; or (3) to reimburse developers who have constructed public facilities described in Exhibit 1 attached hereto, where those facilities were beyond that needed to mitigate the impacts ' of the developer's project(s). 5. FEE REVIEW. ; The Public Works Director shall, on an annual basis, review the ' ..::.. =' estimated cost of the described capital improvements, the continued need for those improvements, and the reasonable relationship between such need and the impacts o f the various types of development pending or anticipated and for which this fee is charged. The Public Works Director shall report his findings to the City Council at a noticed public hearing and recommend any adjustment to this fee or other action as may be needed. 6. JUDICIAL ACTION TO CHALLENGE THIS RESOLLITION Any judicial action or. proceeding to attack, review, set aside,..'.. :. . void or annul this resolution shall be trought within 120 days ' following its adoption.:: PASSED AND ADOPTED THIS 21st day. of December, 1988. s, :. -3 -77 w I hereby certify that Resolution No. 88-165 was passed and adopted by the City Council of the City of Lodi i n a regular meeting held December 21, 1988 by ttie following vote: Ayes : Council Members - Hinchman, Olson, Reid, Snider and Pinkerton (Mayor) Noes : Council Members - None C I T Y O F L 0 D I PUBLIC WORKS DEPARTMENT Ci t y of L od z Master Storm Drain System Capital Improvement Program This document presents the background material for the expansion and funding of the City's Master Storm Drain System, The report consists of the following: ?roipct Summary - list of projects and their total cost Master Storm Drain System Map - shows service area and projects Project Sheets - individual sheets describing the project with cost estimate Ordinance - the ordinance implementing the storm drain fee Resolution - the resolution setting the actual storm drain fee and administrative procedures Cost Study - drainage design and cost comparison for residential area vs. commercial/industrial C 7 ty of Lodi Al:.ster Storm Drain System Capi r37 Improvement Program Project Summary 'rofect Number Pro.iect Title: MSD001 C -Basin Development MSDO02 Calaveras St. Storm Drain, MSDO03 Turner Rd./Guild Ave. Storm Drain MSDO04 Pine St. Storm Drain MSOOOS Thurman St. Storm Drain MSDO06 Vine St. Storm Drain MSDO07 C -Basin Southeast Area Storm Drain MSD008 Evergreen Dr. Storm Drain MSDO09 Evergreen Or. Storm Drain MS0010 E -Basin Expansion MSDO11 F -Basin Development MSDO12 F -Basin North/South Storm Drain MSDO13 Kettieman Lane Storm Drain MSDO14 Kettleman Lane Storm Drain Uodated Cost for? Jan -89 (Pixley Park) Lockeford to Turner Guild Ave. to 800' E/Guild 400' E/Cluff Ave. to Guild Ave. White Oak Way to 500' N/Turner F�d. Bayberry Dr to 1400' S/Bayberry (Westgate Park) East of G -Area Trunk Line Wet of G -Area Trunk Line $ 686.000 119.000 211,000 41,000 63.000 54.000 171,000 128,000 63,000 1.059.000 x. r CITY OF L 0 D MASTER STORM DRAIN n�4 'c1 Faa2~ PUBLIC WORKS DEPARTMENT SYSTEM Dim �'''Ji•1N; nl ��-h ' — ELM ST ,'—•i --i , , , wESTGATE SDOi , � . �__� i ,_.. GL �b —j f OOT wU— 11 I vlaTOR R0. w12 4 ms=4[ Z;e J I � E N Msa N�DWf �., � r3 --- I. `A2iI. 12 EM 0 X ms Ito a4 CENTURY 6 4 c 11 I vlaTOR R0. w12 4 ms=4[ �S1X' TOOOSW - S8 6Z OI - •astHuaylo uMoys.Ssajun uotloadsut +g uotlellslutwpe-lop1lu00 sapntout uotlonalsuo0 •uotlonalsuoo ut papntout st 1C '4ou"•t �. :uotlonilsuoa_ol uot�d a1a6 n P p N aq of Paledtotlua ;t Xjale.azdas uMoys 6uwaaut5u3 u6tsa0. �u u,aa 000`989. S = IS00 LE7ol -- - ..»: :.tayl0 000162 $ '` SZStr un ADL'tr82 88- . C <. 611aIladEaspue3 (a ODO'£trT $ _ SZStr _.,88-unC, 000'Otri 115 dwnd/10.aluo0.(P 000'SLT $'. S2Str 88-uno 000'ILT s,Aoldwl.Zaalls (q 68188 pala6pnq a3ua3 'UotleneOx3 (e :UotlonJ4su03 :•6u3 u6isa0 (6utdeospuet 's3daouo3 00014 u6isap 'aal6t8)=slueltnsiioo _ £ TV :xaPul 2iN 68-uer _:to} 1soo palepdfl xaPul a1Ewt1s3 W 10 alvO lunowy :sluawase3 :XLm Io S448 :M3 _5u3 wttald wal slso� alewtl5 IOOGSN :aagwnN loacosd Ma.o.td Palelab •uotle6tl.:t pue 6utde3spuet '6utPe.16 a41 jo u6tsaP ayl ut aledtoclted 01 Pautela: aq tttM uEtd :alset; ay1 pa:eda.td ot;M loaliyo.:e adeosPual ayl Paunsse st U •s-teaR £ dlalEwtxo.tdde ;o pot.tad a .:ano aq LOM. U014eAEox3 •uMoys se saseyd ut padotaAap aq t1tM utseq ayj 'Xtaleapdas palewtlsa aae slUausanofdwt died Ctuo s,uawaAoldwt utE:O wa15 talsett aos aae salewtlsa ayl (£00388 5w?? 88oi ut paldope uetd .:alsew ayl 01 6utP.,000e utseg-D aq; J0 ;uawdolanaO pue uoisuedxa a41 paontout loafo.:d styi uotlatlasa ZoatO.:� OJEd ,(aLxLd) w2J6OJd �UawaAoidwl je7lde3 juawdolaAa0 ULSeg-j c po7 _4o A• --A c J City of Lad ! Calaveras St. Storm Drain Capital Improvement Program Lockeford to Turner 4 J This project includes the installation of a 30" storn drain in Calaveras Street to carry drainage from the Lockeford St. area to the trunk line in Pioneer Drive_ :_ .., _ � - •-�.