Loading...
HomeMy WebLinkAboutAgenda Report - December 19, 2012 C-06AGENDA ITEM C •b CITY OF LODI . ' COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Authorizing City Managerto Execute Contract Ch nge Order No. 1 to the Professional Services Agreement with Itron, of Liberty Lake, WA, for Fixed Network Systems ($53,700) and Appropriating Funds ($85,000) MEETING DATE: December 19, 2012 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing City Managerto execute Contract Change Order No. 1 to the professional services agreement with Itron, of Liberty Lake, WA, for fixed network systems, in the amount of $53,700, and appropriating funds in the amount of $85,000. BACKGROUND INFORMATION: The Electric Utility and Public Works departments have initiated automatic meter reading (AMR) projects with the installation of meters equipped with encoder receiver transmitters (ERT). To fully receive the benefits of an AMR system, City Council approved the installation of a fixed network system that would read the meters via a network of receivers placed around the community. On August 15, 2012, City Council approved the contract with RuggedCom to conduct a radio backhaul design study for the transmission of data from the receivers to the City's customer information system. Preliminary design recommendations are to install radio receivers on the elevated water tank and on an 80 -foot tall tower in the western residential area of the City. The cost of these installations, uncertainty of performance, and the technical expertise required to operate and maintain the radio backhaul system has resulted in a change in the backhaul network design. The recommended backhaul network design would consist of six cell control units (CCU) installed at Fire Stations 3 and 4;Police Station; and Henning, Industrial and McLane substations. The CCU's would transfer data via a direct connection to the City's existing fiber optic facilities at these locatons. A seventh CCU would be installed on Douglas Fir Drive. Data from this CCU will be transmitted via wireless phone data link. Two additional receiver units would be installed on Evergreen Drive and Iris Drive. Electric Utility staff will move the existing facilities and install the new facilities. Moving the existing installed facilities and adding new facilities requires additional services from Itron in the form of project management, field engineering services, and technical consultant programming. For the past several months, as we have attempted to make the radio backhaul function, Itron has provided significant project management, field engineering and technical consulting services at no charge to the City, probably equal to or greater than the requested change order. Staff recommends approval of Contract Change Order No. 1 (Exhibit A) to the Itron professional services agreement in the amount of $53,700 and appropriating funds in the amount of $85,000 to cover the cost of staff time and the additional CCU's and repeaters. APPROVED: KAJ\�— Konradt Bartlam, Citv K\WP\PROJECTS\WATER\Meters\Fixed NetworMCItron0001 doc 12/6/2012 Adopt ResolutionAuthorizing City Managerto Execute Contract Change Order No. 1 to the Professional Services Agreement with Itron, of Liberty Lake, WA, for Fixed Network Systems ($53,700) and Appropriating Funds ($85,000) December 19,2012 Page 2 FISCAL IMPACT: FUNDING AVAILABLE: FWS/pmf Attachment cc: Electric Utility Director Optimizing the operation of the radio backhaul will result in lower costs for field mitigation associated with poor reads from the radio equipment. Requested Appropriation: Electric Utility Fund (16100): $42,500 Water Utility Fund (181013): $42,500 Jorda rs Deputy City Manager/Internal rvices Director F. Wally SPAndelin Public Works Director K;\WP\PROJECTS\WATERWIeters\Fixed Network\C1tronCC01.doc 12/6/2012 Exhibit A Itrodn Send Pricing Summary to Client? Yes Has contract been signed? Yes General Comments: The purpose of this Change Order is to document the costs associated with redesigned backhaul network requested by the City of Lodi. The new design will incorporate city owned fiber take-out points and GPRS collectors for backhaul services for Choice Connect Solution. Order Processing: PO/Contract #: Comments: Hardware Changes-, ',,rltin 6escti' aw ``?' kUnitPri' �;; it ..._�.. �!_ .r - �, 1 CCU100 — GPRS(Verizon) 1 CCU100 - Ethemet 2 RPT100 Repeaters ;,.Qty.: I;ttem Des�i� , � i�(::t *;�; nit Phi - -'•'�� Comments: National Meter to provide a quote for the above mentioned equipment. Network Redesgn Change Order Form 11_20_2012.doox Confidential Page 1 of 3 Name Date Client Name: City of Lodi 11/13/2012 Requestor: Joe Kelly Client Authorization: Wally Sandelin Itron Rep. Authorization: Contract Admin. Auth.: Send Pricing Summary to Client? Yes Has contract been signed? Yes General Comments: The purpose of this Change Order is to document the costs associated with redesigned backhaul network requested by the City of Lodi. The new design will incorporate city owned fiber take-out points and GPRS collectors for backhaul services for Choice Connect Solution. Order Processing: PO/Contract #: Comments: Hardware Changes-, ',,rltin 6escti' aw ``?' kUnitPri' �;; it ..._�.. �!