Loading...
HomeMy WebLinkAboutAgenda Report - December 19, 1984 (62)AME"IDIr WITii T1X(M, rxm. ANS K IKLU I I TO DEFER I NSTALI.A- TICN bF OFF-SITE IhII'IUMM:NTS MING T GKAY SITtEI'vT APPMVED 0 �l CITY COUNCIL MEETING DECEMBER 11, 1984 CC MIL APPROVED AN ACRES UIIrr WITrd TIU<M, DEIt`IIV AMID KIKLX iI. TO DEFER IN'STALLATICN OF OFF-SITE It11F'I"IMIFNTS AILING `IaC AY STRJT LNrIL SLXIi TINE AS AMITICNAL OFF-SITF. M11MOVF-VE S ARE IW ALL D, AND AIfI1MIZFD THE CITY I1'WNAM AMID C171Y CIMiK TO EX17CiTI'E IIIE DOCLZ E tr CN BD IALF OF 111E C ITL' Council was apprised that the developers of the property at 617 South Lower Sacrw canto Road plan to construct additional office units on this parcel. It is the developer's responsibility to install off-site improvements on one-half of Tokay Street as well as the improvements along Lower Sacramento Road. The developer desires to postpone the installations on Tokay Street until additional off-site irprovements are installed because of local drainage problems and the undeveloped state of the reminder of the street. Under the Code of the City of Lodi. it is permissible to defer these improvements ... "If the Public Works Director determines that it would be in the best interest of the City to cause all or a portion of the wo-k to be done on an area wide basis; provided, that the property owner enters into an agreement with the City..." (Section 5.22) It was Staff's recarmenda t i on tl at the improvements along Tokay Street be deferred at this time with the understanding that they be installed upon demand of the City. At the time that the Tokay Street improvemnts are inste!!ed, the developers would be requiredto abandon the Lower Sacrmiento Road driveway access and reconstruct on-site circulation to utilize Tokay Street.