��--rte ...�.-,� - _ - - 1 Project Number: MSDO02. Estimated Costs Date of ENR Updated Cost for:Jan-89: , `- tern AmountEstimate Index ENR Index_ 4623 Prelim Eng -. Rights cf Y1Fair Easements: Consultants:. Design Eng_:. 9,000 Jun -88 4525 5.9.000 Construction: 108.000 - Jun -88 4525 . s, lia,0oo Other 119,000 Tota 7 Cost_ r Remarks Design Engineering snc :.separately if anticipated to be budgeted prior. to construction, if. not itAs:.includeed.. construction. Construction includes con=tact administration 8 inspectionunless shorn otherwise S City o f L od i (I Turner Rd./Guild Ave. Storm Drain Capital Improvement Program �aroieci Descr 7_t ion This project includes the installation of approximately 650 LF of 60", 800 LF of 54' and 1150 LF of 42" storm drains in Turner Ro. and Guild Ave. plus manholes. The 1 Ines w i I I connect to the existing 60" line to Turner Rd The project will be phased to accomodate adjacent development. Project Number: MS0003 Cf ty o f Loci? Capital Improvement Program Pine St. Storm Drain Guild Ave. to 800' E/Guild G i -11 y of Lod i Thurman St. Storm Drain Capital Improvement Program Project Nu;nber: MSD005 stimated Costs Date of- ENR_ Updated Cost for: .. Jan 89 -Item Amount Estimate index _LMR index:.-.- -4623 Prelim Eng: EIR: Rights of Way: Easements: Consultants: Design Eng_: Construction: 68.000Jun-88 4525 69,000: .._ . , Other:. .... ;a Total Cost S 69 = T ,000 Remarks Design Engineering shown.:separately if anticipated"to be`budgeted.prior to co.istruction: if not, it is included in construction:. _ -Constructior includes contractAdministration&inspection unless. shown otherwise. d .. 10/29,88;. NSDO05 XLS =; _ ------_-•-•,.a. • C i ty of L od i Vine St. Storm Drain ` Capi fa7 Improvement Program 400' E/Cl uff Ave. to Gui I d Ave. aro'ect RescriDtion This project includes the installation of approximately 650 kr of 30" storm drain and manholes. The line will extend east from the existing 30" trunk line located in Vine St. east of Cluff Ave. The project will be phased to accomodate adjacent development. rnw T. __ .$�3':.-..-�f..'.�....:lw.:n r..:rn�•M :. .:F6+.r::,K.=.u�....4-=Yr-.E/i..ib#.��.tifA.%S - ..,w{ .' y,r. f �:..M 3 -. F.+i ct�u�-- .. .0 5. A .iak,.i" s4�rY z�� '9nc iYF..hk9kf A •Gv4x�" Related Projects Project Number:' MSD006 Estimated Costs .' Date of ENR Updated Cost for.. Jan -89 Item' Amount Estimate'Index ENR Index: ,462a Prelim Eng: FTR: Rights of V%Wc:.: . Easements: Consultants: Construction: :a).444' E/C1uff to _ .21,00.0. Jun -88... 4525 S 21.000 .. . 750' E/Cluff b) 750' E/Cluff to 32.000 Jun -88 4525 $33.006. Guild Other: ``Total Cost. ;000 kemark DesignEngineering shown separately if anticipated to be budgeted prior to construction: if not, it 4s incl uded..in,construction: Construction includes contract administration & inspection unless shoim otherwise, 11 16 88 MSD006-YLS y c Y ty of Lodi Capital Improvement Program C -Basin Southeast Area Storm Drain This project includes the installation of 42" and 30" storm drains and manholes_ south and east of C -Basin (Pixley Park) to Guild Ave. The project will include an inlet structure at the southeast corner of the basin. Exact alignment of the storm drain will depend on the street layout of the area. The project will be phased to accomodate adjacent development. kei Project Number: MSD607 Estimated Costs Date of ENR Updated Cost for: Jan -89 Amount Estimate Index ENR Index: 4662 Prei im Eng:...:: <, Rinhts of Yav= Easements: Consultants: Design Eng. ",f!£3tIP&I l 367 0Ae darr88 .' 4Q1 S 271.000` .: Other F Total Cost: S 171,000 li rk Design' Engineering shown separately if anticipated to: be budgeted prior to construction not, it .is included in',construction. Construction -includes contract administration ,& inspection unless shown otherwise:. 4 d� l h 2 v 10/Z9/88MSDD01 XLS .E +J City o f Loci! Evergreen Dr. Storm Drain Capital Improvement Program White Oak Way to 500' !