_ .r - �, 1 CCU100 — GPRS(Verizon) 1 CCU100 - Ethemet 2 RPT100 Repeaters ;,.Qty.: I;ttem Des�i� , � i�(::t *;�; nit Phi - -'•'�� Comments: National Meter to provide a quote for the above mentioned equipment. Network Redesgn Change Order Form 11_20_2012.doox Confidential Page 1 of 3 Software Changes: X Modifications Solution Delivery Services ❑ Meter Licenses ❑ Other Implementation Labor and Expense: X Billable Charge to: City of Lodi Version <Version #>12i5/2012 3:3246 PV Unit Pnoe' Purpose Description.; $ -- Total Project Management Labor 80 Hours $225.00 $18,000.00 PM Travel expenses (Approx) $3,600.00 Field Engineer Labor 80 Hours $190.00 $15,200.00 FE Travel Expenses(Approx.) $3,600.00 Technical Consultant Labor. 60 Hours $190.00 $11,400.00 Systems Engineer ( Prop study) Labor 40 Hours $190.00 $7,600.00 Totals 260 $59,400.00 Other: Optional - Itron to provide optional FE support for network mitigation activities. Continued after the first two weeks will be billed at actual and as incurred. Itron to support 2.5 to 3 month project effort to migrate network from Rugged Comm to Fiber/Verizon GPRS Itron to support Lodi with Verizon VPN to confirm communications between CCUs and the Fixed Network Servers Itron to support ICS preparation and training for Verizon CCUs Itron to support field installation activities over two calendar weeks with one onsite field engineer to provide NeNaork Redesign Change Order Form 11_20_2012.doc x Confidential Page 2 of 3 Solution Delivery Services Version <Version #>12/5/2012 3:32:46 PM Change Order: Joe Kelly Please return this signed Change Order to: Itron, Inc. 2111 N. Molter Rd. Liberty Lake, WA 99019 Attn: Contract Administration Fax: (509) 891-3331 or pdf and email to contract. Leguest0litron.com. — a fully executed version will be returned. Network Redesign Change Order Form 1 UL2012.docx Confidential Page 3 of 3 z 77 support to the City of Lodi Change Order: Joe Kelly Please return this signed Change Order to: Itron, Inc. 2111 N. Molter Rd. Liberty Lake, WA 99019 Attn: Contract Administration Fax: (509) 891-3331 or pdf and email to contract. Leguest0litron.com. — a fully executed version will be returned. Network Redesign Change Order Form 1 UL2012.docx Confidential Page 3 of 3 1. AA# 2. JV# Submit completed form to the Budget Division with any required documentation. Final approval will be provided in electronic copy format. FUND # BUS. UNIT # ACCOUNT # ACCOUNT TITLE AMOUNT A. SOURCE OF FINANCING 161 3205 Fund Balance $ 42 500.00 181 3205 Fund Balance $ 42 500.00 B. USE OF FINANCING 161 161000 1825.1700 Fixed Network System $ 42 500.00 181 181013 1.625.23.00. Fixed Network System $ 42 500.00 Submit completed form to the Budget Division with any required documentation. Final approval will be provided in electronic copy format. I3�Y�1���L�1i•li:L���7�>F�F'Z� A RESOLUTION OF THE LODI CITY COUNCILAUTHORIZING CITY MANAGER TO EXECUTE CONTRACT CHANGE ORDER NO. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH ITRON FOR FIXED NETWORK SYSTEMS AND FURTHERAPPROPRIATING FUNDS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- WHEREAS, the Electric Utility and Public Works departments have initiated automatic meter reading (AMR) projects with the installation of meters equipped with encoder receiver transmitters (ERT). To fully receive the benefits of an AMR system, City Council approved the installation of a fixed network system that would read the meters via a network of receivers placed around the community; and WHEREAS, on August 15, 2012, City Council approved the contractwith RuggedCom to conduct a radio backhaul design study for the transmission of data from the receivers to the City's customer information system. The cost of radio receiver installations, uncertainty of performance, and the technical expertise required to operate and maintain the radio backhaul system has resulted in a change in the backhaul network design; and WHEREAS, moving the existing installed facilities and adding new facilities requires additional services from Itron in the form of project management, field engineering services, and technical consultant programming. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute Contract Change Order No. 1 to the Professional Services Agreement with Itron, cf Liberty Lake, WA, for fixed network systems, in the amount of $53,700; and BE IT FURTHER RESOLVED that funds in the amount of $85,000 be appropriated for the projectfrom Electric Utility and Water Utilityfunds. Dated: December 19, 2012 I hereby certify that Resolution No. 2012-196 was passed and adopted by the City Council of the City of Lodi in a regular meeting held December 19, 2012, by the following vote: AYES: COUNCIL MEMBERS - Hansen, Johnson, Katzakian, Mounce, and Mayor Nakanishi NOES: COUNCIL MEMBERS - None ABSENT: COUNCIL MEMBERS- None ABSTAIN: COUNCIL MEMBERS- None 1<7 t;;L City Clerk 2012-196