Following introduction of the matter by City Manager Glaves,
ALLOCATION 70
Council, on motion of Council Member Wirphy, Snider second,
REBUILD 1981
approved a Special Allocation to rebuild Police Unit No. 10,
DODGE PATROL
a 1981 Dodge Diplomat, in the ftmxmt of $4,700.00.
UNIT # 10
APPRDVFD
Y >
..
t 0.
c
i... .. ..
. ' 7
r j�yd r
L .
xn�ry. tocz',yfyf - 5y
C t_-. -
�.;
4 Q:
Y`
Yr . / C x �
G f
t Y 3 L
•.
� 1.
V.C.
.. �• r��
ff
_
"rt q1
11
MEMORANDUM, City of Lodi, Public Works Department
TO Assistant City Manager
FROM: Equipment Supervisor
DATE: November 22, 1983
SUBJECT: Rebuild Police Patrol Unit
40
The following information is presented for your consideration of rebuilding
Police Patrol Unit No. 10, a 1981 Dodge Diplomat, which has 91,000 miles as
of November 22, 1983.
This Unit was purchased new, October 1, 1981 at a cost of $7,750. The retro
fitting of emergency equipment was $900 for a total investment of $8;650.
If this Unit would be removed from service and replaced with a 1983 new like
Unit, the cost would be; $8,100 for a new vehicle and $725 to remove and re-
install the emergency equipment in the new Unit, for a total investment of
$8,825. The old Unit would be kept for parts, for a value of $1,000 - $1,200.
Selling the old Unit would return $600 - $750.
The following is a breakdown of major component parts to be replaced to pro-
duce a like new vehicle:
1.
New engine assembly
$ 1,600.00
2.
Front suspension and steering parts
500.00;
3.
Wheel bearings and seals
50.00
4.
New master cylinder, front brake rotors, and
rear brake drums
250.00
5.
New certified speedometer head
70.00
6.
Install a rebuilt auto transmission
375.00
7.
Rebuild drive line complete
50.00
8.
Replace exhaust system
150.00
9.
Replace door hinges
50.00
10.
Rebuild and recover front seats
150.00
11.
Replace carpets and miscellaneous
inter' trim
125.00
12.
Body repairs and paint black and white
350.00
13.
Miscellaneous trip and bumper items
50.00
Parts total
-33-775.00
Contract Labor
300.00
Shop Labor - 40 hrs. Q $15, which
includes overhead
600.00
Total Cost
$ 4,670.00
Assistant City'lii[w9W
November 22, 19113
Page 2
1t_is estimated EMt: rebuilt Unit will have a life expectancy of 18 to
24 months and a-wilemSe ffActor of 75,000 miles. At the end of that time
this Unit will ie c 'W*Wlized of all serviceable parts which should have a
value of $800 -SI.IM-17he overall savings to the City would be $4,155.
This project would be.7swrted in January, 1984, and completed within 30 days.
4�441dv�_4
Dick Wiech
Equ i pt . & Bldg. ft-Intenaln.ce Supervisor
CC: Public Works O'iirvrto-r
Omer Coulter
Captain Will; rima
DW/ns