/Turner Rd_ This project includes the installation of 36" and 30" storm drains and manholes north of the Parkwest Subdivision_ The line will connect to the existing trunk line in Evergreen Dr. to E -Basin (Westgate Park). The project will be phased to accomodate adjacent development. C i t y o f L +acl i Evergreen Dr. Storm Drain Capital Improvement Program Bayberry Dr to 1400` S/Bayberry This project includes the installation or 36" and 30" storm drains and manholes south of the Parkwest Sutdiv is ion. The line will connect to the existing trunk I ine in Evergreen Dr. to E -Basin (Westgate Park) The project will be phased to accomodate adjacent development. Project Number• MSDO09 Estimated Costs Date of ENR updated Cost for: Jan -89 Item Amount stimate Index _ENR index - Prelim Eng: EIR: Rights of Way: Easements: C i ty o f Lod i f -Basin Expansion Capital Improvement Program (Westgate Park) Iro ec' Descrio"ion This project includes the expansion and development of the E -Basin according to the Waster Plan adopted in 1986 (P,wg 88E002). The estimates are for piaster Storm Drain improvements only. Park improvements are estimated separately. The basin expansion will be needed when either of the areas north or south of the Parkwest Subdivision develop It is assumed the excavation will be done at no net cost to the City. Estimated Costs Item Anv unt Prelim Eng: EIR: Rights of Way: (15.5 Ac P 530,000/ac) 465.000 Easements: Project Number: NSDO10 Data of ENR Updated Cost for: Jan -89 Estimate Index ENR Index: 4e�3 Jun -88 4525 j 475,000 Consultants: [ Design Eng.: Construction: a) Fence 62,920 Jun -88 4525 $ 64,060 b) Street Improv's 140,400 Jun -BB 452;1 -S 143:000 c) interior drainage _: -.100,750 Jun -88 4525. x`.103,000 d) Control/Pump Str.(existin e) handscae/Irrig. 2b8,�7iO Jun -88 4525 $ 274:000 Other: c Total Cost. $ .1,059,000 '7 Remer -: :. Design Engineering shown separately if anticipated to be budgeted prior to construction, if not. it'is`-included in construction. Construction includes contract .adtnWstratton 4,.irt9pection unless shown otherwise 10 129/88, MSDQ10 XLS . 4 _ f: City off' Lodi F -Basin Development Capita 7 Improvement Program >rotect Cescri-tion This project includes the develoarient of the F -Basin to be located north of Kett)eman Lane. west of Lower Sacramento Goad. No detailed plan has been adopted for this park. The basin will be,needed when the area west of Lower Sacramento Road between Kettleman Lane and the WED canal develops. It is assumed the excavation will be done at no net cost to the City. Related Projects Project Number: MSDO11 Updated Cost for::::'' - Jac -89 ENR index- $ li13, Estima ed Date of ENR _Amount Estimate Index Design Eng.: Prelin Eng: S 5,000 Jun -88 4525 :. EIR: Construction: a) Fence 106.340 Rights of Hay: (20 Ac R $30,000/ac) 600.000 Jun -88 4525 Easements: b) Street Improv's 217,620 Updated Cost for::::'' - Jac -89 ENR index- $ li13, Consultants: Design Eng.: :. Construction: a) Fence 106.340 Jun -88 4525 5 109,000 b) Street Improv's 217,620 Jun -88 4525 S. 222 c) Interior drainage 130,000 Jun -88 4525 S`133,000 d) Control/Pump Str, 117,000 Jun -88 '.4525 -S 124,000 . e} Landscape/ b rig, 345.BO0 Jun -88 4525 'r I;r.1 �n� Other: s Total. Cost::. '.. 1;555,000 Remnark ;.' Design Engineering shown separately if antic4pated to be-budgeted'prior to construction if net .. it is included.in construction. `. „instruction includes contract administration & inspection unless shown otherwise. 1114788 MS0011 XLS- .. City of Lodi F -Basin North/South Storm Drain Capi tO Improvement Program Prosect Descrietion This protect includes the installation of 54", 48", 42" and 30" storm drains and manholes north of F -Basin. Exact alignmmert and lengths of the storm drains will depend cn the street layout of the area. The project will be phased to accomodate adjacent development. Related Proiects Project Number: MSDO12 Estimated Costs Date of ENR Updated Cost for: Jan -89 Item Amount Estimate Index ENR Index: 46 Prelim Eng: EIR: Rights of Way: Easements: Consultants: g.: Design Eng.: Construction: 355,000 Jun -88 4525 363:000 Other: 353,©OU TotaI Cost: $ Remark„ (lesign Engineering shown separately if'anticipated to'be'budgeted prior to construction; if not, it is` included in. constriction. Construction includes contract administration & inspecficn unless shown otherwise. M5DOI2.XLS, .. 