Loading...
HomeMy WebLinkAboutAgenda Report - December 19, 2012 C-05AGENDA ITEMC-S CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for City Hall Annex Phase 1 Interior Demolition and Abatement Project and Adopt Resolution Authorizing City Manager to Execute Change Order No. 1 to the Professional Services Agreement with WMB Architects ($34,638) MEETING DATE: December 19, 2012 PREPARED BY: Public Works Director RECOMMENDEDACTION: Approve plans and specifications and authorize advertisement for bids for City Hall Annex Phase 1 interior demolition and abatement project and adopt resolution authorizing City Managerto execute Change Order No. 1 to the professional services agreement with WMB Architects, in the amount of $34,638. BACKGROUND INFORMATION: This project consists of interior demolition and asbestos abatement at the City Hall Annex (formerlythe Public Safety Building) in the unoccupied first floor and jail area. This is the first phase in remodeling the space for use by the Recreation and Fire Administration Divisions. The existing first floor and jail space has been vacant since the Police Facilitywas completed in 2002. The project will remove all ceiling, wall and floor finishes, as well as existing electrical, HVAC and plumbing items originally installed in 1967 and not meeting current code requirements. A hazardous materials survey has been performed and all hazardous materials within the remodel area will be abated. The completion of this project is necessary prior to the finalization of the Phase 2 remodel plans so informed decisions may be made regardingthe existing building elements. City Council awarded the professional services agreement for the City Hall Annex first floor remodel to WMB Architects, of Stockton, on August 15, 2012. The requested change order (Exhibit A) is due to changes in the project design scope. The project will take advantage of Public Benefits funds to replace the Civic Center chiller unit and add the City Hall Annex Facility to the chiller system. The scope additions also include relocating the computer server and phone rooms from the basementto the first floor and some exterior roof demolition/repairs needed on the facility. The planned bid opening date is January 24, 2013. FISCAL IMPACT: The projectwill expedite the Phase 2 work and permitthe Recreation and Fire Administration Divisionsto return to the Civic Center complex. FUNDING AVAILABLE: Public Benefits (164604): $30,138 / General Fund (1211001): $4,500 Construction proiect funding will be identified at the time of project award. Jordan Ayers Deputy City Managg�er4/Internal ervices Director F. Wally ndelin PublicWorks Director Prepared by Gary Wiman, Construction Project Manager FWS/GRW/pmf Attachment cc Fire Chief _ ;j Parks, Recreation and Cultural Services Director APPROVED: Konradt Gm -city Manaq_er K:\WP\PROJECTS\MISC\City HallAnnex 1st Floor Remodel2012\Demolition\CPS&A City HallAnnexbhase 1 Demo.doc 12111/2012 Change in Project Scope SCOPE CHANGE NUMBER: PROJECT NAME: PROJECT NUMBER: INITIATION DATE: CONTRACT DATE: OWNER rr, WMB ARCHITECTS 1 City Hall Annex 1St Floor Remodel 12-62 November 28, 2012 September 5, 2012 City of Lodi P.O. Box 3006 Lodi CA 95241-1910 5757 Pacific Avenue Suite 226 Stockton CA 95207 209.944-9110 Proposed Change in Project Scope Provide Design Services to: • Replace existing Civic Center chiller with a new energy efficient chiller to serve City Hall, City Hall Annex and Carnegie Forum buildings. Unit sized to serve entire City Hall Annex at future build -out. Mechanical Fee $18,738 Electrical Fee $1,400 Architectural Fee $7,000 • Relocate telephone and computer server room from basement to ground floor with dedicated HVAC system. Mechanical Fee $1,375 • Upgrade Annex remodel HVAC using new chiller based system. Mechanical Fee $3,000 • Demolish existing Annex fascia and construct new roof edge and drainage system. Architectural Fee _ S3.125 Total Scope Change #1 $34,638 Chanee in Architectural / Engineering Contract Fees: • The Original Fee • The previous scope changes • The fee prior to this scope change • The fee will be increased by • The new fee Architect Signature; Owner Signature: $60,820 $0 $60,820 534,638 $95,458 e: November 28, 2012 Date: www.wmbarchitects.com RESOLUTION NO. 2012-195 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING CITY MANAGERTO EXECUTE CHANGE ORDER NO. 1 TO THE PROFESSIONAL SERVICES AGREEMENT FORTHE CITY HALLANNEX FIRST FLOOR REMODEL PROJECT WHEREAS, City Council awarded the Professional Services Agreement for the City Hall Annex first floor remodel to WMB Architects, of Stockton, on August 15, 2012; and WHEREAS, Change Order No. 1 is due to changes in the project design scope, including the replacement of the Civic Center chiller unit and addition of the City Hall Annex Facility to the chiller system utilizing Public Benefits funds; relocation of the computer server and phone rooms from the basement to the first floor; and some exterior roof demolition/repairs needed on the facility. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute Change Order No. 1 to the Professional Services Agreement for the City Hall Annex First Floor Remodel Project with WMB Architects, of Stockton, California, in the amount of $34,638. Dated: December 19, 2012 ------------------------------------------------------------------- ------------------------------------------------------------------- I hereby certify that Resolution No. 2012-195 was passed and adopted by the City Council of the City of Lodi in a regular meeting held December 19, 2012, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Johnson, Katzakian, Mounce, and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None mr::-9014 City Clerk 2012-195