14 29 BE City of Laa! Kett7eman lane Storm Drain Capital Improvement Program East of G -Area Trunk line I ro iect escri- 'ion This project includes the installation of 36" and 30- storm, "rains and manholes north of Kettieman Lane easterly from the existing 54" trunk 'line. - I Exact alignment and lengths of the storm drains will depend on the street layout of the area. The project will be phased to accomodate adjacent development. Projects. �t imat Costs Item Amount Prelim Eng: EIR: Rights of Way. Easements: Date, of ENR Updated Cost for: Jan -89 Estimate. Index E0 Index: r� c l ty ar Lodi Kettleman Lane Storm Drain ICapital Improvement Program West of &-Area Trunk line »eci vescrtotton This project includes the installation of a 30" storm drain and manholes corth of Kettleman Lane westerly iron the existing 54" trunk line to the future r" -Basin E,act alignment and lennths of the storm drains will depend on the street layout of the area. Me project will be phased to accomodate adjacent development. The estimate included jacking pipe across Lower Sacramento Road. Related Proiecti N C i t y of Lodi G -Basin Southeast Area Storm Drain Capita? Improvement Program vrolect Descriotiion T This project includes the installation of 48" and 36" storm drains and manholes south and east of the G -Basi I A second inlet will be added to the C -Basin at the southeast corner. Exact alignment and lengths of the stono drains will depend on the street layout of the area. The project will be phased to accomodate adjacent development, eiateo rrotects Project NumberMSDOIS '. stiaated Costs- Date of: : ENR :updated Cost•for Jan -89".' tin unt sti t n ex ENR'Inc%+ex 4-6 Prelim En EIR: Rights.of Way:'... Easements: Consultants ; Design Eng .. Construction ,.._. 252.500 fur. -88` 4525' S 258.000 :. Other: M Total ;Cost: R ; Design Engineering shownseparately if anticipated to,be budgeted prior to construction if not w =: it is"incivded'in construction Construction includesCc6ntrart administrations Vinspection unless shownotherwtse • i 10/29/08, y( MS0025 K c s t •.- 4 , City of Lodi Orchis Drive Storm Drain I Capital Improvement Program I West of Sylvan Way I'rolect Description This project includes the installation of 36" and 30" storm drains and manholes Fest and north from the existing 36" storm drain. in Orchis Way. � Exact alignment and lengths of the storm drains will depend on the street layout of -the area. The project will be phased to accomodate adjacent development, Estimated Costs Date of ENR Updated Cost for: Jan -89 ItzaAmount stimateIndex _ ENR Index: Q-�.. Prelim Eng. ., EIR: Rights of Way:, Easements:.: Consultants: . Design Eng.:.. Construction 60,800 Jun -88 4525 .. .. $ 62:000 '.Other 620 00 Total : costi_".- $ Remarks ' Design Engineering showi► separately if antzctpated to be budgeted prior to construction ifrnot it is included in.construction Construction includes contract'>administratton`-& inspection unless`sh:wn otherwise.; f 10 29 88 MSDOl6 XLS.� tS d s ' ^^•'�"^m'� �, .�.,ar �e""""s,`i'"f'a'au.r+n4waowau ,J, 7. ��ST t t{ '.' 15Y.(a• �^� ;•+i�.c w.�'?AN <-d' } }'r f 3,N`N'),g 1bt I .+^' ..,. s..4 ..:.. .. ..._ ..... .:+'s �' ,..,..v •%, .. ;.5.' .,. il••i „4k�t�'. Y�v+�,^+✓:i-.n+{:Sr'.,... .s. .-��• aG�'i+a, f .. .. .. .. ..., -T x, ..as��:i.;l.__...5....�.)r?•> V.. y, �w�.Gw .-uniY:,=MM+� C i ley o f Lodi G -Basin Development Capital Improvement Program (future family golf center) This project includes the expansion and development of the -Basin according to the family golf center concept. The estimates are for Master Storm Drain improvements oniy. Golf course improvements are estimated separately. The basin will be developed to phases as shown. Excavation will be over a period of approximately 3 years { with no net cost to the City. !j It is assu-ved a golf course architect will be retained to participate in the design of the grading landscaping -'and-irrigation:.;;, Easements: Consultants- (design concepts, 6,000 Jun -88 4525 $ 6;00C landscaping) Design Eng.: Construction: a) Excavation, fence 160,160 Jun -88 4525 $ 164,00C b) Street Improv's 374,400 _ Jun -88 4525 $ 383,OOC - c) Interior drainage 334,750 Jun -88 4525 $;342:OOC -,. d) Control/Pump Str. 117.000 Jun -88 4525. S_220OOC. e) iandscapellrrig. 830,500 Jun -88 4525 $-310;000 Other: _ Total Cost: ,:2,661 OQ0 Remarks " Design Engineering shown separately if anticipated to be budgeted prior to construction; if not WAS included in construction. " Construction includes contract administration & inspection unless shown otherwise. y- '-10729 88 MS0OI7 XES . City of Lodi (faster Storm Drain System Engineering C i t y of Lodi Master Storm Drain System Engineering Capital Improvement Program Capital Improvement Program This project includes engineering and administration of the Master Storrs Drain system which consists of planning. system studies, map updating, storm drain fee calculations and updates. This engineering will include development of additional, projects needed to mitiga:s the impact of infill development and conversion of land to higher runoff developments. The projects may include: Q increasing basin capacity o extension of gaster Plan trunk tines o improvement of flow regulation/control system as the system grows and becomes more eomplez Project Number: MSDO18 Date of ENR Updated Cost for: "" Jan 83;; Amount Estimate Index ENR Index::.4623 Construction. Consultants ..., ,. Design Eng.: ($4,0001yr x 20 yrs 80.000 Jun -88 4525 $ 82iOD0, Construction. Other Tdtal':Cost: 82,000 - Rem "be , Destgn Engineering sho+, separately if anticipated to budgeted prior to construction if.not r,: `= Ti is "included id construction Construction Tncludes con•ract administration & inspection unless shawrt ath rwise a � w 13!16/88,,MSQ018 XLS F - e 4 , City of L ad i Lodi Ave. Storm Drain Capital Improvement Program 600` E/Cluff Ave. to Guild Ave. IAiF 5 �S P I N K I R 10N_ )r. Ma,6 or ION:: R Kindvi R m a -,or Pro I eatpore - - DAViD M I -fl.,( -'D IAN FRED `-t aE=i= CI'T'Y OF LODI San Joaquin County Public Works Department Attention: Henry 14 rata P.O. BcK 1810 Stockton, CA 95201 CITY HALL. 221 WEST PINE STREET CALL BOX 3006 LODI. CALIFORNIA 9521-1910 (209) 334-5634 FEUCOPTER (209)35)-6745 January 26, 1989 SUBJECT: Storm Drainage Fees - Joint Powers Agreement f AL;([ M REl.`•tC)If Oty Clerk 110B NU NA -1 1 ._ .. r.ttrirr:.•� In December 1988, the Lodi City Council revised the City's storm drainge fee structure. The Master Drainage Fee was revised to comply with A81600. TW copies of the study, resolution, and ordinance are enclosed for your information. # 2 °�»a.��.. ���� �� ��/� $ . � §� , « y .. !�� &�®� . �� � �� � � . . . . r% C I T Y O F L 0 D I PUBLIC WORKS DEPARTMENT ., r",4 - City or LAdi Capital Improvement Program roiect `!umber Pro iect Title MSi1001 C -Basin Development kSD002 Calaveras St. Storm Drain µS0003 Turner Rd./Guild Ave. Storm Drain MS0004 Pine St. Storm Drain MS0005 Thurman St. Storm Drain MS0006 Vine St. Storm Drain MSDO07 C -Basin Southeast Area Storm Drain MSDO08 Evergreen Dr. Storm Drain M30009 Evergreen Dr. Storm Drain Master Storm Drain System Project Summary UDdated Cost for: Jan -89 (Pixley Park) Lockeford to Turner Guild Ave. to 800' E/Guild 400' E/Cluff Ave. to Guild Ave. White Oak Way to 500' N/Turner Rd. Bayberry Dr to 1400' S/Bayberry $ 686.000 119,000 211,000 41,000 69,000 54,000 j 171,000 128.000 63,000 MSDO10 E-Easin Expansion (Westgate Park) 1,059,000 MSDQII F -Basin Development 1,555,000 MSDO12 F-Easin North/South Storm Drain 363,000 MSD013 Kettleman Lane Storm Drain East of G -Area Trunk Line 147,000 MSD014 Kettleman lane Storm Drain West of G -Area Trunk Line 182000 MSDO15 G -Basin Southeast Area Storni Drain 258,000 14SDO16 Orchis Drive Storm Drain West of Sylvan Way 62,000 MSDO17 G -Basin Development (future family golf center) 2,661,000 MSD018 Master Storm Drain System, ErWineering g2,Qp0 MSDOI9 Lodi Ave. Storm Drain 600' E/Cluff Ave.` to Guild Ave.. 31,000 ai Total Cost: 7,942,000 Remarks Refer to individual project sheets for details.' Exhibit 11/16/88 MSDSUM XtS a - s CITY OF L-ODI MASTER STORM DRAIN PUBLIC WORKS DEPARTMENT iJmNr- RIVER R R0. 12 C i iy of Lodi C -Basin Development Capital Improvement Program (Pixley Park) . This prc;ect included the expansion and development of the C -Basin according to the Master Plan adoptee in 1988 (Dwg BSE003)- The estimates are for Master Storm Drain improvements only. Park improvements are estimated separately. The basin will be developed in phases as shown. Excavation will be over a period of approximately 3 years, It is assumed the landscape architect was oreoared the Master Plan wilt be retained to participate in the design of the grading, landscaping and irrigation. fated Projects _ y Date of EXR Updated Cost for: Jan -89 Amount Estimate Index ENR Index: 4623 S -s Consultants:,(Bigler, design 4,000 concepts, landscaping) : I Design Eng.: "- Construction: "a} ExcaJatior.; fence budgeted 88/89 b) Street Improv's 171.000 Jun -88 4525: $ I75 000 c}. interior drainage 72,000 Dec -86 4348 $ 77,000 d) Control/Pump Str. 140,000 dun -88 _- 4525 .: $ 143.000 e} Landscapellrrig. 284.700 Jun -b8 4525 .. $ 231;000 r _ - Other - - Total Cosh-. $ 686,004 -, Estimated Costs Date of ENR Updated Cost for Jan -89 Item AmouEstimate Fedexa nt ENR Fndex: : 4623 Prelim Eng: _ EIR: Rights of Way: Easements: _ Consultants:, Design Eng.: 5.000 Jun -88 4525- S 9.000 Construction: 103,000 Jun=88 4525 5.110,004 7.1 Other. Tota 1: cost.":, II9,OUQ Remarks Design Engineering shown separately if anticipated to be,budgeted prior to construction if not it isincluded in construction— onstruction.= Construction-in Construction includes contract administration &'inspection unless shown otherwise. •••- r• ���-... ^ • +. ...,,c.v �v u�.....•.n...0 �c avJac.Cill uCvet V�3tllCltw. .�"."SiT?,3:i.�'SR3n �b:�aY�'4G tlYlSkYvaS�3PAWkn.:XN.v.isv{TaNNrt.��arnvxeuu....,,......ti�.......,�....................�. ". .. �. �. � - Ci ty co F Lori 1 Turner Rd./Guild Ave- Storm Drain Capital Improvement Program IF'ro 'ect Descri-tion This Project includes the installation of approximately 650 LF of 60", 600 LF of 54" and 1150 LF of 42" storm drains in Turner Pd. and Guild Ave. plus manholes. The iines will connect to the existing 60" line in Turner Pd . - I The project will be phased to accomodate adjacent development. Related Projects ... ...... . Project Number: MSDO03 Estimated Costa, Date of ERR Updated Cost for: Item Amount:",` mount: ti to lnde*�' 'I ENR Index: Prelim Eng: EM Rights of Way Easements: Jan-89- 46?3 m .. ... .... M w City Cor La&Y Pine St. Storm Drain Capital Improvement Program Guild Ave. to 800' EIGuild This project includes the installation of approxiiiately 800 LF of 30" storm drain and manholes.. The project will be phased to acccwdate adjacent development. -.K C i t y OF L od i Thurman St. Storm Drain Capital Improvement Program This project includes the installation of approximately 1250 :F of 36" storm drain and manholes. The lice will extend east from the existing 54" trunk line located in an easement along the extens ion o: CIuf Ave. The project will be phased to accomodate adjacent development. iton Prelim Eng: EIR: Rights of Way: Easements: Date of ENR Amount Estimate Index Updated Cost for: Jan -89 ENR Index, 4623' City o f Lodi Vine St. Storm Drain Capital Improvement Program 400' E/Cluff Ave. to Guild Ave. Descr,iptiom This project includes the installation of approximately E50 LF of 30" storm drain and manholes. The iine will extend east from the existing 30" trunk tine located in Vine St. east of Cluff Ave. The project will be phased to accomodate adjacent development. stimated Costs Item Prelim Ena- EIR: Rights of Way. Date of ENR Updated Cost"for Jan 89 AimyF1I Estimate Index. ENR-irtrfax ea�z:. 00O,'ILI $ SZSb 99-unr 000'/91` :uoi43nt;suoa. 5ua u6isa0 slueltnsuoo fiZ917 77ePul IM3 68-upc • :aoj.4soo palepol L000sw :.xagwnN 40aco.td sl3a,oad Pale{aM xapu{ .alewils,d bN3 10 aleq lunoa+� luawdo{anap lua3eCpe alepow000e of pase4d aq {{tM laaCo.ad a41 'pane a4l to lnok?L laa3ls a4i uo puadap {ttr uteip w.:ols a44 30 luawu5i{e loex3 •utseq a4l 40 aau.too 1sva41nos a44 le a.inlon,ils latui up apn{3ut {{{M l3aCotd ay1 'a^b Pt4n9 of (N.ted XCDtx utspa-0 10 ; up nos sea sa o id) p 4l { y upw pup sute�p w_rols ,.0£ Pup ..Zt, 3o uoile{{elsut ayl sapn{out loaCoid s;41 LUP15OJd JuaWanojdmj je j tde3 utela lujols eaiv IseavInos utseg-3 !P©7 �O X:7 c0 J I i t y o f L oc! i Evergreen Dr. Storm Drain apital Improvement Progrmn Write Oak Way to 500' N/Turner Rd. Proiect Oescriotion This project includes the installation of 36" and 30" storm drains and manholes north of the Parkwest Subdivision. The line will connect to the existing trunk 1 ine in Evergreen Dr. to E -Basin (Westgate Park). The project will be phased to accomodate adjacent development. Item Prelim Eng: EIR: Rights of Way: Easements: Date of ENR updated Cost for Jan -89 Amount Estimate Index —ENR Index 4fi23 Consultants: Design Eng.: Construction: 125,000 Jun -88 4525 $.228,000 Other:- ther: . 2- -77777 Cost: 28-'000 Total Remarks Design Engineering shorn► separatejy if anticipated to be budgeted prior to construction if not is included in construction.. Construction includes contract administration & 'nspection unless shown otherwise: e. s 1 C 7�It y OF L c cl [Evergreen Dr. Storm DrainCapital Improvement Program ayberry Dr to 1400' S/Bayberry 'roiect Descriet ion This project includes the installation of 36" and 30" stow: drains and manholes south of the Parkwest Subdivision. The line will connect to the existing trunk line in Evergreen Dr. to E -Basin (Westgate Park). Theproject will be phased to accomodate adjacent development. C i t,y o f Loci i E -Basin Expansion Capital Improvement Program + (Nestgate Park) Proiect Descriotion This project includes the expansion and development of the E -Basin according to the Master Plan adopted in 1955 (0wg 88E002). The estimates are for Plaster Storm Drain improvements only. Park improvements are estimated separately. The basin expansion will be needed when either of the areas north or south of the Parkwest Subdivision develop. It is assumed the excavation will be done at no net cost to the City. timated Costs sra,. cirism.cng , Rights,of. Way: (15.5:Ac. @ $30,000/ac). Easements: Date of ENR Amount Estimate Index 455,G00 Jun -88 4525 s.. Updated`Cost°for. Jan 89 k_ ENR Index` 4623 $ 475,000 $` Consul tants: Construction: a) Fence 62,920 Jun -88 4525 ooa b) Street Improv's 140,400 Jun -88 4525 $ 143 000 c) Interior drainage 100,750 Jun -88 4525 `$ 1 03;000 . -. ;d).Control/Pump Str. (existing)...` e) Landscape/Irrig. 268,060 Jun 88 4525 $ ?74 000 Other. .. s 3 1 vital Lmprovement Program t F -Basin Development This project includes the development of the F -Basin to be located north of Kettleman Lane. west of Lower Sacramento Road. W detailed plan has been adopted for this park. The basin will bD'needed when the area west of Lower Sacramento Road between Kettleman Lane and the WID canal develops. It is assumed the excavation will be done at no net cost to the City. Related Pttiemts Project Numbzr:. MSDOII bats Date of . ENR Update d'Cost for: Jori -89 t- .tensAPVXft AS&Amft Index ENR =Ipdex 4623 . Prelim:Eng $ 5,000 Jun -88 4525 $'5,000 Rights of MY. (20 AC $30,000/ac) 500,000 Sun -88 600,000 4525 $ A Sun -88 4525 611 Consultants: Mxsign Eng.: _ Construction: a) Fence 406.340 Jun -88. 4525''1091,000 b) Street Improv's 217,620 Jun -88 4525 $`222 OOQ C) Interior drainage 130,000 Jun -88 4525 $ 133.000 . d) Control/Pump.Str., 117.000 Jun -88 4525 $.120.000 e) Landscape/Irrig. 345,800 Jun -88 4525 353.000 ;. Other .. . 9 t Total.cost: I,5 - 5,p Remarks k Design Engineering shown .separately. if _anticipated to be budgeted prior to- construction if not. it, is'included in construction.: _ Construction includes contract administration &inspection unless shown otherwise 14 88 MSDO XLS I1 i 4 ��-'n.-.."...^'^...w"`Z _ - �.. 0,--`W:'HKthe'�%'�,4Yve".•f4i._ .m s+s,.n_�r.rw.dr-.wr�.a..:......-....--.... _ .• .�. rMI C I qty o f L ad V F -Basin North/South Stem ®roln faWbal ;mprovement Program .Pro-lect 0escriatian - This project includes Me installation of 54", 48", 42" and 30" storm drains and manholes north of F -Basin. Exact alignmen: and lengths of the storm drains will depend on the street layout of the area. I Project'Number• MSDO12 Date of = ENR '. "Updated; Cost for an89 ,. Amount Estimate. Index SNR Index 46ca - Prel irk Eng: Rights o€ -Way Design Eng.: Consiructioi: 355.000 Jun 88 . 4525 $.3631000 Other ; YngG�,�x�`��F Total Cast -363000 R ma ks- Oesign Engineering shown separately tf anticipated to be' budgeted prtor:to construction If not �' 'it is`included is construction::?' Construction includes contract admntstrat.ion & .inspection-unless.shown otherwise t z 10/29/88 } MSQCf12 XLS 7 Exact alignment and lengths of the storm drains will depend on the street layout of the area. The project rill be phased to accomodate adjacent development. Estimated Costs Item Peet iii -Eng EIR:.:. Rights of Way: Easements: Date of ENR Amount Estimate Index Project Number: :MS6013 Updated Cost`for. Jan -88 ENR Index =4623 of ty or Lodi Kettleman Lane Storm Drain Capita] .improvement Program West of &-Area Trunk Line Protect Descri tion This project includes the installation of a 30" storm drain and manholes north of Kettleman Lane westerly from the existing 54" trunk line to the future F -Basin. Exact alignment and lengths of the storm drains will depend cn the street layout of the area. The project will be phased to accomodate adjacent development. The e'imate included jacking pipe across Lower Sacramento Road. 3elated Proiects Project Number: MSDO14 r— Estimated Costs Date of ENR Updated Cost for: Jan -89 Item Amount Estimate Index ENR Index: 4623'-: Pret itn Eng: EIR: Rights of Way. Easements: CT ty or Lodi G -Basin Southeast Area Storm Drain Capital Improvement Program 'ro ect Descriotion l This project includes the installation of 48" and 36" storm drains and manholes south and east of the &-Bash A second inlet will be added to the G -Basin at the southeast corner. I Exact alignment and lengths of the storm drains will depend on the street layout of the area The project will be phased to accomodate adjacent development. Estimated Costs Item Amount Prelim Eng: EIR- Rights.'of Way Easements:' Date of ENR Updated Cost for „ Jan -891. Estimate Estimate Tndex ; ENR Index: 43 . C i %y o f Loci i I Orchis Drive Storm Drain Capital Improvement Program West of Sylvan Way t r�ro ect Description t This pro�ect includes the installation of 36" and 30" storm Grains and manholes west and north from the existing 36" storm drain in Orchis Way. Exact alignment and lengths of the storm drains will depend on tre street layout of the area. The project will be phased to accomodate adjacent development. 1 Lstimated'Co its [tPm ...Amount p al iir. Eng. ' Rights of Way. , Easements: Consultants:;.,. - . Design Eng. Construction 80.800 Jun -88 4525 -: ..: $..62.006 w Other Total Cost 62,000 r R mar s'.• Design Engineering shown separately; if antictpated:to be budgeted prior to construction; tf Construction;inciudes contract administration $inspection unless stioxn otherwise z -. ... I f, �`° io is as Msoois xt s 44, s 3 WAWAiM Cf ty off` Lo -d! City off" LocY G -Basin Development Capital Improvement Program Capital Improvement Program (future family golf center) tpraiaat Deseriotion This project includes the expansion and development of the G -Basin according to the family golf center concept.' The estimates are for Master Storm Drain improvements only. Golf course improvements are estimated separately.i The basir will be developed in phases as shown. Excavation will be over a period of approxinateiy 3 years with, no net cost to the City. It is assumed a golf course architect will be retained to participate in the design of the grading, landscaping and irriVatimn. Related P iertts Project Number: 140017 Estimated Costs Date of ENR. Updated Cost>for Jan -89 Item Amount - Estimate Index ENR Index. .': 4u23`: Prelim Eng: .. EIR: . Rights of.Way: (24 Ac ta.$30.000%ec) 720,000 Jun -88 4525 $ 7361000 Easements: g Consultants: (design concepts,: 6,000 Jun -88 4525 $ 6,000 R landscaping) Design Eng:: 4. z Construction:. a} Excavation,' fence. 160.160 Jun -88 4525 . 164.00D ;. :.;. - b} Sfreet:Improy.s . _ . , 374:400 i'Jun 88 `' 4525' .. .00e 5 . < c} Interior drainage 334:750 Jun 88 .4525 342;0001 s d} Contr611Pump Str. 117;000 Jun -8&' 4525 120,000 e} landscape/Irrig_ 880,500 Jun -88 4525 $" 910,000 _> X X70.. "s `%Y[' 1 .•" :4- ! .a% 4 f 9'�'� ` G&a4M W E ¢oy �:>> Total �- Cost• -. _ ^`"."P' FAN"` rk Remarks Design Engineering shown:'separately if antficipated to be budgeted prior to construction. if not. it is included:`in construction. Construction .'inciudes contract:_administration & insp6ation unless shown otherwise.. A. 20 29 88 j tISD017 XiS A ; : t _ ,c Cit v of I_ e>cf i Master Storm Drain System Engineering Capital Improvement Program iot-ion This project includes engineering and administration of the Master Storm Drain system which consist s of planning. system studies. -P updating. storm drain fee calculations and updates. This engineering will include development of additional projects needed to mitigate the impact of infill development and conversion of land to higher runoff developments. T -ie projects may include: o increasing basin capacity o extension of Master Plan trunk lines o improvement of flow reeulationfcontrol system as the system grows and becanes more complex stim,ated Cosh Item Prelim Eng:' EIR: Rights of Way: Easements: Date of ENR Project Nurn@er: MSDOE8 Updated`Cost for. fan -S9. ENR Index 4623 CYty of Lodi Capita} Improvement Program r Lodi Ave. Storm Drain 600' E/fluff Ave. to Guild Ave. t?roiect Description This project includes the installation of approximately 600 LF of 30" storm drain and manholes. The Lire will extend east from the existing 30" trunk line located in Loai Ave. east of Cluff Ave. Related Projects Project Number_ MSDO19 Item Prelim Eng: -: EIR- Rights of Way: Easements: Date of ENR Updated,tost'for Jan -89` Amoua# Es#iMai, _Index., ENR Ind x 4623:=